Tender for Tender for Work Of Electrification In Jhatpat Portal And Nivesh Mitra Portal New Connection In Full Deposite Scheme Under Edd Phaphamau Pryagraj
Tender Value
15 Lakhs
Estimated cost
Bid Submission
16 Oct 2026
9 days left
EMD
15000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Prayagraj → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Work Of Electrification In Jhatpat Portal And Nivesh Mitra Portal New Connection In Full Deposite Scheme Under Edd Phaphamau Pryagraj
BOQ
| Sl. No. | Item Description |
| 1 | Carriage of Materials from Store Centre Naini to Site |
| 2 | PCC/ STP Pole |
| 3 | ACSR Wesal Conductor |
| 4 | 10 KVA T/f |
| 5 | 25 KVA T/f |
| 6 | 63 KVA T/f |
| 7 | 100 KVA T/f |
| 8 | 250 KVA T/f |
| 9 | 33/11 kv Meter Cubide Box |
| 10 | 33kv/11kv CVT |
| 11 | XLPE Cable to Various Capacity (3x70, 3x185, 3x120) mm2 |
| 12 | LT ABC Cable (3x120, 1x95, 1x16) mm2 |
| 13 | LT ABC Cable (3x95, 1x70, 1x16) mm2 |
| 14 | LT ABC Cable (3x50, 1x25) mm2 |
| 15 | LT ABC Cable (1x16, 1x25) mm2 |
| 16 | HT/LT Line Erection Materials-11 KV Pin Insulator, 11 KV V-Type Cross ARm (Steel), T-Off Channel, Top Channel, Sub Station Base Angle, Dropper Angle, Stay Complete, Earthing Wire & Other Accessories |
| 17 | ERECTION OF HT/LT LINE & INSTALLATION OF VARIOUS TYPE DISTRIBUTION TRANSFORMER AND OTHER WORKS. |
| 18 | Erection of Single pole for placing 8.5 mtr. PCC/11 mtr ST Pole indudind grouting (As per RESPO Standard) (Grauting work in all material provided by contractor) |
| 19 | Earthing of Poles |
| 20 | Grouting and Nauzzling of stay. (All the marerial will be provided by the contractor) |
| 21 | Constrction of double pole for placing Transformer with Support Pole induding grouting. (All the marerial will be provided by the contractor) |
| 22 | Line shifting of PCC/ST Pole including grouting (As per RESPO Standard) (Grauting work in all material provided by contractor) |
| 23 | Shifting work of distribution transformers, construction of double pole including grouting (As per RESPO Standard) (Grauting work in all material provided by contractor) |
| 24 | Laying, sagging and binding of HT/LT Line on ST/PCC pole with ACSR Weasal conductor |
| 25 | Installation and connection of 11 kv meter cubecle box in meter room and earthing work, (All material for earthing work will be provided by the contractor) |
| 26 | Installation andconnection of 11 kv C.V.T. and earthing work. (All material for earthing work will be provided by the contractor) |
| 27 | Installation of 25/63/100 kva transformer on double pole, dressing of cable, making all connections energizing of transformer, connection to cable, earghing of the transformer body and natural |
| 28 | Installation of 10 KVA transformer on single pole and earthing/jumpering. |
| 29 | Making of plinth of 250 kva transformer size 1.5x1.5x1.5 mtr as per standard of UPPCL all material including Rail Losse/ channel material shall be provided by contractor. |
| 30 | Installation of 250 kva transformer on plinth and connection it to HT line and chemical earthing (body and neutral) of the transformer, (All material for earthing work will be provided by the contractor) |
| 31 | Laying, Sagging and Binding of LT cable ABC 3x50+1x35+1x16 mm2 |
| 32 | Laying, Sagging and Binding of LT cable ABC 3x95+1x70+1x16 mm2 |
| 33 | Laying, Sagging and Binding of LT cable ABC 3x120+1x95+1x16 mm2 |
| 34 | Laying, Sagging and Binding of LT cable ABC 3x16+1x25 mm2 |
| 35 | Laying of XLPE cable of various capacity (3x70, 3x185, 3x120) mm2 |
| 36 | Dismental Damage wire/weasel/Iron Recived back site to store, Prayagraj |
| 37 | SUPPLY OF MATERIAL |
| 38 | Nut & Bolt of varius size |
| 39 | G.I. strip |
| 40 | STP/PCC Clamp |
| 41 | Transformer Holding Clamp |
| 42 | Dropper Angle |
| 43 | Suspension Clamp |
| 44 | I Hook with Clamp |
| 45 | X Arm Holding Clamp |
| 46 | Dead end Clamp |
| 47 | Chemical Earthing |
| 48 | Base Angle |
| 49 | 11 KV D/O Fuse Set |
| 50 | LT Fuse Set GST Extra as legally applicable Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysOct 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender