Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Indian Naval Ships Of Wnc; Rrc For Repairs/Rewinding Of Pumps And Motors Of Various Sizes And Types Fitted Onboard Indian Naval Ships Of Wnc
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Indian Naval Ships Of Wnc; Rrc For Repairs/Rewinding Of Pumps And Motors Of Various Sizes And Types Fitted Onboard Indian Naval Ships Of Wnc; Service Provider - Scope Of Work For Repairs Of Pump , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (0-25 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (25.1-50 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (50.1-75 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (75.1-100 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (100.1-150 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (150.1-200 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (>200 Tph) , Shifting Of Pump From Ship To Firms Premises (0-25 Tph) , Shifting Of Pump From Ship To Firms Premises (25.1-50 Tph) , Shifting Of Pump From Ship To Firms Premises (50.1-75 Tph) , Shifting Of Pump From Ship To Firms Premises (75.1-100 Tph) , Shifting Of Pump From Ship To Firms Premises (100.1-150 Tph) , Shifting Of Pump From Ship To Firms Premises (150.1-200 Tph) , Shifting Of Pump From Ship To Firms Premises (>200 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (0-25 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (25.1-50 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (50.1-75 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (75.1-100 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (100.1-150 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (150.1-200 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (>200 Tph) , Undertake Shaft Trueness Checks (0-25 Tph) , Undertake Shaft Trueness Checks (25.1-50 Tph) , Undertake Shaft Trueness Checks (50.1-75 Tph) , Undertake Shaft Trueness Checks (75.1-100 Tph) , Undertake Shaft Trueness Checks (100.1-150 Tph) , Undertake Shaft Trueness Checks (150.1-200 Tph) , Undertake Shaft Trueness Checks (>200 Tph) , Repairs Of Shaft Including Impeller Nut And Key (0-25 Tph) , Repairs Of Shaft Including Impeller Nut And Key (25.1-50 Tph) , Repairs Of Shaft Including Impeller Nut And Key (50.1-75 Tph) , Repairs Of Shaft Including Impeller Nut And Key (75.1-100 Tph) , Repairs Of Shaft Including Impeller Nut And Key (100.1-150 Tph) , Repairs Of Shaft Including Impeller Nut And Key (150.1-200 Tph) , Repairs Of Shaft Including Impeller Nut And Key (>200 Tph) , Insitu Replacement Of Mechanical Seal (0-25 Tph) , Insitu Replacement Of Mechanical Seal (25.1-50 Tph) , Insitu Replacement Of Mechanical Seal (50.1-75 Tph) , Insitu Replacement Of Mechanical Seal (75.1-100 Tph) , Insitu Replacement Of Mechanical Seal (100.1-150 Tph) , Insitu Replacement Of Mechanical Seal (150.1-200 Tph) , Insitu Replacement Of Mechanical Seal (>200 Tph) , Manufacturing Of Wear Rings To Maintain Design Clearance (0-25) , Manufacturing Of Wear Rings To Maintain Design Clearance (25.1-50) , Manufacturing Of Wear Rings To Maintain Design Clearance (50.1-75) , Manufacturing Of Wear Rings To Maintain Design Clearance (75.1-100) , Manufacturing Of Wear Rings To Maintain Design Clearance (100.1-150) , Manufacturing Of Wear Rings To Maintain Design Clearance (150.1-200) , Manufacturing Of Wear Rings To Maintain Design Clearance (>200) , Repairs Of Pump Casing (0-25) , Repairs Of Pump Casing (25.1-50) , Repairs Of Pump Casing (50.1-75) , Repairs Of Pump Casing (75.1-100) , Repairs Of Pump Casing (100.1-150) , Repairs Of Pump Casing (150.1-200) , Repairs Of Pump Casing (>200) , Dynamic Balancing Of Impeller (0-25 Tph) , Dynamic Balancing Of Impeller (25.1-50 Tph) , Dynamic Balancing Of Impeller (50.1-75 Tph) , Dynamic Balancing Of Impeller (75.1-100 Tph) , Dynamic Balancing Of Impeller (100.1-150 Tph) , Dynamic Balancing Of Impeller (150.1-200 Tph) , Dynamic Balancing Of Impeller (>200 Tph) , Manufacturing Of Shaft Bushes/Sleeve (0-25 Tph) , Manufacturing Of Shaft Bushes/Sleeve (25.1-50 Tph) , Manufacturing Of Shaft Bushes/Sleeve (50.1-75 Tph) , Manufacturing Of Shaft Bushes/Sleeve (75.1-100 Tph) , Manufacturing Of Shaft Bushes/Sleeve (100.1-150 Tph) , Manufacturing Of Shaft Bushes/Sleeve (150.1-200 Tph) , Manufacturing Of Shaft Bushes/Sleeve (>200 Tph) , Repairs Of Coupling/ Coupling Distance Piece (0-25 Tph) , Repairs Of Coupling/ Coupling Distance Piece (25.1-50 Tph) , Repairs Of Coupling/ Coupling Distance Piece (50.1-75 Tph) , Repairs Of Coupling/ Coupling Distance Piece (75.1-100 Tph) , Repairs Of Coupling/ Coupling Distance Piece (100.1-150 Tph) , Repairs Of Coupling/ Coupling Distance Piece (150.1-200 Tph) , Repairs Of Coupling/ Coupling Distance Piece (>200 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (0-25 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (25.1-50 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (50.1- 75 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (75.1-100 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (100.1-150 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (150.1-200 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (>200 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (0-25 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (25.1-50 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (50.1-75 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (75.1-100 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (100.1-150 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (150.1-200 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (>200 Tph) , Repairs Of Bearing Housing (0-25 Tph) , Repairs Of Bearing Housing (25.1-50 Tph) , Repairs Of Bearing Housing (50.1-75 Tph) , Repairs Of Bearing Housing (75.1-100 Tph) , Repairs Of Bearing Housing (100.1-150 Tph) , Repairs Of Bearing Housing (150.1-200 Tph) , Repairs Of Bearing Housing (>200 Tph) , Insitu Replacement Of Bearing Housing (0-25 Tph) , Insitu Replacement Of Bearing Housing (25.1-50 Tph) , Insitu Replacement Of Bearing Housing (50.1-75 Tph) , Insitu Replacement Of Bearing Housing (75.1-100 Tph) , Insitu Replacement Of Bearing Housing (100.1-150 Tph) , Insitu Replacement Of Bearing Housing (150.1-200 Tph) , Insitu Replacement Of Bearing Housing (0-25 Tph) , Repairs To Impeller (0-25 Tph) , Repairs To Impeller (25.1-50 Tph) , Repairs To Impeller (50.1-75 Tph) , Repairs To Impeller (75.1-100 Tph) , Repairs To Impeller (100.1-150 Tph) , Repairs To Impeller (150.1-200 Tph) , Repairs To Impeller (>200 Tph) , Insitu Replacement Of Bearings (0-25 Tph) , Insitu Replacement Of Bearings (25.1-50 Tph) , Insitu Replacement Of Bearings (50.1-75 Tph) , Insitu Replacement Of Bearings (75.1-100 Tph) , Insitu Replacement Of Bearings (100.1-150 Tph) , Insitu Replacement Of Bearings (150.1-200 Tph) , Insitu Replacement Of Bearings (>200 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (0-25 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (25.1-50 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (50.1-75 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (75.1-100 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (100.1-150 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (150.1-200 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (>200 Tph) , Static Pressure Testing Of Pump At Workshop (0-25 Tph) , Static Pressure Testing Of Pump At Workshop (25.1-50 Tph) , Static Pressure Testing Of Pump At Workshop (50.1-75 Tph) , Static Pressure Testing Of Pump At Workshop (75.1-100 Tph) , Static Pressure Testing Of Pump At Workshop (100.1-150 Tph) , Static Pressure Testing Of Pump At Workshop (150.1-200 Tph) , Static Pressure Testing Of Pump At Workshop (>200 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (0-25 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (25.1-50 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (50.1-75 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (75.1-100 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (100.1-150 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (150.1-200 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (>200 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (0-25 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (25.1-50 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (50.1-75 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (75.1-100 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (100.1-150 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (150.1-200 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (>200 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (0-25 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (25.1-50 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (50.1-75 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (75.1-100 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (100.1-150 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (150.1-200 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (>200 Tph) , Scope Of Work For Repairs/Rewinding Of Motors , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (0.5-5 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (5.1-10 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (10.1-15 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (15.1-25 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (25.1-50 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (50.1-100 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (100.1-150 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (150.1-200 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (>200 Kw) , Shifting Of Motor From Ship To Firms Premises (0.5-5 Kw) , Shifting Of Motor From Ship To Firms Premises (5.1- 10 Kw) , Shifting Of Motor From Ship To Firms Premises (10.1-15 Kw) , Shifting Of Motor From Ship To Firms Premises (15.1-25 Kw) , Shifting Of Motor From Ship To Firms Premises (25.1-50 Kw) , Shifting Of Motor From Ship To Firms Premises (50.1-100 Kw) , Shifting Of Motor From Ship To Firms Premises (100.1-150 Kw) , Shifting Of Motor From Ship To Firms Premises (150.1-200 Kw) , Shifting Of Motor From Ship To Firms Premises (>200 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (0.5-5 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (5.1-10 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (10.1-15 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (15.1-25 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (25.1-50 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (50.1-100 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (100.1-150 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (150.1-200 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (>200 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (0.5-5 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (5.1-10 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (10.1-15 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (15.1- 25 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (25.1-50 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (50.1-100 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (100.1-150 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (150.1-200 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (> 200 Kw) , Repairs Of Bearing Holder/Bearing Cap (0.5-5 Kw) , Repairs Of Bearing Holder/Bearing Cap (5.1-10 Kw) , Repairs Of Bearing Holder/Bearing Cap (10.1-15 Kw) , Repairs Of Bearing Holder/Bearing Cap (15.1-25 Kw) , Repairs Of Bearing Holder/Bearing Cap (25.1-50 Kw) , Repairs Of Bearing Holder/Bearing Cap (50.1-100 Kw) , Repairs Of Bearing Holder/Bearing Cap (100.1-150 Kw) , Repairs Of Bearing Holder/Bearing Cap (150.1-200 Kw) , Repairs Of Bearing Holder/Bearing Cap (>200 Kw) , Dynamic Balancing Of Rotor (0.5-5 Kw) , Dynamic Balancing Of Rotor (5.1-10 Kw) , Dynamic Balancing Of Rotor (10.1-15 Kw) , Dynamic Balancing Of Rotor (15.1-25 Kw) , Dynamic Balancing Of Rotor (25.1-50 Kw) , Dynamic Balancing Of Rotor (50.1-100 Kw) , Dynamic Balancing Of Rotor (100.1-150 Kw) , Dynamic Balancing Of Rotor (150.1-200 Kw) , Dynamic Balancing Of Rotor (>200 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (0.5-5 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (5.1-10 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (10.1-15 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (15.1-25 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (25.1-50 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (50.1-100 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (100.1-150 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (150.1-200 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (>200 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (0.5-5 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (5.1-10 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (10.1-15 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (15.1-25 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (25.1-50 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (50.1-100 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (100.1-150 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (150.1-200 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (>200 Kw) , Repairs Of Terminal Box (0.5-5 Kw) , Repairs Of Terminal Box (5.1-10 Kw) , Repairs Of Terminal Box (10.1-15 Kw) , Repairs Of Terminal Box (15.1-25 Kw) , Repairs Of Terminal Box (25.1-50 Kw) , Repairs Of Terminal Box (50.1-100 Kw) , Repairs Of Terminal Box (100.1-150 Kw) , Repairs Of Terminal Box (150.1-200 Kw) , Repairs Of Terminal Box (>200 Kw) , Repairs Of Cooling Fan (0.5-5 Kw) , Repairs Of Cooling Fan (5.1-10 Kw) , Repairs Of Cooling Fan (10.1-15 Kw) , Repairs Of Cooling Fan (15.1-25 Kw) , Repairs Of Cooling Fan (25.1-50 Kw) , Repairs Of Cooling Fan (50.1-100 Kw) , Repairs Of Cooling Fan (100.1-150 Kw) , Repairs Of Cooling Fan (150.1-200 Kw) , Repairs Of Cooling Fan (>200 Kw) , Repairs Of Foundation Stool (0.5-5 Kw) , Repairs Of Foundation Stool (5.1-10 Kw) , Repairs Of Foundation Stool (10.1-15 Kw) , Repairs Of Foundation Stool (15.1-25 Kw) , Repairs Of Foundation Stool (25.1-50 Kw) , Repairs Of Foundation Stool (50.1-100 Kw) , Repairs Of Foundation Stool (100.1-150 Kw) , Repairs Of Foundation Stool (150.1-200 Kw) , Repairs Of Foundation Stool (>200 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (0.5-5 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (5.1-10 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (10.1-15 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (15.1-25 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (25.1-50 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (50.1-100 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (100.1-150 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (150.1-200 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (>200 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (0.5-5 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (5.1-10 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (10.1-15 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (15.1-25 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (25.1-50 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (50.1-100 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (100.1-150 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (150.1-200 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (>200 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (0.5-5 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (5.1-10 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (10.1-15 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (15.1-25 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (25.1-50 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (50.1-100 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (100.1-150 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (150.1-200 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (>200 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (0.5-5 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (5.1-10 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (10.1-15 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (15.1-25 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (25.1-50 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (50.1-100 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (100.1-150 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (150.1-200 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (>200 Kw) , Manday Rates , Manday Rates At Stations Other Than Mumbai , Karwar , Okha , Porbandar , Goa
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Scope of work for Repairs of Pump | Scope of work for Repairs of Pump |
| 2 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (0-25 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (0-25 TPH) |
| 3 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (25.1-50 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (25.1-50 TPH) |
| 4 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (50.1-75 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (50.1-75 TPH) |
| 5 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (75.1-100 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (75.1-100 TPH) |
| 6 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (100.1-150 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (100.1-150 TPH) |
| 7 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (150.1-200 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (150.1-200 TPH) |
| 8 | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (>200 TPH) | Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (>200 TPH) |
| 9 | shifting of pump from ship to firm's premises (0-25 TPH) | shifting of pump from ship to firm's premises (0-25 TPH) |
| 10 | shifting of pump from ship to firm's premises (25.1-50 TPH) | shifting of pump from ship to firm's premises (25.1-50 TPH) |
| 11 | shifting of pump from ship to firm's premises (50.1-75 TPH) | shifting of pump from ship to firm's premises (50.1-75 TPH) |
| 12 | shifting of pump from ship to firm's premises (75.1-100 TPH) | shifting of pump from ship to firm's premises (75.1-100 TPH) |
| 13 | shifting of pump from ship to firm's premises (100.1-150 TPH) | shifting of pump from ship to firm's premises (100.1-150 TPH) |
| 14 | shifting of pump from ship to firm's premises (150.1-200 TPH) | shifting of pump from ship to firm's premises (150.1-200 TPH) |
| 15 | shifting of pump from ship to firm's premises (>200 TPH) | shifting of pump from ship to firm's premises (>200 TPH) |
| 16 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (0-25 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (0-25 TPH) |
| 17 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (25.1-50 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (25.1-50 TPH) |
| 18 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (50.1-75 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (50.1-75 TPH) |
| 19 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (75.1-100 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (75.1-100 TPH) |
| 20 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (100.1-150 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (100.1-150 TPH) |
| 21 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (150.1-200 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (150.1-200 TPH) |
| 22 | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (>200 TPH) | Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (>200 TPH) |
| 23 | Undertake shaft trueness checks (0-25 TPH) | Undertake shaft trueness checks (0-25 TPH) |
| 24 | Undertake shaft trueness checks (25.1-50 TPH) | Undertake shaft trueness checks (25.1-50 TPH) |
| 25 | Undertake shaft trueness checks (50.1-75 TPH) | Undertake shaft trueness checks (50.1-75 TPH) |
| 26 | Undertake shaft trueness checks (75.1-100 TPH) | Undertake shaft trueness checks (75.1-100 TPH) |
| 27 | Undertake shaft trueness checks (100.1-150 TPH) | Undertake shaft trueness checks (100.1-150 TPH) |
| 28 | Undertake shaft trueness checks (150.1-200 TPH) | Undertake shaft trueness checks (150.1-200 TPH) |
| 29 | Undertake shaft trueness checks (>200 TPH) | Undertake shaft trueness checks (>200 TPH) |
| 30 | Repairs of shaft including impeller nut and key (0-25 TPH) | Repairs of shaft including impeller nut and key (0-25 TPH) |
| 31 | Repairs of shaft including impeller nut and key (25.1-50 TPH) | Repairs of shaft including impeller nut and key (25.1-50 TPH) |
| 32 | Repairs of shaft including impeller nut and key (50.1-75 TPH) | Repairs of shaft including impeller nut and key (50.1-75 TPH) |
| 33 | Repairs of shaft including impeller nut and key (75.1-100 TPH) | Repairs of shaft including impeller nut and key (75.1-100 TPH) |
| 34 | Repairs of shaft including impeller nut and key (100.1-150 TPH) | Repairs of shaft including impeller nut and key (100.1-150 TPH) |
| 35 | Repairs of shaft including impeller nut and key (150.1-200 TPH) | Repairs of shaft including impeller nut and key (150.1-200 TPH) |
| 36 | Repairs of shaft including impeller nut and key (>200 TPH) | Repairs of shaft including impeller nut and key (>200 TPH) |
| 37 | Insitu replacement of mechanical seal (0-25 TPH) | Insitu replacement of mechanical seal (0-25 TPH) |
| 38 | Insitu replacement of mechanical seal (25.1-50 TPH) | Insitu replacement of mechanical seal (25.1-50 TPH) |
| 39 | Insitu replacement of mechanical seal (50.1-75 TPH) | Insitu replacement of mechanical seal (50.1-75 TPH) |
| 40 | Insitu replacement of mechanical seal (75.1-100 TPH) | Insitu replacement of mechanical seal (75.1-100 TPH) |
| 41 | Insitu replacement of mechanical seal (100.1-150 TPH) | Insitu replacement of mechanical seal (100.1-150 TPH) |
| 42 | Insitu replacement of mechanical seal (150.1-200 TPH) | Insitu replacement of mechanical seal (150.1-200 TPH) |
| 43 | Insitu replacement of mechanical seal (>200 TPH) | Insitu replacement of mechanical seal (>200 TPH) |
| 44 | Manufacturing of wear rings to maintain design clearance (0-25) | Manufacturing of wear rings to maintain design clearance (0-25) |
| 45 | Manufacturing of wear rings to maintain design clearance (25.1-50) | Manufacturing of wear rings to maintain design clearance (25.1-50) |
| 46 | Manufacturing of wear rings to maintain design clearance (50.1-75) | Manufacturing of wear rings to maintain design clearance (50.1-75) |
| 47 | Manufacturing of wear rings to maintain design clearance (75.1-100) | Manufacturing of wear rings to maintain design clearance (75.1-100) |
| 48 | Manufacturing of wear rings to maintain design clearance (100.1-150) | Manufacturing of wear rings to maintain design clearance (100.1-150) |
| 49 | Manufacturing of wear rings to maintain design clearance (150.1-200) | Manufacturing of wear rings to maintain design clearance (150.1-200) |
| 50 | Manufacturing of wear rings to maintain design clearance (>200) | Manufacturing of wear rings to maintain design clearance (>200) |
| 51 | Repairs of pump casing (0-25) | Repairs of pump casing (0-25) |
| 52 | Repairs of pump casing (25.1-50) | Repairs of pump casing (25.1-50) |
| 53 | Repairs of pump casing (50.1-75) | Repairs of pump casing (50.1-75) |
| 54 | Repairs of pump casing (75.1-100) | Repairs of pump casing (75.1-100) |
| 55 | Repairs of pump casing (100.1-150) | Repairs of pump casing (100.1-150) |
| 56 | Repairs of pump casing (150.1-200) | Repairs of pump casing (150.1-200) |
| 57 | Repairs of pump casing (>200) | Repairs of pump casing (>200) |
| 58 | Dynamic Balancing of impeller (0-25 TPH) | Dynamic Balancing of impeller (0-25 TPH) |
| 59 | Dynamic Balancing of impeller (25.1-50 TPH) | Dynamic Balancing of impeller (25.1-50 TPH) |
| 60 | Dynamic Balancing of impeller (50.1-75 TPH) | Dynamic Balancing of impeller (50.1-75 TPH) |
| 61 | Dynamic Balancing of impeller (75.1-100 TPH) | Dynamic Balancing of impeller (75.1-100 TPH) |
| 62 | Dynamic Balancing of impeller (100.1-150 TPH) | Dynamic Balancing of impeller (100.1-150 TPH) |
| 63 | Dynamic Balancing of impeller (150.1-200 TPH) | Dynamic Balancing of impeller (150.1-200 TPH) |
| 64 | Dynamic Balancing of impeller (>200 TPH) | Dynamic Balancing of impeller (>200 TPH) |
| 65 | Manufacturing of shaft bushes/sleeve (0-25 TPH) | Manufacturing of shaft bushes/sleeve (0-25 TPH) |
| 66 | Manufacturing of shaft bushes/sleeve (25.1-50 TPH) | Manufacturing of shaft bushes/sleeve (25.1-50 TPH) |
| 67 | Manufacturing of shaft bushes/sleeve (50.1-75 TPH) | Manufacturing of shaft bushes/sleeve (50.1-75 TPH) |
| 68 | Manufacturing of shaft bushes/sleeve (75.1-100 TPH) | Manufacturing of shaft bushes/sleeve (75.1-100 TPH) |
| 69 | Manufacturing of shaft bushes/sleeve (100.1-150 TPH) | Manufacturing of shaft bushes/sleeve (100.1-150 TPH) |
| 70 | Manufacturing of shaft bushes/sleeve (150.1-200 TPH) | Manufacturing of shaft bushes/sleeve (150.1-200 TPH) |
| 71 | Manufacturing of shaft bushes/sleeve (>200 TPH) | Manufacturing of shaft bushes/sleeve (>200 TPH) |
| 72 | Repairs of coupling/ coupling distance piece (0-25 TPH) | Repairs of coupling/ coupling distance piece (0-25 TPH) |
| 73 | Repairs of coupling/ coupling distance piece (25.1-50 TPH) | Repairs of coupling/ coupling distance piece (25.1-50 TPH) |
| 74 | Repairs of coupling/ coupling distance piece (50.1-75 TPH) | Repairs of coupling/ coupling distance piece (50.1-75 TPH) |
| 75 | Repairs of coupling/ coupling distance piece (75.1-100 TPH) | Repairs of coupling/ coupling distance piece (75.1-100 TPH) |
| 76 | Repairs of coupling/ coupling distance piece (100.1-150 TPH) | Repairs of coupling/ coupling distance piece (100.1-150 TPH) |
| 77 | Repairs of coupling/ coupling distance piece (150.1-200 TPH) | Repairs of coupling/ coupling distance piece (150.1-200 TPH) |
| 78 | Repairs of coupling/ coupling distance piece (>200 TPH) | Repairs of coupling/ coupling distance piece (>200 TPH) |
| 79 | Manufacture of coupling 7 coupling distance piece (0-25 TPH) | Manufacture of coupling 7 coupling distance piece (0-25 TPH) |
| 80 | Manufacture of coupling 7 coupling distance piece (25.1-50 TPH) | Manufacture of coupling 7 coupling distance piece (25.1-50 TPH) |
| 81 | Manufacture of coupling 7 coupling distance piece (50.1- 75 TPH) | Manufacture of coupling 7 coupling distance piece (50.1- 75 TPH) |
| 82 | Manufacture of coupling 7 coupling distance piece (75.1-100 TPH) | Manufacture of coupling 7 coupling distance piece (75.1-100 TPH) |
| 83 | Manufacture of coupling 7 coupling distance piece (100.1-150 TPH) | Manufacture of coupling 7 coupling distance piece (100.1-150 TPH) |
| 84 | Manufacture of coupling 7 coupling distance piece (150.1-200 TPH) | Manufacture of coupling 7 coupling distance piece (150.1-200 TPH) |
| 85 | Manufacture of coupling 7 coupling distance piece (>200 TPH) | Manufacture of coupling 7 coupling distance piece (>200 TPH) |
| 86 | Insitu fitment of coupling/ coupling distance piece (0-25 TPH) | Insitu fitment of coupling/ coupling distance piece (0-25 TPH) |
| 87 | Insitu fitment of coupling/ coupling distance piece (25.1-50 TPH) | Insitu fitment of coupling/ coupling distance piece (25.1-50 TPH) |
| 88 | Insitu fitment of coupling/ coupling distance piece (50.1-75 TPH) | Insitu fitment of coupling/ coupling distance piece (50.1-75 TPH) |
| 89 | Insitu fitment of coupling/ coupling distance piece (75.1-100 TPH) | Insitu fitment of coupling/ coupling distance piece (75.1-100 TPH) |
| 90 | Insitu fitment of coupling/ coupling distance piece (100.1-150 TPH) | Insitu fitment of coupling/ coupling distance piece (100.1-150 TPH) |
| 91 | Insitu fitment of coupling/ coupling distance piece (150.1-200 TPH) | Insitu fitment of coupling/ coupling distance piece (150.1-200 TPH) |
| 92 | Insitu fitment of coupling/ coupling distance piece (>200 TPH) | Insitu fitment of coupling/ coupling distance piece (>200 TPH) |
| 93 | Repairs of Bearing housing (0-25 TPH) | Repairs of Bearing housing (0-25 TPH) |
| 94 | Repairs of Bearing housing (25.1-50 TPH) | Repairs of Bearing housing (25.1-50 TPH) |
| 95 | Repairs of Bearing housing (50.1-75 TPH) | Repairs of Bearing housing (50.1-75 TPH) |
| 96 | Repairs of Bearing housing (75.1-100 TPH) | Repairs of Bearing housing (75.1-100 TPH) |
| 97 | Repairs of Bearing housing (100.1-150 TPH) | Repairs of Bearing housing (100.1-150 TPH) |
| 98 | Repairs of Bearing housing (150.1-200 TPH) | Repairs of Bearing housing (150.1-200 TPH) |
| 99 | Repairs of Bearing housing (>200 TPH) | Repairs of Bearing housing (>200 TPH) |
| 100 | Insitu replacement of Bearing housing (0-25 TPH) | Insitu replacement of Bearing housing (0-25 TPH) |
| 101 | Insitu replacement of Bearing housing (25.1-50 TPH) | Insitu replacement of Bearing housing (25.1-50 TPH) |
| 102 | Insitu replacement of Bearing housing (50.1-75 TPH) | Insitu replacement of Bearing housing (50.1-75 TPH) |
| 103 | Insitu replacement of Bearing housing (75.1-100 TPH) | Insitu replacement of Bearing housing (75.1-100 TPH) |
| 104 | Insitu replacement of Bearing housing (100.1-150 TPH) | Insitu replacement of Bearing housing (100.1-150 TPH) |
| 105 | Insitu replacement of Bearing housing (150.1-200 TPH) | Insitu replacement of Bearing housing (150.1-200 TPH) |
| 106 | Insitu replacement of Bearing housing (0-25 TPH) | Insitu replacement of Bearing housing (0-25 TPH) |
| 107 | Repairs to Impeller (0-25 TPH) | Repairs to Impeller (0-25 TPH) |
| 108 | Repairs to Impeller (25.1-50 TPH) | Repairs to Impeller (25.1-50 TPH) |
| 109 | Repairs to Impeller (50.1-75 TPH) | Repairs to Impeller (50.1-75 TPH) |
| 110 | Repairs to Impeller (75.1-100 TPH) | Repairs to Impeller (75.1-100 TPH) |
| 111 | Repairs to Impeller (100.1-150 TPH) | Repairs to Impeller (100.1-150 TPH) |
| 112 | Repairs to Impeller (150.1-200 TPH) | Repairs to Impeller (150.1-200 TPH) |
| 113 | Repairs to Impeller (>200 TPH) | Repairs to Impeller (>200 TPH) |
| 114 | Insitu Replacement of Bearings (0-25 TPH) | Insitu Replacement of Bearings (0-25 TPH) |
| 115 | Insitu Replacement of Bearings (25.1-50 TPH) | Insitu Replacement of Bearings (25.1-50 TPH) |
| 116 | Insitu Replacement of Bearings (50.1-75 TPH) | Insitu Replacement of Bearings (50.1-75 TPH) |
| 117 | Insitu Replacement of Bearings (75.1-100 TPH) | Insitu Replacement of Bearings (75.1-100 TPH) |
| 118 | Insitu Replacement of Bearings (100.1-150 TPH) | Insitu Replacement of Bearings (100.1-150 TPH) |
| 119 | Insitu Replacement of Bearings (150.1-200 TPH) | Insitu Replacement of Bearings (150.1-200 TPH) |
| 120 | Insitu Replacement of Bearings (>200 TPH) | Insitu Replacement of Bearings (>200 TPH) |
| 121 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (0-25 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (0-25 TPH) |
| 122 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (25.1-50 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (25.1-50 TPH) |
| 123 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (50.1-75 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (50.1-75 TPH) |
| 124 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (75.1-100 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (75.1-100 TPH) |
| 125 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (100.1-150 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (100.1-150 TPH) |
| 126 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (150.1-200 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (150.1-200 TPH) |
| 127 | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (>200 TPH) | Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (>200 TPH) |
| 128 | Static Pressure testing of pump at workshop (0-25 TPH) | Static Pressure testing of pump at workshop (0-25 TPH) |
| 129 | Static Pressure testing of pump at workshop (25.1-50 TPH) | Static Pressure testing of pump at workshop (25.1-50 TPH) |
| 130 | Static Pressure testing of pump at workshop (50.1-75 TPH) | Static Pressure testing of pump at workshop (50.1-75 TPH) |
| 131 | Static Pressure testing of pump at workshop (75.1-100 TPH) | Static Pressure testing of pump at workshop (75.1-100 TPH) |
| 132 | Static Pressure testing of pump at workshop (100.1-150 TPH) | Static Pressure testing of pump at workshop (100.1-150 TPH) |
| 133 | Static Pressure testing of pump at workshop (150.1-200 TPH) | Static Pressure testing of pump at workshop (150.1-200 TPH) |
| 134 | Static Pressure testing of pump at workshop (>200 TPH) | Static Pressure testing of pump at workshop (>200 TPH) |
| 135 | Shifting of pump from firm's premises to ship for fitment (0-25 TPH) | Shifting of pump from firm's premises to ship for fitment (0-25 TPH) |
| 136 | Shifting of pump from firm's premises to ship for fitment (25.1-50 TPH) | Shifting of pump from firm's premises to ship for fitment (25.1-50 TPH) |
| 137 | Shifting of pump from firm's premises to ship for fitment (50.1-75 TPH) | Shifting of pump from firm's premises to ship for fitment (50.1-75 TPH) |
| 138 | Shifting of pump from firm's premises to ship for fitment (75.1-100 TPH) | Shifting of pump from firm's premises to ship for fitment (75.1-100 TPH) |
| 139 | Shifting of pump from firm's premises to ship for fitment (100.1-150 TPH) | Shifting of pump from firm's premises to ship for fitment (100.1-150 TPH) |
| 140 | Shifting of pump from firm's premises to ship for fitment (150.1-200 TPH) | Shifting of pump from firm's premises to ship for fitment (150.1-200 TPH) |
| 141 | Shifting of pump from firm's premises to ship for fitment (>200 TPH) | Shifting of pump from firm's premises to ship for fitment (>200 TPH) |
| 142 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (0-25 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (0-25 TPH) |
| 143 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (25.1-50 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (25.1-50 TPH) |
| 144 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (50.1-75 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (50.1-75 TPH) |
| 145 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (75.1-100 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (75.1-100 TPH) |
| 146 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (100.1-150 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (100.1-150 TPH) |
| 147 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (150.1-200 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (150.1-200 TPH) |
| 148 | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (>200 TPH) | Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (>200 TPH) |
| 149 | Alignment and coupling of pump & motor assembly insitu (0-25 TPH) | Alignment and coupling of pump & motor assembly insitu (0-25 TPH) |
| 150 | Alignment and coupling of pump & motor assembly insitu (25.1-50 TPH) | Alignment and coupling of pump & motor assembly insitu (25.1-50 TPH) |
| 151 | Alignment and coupling of pump & motor assembly insitu (50.1-75 TPH) | Alignment and coupling of pump & motor assembly insitu (50.1-75 TPH) |
| 152 | Alignment and coupling of pump & motor assembly insitu (75.1-100 TPH) | Alignment and coupling of pump & motor assembly insitu (75.1-100 TPH) |
| 153 | Alignment and coupling of pump & motor assembly insitu (100.1-150 TPH) | Alignment and coupling of pump & motor assembly insitu (100.1-150 TPH) |
| 154 | Alignment and coupling of pump & motor assembly insitu (150.1-200 TPH) | Alignment and coupling of pump & motor assembly insitu (150.1-200 TPH) |
| 155 | Alignment and coupling of pump & motor assembly insitu (>200 TPH) | Alignment and coupling of pump & motor assembly insitu (>200 TPH) |
| 156 | Scope of work for Repairs/Rewinding of Motors | Scope of work for Repairs/Rewinding of Motors |
| 157 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (0.5-5 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (0.5-5 KW) |
| 158 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (5.1-10 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (5.1-10 KW) |
| 159 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (10.1-15 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (10.1-15 KW) |
| 160 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (15.1-25 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (15.1-25 KW) |
| 161 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (25.1-50 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (25.1-50 KW) |
| 162 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (50.1-100 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (50.1-100 KW) |
| 163 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (100.1-150 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (100.1-150 KW) |
| 164 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (150.1-200 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (150.1-200 KW) |
| 165 | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (>200 KW) | Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (>200 KW) |
| 166 | Shifting of motor from ship to firm's premises (0.5-5 KW) | Shifting of motor from ship to firm's premises (0.5-5 KW) |
| 167 | Shifting of motor from ship to firm's premises (5.1- 10 KW) | Shifting of motor from ship to firm's premises (5.1- 10 KW) |
| 168 | Shifting of motor from ship to firm's premises (10.1-15 KW) | Shifting of motor from ship to firm's premises (10.1-15 KW) |
| 169 | Shifting of motor from ship to firm's premises (15.1-25 KW) | Shifting of motor from ship to firm's premises (15.1-25 KW) |
| 170 | Shifting of motor from ship to firm's premises (25.1-50 KW) | Shifting of motor from ship to firm's premises (25.1-50 KW) |
| 171 | Shifting of motor from ship to firm's premises (50.1-100 KW) | Shifting of motor from ship to firm's premises (50.1-100 KW) |
| 172 | Shifting of motor from ship to firm's premises (100.1-150 KW) | Shifting of motor from ship to firm's premises (100.1-150 KW) |
| 173 | Shifting of motor from ship to firm's premises (150.1-200 KW) | Shifting of motor from ship to firm's premises (150.1-200 KW) |
| 174 | Shifting of motor from ship to firm's premises (>200 KW) | Shifting of motor from ship to firm's premises (>200 KW) |
| 175 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (0.5-5 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (0.5-5 KW) |
| 176 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (5.1-10 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (5.1-10 KW) |
| 177 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (10.1-15 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (10.1-15 KW) |
| 178 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (15.1-25 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (15.1-25 KW) |
| 179 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (25.1-50 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (25.1-50 KW) |
| 180 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (50.1-100 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (50.1-100 KW) |
| 181 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (100.1-150 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (100.1-150 KW) |
| 182 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (150.1-200 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (150.1-200 KW) |
| 183 | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (>200 KW) | Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (>200 KW) |
| 184 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (0.5-5 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (0.5-5 KW) |
| 185 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (5.1-10 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (5.1-10 KW) |
| 186 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (10.1-15 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (10.1-15 KW) |
| 187 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (15.1- 25 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (15.1- 25 KW) |
| 188 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (25.1-50 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (25.1-50 KW) |
| 189 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (50.1-100 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (50.1-100 KW) |
| 190 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (100.1-150 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (100.1-150 KW) |
| 191 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (150.1-200 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (150.1-200 KW) |
| 192 | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (> 200 KW) | Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (> 200 KW) |
| 193 | Repairs of bearing holder/bearing cap (0.5-5 KW) | Repairs of bearing holder/bearing cap (0.5-5 KW) |
| 194 | Repairs of bearing holder/bearing cap (5.1-10 KW) | Repairs of bearing holder/bearing cap (5.1-10 KW) |
| 195 | Repairs of bearing holder/bearing cap (10.1-15 KW) | Repairs of bearing holder/bearing cap (10.1-15 KW) |
| 196 | Repairs of bearing holder/bearing cap (15.1-25 KW) | Repairs of bearing holder/bearing cap (15.1-25 KW) |
| 197 | Repairs of bearing holder/bearing cap (25.1-50 KW) | Repairs of bearing holder/bearing cap (25.1-50 KW) |
| 198 | Repairs of bearing holder/bearing cap (50.1-100 KW) | Repairs of bearing holder/bearing cap (50.1-100 KW) |
| 199 | Repairs of bearing holder/bearing cap (100.1-150 KW) | Repairs of bearing holder/bearing cap (100.1-150 KW) |
| 200 | Repairs of bearing holder/bearing cap (150.1-200 KW) | Repairs of bearing holder/bearing cap (150.1-200 KW) |
| 201 | Repairs of bearing holder/bearing cap (>200 KW) | Repairs of bearing holder/bearing cap (>200 KW) |
| 202 | Dynamic balancing of rotor (0.5-5 KW) | Dynamic balancing of rotor (0.5-5 KW) |
| 203 | Dynamic balancing of rotor (5.1-10 KW) | Dynamic balancing of rotor (5.1-10 KW) |
| 204 | Dynamic balancing of rotor (10.1-15 KW) | Dynamic balancing of rotor (10.1-15 KW) |
| 205 | Dynamic balancing of rotor (15.1-25 KW) | Dynamic balancing of rotor (15.1-25 KW) |
| 206 | Dynamic balancing of rotor (25.1-50 KW) | Dynamic balancing of rotor (25.1-50 KW) |
| 207 | Dynamic balancing of rotor (50.1-100 KW) | Dynamic balancing of rotor (50.1-100 KW) |
| 208 | Dynamic balancing of rotor (100.1-150 KW) | Dynamic balancing of rotor (100.1-150 KW) |
| 209 | Dynamic balancing of rotor (150.1-200 KW) | Dynamic balancing of rotor (150.1-200 KW) |
| 210 | Dynamic balancing of rotor (>200 KW) | Dynamic balancing of rotor (>200 KW) |
| 211 | Repairs of rotor shaft including shaft trueness checks (0.5-5 KW) | Repairs of rotor shaft including shaft trueness checks (0.5-5 KW) |
| 212 | Repairs of rotor shaft including shaft trueness checks (5.1-10 KW) | Repairs of rotor shaft including shaft trueness checks (5.1-10 KW) |
| 213 | Repairs of rotor shaft including shaft trueness checks (10.1-15 KW) | Repairs of rotor shaft including shaft trueness checks (10.1-15 KW) |
| 214 | Repairs of rotor shaft including shaft trueness checks (15.1-25 KW) | Repairs of rotor shaft including shaft trueness checks (15.1-25 KW) |
| 215 | Repairs of rotor shaft including shaft trueness checks (25.1-50 KW) | Repairs of rotor shaft including shaft trueness checks (25.1-50 KW) |
| 216 | Repairs of rotor shaft including shaft trueness checks (50.1-100 KW) | Repairs of rotor shaft including shaft trueness checks (50.1-100 KW) |
| 217 | Repairs of rotor shaft including shaft trueness checks (100.1-150 KW) | Repairs of rotor shaft including shaft trueness checks (100.1-150 KW) |
| 218 | Repairs of rotor shaft including shaft trueness checks (150.1-200 KW) | Repairs of rotor shaft including shaft trueness checks (150.1-200 KW) |
| 219 | Repairs of rotor shaft including shaft trueness checks (>200 KW) | Repairs of rotor shaft including shaft trueness checks (>200 KW) |
| 220 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (0.5-5 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (0.5-5 KW) |
| 221 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (5.1-10 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (5.1-10 KW) |
| 222 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (10.1-15 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (10.1-15 KW) |
| 223 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (15.1-25 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (15.1-25 KW) |
| 224 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (25.1-50 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (25.1-50 KW) |
| 225 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (50.1-100 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (50.1-100 KW) |
| 226 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (100.1-150 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (100.1-150 KW) |
| 227 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (150.1-200 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (150.1-200 KW) |
| 228 | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (>200 KW) | Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (>200 KW) |
| 229 | Repairs of terminal box (0.5-5 KW) | Repairs of terminal box (0.5-5 KW) |
| 230 | Repairs of terminal box (5.1-10 KW) | Repairs of terminal box (5.1-10 KW) |
| 231 | Repairs of terminal box (10.1-15 KW) | Repairs of terminal box (10.1-15 KW) |
| 232 | Repairs of terminal box (15.1-25 KW) | Repairs of terminal box (15.1-25 KW) |
| 233 | Repairs of terminal box (25.1-50 KW) | Repairs of terminal box (25.1-50 KW) |
| 234 | Repairs of terminal box (50.1-100 KW) | Repairs of terminal box (50.1-100 KW) |
| 235 | Repairs of terminal box (100.1-150 KW) | Repairs of terminal box (100.1-150 KW) |
| 236 | Repairs of terminal box (150.1-200 KW) | Repairs of terminal box (150.1-200 KW) |
| 237 | Repairs of terminal box (>200 KW) | Repairs of terminal box (>200 KW) |
| 238 | Repairs of cooling fan (0.5-5 KW) | Repairs of cooling fan (0.5-5 KW) |
| 239 | Repairs of cooling fan (5.1-10 KW) | Repairs of cooling fan (5.1-10 KW) |
| 240 | Repairs of cooling fan (10.1-15 KW) | Repairs of cooling fan (10.1-15 KW) |
| 241 | Repairs of cooling fan (15.1-25 KW) | Repairs of cooling fan (15.1-25 KW) |
| 242 | Repairs of cooling fan (25.1-50 KW) | Repairs of cooling fan (25.1-50 KW) |
| 243 | Repairs of cooling fan (50.1-100 KW) | Repairs of cooling fan (50.1-100 KW) |
| 244 | Repairs of cooling fan (100.1-150 KW) | Repairs of cooling fan (100.1-150 KW) |
| 245 | Repairs of cooling fan (150.1-200 KW) | Repairs of cooling fan (150.1-200 KW) |
| 246 | Repairs of cooling fan (>200 KW) | Repairs of cooling fan (>200 KW) |
| 247 | Repairs of foundation stool (0.5-5 KW) | Repairs of foundation stool (0.5-5 KW) |
| 248 | Repairs of foundation stool (5.1-10 KW) | Repairs of foundation stool (5.1-10 KW) |
| 249 | Repairs of foundation stool (10.1-15 KW) | Repairs of foundation stool (10.1-15 KW) |
| 250 | Repairs of foundation stool (15.1-25 KW) | Repairs of foundation stool (15.1-25 KW) |
| 251 | Repairs of foundation stool (25.1-50 KW) | Repairs of foundation stool (25.1-50 KW) |
| 252 | Repairs of foundation stool (50.1-100 KW) | Repairs of foundation stool (50.1-100 KW) |
| 253 | Repairs of foundation stool (100.1-150 KW) | Repairs of foundation stool (100.1-150 KW) |
| 254 | Repairs of foundation stool (150.1-200 KW) | Repairs of foundation stool (150.1-200 KW) |
| 255 | Repairs of foundation stool (>200 KW) | Repairs of foundation stool (>200 KW) |
| 256 | Boxing up and trials of motor at firm workshop (0.5-5 KW) | Boxing up and trials of motor at firm workshop (0.5-5 KW) |
| 257 | Boxing up and trials of motor at firm workshop (5.1-10 KW) | Boxing up and trials of motor at firm workshop (5.1-10 KW) |
| 258 | Boxing up and trials of motor at firm workshop (10.1-15 KW) | Boxing up and trials of motor at firm workshop (10.1-15 KW) |
| 259 | Boxing up and trials of motor at firm workshop (15.1-25 KW) | Boxing up and trials of motor at firm workshop (15.1-25 KW) |
| 260 | Boxing up and trials of motor at firm workshop (25.1-50 KW) | Boxing up and trials of motor at firm workshop (25.1-50 KW) |
| 261 | Boxing up and trials of motor at firm workshop (50.1-100 KW) | Boxing up and trials of motor at firm workshop (50.1-100 KW) |
| 262 | Boxing up and trials of motor at firm workshop (100.1-150 KW) | Boxing up and trials of motor at firm workshop (100.1-150 KW) |
| 263 | Boxing up and trials of motor at firm workshop (150.1-200 KW) | Boxing up and trials of motor at firm workshop (150.1-200 KW) |
| 264 | Boxing up and trials of motor at firm workshop (>200 KW) | Boxing up and trials of motor at firm workshop (>200 KW) |
| 265 | Shifting of motor from firm's premisesto ship for fitment (0.5-5 KW) | Shifting of motor from firm's premisesto ship for fitment (0.5-5 KW) |
| 266 | Shifting of motor from firm's premisesto ship for fitment (5.1-10 KW) | Shifting of motor from firm's premisesto ship for fitment (5.1-10 KW) |
| 267 | Shifting of motor from firm's premisesto ship for fitment (10.1-15 KW) | Shifting of motor from firm's premisesto ship for fitment (10.1-15 KW) |
| 268 | Shifting of motor from firm's premisesto ship for fitment (15.1-25 KW) | Shifting of motor from firm's premisesto ship for fitment (15.1-25 KW) |
| 269 | Shifting of motor from firm's premisesto ship for fitment (25.1-50 KW) | Shifting of motor from firm's premisesto ship for fitment (25.1-50 KW) |
| 270 | Shifting of motor from firm's premisesto ship for fitment (50.1-100 KW) | Shifting of motor from firm's premisesto ship for fitment (50.1-100 KW) |
| 271 | Shifting of motor from firm's premisesto ship for fitment (100.1-150 KW) | Shifting of motor from firm's premisesto ship for fitment (100.1-150 KW) |
| 272 | Shifting of motor from firm's premisesto ship for fitment (150.1-200 KW) | Shifting of motor from firm's premisesto ship for fitment (150.1-200 KW) |
| 273 | Shifting of motor from firm's premisesto ship for fitment (>200 KW) | Shifting of motor from firm's premisesto ship for fitment (>200 KW) |
| 274 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (0.5-5 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (0.5-5 KW) |
| 275 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (5.1-10 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (5.1-10 KW) |
| 276 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (10.1-15 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (10.1-15 KW) |
| 277 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (15.1-25 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (15.1-25 KW) |
| 278 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (25.1-50 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (25.1-50 KW) |
| 279 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (50.1-100 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (50.1-100 KW) |
| 280 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (100.1-150 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (100.1-150 KW) |
| 281 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (150.1-200 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (150.1-200 KW) |
| 282 | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (>200 KW) | Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (>200 KW) |
| 283 | Alignment & coupling of pimp & motor assembly insitu (0.5-5 KW) | Alignment & coupling of pimp & motor assembly insitu (0.5-5 KW) |
| 284 | Alignment & coupling of pimp & motor assembly insitu (5.1-10 KW) | Alignment & coupling of pimp & motor assembly insitu (5.1-10 KW) |
| 285 | Alignment & coupling of pimp & motor assembly insitu (10.1-15 KW) | Alignment & coupling of pimp & motor assembly insitu (10.1-15 KW) |
| 286 | Alignment & coupling of pimp & motor assembly insitu (15.1-25 KW) | Alignment & coupling of pimp & motor assembly insitu (15.1-25 KW) |
| 287 | Alignment & coupling of pimp & motor assembly insitu (25.1-50 KW) | Alignment & coupling of pimp & motor assembly insitu (25.1-50 KW) |
| 288 | Alignment & coupling of pimp & motor assembly insitu (50.1-100 KW) | Alignment & coupling of pimp & motor assembly insitu (50.1-100 KW) |
| 289 | Alignment & coupling of pimp & motor assembly insitu (100.1-150 KW) | Alignment & coupling of pimp & motor assembly insitu (100.1-150 KW) |
| 290 | Alignment & coupling of pimp & motor assembly insitu (150.1-200 KW) | Alignment & coupling of pimp & motor assembly insitu (150.1-200 KW) |
| 291 | Alignment & coupling of pimp & motor assembly insitu (>200 KW) | Alignment & coupling of pimp & motor assembly insitu (>200 KW) |
| 292 | Manday Rates | Manday Rates |
| 293 | Manday rates at stations other than Mumbai | Manday rates at stations other than Mumbai |
| 294 | Karwar | Karwar |
| 295 | Okha | Okha |
| 296 | Porbandar | Porbandar |
| 297 | Goa | Goa |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender