Defence Government Departments Closing in 17 days TDR #57851574

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Indian Naval Ships Of Wnc; Rrc For Repairs/Rewinding Of Pumps And Motors Of Various Sizes And Types Fitted Onboard Indian Naval Ships Of Wnc

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
24 Oct 2026
17 days left
EMD
5.65 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Indian Naval Ships Of Wnc; Rrc For Repairs/Rewinding Of Pumps And Motors Of Various Sizes And Types Fitted Onboard Indian Naval Ships Of Wnc; Service Provider - Scope Of Work For Repairs Of Pump , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (0-25 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (25.1-50 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (50.1-75 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (75.1-100 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (100.1-150 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (150.1-200 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (>200 Tph) , Shifting Of Pump From Ship To Firms Premises (0-25 Tph) , Shifting Of Pump From Ship To Firms Premises (25.1-50 Tph) , Shifting Of Pump From Ship To Firms Premises (50.1-75 Tph) , Shifting Of Pump From Ship To Firms Premises (75.1-100 Tph) , Shifting Of Pump From Ship To Firms Premises (100.1-150 Tph) , Shifting Of Pump From Ship To Firms Premises (150.1-200 Tph) , Shifting Of Pump From Ship To Firms Premises (>200 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (0-25 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (25.1-50 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (50.1-75 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (75.1-100 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (100.1-150 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (150.1-200 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (>200 Tph) , Undertake Shaft Trueness Checks (0-25 Tph) , Undertake Shaft Trueness Checks (25.1-50 Tph) , Undertake Shaft Trueness Checks (50.1-75 Tph) , Undertake Shaft Trueness Checks (75.1-100 Tph) , Undertake Shaft Trueness Checks (100.1-150 Tph) , Undertake Shaft Trueness Checks (150.1-200 Tph) , Undertake Shaft Trueness Checks (>200 Tph) , Repairs Of Shaft Including Impeller Nut And Key (0-25 Tph) , Repairs Of Shaft Including Impeller Nut And Key (25.1-50 Tph) , Repairs Of Shaft Including Impeller Nut And Key (50.1-75 Tph) , Repairs Of Shaft Including Impeller Nut And Key (75.1-100 Tph) , Repairs Of Shaft Including Impeller Nut And Key (100.1-150 Tph) , Repairs Of Shaft Including Impeller Nut And Key (150.1-200 Tph) , Repairs Of Shaft Including Impeller Nut And Key (>200 Tph) , Insitu Replacement Of Mechanical Seal (0-25 Tph) , Insitu Replacement Of Mechanical Seal (25.1-50 Tph) , Insitu Replacement Of Mechanical Seal (50.1-75 Tph) , Insitu Replacement Of Mechanical Seal (75.1-100 Tph) , Insitu Replacement Of Mechanical Seal (100.1-150 Tph) , Insitu Replacement Of Mechanical Seal (150.1-200 Tph) , Insitu Replacement Of Mechanical Seal (>200 Tph) , Manufacturing Of Wear Rings To Maintain Design Clearance (0-25) , Manufacturing Of Wear Rings To Maintain Design Clearance (25.1-50) , Manufacturing Of Wear Rings To Maintain Design Clearance (50.1-75) , Manufacturing Of Wear Rings To Maintain Design Clearance (75.1-100) , Manufacturing Of Wear Rings To Maintain Design Clearance (100.1-150) , Manufacturing Of Wear Rings To Maintain Design Clearance (150.1-200) , Manufacturing Of Wear Rings To Maintain Design Clearance (>200) , Repairs Of Pump Casing (0-25) , Repairs Of Pump Casing (25.1-50) , Repairs Of Pump Casing (50.1-75) , Repairs Of Pump Casing (75.1-100) , Repairs Of Pump Casing (100.1-150) , Repairs Of Pump Casing (150.1-200) , Repairs Of Pump Casing (>200) , Dynamic Balancing Of Impeller (0-25 Tph) , Dynamic Balancing Of Impeller (25.1-50 Tph) , Dynamic Balancing Of Impeller (50.1-75 Tph) , Dynamic Balancing Of Impeller (75.1-100 Tph) , Dynamic Balancing Of Impeller (100.1-150 Tph) , Dynamic Balancing Of Impeller (150.1-200 Tph) , Dynamic Balancing Of Impeller (>200 Tph) , Manufacturing Of Shaft Bushes/Sleeve (0-25 Tph) , Manufacturing Of Shaft Bushes/Sleeve (25.1-50 Tph) , Manufacturing Of Shaft Bushes/Sleeve (50.1-75 Tph) , Manufacturing Of Shaft Bushes/Sleeve (75.1-100 Tph) , Manufacturing Of Shaft Bushes/Sleeve (100.1-150 Tph) , Manufacturing Of Shaft Bushes/Sleeve (150.1-200 Tph) , Manufacturing Of Shaft Bushes/Sleeve (>200 Tph) , Repairs Of Coupling/ Coupling Distance Piece (0-25 Tph) , Repairs Of Coupling/ Coupling Distance Piece (25.1-50 Tph) , Repairs Of Coupling/ Coupling Distance Piece (50.1-75 Tph) , Repairs Of Coupling/ Coupling Distance Piece (75.1-100 Tph) , Repairs Of Coupling/ Coupling Distance Piece (100.1-150 Tph) , Repairs Of Coupling/ Coupling Distance Piece (150.1-200 Tph) , Repairs Of Coupling/ Coupling Distance Piece (>200 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (0-25 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (25.1-50 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (50.1- 75 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (75.1-100 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (100.1-150 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (150.1-200 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (>200 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (0-25 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (25.1-50 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (50.1-75 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (75.1-100 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (100.1-150 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (150.1-200 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (>200 Tph) , Repairs Of Bearing Housing (0-25 Tph) , Repairs Of Bearing Housing (25.1-50 Tph) , Repairs Of Bearing Housing (50.1-75 Tph) , Repairs Of Bearing Housing (75.1-100 Tph) , Repairs Of Bearing Housing (100.1-150 Tph) , Repairs Of Bearing Housing (150.1-200 Tph) , Repairs Of Bearing Housing (>200 Tph) , Insitu Replacement Of Bearing Housing (0-25 Tph) , Insitu Replacement Of Bearing Housing (25.1-50 Tph) , Insitu Replacement Of Bearing Housing (50.1-75 Tph) , Insitu Replacement Of Bearing Housing (75.1-100 Tph) , Insitu Replacement Of Bearing Housing (100.1-150 Tph) , Insitu Replacement Of Bearing Housing (150.1-200 Tph) , Insitu Replacement Of Bearing Housing (0-25 Tph) , Repairs To Impeller (0-25 Tph) , Repairs To Impeller (25.1-50 Tph) , Repairs To Impeller (50.1-75 Tph) , Repairs To Impeller (75.1-100 Tph) , Repairs To Impeller (100.1-150 Tph) , Repairs To Impeller (150.1-200 Tph) , Repairs To Impeller (>200 Tph) , Insitu Replacement Of Bearings (0-25 Tph) , Insitu Replacement Of Bearings (25.1-50 Tph) , Insitu Replacement Of Bearings (50.1-75 Tph) , Insitu Replacement Of Bearings (75.1-100 Tph) , Insitu Replacement Of Bearings (100.1-150 Tph) , Insitu Replacement Of Bearings (150.1-200 Tph) , Insitu Replacement Of Bearings (>200 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (0-25 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (25.1-50 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (50.1-75 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (75.1-100 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (100.1-150 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (150.1-200 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (>200 Tph) , Static Pressure Testing Of Pump At Workshop (0-25 Tph) , Static Pressure Testing Of Pump At Workshop (25.1-50 Tph) , Static Pressure Testing Of Pump At Workshop (50.1-75 Tph) , Static Pressure Testing Of Pump At Workshop (75.1-100 Tph) , Static Pressure Testing Of Pump At Workshop (100.1-150 Tph) , Static Pressure Testing Of Pump At Workshop (150.1-200 Tph) , Static Pressure Testing Of Pump At Workshop (>200 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (0-25 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (25.1-50 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (50.1-75 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (75.1-100 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (100.1-150 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (150.1-200 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (>200 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (0-25 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (25.1-50 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (50.1-75 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (75.1-100 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (100.1-150 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (150.1-200 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (>200 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (0-25 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (25.1-50 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (50.1-75 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (75.1-100 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (100.1-150 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (150.1-200 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (>200 Tph) , Scope Of Work For Repairs/Rewinding Of Motors , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (0.5-5 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (5.1-10 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (10.1-15 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (15.1-25 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (25.1-50 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (50.1-100 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (100.1-150 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (150.1-200 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (>200 Kw) , Shifting Of Motor From Ship To Firms Premises (0.5-5 Kw) , Shifting Of Motor From Ship To Firms Premises (5.1- 10 Kw) , Shifting Of Motor From Ship To Firms Premises (10.1-15 Kw) , Shifting Of Motor From Ship To Firms Premises (15.1-25 Kw) , Shifting Of Motor From Ship To Firms Premises (25.1-50 Kw) , Shifting Of Motor From Ship To Firms Premises (50.1-100 Kw) , Shifting Of Motor From Ship To Firms Premises (100.1-150 Kw) , Shifting Of Motor From Ship To Firms Premises (150.1-200 Kw) , Shifting Of Motor From Ship To Firms Premises (>200 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (0.5-5 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (5.1-10 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (10.1-15 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (15.1-25 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (25.1-50 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (50.1-100 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (100.1-150 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (150.1-200 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (>200 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (0.5-5 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (5.1-10 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (10.1-15 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (15.1- 25 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (25.1-50 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (50.1-100 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (100.1-150 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (150.1-200 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (> 200 Kw) , Repairs Of Bearing Holder/Bearing Cap (0.5-5 Kw) , Repairs Of Bearing Holder/Bearing Cap (5.1-10 Kw) , Repairs Of Bearing Holder/Bearing Cap (10.1-15 Kw) , Repairs Of Bearing Holder/Bearing Cap (15.1-25 Kw) , Repairs Of Bearing Holder/Bearing Cap (25.1-50 Kw) , Repairs Of Bearing Holder/Bearing Cap (50.1-100 Kw) , Repairs Of Bearing Holder/Bearing Cap (100.1-150 Kw) , Repairs Of Bearing Holder/Bearing Cap (150.1-200 Kw) , Repairs Of Bearing Holder/Bearing Cap (>200 Kw) , Dynamic Balancing Of Rotor (0.5-5 Kw) , Dynamic Balancing Of Rotor (5.1-10 Kw) , Dynamic Balancing Of Rotor (10.1-15 Kw) , Dynamic Balancing Of Rotor (15.1-25 Kw) , Dynamic Balancing Of Rotor (25.1-50 Kw) , Dynamic Balancing Of Rotor (50.1-100 Kw) , Dynamic Balancing Of Rotor (100.1-150 Kw) , Dynamic Balancing Of Rotor (150.1-200 Kw) , Dynamic Balancing Of Rotor (>200 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (0.5-5 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (5.1-10 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (10.1-15 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (15.1-25 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (25.1-50 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (50.1-100 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (100.1-150 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (150.1-200 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (>200 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (0.5-5 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (5.1-10 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (10.1-15 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (15.1-25 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (25.1-50 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (50.1-100 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (100.1-150 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (150.1-200 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (>200 Kw) , Repairs Of Terminal Box (0.5-5 Kw) , Repairs Of Terminal Box (5.1-10 Kw) , Repairs Of Terminal Box (10.1-15 Kw) , Repairs Of Terminal Box (15.1-25 Kw) , Repairs Of Terminal Box (25.1-50 Kw) , Repairs Of Terminal Box (50.1-100 Kw) , Repairs Of Terminal Box (100.1-150 Kw) , Repairs Of Terminal Box (150.1-200 Kw) , Repairs Of Terminal Box (>200 Kw) , Repairs Of Cooling Fan (0.5-5 Kw) , Repairs Of Cooling Fan (5.1-10 Kw) , Repairs Of Cooling Fan (10.1-15 Kw) , Repairs Of Cooling Fan (15.1-25 Kw) , Repairs Of Cooling Fan (25.1-50 Kw) , Repairs Of Cooling Fan (50.1-100 Kw) , Repairs Of Cooling Fan (100.1-150 Kw) , Repairs Of Cooling Fan (150.1-200 Kw) , Repairs Of Cooling Fan (>200 Kw) , Repairs Of Foundation Stool (0.5-5 Kw) , Repairs Of Foundation Stool (5.1-10 Kw) , Repairs Of Foundation Stool (10.1-15 Kw) , Repairs Of Foundation Stool (15.1-25 Kw) , Repairs Of Foundation Stool (25.1-50 Kw) , Repairs Of Foundation Stool (50.1-100 Kw) , Repairs Of Foundation Stool (100.1-150 Kw) , Repairs Of Foundation Stool (150.1-200 Kw) , Repairs Of Foundation Stool (>200 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (0.5-5 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (5.1-10 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (10.1-15 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (15.1-25 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (25.1-50 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (50.1-100 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (100.1-150 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (150.1-200 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (>200 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (0.5-5 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (5.1-10 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (10.1-15 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (15.1-25 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (25.1-50 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (50.1-100 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (100.1-150 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (150.1-200 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (>200 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (0.5-5 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (5.1-10 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (10.1-15 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (15.1-25 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (25.1-50 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (50.1-100 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (100.1-150 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (150.1-200 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (>200 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (0.5-5 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (5.1-10 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (10.1-15 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (15.1-25 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (25.1-50 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (50.1-100 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (100.1-150 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (150.1-200 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (>200 Kw) , Manday Rates , Manday Rates At Stations Other Than Mumbai , Karwar , Okha , Porbandar , Goa

BOQ

Sl. No. Item TitleItem Description
1Scope of work for Repairs of PumpScope of work for Repairs of Pump
2Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (0-25 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (0-25 TPH)
3Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (25.1-50 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (25.1-50 TPH)
4Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (50.1-75 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (50.1-75 TPH)
5Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (75.1-100 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (75.1-100 TPH)
6Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (100.1-150 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (100.1-150 TPH)
7Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (150.1-200 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (150.1-200 TPH)
8Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (>200 TPH)Decoupling of pump from motor, removal of pump from first connection and lifting of pump from foundation (>200 TPH)
9shifting of pump from ship to firm's premises (0-25 TPH)shifting of pump from ship to firm's premises (0-25 TPH)
10shifting of pump from ship to firm's premises (25.1-50 TPH)shifting of pump from ship to firm's premises (25.1-50 TPH)
11shifting of pump from ship to firm's premises (50.1-75 TPH)shifting of pump from ship to firm's premises (50.1-75 TPH)
12shifting of pump from ship to firm's premises (75.1-100 TPH)shifting of pump from ship to firm's premises (75.1-100 TPH)
13shifting of pump from ship to firm's premises (100.1-150 TPH)shifting of pump from ship to firm's premises (100.1-150 TPH)
14shifting of pump from ship to firm's premises (150.1-200 TPH)shifting of pump from ship to firm's premises (150.1-200 TPH)
15shifting of pump from ship to firm's premises (>200 TPH)shifting of pump from ship to firm's premises (>200 TPH)
16Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (0-25 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (0-25 TPH)
17Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (25.1-50 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (25.1-50 TPH)
18Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (50.1-75 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (50.1-75 TPH)
19Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (75.1-100 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (75.1-100 TPH)
20Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (100.1-150 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (100.1-150 TPH)
21Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (150.1-200 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (150.1-200 TPH)
22Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (>200 TPH)Dismantling of pump and submission of material condition assessment report within 24 Hrs. for establishment of scope of work (>200 TPH)
23Undertake shaft trueness checks (0-25 TPH)Undertake shaft trueness checks (0-25 TPH)
24Undertake shaft trueness checks (25.1-50 TPH)Undertake shaft trueness checks (25.1-50 TPH)
25Undertake shaft trueness checks (50.1-75 TPH)Undertake shaft trueness checks (50.1-75 TPH)
26Undertake shaft trueness checks (75.1-100 TPH)Undertake shaft trueness checks (75.1-100 TPH)
27Undertake shaft trueness checks (100.1-150 TPH)Undertake shaft trueness checks (100.1-150 TPH)
28Undertake shaft trueness checks (150.1-200 TPH)Undertake shaft trueness checks (150.1-200 TPH)
29Undertake shaft trueness checks (>200 TPH)Undertake shaft trueness checks (>200 TPH)
30Repairs of shaft including impeller nut and key (0-25 TPH)Repairs of shaft including impeller nut and key (0-25 TPH)
31Repairs of shaft including impeller nut and key (25.1-50 TPH)Repairs of shaft including impeller nut and key (25.1-50 TPH)
32Repairs of shaft including impeller nut and key (50.1-75 TPH)Repairs of shaft including impeller nut and key (50.1-75 TPH)
33Repairs of shaft including impeller nut and key (75.1-100 TPH)Repairs of shaft including impeller nut and key (75.1-100 TPH)
34Repairs of shaft including impeller nut and key (100.1-150 TPH)Repairs of shaft including impeller nut and key (100.1-150 TPH)
35Repairs of shaft including impeller nut and key (150.1-200 TPH)Repairs of shaft including impeller nut and key (150.1-200 TPH)
36Repairs of shaft including impeller nut and key (>200 TPH)Repairs of shaft including impeller nut and key (>200 TPH)
37Insitu replacement of mechanical seal (0-25 TPH)Insitu replacement of mechanical seal (0-25 TPH)
38Insitu replacement of mechanical seal (25.1-50 TPH)Insitu replacement of mechanical seal (25.1-50 TPH)
39Insitu replacement of mechanical seal (50.1-75 TPH)Insitu replacement of mechanical seal (50.1-75 TPH)
40Insitu replacement of mechanical seal (75.1-100 TPH)Insitu replacement of mechanical seal (75.1-100 TPH)
41Insitu replacement of mechanical seal (100.1-150 TPH)Insitu replacement of mechanical seal (100.1-150 TPH)
42Insitu replacement of mechanical seal (150.1-200 TPH)Insitu replacement of mechanical seal (150.1-200 TPH)
43Insitu replacement of mechanical seal (>200 TPH)Insitu replacement of mechanical seal (>200 TPH)
44Manufacturing of wear rings to maintain design clearance (0-25)Manufacturing of wear rings to maintain design clearance (0-25)
45Manufacturing of wear rings to maintain design clearance (25.1-50)Manufacturing of wear rings to maintain design clearance (25.1-50)
46Manufacturing of wear rings to maintain design clearance (50.1-75)Manufacturing of wear rings to maintain design clearance (50.1-75)
47Manufacturing of wear rings to maintain design clearance (75.1-100)Manufacturing of wear rings to maintain design clearance (75.1-100)
48Manufacturing of wear rings to maintain design clearance (100.1-150)Manufacturing of wear rings to maintain design clearance (100.1-150)
49Manufacturing of wear rings to maintain design clearance (150.1-200)Manufacturing of wear rings to maintain design clearance (150.1-200)
50Manufacturing of wear rings to maintain design clearance (>200)Manufacturing of wear rings to maintain design clearance (>200)
51Repairs of pump casing (0-25)Repairs of pump casing (0-25)
52Repairs of pump casing (25.1-50)Repairs of pump casing (25.1-50)
53Repairs of pump casing (50.1-75)Repairs of pump casing (50.1-75)
54Repairs of pump casing (75.1-100)Repairs of pump casing (75.1-100)
55Repairs of pump casing (100.1-150)Repairs of pump casing (100.1-150)
56Repairs of pump casing (150.1-200)Repairs of pump casing (150.1-200)
57Repairs of pump casing (>200)Repairs of pump casing (>200)
58Dynamic Balancing of impeller (0-25 TPH)Dynamic Balancing of impeller (0-25 TPH)
59Dynamic Balancing of impeller (25.1-50 TPH)Dynamic Balancing of impeller (25.1-50 TPH)
60Dynamic Balancing of impeller (50.1-75 TPH)Dynamic Balancing of impeller (50.1-75 TPH)
61Dynamic Balancing of impeller (75.1-100 TPH)Dynamic Balancing of impeller (75.1-100 TPH)
62Dynamic Balancing of impeller (100.1-150 TPH)Dynamic Balancing of impeller (100.1-150 TPH)
63Dynamic Balancing of impeller (150.1-200 TPH)Dynamic Balancing of impeller (150.1-200 TPH)
64Dynamic Balancing of impeller (>200 TPH)Dynamic Balancing of impeller (>200 TPH)
65Manufacturing of shaft bushes/sleeve (0-25 TPH)Manufacturing of shaft bushes/sleeve (0-25 TPH)
66Manufacturing of shaft bushes/sleeve (25.1-50 TPH)Manufacturing of shaft bushes/sleeve (25.1-50 TPH)
67Manufacturing of shaft bushes/sleeve (50.1-75 TPH)Manufacturing of shaft bushes/sleeve (50.1-75 TPH)
68Manufacturing of shaft bushes/sleeve (75.1-100 TPH)Manufacturing of shaft bushes/sleeve (75.1-100 TPH)
69Manufacturing of shaft bushes/sleeve (100.1-150 TPH)Manufacturing of shaft bushes/sleeve (100.1-150 TPH)
70Manufacturing of shaft bushes/sleeve (150.1-200 TPH)Manufacturing of shaft bushes/sleeve (150.1-200 TPH)
71Manufacturing of shaft bushes/sleeve (>200 TPH)Manufacturing of shaft bushes/sleeve (>200 TPH)
72Repairs of coupling/ coupling distance piece (0-25 TPH)Repairs of coupling/ coupling distance piece (0-25 TPH)
73Repairs of coupling/ coupling distance piece (25.1-50 TPH)Repairs of coupling/ coupling distance piece (25.1-50 TPH)
74Repairs of coupling/ coupling distance piece (50.1-75 TPH)Repairs of coupling/ coupling distance piece (50.1-75 TPH)
75Repairs of coupling/ coupling distance piece (75.1-100 TPH)Repairs of coupling/ coupling distance piece (75.1-100 TPH)
76Repairs of coupling/ coupling distance piece (100.1-150 TPH)Repairs of coupling/ coupling distance piece (100.1-150 TPH)
77Repairs of coupling/ coupling distance piece (150.1-200 TPH)Repairs of coupling/ coupling distance piece (150.1-200 TPH)
78Repairs of coupling/ coupling distance piece (>200 TPH)Repairs of coupling/ coupling distance piece (>200 TPH)
79Manufacture of coupling 7 coupling distance piece (0-25 TPH)Manufacture of coupling 7 coupling distance piece (0-25 TPH)
80Manufacture of coupling 7 coupling distance piece (25.1-50 TPH)Manufacture of coupling 7 coupling distance piece (25.1-50 TPH)
81Manufacture of coupling 7 coupling distance piece (50.1- 75 TPH)Manufacture of coupling 7 coupling distance piece (50.1- 75 TPH)
82Manufacture of coupling 7 coupling distance piece (75.1-100 TPH)Manufacture of coupling 7 coupling distance piece (75.1-100 TPH)
83Manufacture of coupling 7 coupling distance piece (100.1-150 TPH)Manufacture of coupling 7 coupling distance piece (100.1-150 TPH)
84Manufacture of coupling 7 coupling distance piece (150.1-200 TPH)Manufacture of coupling 7 coupling distance piece (150.1-200 TPH)
85Manufacture of coupling 7 coupling distance piece (>200 TPH)Manufacture of coupling 7 coupling distance piece (>200 TPH)
86Insitu fitment of coupling/ coupling distance piece (0-25 TPH)Insitu fitment of coupling/ coupling distance piece (0-25 TPH)
87Insitu fitment of coupling/ coupling distance piece (25.1-50 TPH)Insitu fitment of coupling/ coupling distance piece (25.1-50 TPH)
88Insitu fitment of coupling/ coupling distance piece (50.1-75 TPH)Insitu fitment of coupling/ coupling distance piece (50.1-75 TPH)
89Insitu fitment of coupling/ coupling distance piece (75.1-100 TPH)Insitu fitment of coupling/ coupling distance piece (75.1-100 TPH)
90Insitu fitment of coupling/ coupling distance piece (100.1-150 TPH)Insitu fitment of coupling/ coupling distance piece (100.1-150 TPH)
91Insitu fitment of coupling/ coupling distance piece (150.1-200 TPH)Insitu fitment of coupling/ coupling distance piece (150.1-200 TPH)
92Insitu fitment of coupling/ coupling distance piece (>200 TPH)Insitu fitment of coupling/ coupling distance piece (>200 TPH)
93Repairs of Bearing housing (0-25 TPH)Repairs of Bearing housing (0-25 TPH)
94Repairs of Bearing housing (25.1-50 TPH)Repairs of Bearing housing (25.1-50 TPH)
95Repairs of Bearing housing (50.1-75 TPH)Repairs of Bearing housing (50.1-75 TPH)
96Repairs of Bearing housing (75.1-100 TPH)Repairs of Bearing housing (75.1-100 TPH)
97Repairs of Bearing housing (100.1-150 TPH)Repairs of Bearing housing (100.1-150 TPH)
98Repairs of Bearing housing (150.1-200 TPH)Repairs of Bearing housing (150.1-200 TPH)
99Repairs of Bearing housing (>200 TPH)Repairs of Bearing housing (>200 TPH)
100Insitu replacement of Bearing housing (0-25 TPH)Insitu replacement of Bearing housing (0-25 TPH)
101Insitu replacement of Bearing housing (25.1-50 TPH)Insitu replacement of Bearing housing (25.1-50 TPH)
102Insitu replacement of Bearing housing (50.1-75 TPH)Insitu replacement of Bearing housing (50.1-75 TPH)
103Insitu replacement of Bearing housing (75.1-100 TPH)Insitu replacement of Bearing housing (75.1-100 TPH)
104Insitu replacement of Bearing housing (100.1-150 TPH)Insitu replacement of Bearing housing (100.1-150 TPH)
105Insitu replacement of Bearing housing (150.1-200 TPH)Insitu replacement of Bearing housing (150.1-200 TPH)
106Insitu replacement of Bearing housing (0-25 TPH)Insitu replacement of Bearing housing (0-25 TPH)
107Repairs to Impeller (0-25 TPH)Repairs to Impeller (0-25 TPH)
108Repairs to Impeller (25.1-50 TPH)Repairs to Impeller (25.1-50 TPH)
109Repairs to Impeller (50.1-75 TPH)Repairs to Impeller (50.1-75 TPH)
110Repairs to Impeller (75.1-100 TPH)Repairs to Impeller (75.1-100 TPH)
111Repairs to Impeller (100.1-150 TPH)Repairs to Impeller (100.1-150 TPH)
112Repairs to Impeller (150.1-200 TPH)Repairs to Impeller (150.1-200 TPH)
113Repairs to Impeller (>200 TPH)Repairs to Impeller (>200 TPH)
114Insitu Replacement of Bearings (0-25 TPH)Insitu Replacement of Bearings (0-25 TPH)
115Insitu Replacement of Bearings (25.1-50 TPH)Insitu Replacement of Bearings (25.1-50 TPH)
116Insitu Replacement of Bearings (50.1-75 TPH)Insitu Replacement of Bearings (50.1-75 TPH)
117Insitu Replacement of Bearings (75.1-100 TPH)Insitu Replacement of Bearings (75.1-100 TPH)
118Insitu Replacement of Bearings (100.1-150 TPH)Insitu Replacement of Bearings (100.1-150 TPH)
119Insitu Replacement of Bearings (150.1-200 TPH)Insitu Replacement of Bearings (150.1-200 TPH)
120Insitu Replacement of Bearings (>200 TPH)Insitu Replacement of Bearings (>200 TPH)
121Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (0-25 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (0-25 TPH)
122Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (25.1-50 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (25.1-50 TPH)
123Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (50.1-75 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (50.1-75 TPH)
124Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (75.1-100 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (75.1-100 TPH)
125Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (100.1-150 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (100.1-150 TPH)
126Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (150.1-200 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (150.1-200 TPH)
127Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (>200 TPH)Boxing-up of pump assembly after repairs or replacement (as provided by IN) of sub-components. Replacement of consumables such as CNFM gasket, grease, fastener etc. will be provided by the firm and not IN (>200 TPH)
128Static Pressure testing of pump at workshop (0-25 TPH)Static Pressure testing of pump at workshop (0-25 TPH)
129Static Pressure testing of pump at workshop (25.1-50 TPH)Static Pressure testing of pump at workshop (25.1-50 TPH)
130Static Pressure testing of pump at workshop (50.1-75 TPH)Static Pressure testing of pump at workshop (50.1-75 TPH)
131Static Pressure testing of pump at workshop (75.1-100 TPH)Static Pressure testing of pump at workshop (75.1-100 TPH)
132Static Pressure testing of pump at workshop (100.1-150 TPH)Static Pressure testing of pump at workshop (100.1-150 TPH)
133Static Pressure testing of pump at workshop (150.1-200 TPH)Static Pressure testing of pump at workshop (150.1-200 TPH)
134Static Pressure testing of pump at workshop (>200 TPH)Static Pressure testing of pump at workshop (>200 TPH)
135Shifting of pump from firm's premises to ship for fitment (0-25 TPH)Shifting of pump from firm's premises to ship for fitment (0-25 TPH)
136Shifting of pump from firm's premises to ship for fitment (25.1-50 TPH)Shifting of pump from firm's premises to ship for fitment (25.1-50 TPH)
137Shifting of pump from firm's premises to ship for fitment (50.1-75 TPH)Shifting of pump from firm's premises to ship for fitment (50.1-75 TPH)
138Shifting of pump from firm's premises to ship for fitment (75.1-100 TPH)Shifting of pump from firm's premises to ship for fitment (75.1-100 TPH)
139Shifting of pump from firm's premises to ship for fitment (100.1-150 TPH)Shifting of pump from firm's premises to ship for fitment (100.1-150 TPH)
140Shifting of pump from firm's premises to ship for fitment (150.1-200 TPH)Shifting of pump from firm's premises to ship for fitment (150.1-200 TPH)
141Shifting of pump from firm's premises to ship for fitment (>200 TPH)Shifting of pump from firm's premises to ship for fitment (>200 TPH)
142Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (0-25 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (0-25 TPH)
143Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (25.1-50 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (25.1-50 TPH)
144Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (50.1-75 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (50.1-75 TPH)
145Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (75.1-100 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (75.1-100 TPH)
146Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (100.1-150 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (100.1-150 TPH)
147Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (150.1-200 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (150.1-200 TPH)
148Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (>200 TPH)Fitment of pump at location with first fitting and proving trials onboard with SS and fmU Rep. (>200 TPH)
149Alignment and coupling of pump & motor assembly insitu (0-25 TPH)Alignment and coupling of pump & motor assembly insitu (0-25 TPH)
150Alignment and coupling of pump & motor assembly insitu (25.1-50 TPH)Alignment and coupling of pump & motor assembly insitu (25.1-50 TPH)
151Alignment and coupling of pump & motor assembly insitu (50.1-75 TPH)Alignment and coupling of pump & motor assembly insitu (50.1-75 TPH)
152Alignment and coupling of pump & motor assembly insitu (75.1-100 TPH)Alignment and coupling of pump & motor assembly insitu (75.1-100 TPH)
153Alignment and coupling of pump & motor assembly insitu (100.1-150 TPH)Alignment and coupling of pump & motor assembly insitu (100.1-150 TPH)
154Alignment and coupling of pump & motor assembly insitu (150.1-200 TPH)Alignment and coupling of pump & motor assembly insitu (150.1-200 TPH)
155Alignment and coupling of pump & motor assembly insitu (>200 TPH)Alignment and coupling of pump & motor assembly insitu (>200 TPH)
156Scope of work for Repairs/Rewinding of MotorsScope of work for Repairs/Rewinding of Motors
157Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (0.5-5 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (0.5-5 KW)
158Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (5.1-10 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (5.1-10 KW)
159Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (10.1-15 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (10.1-15 KW)
160Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (15.1-25 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (15.1-25 KW)
161Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (25.1-50 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (25.1-50 KW)
162Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (50.1-100 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (50.1-100 KW)
163Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (100.1-150 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (100.1-150 KW)
164Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (150.1-200 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (150.1-200 KW)
165Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (>200 KW)Decoupling of moto from pump, removal of motor from first connection and lifting of motor from foundation (>200 KW)
166Shifting of motor from ship to firm's premises (0.5-5 KW)Shifting of motor from ship to firm's premises (0.5-5 KW)
167Shifting of motor from ship to firm's premises (5.1- 10 KW)Shifting of motor from ship to firm's premises (5.1- 10 KW)
168Shifting of motor from ship to firm's premises (10.1-15 KW)Shifting of motor from ship to firm's premises (10.1-15 KW)
169Shifting of motor from ship to firm's premises (15.1-25 KW)Shifting of motor from ship to firm's premises (15.1-25 KW)
170Shifting of motor from ship to firm's premises (25.1-50 KW)Shifting of motor from ship to firm's premises (25.1-50 KW)
171Shifting of motor from ship to firm's premises (50.1-100 KW)Shifting of motor from ship to firm's premises (50.1-100 KW)
172Shifting of motor from ship to firm's premises (100.1-150 KW)Shifting of motor from ship to firm's premises (100.1-150 KW)
173Shifting of motor from ship to firm's premises (150.1-200 KW)Shifting of motor from ship to firm's premises (150.1-200 KW)
174Shifting of motor from ship to firm's premises (>200 KW)Shifting of motor from ship to firm's premises (>200 KW)
175Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (0.5-5 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (0.5-5 KW)
176Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (5.1-10 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (5.1-10 KW)
177Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (10.1-15 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (10.1-15 KW)
178Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (15.1-25 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (15.1-25 KW)
179Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (25.1-50 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (25.1-50 KW)
180Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (50.1-100 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (50.1-100 KW)
181Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (100.1-150 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (100.1-150 KW)
182Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (150.1-200 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (150.1-200 KW)
183Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (>200 KW)Dismantling of motor and submission of material condition assessment repor within 24 hrs for establishment of scope of work (>200 KW)
184Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (0.5-5 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (0.5-5 KW)
185Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (5.1-10 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (5.1-10 KW)
186Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (10.1-15 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (10.1-15 KW)
187Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (15.1- 25 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (15.1- 25 KW)
188Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (25.1-50 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (25.1-50 KW)
189Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (50.1-100 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (50.1-100 KW)
190Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (100.1-150 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (100.1-150 KW)
191Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (150.1-200 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (150.1-200 KW)
192Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (> 200 KW)Replacement of bearings (inclusive of cost of grease, oil/lip seal, nuts & bolts etc) (> 200 KW)
193Repairs of bearing holder/bearing cap (0.5-5 KW)Repairs of bearing holder/bearing cap (0.5-5 KW)
194Repairs of bearing holder/bearing cap (5.1-10 KW)Repairs of bearing holder/bearing cap (5.1-10 KW)
195Repairs of bearing holder/bearing cap (10.1-15 KW)Repairs of bearing holder/bearing cap (10.1-15 KW)
196Repairs of bearing holder/bearing cap (15.1-25 KW)Repairs of bearing holder/bearing cap (15.1-25 KW)
197Repairs of bearing holder/bearing cap (25.1-50 KW)Repairs of bearing holder/bearing cap (25.1-50 KW)
198Repairs of bearing holder/bearing cap (50.1-100 KW)Repairs of bearing holder/bearing cap (50.1-100 KW)
199Repairs of bearing holder/bearing cap (100.1-150 KW)Repairs of bearing holder/bearing cap (100.1-150 KW)
200Repairs of bearing holder/bearing cap (150.1-200 KW)Repairs of bearing holder/bearing cap (150.1-200 KW)
201Repairs of bearing holder/bearing cap (>200 KW)Repairs of bearing holder/bearing cap (>200 KW)
202Dynamic balancing of rotor (0.5-5 KW)Dynamic balancing of rotor (0.5-5 KW)
203Dynamic balancing of rotor (5.1-10 KW)Dynamic balancing of rotor (5.1-10 KW)
204Dynamic balancing of rotor (10.1-15 KW)Dynamic balancing of rotor (10.1-15 KW)
205Dynamic balancing of rotor (15.1-25 KW)Dynamic balancing of rotor (15.1-25 KW)
206Dynamic balancing of rotor (25.1-50 KW)Dynamic balancing of rotor (25.1-50 KW)
207Dynamic balancing of rotor (50.1-100 KW)Dynamic balancing of rotor (50.1-100 KW)
208Dynamic balancing of rotor (100.1-150 KW)Dynamic balancing of rotor (100.1-150 KW)
209Dynamic balancing of rotor (150.1-200 KW)Dynamic balancing of rotor (150.1-200 KW)
210Dynamic balancing of rotor (>200 KW)Dynamic balancing of rotor (>200 KW)
211Repairs of rotor shaft including shaft trueness checks (0.5-5 KW)Repairs of rotor shaft including shaft trueness checks (0.5-5 KW)
212Repairs of rotor shaft including shaft trueness checks (5.1-10 KW)Repairs of rotor shaft including shaft trueness checks (5.1-10 KW)
213Repairs of rotor shaft including shaft trueness checks (10.1-15 KW)Repairs of rotor shaft including shaft trueness checks (10.1-15 KW)
214Repairs of rotor shaft including shaft trueness checks (15.1-25 KW)Repairs of rotor shaft including shaft trueness checks (15.1-25 KW)
215Repairs of rotor shaft including shaft trueness checks (25.1-50 KW)Repairs of rotor shaft including shaft trueness checks (25.1-50 KW)
216Repairs of rotor shaft including shaft trueness checks (50.1-100 KW)Repairs of rotor shaft including shaft trueness checks (50.1-100 KW)
217Repairs of rotor shaft including shaft trueness checks (100.1-150 KW)Repairs of rotor shaft including shaft trueness checks (100.1-150 KW)
218Repairs of rotor shaft including shaft trueness checks (150.1-200 KW)Repairs of rotor shaft including shaft trueness checks (150.1-200 KW)
219Repairs of rotor shaft including shaft trueness checks (>200 KW)Repairs of rotor shaft including shaft trueness checks (>200 KW)
220Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (0.5-5 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (0.5-5 KW)
221Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (5.1-10 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (5.1-10 KW)
222Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (10.1-15 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (10.1-15 KW)
223Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (15.1-25 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (15.1-25 KW)
224Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (25.1-50 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (25.1-50 KW)
225Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (50.1-100 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (50.1-100 KW)
226Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (100.1-150 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (100.1-150 KW)
227Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (150.1-200 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (150.1-200 KW)
228Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (>200 KW)Rewinding of stator (includes cost of winding wire, varnish, lugs,ebonite/bakelite sheets, thermistor, ststor insulation material, fasteners, oil/lip seals, washer joints etc) (>200 KW)
229Repairs of terminal box (0.5-5 KW)Repairs of terminal box (0.5-5 KW)
230Repairs of terminal box (5.1-10 KW)Repairs of terminal box (5.1-10 KW)
231Repairs of terminal box (10.1-15 KW)Repairs of terminal box (10.1-15 KW)
232Repairs of terminal box (15.1-25 KW)Repairs of terminal box (15.1-25 KW)
233Repairs of terminal box (25.1-50 KW)Repairs of terminal box (25.1-50 KW)
234Repairs of terminal box (50.1-100 KW)Repairs of terminal box (50.1-100 KW)
235Repairs of terminal box (100.1-150 KW)Repairs of terminal box (100.1-150 KW)
236Repairs of terminal box (150.1-200 KW)Repairs of terminal box (150.1-200 KW)
237Repairs of terminal box (>200 KW)Repairs of terminal box (>200 KW)
238Repairs of cooling fan (0.5-5 KW)Repairs of cooling fan (0.5-5 KW)
239Repairs of cooling fan (5.1-10 KW)Repairs of cooling fan (5.1-10 KW)
240Repairs of cooling fan (10.1-15 KW)Repairs of cooling fan (10.1-15 KW)
241Repairs of cooling fan (15.1-25 KW)Repairs of cooling fan (15.1-25 KW)
242Repairs of cooling fan (25.1-50 KW)Repairs of cooling fan (25.1-50 KW)
243Repairs of cooling fan (50.1-100 KW)Repairs of cooling fan (50.1-100 KW)
244Repairs of cooling fan (100.1-150 KW)Repairs of cooling fan (100.1-150 KW)
245Repairs of cooling fan (150.1-200 KW)Repairs of cooling fan (150.1-200 KW)
246Repairs of cooling fan (>200 KW)Repairs of cooling fan (>200 KW)
247Repairs of foundation stool (0.5-5 KW)Repairs of foundation stool (0.5-5 KW)
248Repairs of foundation stool (5.1-10 KW)Repairs of foundation stool (5.1-10 KW)
249Repairs of foundation stool (10.1-15 KW)Repairs of foundation stool (10.1-15 KW)
250Repairs of foundation stool (15.1-25 KW)Repairs of foundation stool (15.1-25 KW)
251Repairs of foundation stool (25.1-50 KW)Repairs of foundation stool (25.1-50 KW)
252Repairs of foundation stool (50.1-100 KW)Repairs of foundation stool (50.1-100 KW)
253Repairs of foundation stool (100.1-150 KW)Repairs of foundation stool (100.1-150 KW)
254Repairs of foundation stool (150.1-200 KW)Repairs of foundation stool (150.1-200 KW)
255Repairs of foundation stool (>200 KW)Repairs of foundation stool (>200 KW)
256Boxing up and trials of motor at firm workshop (0.5-5 KW)Boxing up and trials of motor at firm workshop (0.5-5 KW)
257Boxing up and trials of motor at firm workshop (5.1-10 KW)Boxing up and trials of motor at firm workshop (5.1-10 KW)
258Boxing up and trials of motor at firm workshop (10.1-15 KW)Boxing up and trials of motor at firm workshop (10.1-15 KW)
259Boxing up and trials of motor at firm workshop (15.1-25 KW)Boxing up and trials of motor at firm workshop (15.1-25 KW)
260Boxing up and trials of motor at firm workshop (25.1-50 KW)Boxing up and trials of motor at firm workshop (25.1-50 KW)
261Boxing up and trials of motor at firm workshop (50.1-100 KW)Boxing up and trials of motor at firm workshop (50.1-100 KW)
262Boxing up and trials of motor at firm workshop (100.1-150 KW)Boxing up and trials of motor at firm workshop (100.1-150 KW)
263Boxing up and trials of motor at firm workshop (150.1-200 KW)Boxing up and trials of motor at firm workshop (150.1-200 KW)
264Boxing up and trials of motor at firm workshop (>200 KW)Boxing up and trials of motor at firm workshop (>200 KW)
265Shifting of motor from firm's premisesto ship for fitment (0.5-5 KW)Shifting of motor from firm's premisesto ship for fitment (0.5-5 KW)
266Shifting of motor from firm's premisesto ship for fitment (5.1-10 KW)Shifting of motor from firm's premisesto ship for fitment (5.1-10 KW)
267Shifting of motor from firm's premisesto ship for fitment (10.1-15 KW)Shifting of motor from firm's premisesto ship for fitment (10.1-15 KW)
268Shifting of motor from firm's premisesto ship for fitment (15.1-25 KW)Shifting of motor from firm's premisesto ship for fitment (15.1-25 KW)
269Shifting of motor from firm's premisesto ship for fitment (25.1-50 KW)Shifting of motor from firm's premisesto ship for fitment (25.1-50 KW)
270Shifting of motor from firm's premisesto ship for fitment (50.1-100 KW)Shifting of motor from firm's premisesto ship for fitment (50.1-100 KW)
271Shifting of motor from firm's premisesto ship for fitment (100.1-150 KW)Shifting of motor from firm's premisesto ship for fitment (100.1-150 KW)
272Shifting of motor from firm's premisesto ship for fitment (150.1-200 KW)Shifting of motor from firm's premisesto ship for fitment (150.1-200 KW)
273Shifting of motor from firm's premisesto ship for fitment (>200 KW)Shifting of motor from firm's premisesto ship for fitment (>200 KW)
274Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (0.5-5 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (0.5-5 KW)
275Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (5.1-10 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (5.1-10 KW)
276Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (10.1-15 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (10.1-15 KW)
277Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (15.1-25 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (15.1-25 KW)
278Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (25.1-50 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (25.1-50 KW)
279Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (50.1-100 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (50.1-100 KW)
280Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (100.1-150 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (100.1-150 KW)
281Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (150.1-200 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (150.1-200 KW)
282Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (>200 KW)Fitment of motor at location and proving of trials onboard with SS and FMU Rep. (>200 KW)
283Alignment & coupling of pimp & motor assembly insitu (0.5-5 KW)Alignment & coupling of pimp & motor assembly insitu (0.5-5 KW)
284Alignment & coupling of pimp & motor assembly insitu (5.1-10 KW)Alignment & coupling of pimp & motor assembly insitu (5.1-10 KW)
285Alignment & coupling of pimp & motor assembly insitu (10.1-15 KW)Alignment & coupling of pimp & motor assembly insitu (10.1-15 KW)
286Alignment & coupling of pimp & motor assembly insitu (15.1-25 KW)Alignment & coupling of pimp & motor assembly insitu (15.1-25 KW)
287Alignment & coupling of pimp & motor assembly insitu (25.1-50 KW)Alignment & coupling of pimp & motor assembly insitu (25.1-50 KW)
288Alignment & coupling of pimp & motor assembly insitu (50.1-100 KW)Alignment & coupling of pimp & motor assembly insitu (50.1-100 KW)
289Alignment & coupling of pimp & motor assembly insitu (100.1-150 KW)Alignment & coupling of pimp & motor assembly insitu (100.1-150 KW)
290Alignment & coupling of pimp & motor assembly insitu (150.1-200 KW)Alignment & coupling of pimp & motor assembly insitu (150.1-200 KW)
291Alignment & coupling of pimp & motor assembly insitu (>200 KW)Alignment & coupling of pimp & motor assembly insitu (>200 KW)
292Manday RatesManday Rates
293Manday rates at stations other than MumbaiManday rates at stations other than Mumbai
294KarwarKarwar
295OkhaOkha
296PorbandarPorbandar
297GoaGoa

AI Tender Summary

OUR REF NO 57851574
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 24-10-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Indian Naval Ships Of Wnc; Rrc For Repairs/Rewinding Of Pumps And Motors Of Various Sizes And Types Fitted Onboard Indian Naval Ships Of Wnc; Service Provider - Scope Of Work For Repairs Of Pump , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (0-25 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (25.1-50 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (50.1-75 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (75.1-100 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (100.1-150 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (150.1-200 Tph) , Decoupling Of Pump From Motor, Removal Of Pump From First Connection And Lifting Of Pump From Foundation (>200 Tph) , Shifting Of Pump From Ship To Firms Premises (0-25 Tph) , Shifting Of Pump From Ship To Firms Premises (25.1-50 Tph) , Shifting Of Pump From Ship To Firms Premises (50.1-75 Tph) , Shifting Of Pump From Ship To Firms Premises (75.1-100 Tph) , Shifting Of Pump From Ship To Firms Premises (100.1-150 Tph) , Shifting Of Pump From Ship To Firms Premises (150.1-200 Tph) , Shifting Of Pump From Ship To Firms Premises (>200 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (0-25 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (25.1-50 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (50.1-75 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (75.1-100 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (100.1-150 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (150.1-200 Tph) , Dismantling Of Pump And Submission Of Material Condition Assessment Report Within 24 Hrs. For Establishment Of Scope Of Work (>200 Tph) , Undertake Shaft Trueness Checks (0-25 Tph) , Undertake Shaft Trueness Checks (25.1-50 Tph) , Undertake Shaft Trueness Checks (50.1-75 Tph) , Undertake Shaft Trueness Checks (75.1-100 Tph) , Undertake Shaft Trueness Checks (100.1-150 Tph) , Undertake Shaft Trueness Checks (150.1-200 Tph) , Undertake Shaft Trueness Checks (>200 Tph) , Repairs Of Shaft Including Impeller Nut And Key (0-25 Tph) , Repairs Of Shaft Including Impeller Nut And Key (25.1-50 Tph) , Repairs Of Shaft Including Impeller Nut And Key (50.1-75 Tph) , Repairs Of Shaft Including Impeller Nut And Key (75.1-100 Tph) , Repairs Of Shaft Including Impeller Nut And Key (100.1-150 Tph) , Repairs Of Shaft Including Impeller Nut And Key (150.1-200 Tph) , Repairs Of Shaft Including Impeller Nut And Key (>200 Tph) , Insitu Replacement Of Mechanical Seal (0-25 Tph) , Insitu Replacement Of Mechanical Seal (25.1-50 Tph) , Insitu Replacement Of Mechanical Seal (50.1-75 Tph) , Insitu Replacement Of Mechanical Seal (75.1-100 Tph) , Insitu Replacement Of Mechanical Seal (100.1-150 Tph) , Insitu Replacement Of Mechanical Seal (150.1-200 Tph) , Insitu Replacement Of Mechanical Seal (>200 Tph) , Manufacturing Of Wear Rings To Maintain Design Clearance (0-25) , Manufacturing Of Wear Rings To Maintain Design Clearance (25.1-50) , Manufacturing Of Wear Rings To Maintain Design Clearance (50.1-75) , Manufacturing Of Wear Rings To Maintain Design Clearance (75.1-100) , Manufacturing Of Wear Rings To Maintain Design Clearance (100.1-150) , Manufacturing Of Wear Rings To Maintain Design Clearance (150.1-200) , Manufacturing Of Wear Rings To Maintain Design Clearance (>200) , Repairs Of Pump Casing (0-25) , Repairs Of Pump Casing (25.1-50) , Repairs Of Pump Casing (50.1-75) , Repairs Of Pump Casing (75.1-100) , Repairs Of Pump Casing (100.1-150) , Repairs Of Pump Casing (150.1-200) , Repairs Of Pump Casing (>200) , Dynamic Balancing Of Impeller (0-25 Tph) , Dynamic Balancing Of Impeller (25.1-50 Tph) , Dynamic Balancing Of Impeller (50.1-75 Tph) , Dynamic Balancing Of Impeller (75.1-100 Tph) , Dynamic Balancing Of Impeller (100.1-150 Tph) , Dynamic Balancing Of Impeller (150.1-200 Tph) , Dynamic Balancing Of Impeller (>200 Tph) , Manufacturing Of Shaft Bushes/Sleeve (0-25 Tph) , Manufacturing Of Shaft Bushes/Sleeve (25.1-50 Tph) , Manufacturing Of Shaft Bushes/Sleeve (50.1-75 Tph) , Manufacturing Of Shaft Bushes/Sleeve (75.1-100 Tph) , Manufacturing Of Shaft Bushes/Sleeve (100.1-150 Tph) , Manufacturing Of Shaft Bushes/Sleeve (150.1-200 Tph) , Manufacturing Of Shaft Bushes/Sleeve (>200 Tph) , Repairs Of Coupling/ Coupling Distance Piece (0-25 Tph) , Repairs Of Coupling/ Coupling Distance Piece (25.1-50 Tph) , Repairs Of Coupling/ Coupling Distance Piece (50.1-75 Tph) , Repairs Of Coupling/ Coupling Distance Piece (75.1-100 Tph) , Repairs Of Coupling/ Coupling Distance Piece (100.1-150 Tph) , Repairs Of Coupling/ Coupling Distance Piece (150.1-200 Tph) , Repairs Of Coupling/ Coupling Distance Piece (>200 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (0-25 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (25.1-50 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (50.1- 75 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (75.1-100 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (100.1-150 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (150.1-200 Tph) , Manufacture Of Coupling 7 Coupling Distance Piece (>200 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (0-25 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (25.1-50 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (50.1-75 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (75.1-100 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (100.1-150 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (150.1-200 Tph) , Insitu Fitment Of Coupling/ Coupling Distance Piece (>200 Tph) , Repairs Of Bearing Housing (0-25 Tph) , Repairs Of Bearing Housing (25.1-50 Tph) , Repairs Of Bearing Housing (50.1-75 Tph) , Repairs Of Bearing Housing (75.1-100 Tph) , Repairs Of Bearing Housing (100.1-150 Tph) , Repairs Of Bearing Housing (150.1-200 Tph) , Repairs Of Bearing Housing (>200 Tph) , Insitu Replacement Of Bearing Housing (0-25 Tph) , Insitu Replacement Of Bearing Housing (25.1-50 Tph) , Insitu Replacement Of Bearing Housing (50.1-75 Tph) , Insitu Replacement Of Bearing Housing (75.1-100 Tph) , Insitu Replacement Of Bearing Housing (100.1-150 Tph) , Insitu Replacement Of Bearing Housing (150.1-200 Tph) , Insitu Replacement Of Bearing Housing (0-25 Tph) , Repairs To Impeller (0-25 Tph) , Repairs To Impeller (25.1-50 Tph) , Repairs To Impeller (50.1-75 Tph) , Repairs To Impeller (75.1-100 Tph) , Repairs To Impeller (100.1-150 Tph) , Repairs To Impeller (150.1-200 Tph) , Repairs To Impeller (>200 Tph) , Insitu Replacement Of Bearings (0-25 Tph) , Insitu Replacement Of Bearings (25.1-50 Tph) , Insitu Replacement Of Bearings (50.1-75 Tph) , Insitu Replacement Of Bearings (75.1-100 Tph) , Insitu Replacement Of Bearings (100.1-150 Tph) , Insitu Replacement Of Bearings (150.1-200 Tph) , Insitu Replacement Of Bearings (>200 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (0-25 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (25.1-50 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (50.1-75 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (75.1-100 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (100.1-150 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (150.1-200 Tph) , Boxing-Up Of Pump Assembly After Repairs Or Replacement (As Provided By In) Of Sub-Components. Replacement Of Consumables Such As Cnfm Gasket, Grease, Fastener Etc. Will Be Provided By The Firm And Not In (>200 Tph) , Static Pressure Testing Of Pump At Workshop (0-25 Tph) , Static Pressure Testing Of Pump At Workshop (25.1-50 Tph) , Static Pressure Testing Of Pump At Workshop (50.1-75 Tph) , Static Pressure Testing Of Pump At Workshop (75.1-100 Tph) , Static Pressure Testing Of Pump At Workshop (100.1-150 Tph) , Static Pressure Testing Of Pump At Workshop (150.1-200 Tph) , Static Pressure Testing Of Pump At Workshop (>200 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (0-25 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (25.1-50 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (50.1-75 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (75.1-100 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (100.1-150 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (150.1-200 Tph) , Shifting Of Pump From Firms Premises To Ship For Fitment (>200 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (0-25 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (25.1-50 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (50.1-75 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (75.1-100 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (100.1-150 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (150.1-200 Tph) , Fitment Of Pump At Location With First Fitting And Proving Trials Onboard With Ss And Fmu Rep. (>200 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (0-25 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (25.1-50 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (50.1-75 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (75.1-100 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (100.1-150 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (150.1-200 Tph) , Alignment And Coupling Of Pump & Motor Assembly Insitu (>200 Tph) , Scope Of Work For Repairs/Rewinding Of Motors , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (0.5-5 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (5.1-10 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (10.1-15 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (15.1-25 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (25.1-50 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (50.1-100 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (100.1-150 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (150.1-200 Kw) , Decoupling Of Moto From Pump, Removal Of Motor From First Connection And Lifting Of Motor From Foundation (>200 Kw) , Shifting Of Motor From Ship To Firms Premises (0.5-5 Kw) , Shifting Of Motor From Ship To Firms Premises (5.1- 10 Kw) , Shifting Of Motor From Ship To Firms Premises (10.1-15 Kw) , Shifting Of Motor From Ship To Firms Premises (15.1-25 Kw) , Shifting Of Motor From Ship To Firms Premises (25.1-50 Kw) , Shifting Of Motor From Ship To Firms Premises (50.1-100 Kw) , Shifting Of Motor From Ship To Firms Premises (100.1-150 Kw) , Shifting Of Motor From Ship To Firms Premises (150.1-200 Kw) , Shifting Of Motor From Ship To Firms Premises (>200 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (0.5-5 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (5.1-10 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (10.1-15 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (15.1-25 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (25.1-50 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (50.1-100 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (100.1-150 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (150.1-200 Kw) , Dismantling Of Motor And Submission Of Material Condition Assessment Repor Within 24 Hrs For Establishment Of Scope Of Work (>200 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (0.5-5 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (5.1-10 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (10.1-15 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (15.1- 25 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (25.1-50 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (50.1-100 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (100.1-150 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (150.1-200 Kw) , Replacement Of Bearings (Inclusive Of Cost Of Grease, Oil/Lip Seal, Nuts & Bolts Etc) (> 200 Kw) , Repairs Of Bearing Holder/Bearing Cap (0.5-5 Kw) , Repairs Of Bearing Holder/Bearing Cap (5.1-10 Kw) , Repairs Of Bearing Holder/Bearing Cap (10.1-15 Kw) , Repairs Of Bearing Holder/Bearing Cap (15.1-25 Kw) , Repairs Of Bearing Holder/Bearing Cap (25.1-50 Kw) , Repairs Of Bearing Holder/Bearing Cap (50.1-100 Kw) , Repairs Of Bearing Holder/Bearing Cap (100.1-150 Kw) , Repairs Of Bearing Holder/Bearing Cap (150.1-200 Kw) , Repairs Of Bearing Holder/Bearing Cap (>200 Kw) , Dynamic Balancing Of Rotor (0.5-5 Kw) , Dynamic Balancing Of Rotor (5.1-10 Kw) , Dynamic Balancing Of Rotor (10.1-15 Kw) , Dynamic Balancing Of Rotor (15.1-25 Kw) , Dynamic Balancing Of Rotor (25.1-50 Kw) , Dynamic Balancing Of Rotor (50.1-100 Kw) , Dynamic Balancing Of Rotor (100.1-150 Kw) , Dynamic Balancing Of Rotor (150.1-200 Kw) , Dynamic Balancing Of Rotor (>200 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (0.5-5 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (5.1-10 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (10.1-15 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (15.1-25 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (25.1-50 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (50.1-100 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (100.1-150 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (150.1-200 Kw) , Repairs Of Rotor Shaft Including Shaft Trueness Checks (>200 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (0.5-5 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (5.1-10 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (10.1-15 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (15.1-25 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (25.1-50 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (50.1-100 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (100.1-150 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (150.1-200 Kw) , Rewinding Of Stator (Includes Cost Of Winding Wire, Varnish, Lugs,Ebonite/Bakelite Sheets, Thermistor, Ststor Insulation Material, Fasteners, Oil/Lip Seals, Washer Joints Etc) (>200 Kw) , Repairs Of Terminal Box (0.5-5 Kw) , Repairs Of Terminal Box (5.1-10 Kw) , Repairs Of Terminal Box (10.1-15 Kw) , Repairs Of Terminal Box (15.1-25 Kw) , Repairs Of Terminal Box (25.1-50 Kw) , Repairs Of Terminal Box (50.1-100 Kw) , Repairs Of Terminal Box (100.1-150 Kw) , Repairs Of Terminal Box (150.1-200 Kw) , Repairs Of Terminal Box (>200 Kw) , Repairs Of Cooling Fan (0.5-5 Kw) , Repairs Of Cooling Fan (5.1-10 Kw) , Repairs Of Cooling Fan (10.1-15 Kw) , Repairs Of Cooling Fan (15.1-25 Kw) , Repairs Of Cooling Fan (25.1-50 Kw) , Repairs Of Cooling Fan (50.1-100 Kw) , Repairs Of Cooling Fan (100.1-150 Kw) , Repairs Of Cooling Fan (150.1-200 Kw) , Repairs Of Cooling Fan (>200 Kw) , Repairs Of Foundation Stool (0.5-5 Kw) , Repairs Of Foundation Stool (5.1-10 Kw) , Repairs Of Foundation Stool (10.1-15 Kw) , Repairs Of Foundation Stool (15.1-25 Kw) , Repairs Of Foundation Stool (25.1-50 Kw) , Repairs Of Foundation Stool (50.1-100 Kw) , Repairs Of Foundation Stool (100.1-150 Kw) , Repairs Of Foundation Stool (150.1-200 Kw) , Repairs Of Foundation Stool (>200 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (0.5-5 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (5.1-10 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (10.1-15 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (15.1-25 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (25.1-50 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (50.1-100 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (100.1-150 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (150.1-200 Kw) , Boxing Up And Trials Of Motor At Firm Workshop (>200 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (0.5-5 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (5.1-10 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (10.1-15 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (15.1-25 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (25.1-50 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (50.1-100 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (100.1-150 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (150.1-200 Kw) , Shifting Of Motor From Firms Premisesto Ship For Fitment (>200 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (0.5-5 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (5.1-10 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (10.1-15 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (15.1-25 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (25.1-50 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (50.1-100 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (100.1-150 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (150.1-200 Kw) , Fitment Of Motor At Location And Proving Of Trials Onboard With Ss And Fmu Rep. (>200 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (0.5-5 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (5.1-10 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (10.1-15 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (15.1-25 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (25.1-50 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (50.1-100 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (100.1-150 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (150.1-200 Kw) , Alignment & Coupling Of Pimp & Motor Assembly Insitu (>200 Kw) , Manday Rates , Manday Rates At Stations Other Than Mumbai , Karwar , Okha , Porbandar , Goa
Basic Detail
Tender No GEM/2026/B/7939786
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 03 Oct 2026
Submission Date 24 Oct 2026
Open Date 25 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 5.65 Lakhs
Exemption Available
Document List
62a5582a-3a35-4fab-be79-b7b22c1ba3d3.pdf
1791022938.xlsx
1791014529.pdf
1791014533.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Oct 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

62a5582a-3a35-4fab-be79-b7b22c1ba3d3.pdf

xlsx

1791022938.xlsx

pdf

1791014529.pdf

pdf

1791014533.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders