Bids Are invited for Custom Bid For Services - Renovation And Upgradation Of Office Space - Cost Of Dismantling And Removal Of Existing Wall Wooden Paneling/ Panels, Wiring, Conduits Associated Fixtures Complete And Disposing Of Unserviceable Materia
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - Renovation And Upgradation Of Office Space - Cost Of Dismantling And Removal Of Existing Wall Wooden Paneling/ Panels, Wiring, Conduits Associated Fixtures Complete And Disposing Of Unserviceable Materials Outside The Premises As Directed. , Cost Of Providing And Fixing False Ceiling And Wall Paneling Including Modification Of Existing Space To Achieve Temperature And Humidity Controlled Conditions Suitable For Office. , Cost Of Providing Of Water Resistant And Stain Resistant Finishing Floor Covering In Non-Destructive Way By Laying Wooden Finish Floor Covering Of Thickness Upto 4 Mm In Staggered Pattern. The Shade And Colour Of Floor Covering As Per Users Selection. , Cost Of Providing And Concealing Of All Network Cables And Server Cable Including Supply And Fixing Of Conduits Cable Trays, Crimping, Connectorisation, Testing And Providing Extension Cable With Suitable Adapters At Office. , Cost Of Providing And Installing Additional Light Points And Fixtures To Enhance Illumination Levels And Improve Ambient Lighting At Office , Cost Of Providing And Concealing Electrical Wiring On Wall Surfaces At Specified Locations. Upgrade Existing Electrical Infrastructure To Make Modern Technology , Cost Of Comprehensive Interior Enhancement Works Including Supply And Installation Of Fixtures Artwork, Indoor Plants With Pots And Associated Decorative Elements To Improve The Aesthetics And Functionality Of The Office. , Cost Of Fabrication , Supply And Installation Of New Door Panels As Per Aesthetic Requirements Of The Office Including Surface Preparation, Application Of Primer, And Finishing With Approved Paint/ Polish, Complete In All Respects. , Cost Of Providing And Fixing Of Shading Devices At Office. , Cost Of Supply And Placement Of Glass Top / Marble Top Coffee Table Of Approved Design And Quality. , Cost Of Fabrication & Installation Of Dockyard Crest In Stainless Steel Grade Crest In Stainless Steel Grade 304, 18 Swg Thickness, Using Laser Cutting, Including Edge Finishing, Polishing And Fixing Arrangements With Brass Finishing , Cost Of Provisioning Of Suitable Cushioned One Seater Sofa , Cost Of Window Ac Cover Paneling , Cost Of Provisioning Of High Raised Working Desk Tables
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Cost of dismantling and removal of existing wall wooden paneling/ panels, wiring, conduits associated fixtures complete and disposing of unserviceable materials outside the premises as directed. | Cost of dismantling and removal of existing wall wooden paneling/ panels, wiring, conduits associated fixtures complete and disposing of unserviceable materials outside the premises as directed. |
| 2 | Cost of providing and fixing false ceiling and wall paneling including modification of existing space to achieve temperature and humidity controlled conditions suitable for office. | Cost of providing and fixing false ceiling and wall paneling including modification of existing space to achieve temperature and humidity controlled conditions suitable for office. |
| 3 | Cost of providing of water resistant and stain resistant finishing floor covering in non-destructive way by laying wooden finish floor covering of thickness upto 4 mm in staggered pattern. The shade and colour of floor covering as per user’s selection. | Cost of providing of water resistant and stain resistant finishing floor covering in non-destructive way by laying wooden finish floor covering of thickness upto 4 mm in staggered pattern. The shade and colour of floor covering as per user’s selection. |
| 4 | Cost of providing and concealing of all network cables and server cable including supply and fixing of conduits cable trays, crimping, connectorisation, testing and providing extension cable with suitable adapters at office. | Cost of providing and concealing of all network cables and server cable including supply and fixing of conduits cable trays, crimping, connectorisation, testing and providing extension cable with suitable adapters at office. |
| 5 | Cost of providing and installing additional light points and fixtures to enhance illumination levels and improve ambient lighting at office | Cost of providing and installing additional light points and fixtures to enhance illumination levels and improve ambient lighting at office |
| 6 | Cost of providing and concealing electrical wiring on wall surfaces at specified locations. Upgrade existing electrical infrastructure to make modern technology | Cost of providing and concealing electrical wiring on wall surfaces at specified locations. Upgrade existing electrical infrastructure to make modern technology |
| 7 | Cost of comprehensive interior enhancement works including supply and installation of fixtures artwork, indoor plants with pots and associated decorative elements to improve the aesthetics and functionality of the office. | Cost of comprehensive interior enhancement works including supply and installation of fixtures artwork, indoor plants with pots and associated decorative elements to improve the aesthetics and functionality of the office. |
| 8 | Cost of fabrication , supply and installation of new door panels as per aesthetic requirements of the office including surface preparation, application of primer, and finishing with approved paint/ polish, complete in all respects. | Cost of fabrication , supply and installation of new door panels as per aesthetic requirements of the office including surface preparation, application of primer, and finishing with approved paint/ polish, complete in all respects. |
| 9 | Cost of providing and fixing of shading devices at office. | Cost of providing and fixing of shading devices at office. |
| 10 | Cost of supply and placement of glass top / marble top coffee table of approved design and quality. | Cost of supply and placement of glass top / marble top coffee table of approved design and quality. |
| 11 | Cost of fabrication & Installation of Dockyard crest in stainless steel Grade crest in stainless steel Grade 304, 18 SWG thickness, using laser cutting, including edge finishing, polishing and fixing arrangements with Brass finishing | Cost of fabrication & Installation of Dockyard crest in stainless steel Grade crest in stainless steel Grade 304, 18 SWG thickness, using laser cutting, including edge finishing, polishing and fixing arrangements with Brass finishing |
| 12 | Cost of Provisioning of suitable cushioned one seater sofa | Cost of Provisioning of suitable cushioned one seater sofa |
| 13 | Cost of window AC cover paneling | Cost of window AC cover paneling |
| 14 | Cost of Provisioning of high raised working desk tables | Cost of Provisioning of high raised working desk tables |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender