Health and Family Welfare Government Departments Closing in 21 days TDR #57845890

Tender For Procurement Of 33Kv Transformer At State Cancer Institute, Guwahati

Issued by Government Departments · Kamrup Metro, Assam
Tender Value
1.83 Crore
Estimated cost
Bid Submission
26 Oct 2026
21 days left
EMD
3 Lakhs
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kamrup Metro → Assam
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Procurement Of 33Kv Transformer At State Cancer Institute, Guwahati , Sci Guwahati Sr.No Material Description Uom Required Qty Approved Makes Rate Gst Amount , Distribution Transformers (Indoor Dry Type) Supply, Delivery, Testing And Commissioning Of The Following Indoor (Ip 23 ) Type 33Kv/433V, 50Hz, Cast Resin Dry Type, Air-Cooled Distribution Transformer With Class H Including All Accessories And Components As Required. The Rate Shall Be Inclusive Of Transportation, Bottom Mounting Channels, Foundation Bolts, Routine Test, And Type Test As Per Standards And As Per The Following Specifications: A) Continuous Rating - 1600Kva B) Service - Indoor (Ip 23) C) Mounting - Plinth / Floor Mounting Type D) Type - Dry Type (Cast Resin) E) Hv Winding - Hv Copper Winding F) Lv Windig - Lv Copper Coil Winding. G) Design Temperature - The Temperature Rise Of The Winding Shall Not Exceed 115 Deg C On Continuous Full Load Above Maximum Ambient Temperature Of 50 Deg C H) Cooling - An I)Maximum Ambient Temperature - 50 Deg C. J) Minimum Ambient Temperature : ( -5) Deg C K) Degree Of Protection Ip - 23 L) Primary Side Connection - Delta M) Primary Side Voltage - 33000 Volts. N) Primary Side Frequency - 50 Hz. O) Primary Side Phases- 3 P) Primary Side Wires - 3 Q) Secondary Side Connection - Star R) Secondary Side Voltage - 433 Volts S) Secondary Side Wires - 4 T) Secondary Side Phases - 3 U) Vector Diagram - Dyn-11 V) On Load Circuit Tap Changing With Avr Arrangement On H.V Side Is To Be Provided 5% To - 15% Steps Of 2.5% Padlocking Facilities In Each Tap, In Steps Of 2.5%. W)Type Of Loading - Mixed X) Adapter Cable Box On Ht/Primary Side Suitable To Terminate 33Kv (E) Grade, 2R - 3C X 300 Sqmm Xlpe Cable/Suitable For 33Kv Suitable Current Bus Trunking. Y) Adapter Cable Box On Lv/Secondary Side Suitable To Terminate Sandwich Al.Bus Duct F Painting - Pebble Grey Shade Ral 7032 6 Nos Thermistor For Alarm Trip 1No Winding Temperature Relay Unit With Rs485 1No Winding Temperature Indicator With Rs485 Ae) Limit Switches For Transfomer Door Open Trip Af) 1 Set Of Surge Arrestor Ag) Supply Of Rtcc Panel To Be Operated Along With Oltc As Per Specifications Standards As Per Is 2026 And Other Authorities Like Ceig, Fire Regulations Etc. Percentage Impedance - - 6% With Is Tol (+/- 10%) Tolerance Above Impedance - - As Per Is. Impulse Voltage (For Voltage Withstand Insulation Test) - As Per Is For 33Kv Power Frequency Withstand Voltage For Hv - As Per Is For 33Kv Switching Impulse Withstand Voltage - As Per Is For 33Kv Windings : Copper Wound And Uniformly Insulated. Accessories & Fittings : 1) 1 No. Pt 100 Type Temperatre Scanner And Conection With Marshal Box 2) Terminals Complete With Connectors For External Conductors. 3) 2 Nos. Earthing Terminals. 4) Lifting Lugs For Complete Transformer And Other Components, Wherever Necessary. 5) Jacking Pads, Underbase Provided With Channels For Fixing Rollers, 4 Nos Of Bi-Directional Rollers In Base Frame. 6) Marshalling Box Complete With Wiring, Illumination Lamp,Space Heater And Suitable Cable Glands And Lugs. 7) Ratings And Terminal Marking Plate 8) Marshal Box With Wiring And Terminal And Temperature Scanner. 9) Rtcc Panel To Be Provided Transformer Losses At 50% & 100% Loads & Impedance Shall Be As Per Ecbc Building Norms Complete Transformer, Oltc, Rtcc Panel And Accessories Shall Be Guaranteed For 24 Months From Successful Commissioning Or 30 Months From Delivery, Whichever Is Earlier. Defects Shall Be Rectified/Replaced Free Of Cost, Including Labour, Transport And Testing. All The Temperature Parameters, Oltc Taps & Rtcc Panel Shall Be Provided With Necessary Provisions For Integrating With Scada System Factory Inspection And Witnessing Of Routine Tests Shall Be Mandatory Prior To Dispatch. One Representative From Accf And One Representative From Pmc Shall Visit The Manufacturers Works For Fat. The Successful Bidder Shall Make All Necessary Arrangements And Bear All Expenses Towards Travel, Local Transportation, Boarding And Lodging For The Visiting Accf And Pmc Representatives. No Material Shall Be Dispatched Without Obtaining Fat Clearance From The Employer/Pmc. (I) 1600 Kva Cast Resin Indoor Dry Type Distribution Transformer Set 1.0 Universal/Voltamp/Hitachi/Kirloskar 0.0 , Distribution Transformers (Indoor Dry Type) Supply, Delivery, Testing And Commissioning Of The Following Indoor (Ip 23 ) Type 33Kv/433V, 50Hz, Cast Resin Dry Type, Air-Cooled Distribution Transformer With Class H Including All Accessories And Components As Required. The Rate Shall Be Inclusive Of Transportation, Bottom Mounting Channels, Foundation Bolts, Routine Test, And Type Test As Per Standards And As Per The Following Specifications: A) Continuous Rating - 1250Kva B) Service - Indoor (Ip 23) C) Mounting - Plinth / Floor Mounting Type D) Type - Dry Type (Cast Resin) E) Hv Winding - Hv Copper Winding F) Lv Windig - Lv Copper Coil Winding. G) Design Temperature - The Temperature Rise Of The Winding Shall Not Exceed 115 Deg C On Continuous Full Load Above Maximum Ambient Temperature Of 50 Deg C H) Cooling - An I)Maximum Ambient Temperature - 50 Deg C. J) Minimum Ambient Temperature : ( -5) Deg C K) Degree Of Protection Ip - 23 L) Primary Side Connection - Delta M) Primary Side Voltage - 33000 Volts. N) Primary Side Frequency - 50 Hz. O) Primary Side Phases- 3 P) Primary Side Wires - 3 Q) Secondary Side Connection - Star R) Secondary Side Voltage - 433 Volts S) Secondary Side Wires - 4 T) Secondary Side Phases - 3 U) Vector Diagram - Dyn-11 V) On Load Circuit Tap Changing With Avr Arrangement On H.V Side Is To Be Provided 5% To - 15% Steps Of 2.5% Padlocking Facilities In Each Tap, In Steps Of 2.5%. W)Type Of Loading - Mixed X) Adapter Cable Box On Ht/Primary Side Suitable To Terminate 33Kv (E) Grade, 2R - 3C X 300 Sqmm Xlpe Cable/Suitable For 33Kv Suitable Current Bus Trunking. Y) Adapter Cable Box On Lv/Secondary Side Suitable To Terminate Sandwich Al.Bus Duct F Painting - Pebble Grey Shade Ral 7032 6 Nos Thermistor For Alarm Trip 1No Winding Temperature Relay Unit With Rs485 1No Winding Temperature Indicator With Rs485 Ae) Limit Switches For Transfomer Door Open Trip Af) 1 Set Of Surge Arrestor Ag) Supply Of Rtcc Panel To Be Operated Along With Oltc As Per Specifications Standards As Per Is 2026 And Other Authorities Like Ceig, Fire Regulations Etc. Percentage Impedance - 5% With Is Tol (+/- 10%) Tolerance Above Impedance - - As Per Is. Impulse Voltage (For Voltage Withstand Insulation Test) - As Per Is For 33Kv Power Frequency Withstand Voltage For Hv - As Per Is For 33Kv Switching Impulse Withstand Voltage - As Per Is For 33Kv Windings : Copper Wound And Uniformly Insulated. Accessories & Fittings : 1) 1 No. Pt 100 Type Temperatre Scanner And Conection With Marshal Box 2) Terminals Complete With Connectors For External Conductors. 3) 2 Nos. Earthing Terminals. 4) Lifting Lugs For Complete Transformer And Other Components, Wherever Necessary. 5) Jacking Pads, Underbase Provided With Channels For Fixing Rollers, 4 Nos Of Bi-Directional Rollers In Base Frame. 6) Marshalling Box Complete With Wiring, Illumination Lamp,Space Heater And Suitable Cable Glands And Lugs. 7) Ratings And Terminal Marking Plate 8) Marshal Box With Wiring And Terminal And Temperature Scanner. 9) Rtcc Panel To Be Provided Transformer Losses At 50% & 100% Loads & Impedance Shall Be As Per Ecbc Building Norms Complete Transformer, Oltc, Rtcc Panel And Accessories Shall Be Guaranteed For 24 Months From Successful Commissioning Or 30 Months From Delivery, Whichever Is Earlier. Defects Shall Be Rectified/Replaced Free Of Cost, Including Labour, Transport And Testing. All The Temperature Parameters, Oltc Taps & Rtcc Panel Shall Be Provided With Necessary Provisions For Integrating With Scada System Factory Inspection And Witnessing Of Routine Tests Shall Be Mandatory Prior To Dispatch. One Representative From Accf And One Representative From Pmc Shall Visit The Manufacturers Works For Fat. The Successful Bidder Shall Make All Necessary Arrangements And Bear All Expenses Towards Travel, Local Transportation, Boarding And Lodging For The Visiting Accf And Pmc Representatives. No Material Shall Be Dispatched Without Obtaining Fat Clearance From The Employer/Pmc. (I) 1250 Kva Cast Resin Indoor Dry Type Distribution Transformer Set 1.0 Universal/Voltamp/Hitachi/Kirloskar 0.0 Grand Total 0.0 0.0 0.0

BOQ

Name of Work:- Procurement of 33KV Transformer at State Cancer Institute, Guwahati
Sl. No. Item Description
1SCI Guwahati Sr.No Material Description UOM Required Qty Approved Makes Rate GST Amount
2DISTRIBUTION TRANSFORMERS (Indoor Dry Type) Supply, Delivery, Testing and Commissioning of the following Indoor (IP 23 ) type 33KV/433V, 50Hz, Cast resin Dry type, Air-cooled Distribution transformer with Class H including all accessories and components as required. The rate shall be inclusive of transportation, bottom mounting channels, foundation bolts, routine test, and type test as per standards and as per the following specifications: a) Continuous rating - 1600kVA b) Service - Indoor (IP 23) c) Mounting - plinth / Floor mounting type d) Type - Dry Type (Cast Resin) e) HV winding - HV copper winding f) LV windig - LV copper coil winding. g) Design Temperature - The temperature rise of the winding shall not exceed 115 deg C on continuous full load above maximum ambient temperature of 50 Deg C h) Cooling - AN i)Maximum ambient temperature - 50 deg C. j) Minimum ambient temperature : ( -5) deg C k) Degree of Protection IP - 23 l) Primary side connection - Delta m) Primary side Voltage - 33000 volts. n) Primary side frequency - 50 Hz. o) Primary side phases- 3 p) Primary side wires - 3 q) Secondary side connection - Star r) Secondary side voltage - 433 Volts s) Secondary side wires - 4 t) Secondary side phases - 3 u) Vector Diagram - Dyn-11 v) \\"ON LOAD\\" circuit tap changing with AVR arrangement on H.V side is to be provided 5% to - 15% steps of 2.5% padlocking facilities in each tap, in steps of 2.5%. w)Type of loading - Mixed x) Adapter cable box on HT/primary side suitable to terminate 33KV (E) Grade, 2R - 3c x 300 sqmm XLPE cable/suitable for 33kV suitable current bus trunking. y) Adapter cable box on LV/secondary side suitable to terminate Sandwich Al.bus duct f Painting - Pebble grey shade RAL 7032 6 Nos Thermistor for alarm trip 1No Winding temperature relay unit with RS485 1No Winding temperature indicator with RS485 ae) limit switches for transfomer door open trip af) '1 set of Surge Arrestor ag) Supply of RTCC panel to be operated along with OLTC as per specifications Standards as per IS 2026 and other authorities like CEIG, fire regulations etc. Percentage impedance - - 6% with IS Tol (+/- 10%) Tolerance above impedance - - As per IS. Impulse voltage (for voltage withstand insulation test) - As per IS for 33kV Power frequency withstand voltage for HV - As per IS for 33kV Switching Impulse withstand voltage - As per IS for 33kV Windings : Copper wound and Uniformly Insulated. Accessories & Fittings : 1) 1 No. PT 100 type temperatre scanner and conection with marshal box 2) Terminals complete with connectors for external conductors. 3) 2 Nos. Earthing terminals. 4) Lifting lugs for complete transformer and other components, wherever necessary. 5) Jacking pads, Underbase provided with channels for fixing rollers, 4 nos of bi-directional rollers in base frame. 6) Marshalling Box complete with wiring, illumination lamp,space heater and suitable cable glands and lugs. 7) Ratings and terminal marking plate 8) Marshal Box with wiring and terminal and temperature scanner. 9) RTCC panel to be provided Transformer losses at 50% & 100% loads & impedance shall be as per ECBC Building norms Complete transformer, OLTC, RTCC panel and accessories shall be guaranteed for 24 months from successful commissioning or 30 months from delivery, whichever is earlier. Defects shall be rectified/replaced free of cost, including labour, transport and testing. All the Temperature Parameters, OLTC Taps & RTCC Panel shall be provided with necessary provisions for integrating with SCADA system Factory inspection and witnessing of routine tests shall be mandatory prior to dispatch. One representative from ACCF and one representative from PMC shall visit the manufacturer's works for FAT. The successful bidder shall make all necessary arrangements and bear all expenses towards travel, local transportation, boarding and lodging for the visiting ACCF and PMC representatives. No material shall be dispatched without obtaining FAT clearance from the Employer/PMC. (i) 1600 KVA Cast Resin indoor dry type distribution Transformer Set 1.0 Universal/Voltamp/Hitachi/Kirloskar 0.0
3DISTRIBUTION TRANSFORMERS (Indoor Dry Type) Supply, Delivery, Testing and Commissioning of the following Indoor (IP 23 ) type 33KV/433V, 50Hz, Cast resin Dry type, Air-cooled Distribution transformer with Class H including all accessories and components as required. The rate shall be inclusive of transportation, bottom mounting channels, foundation bolts, routine test, and type test as per standards and as per the following specifications: a) Continuous rating - 1250kVA b) Service - Indoor (IP 23) c) Mounting - plinth / Floor mounting type d) Type - Dry Type (Cast Resin) e) HV winding - HV copper winding f) LV windig - LV copper coil winding. g) Design Temperature - The temperature rise of the winding shall not exceed 115 deg C on continuous full load above maximum ambient temperature of 50 Deg C h) Cooling - AN i)Maximum ambient temperature - 50 deg C. j) Minimum ambient temperature : ( -5) deg C k) Degree of Protection IP - 23 l) Primary side connection - Delta m) Primary side Voltage - 33000 volts. n) Primary side frequency - 50 Hz. o) Primary side phases- 3 p) Primary side wires - 3 q) Secondary side connection - Star r) Secondary side voltage - 433 Volts s) Secondary side wires - 4 t) Secondary side phases - 3 u) Vector Diagram - Dyn-11 v) \\"ON LOAD\\" circuit tap changing with AVR arrangement on H.V side is to be provided 5% to - 15% steps of 2.5% padlocking facilities in each tap, in steps of 2.5%. w)Type of loading - Mixed x) Adapter cable box on HT/primary side suitable to terminate 33KV (E) Grade, 2R - 3c x 300 sqmm XLPE cable/suitable for 33kV suitable current bus trunking. y) Adapter cable box on LV/secondary side suitable to terminate Sandwich Al.bus duct f Painting - Pebble grey shade RAL 7032 6 Nos Thermistor for alarm trip 1No Winding temperature relay unit with RS485 1No Winding temperature indicator with RS485 ae) limit switches for transfomer door open trip af) '1 set of Surge Arrestor ag) Supply of RTCC panel to be operated along with OLTC as per specifications Standards as per IS 2026 and other authorities like CEIG, fire regulations etc. Percentage impedance - 5% with IS Tol (+/- 10%) Tolerance above impedance - - As per IS. Impulse voltage (for voltage withstand insulation test) - As per IS for 33kV Power frequency withstand voltage for HV - As per IS for 33kV Switching Impulse withstand voltage - As per IS for 33kV Windings : Copper wound and Uniformly Insulated. Accessories & Fittings : 1) 1 No. PT 100 type temperatre scanner and conection with marshal box 2) Terminals complete with connectors for external conductors. 3) 2 Nos. Earthing terminals. 4) Lifting lugs for complete transformer and other components, wherever necessary. 5) Jacking pads, Underbase provided with channels for fixing rollers, 4 nos of bi-directional rollers in base frame. 6) Marshalling Box complete with wiring, illumination lamp,space heater and suitable cable glands and lugs. 7) Ratings and terminal marking plate 8) Marshal Box with wiring and terminal and temperature scanner. 9) RTCC panel to be provided Transformer losses at 50% & 100% loads & impedance shall be as per ECBC Building norms Complete transformer, OLTC, RTCC panel and accessories shall be guaranteed for 24 months from successful commissioning or 30 months from delivery, whichever is earlier. Defects shall be rectified/replaced free of cost, including labour, transport and testing. All the Temperature Parameters, OLTC Taps & RTCC Panel shall be provided with necessary provisions for integrating with SCADA system Factory inspection and witnessing of routine tests shall be mandatory prior to dispatch. One representative from ACCF and one representative from PMC shall visit the manufacturer's works for FAT. The successful bidder shall make all necessary arrangements and bear all expenses towards travel, local transportation, boarding and lodging for the visiting ACCF and PMC representatives. No material shall be dispatched without obtaining FAT clearance from the Employer/PMC. (i) 1250 KVA Cast Resin indoor dry type distribution Transformer Set 1.0 Universal/Voltamp/Hitachi/Kirloskar 0.0 Grand Total 0.0 0.0 0.0 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57845890
AUTHORITY Government Departments
TENDER VALUE 1.83 Crore
LAST DATE 26-10-2026
Authority
Authority Name Assam Cancer Care Foundation
Work Description Tender for Procurement Of 33Kv Transformer At State Cancer Institute, Guwahati , Sci Guwahati Sr.No Material Description Uom Required Qty Approved Makes Rate Gst Amount , Distribution Transformers (Indoor Dry Type) Supply, Delivery, Testing And Commissioning Of The Following Indoor (Ip 23 ) Type 33Kv/433V, 50Hz, Cast Resin Dry Type, Air-Cooled Distribution Transformer With Class H Including All Accessories And Components As Required. The Rate Shall Be Inclusive Of Transportation, Bottom Mounting Channels, Foundation Bolts, Routine Test, And Type Test As Per Standards And As Per The Following Specifications: A) Continuous Rating - 1600Kva B) Service - Indoor (Ip 23) C) Mounting - Plinth / Floor Mounting Type D) Type - Dry Type (Cast Resin) E) Hv Winding - Hv Copper Winding F) Lv Windig - Lv Copper Coil Winding. G) Design Temperature - The Temperature Rise Of The Winding Shall Not Exceed 115 Deg C On Continuous Full Load Above Maximum Ambient Temperature Of 50 Deg C H) Cooling - An I)Maximum Ambient Temperature - 50 Deg C. J) Minimum Ambient Temperature : ( -5) Deg C K) Degree Of Protection Ip - 23 L) Primary Side Connection - Delta M) Primary Side Voltage - 33000 Volts. N) Primary Side Frequency - 50 Hz. O) Primary Side Phases- 3 P) Primary Side Wires - 3 Q) Secondary Side Connection - Star R) Secondary Side Voltage - 433 Volts S) Secondary Side Wires - 4 T) Secondary Side Phases - 3 U) Vector Diagram - Dyn-11 V) On Load Circuit Tap Changing With Avr Arrangement On H.V Side Is To Be Provided 5% To - 15% Steps Of 2.5% Padlocking Facilities In Each Tap, In Steps Of 2.5%. W)Type Of Loading - Mixed X) Adapter Cable Box On Ht/Primary Side Suitable To Terminate 33Kv (E) Grade, 2R - 3C X 300 Sqmm Xlpe Cable/Suitable For 33Kv Suitable Current Bus Trunking. Y) Adapter Cable Box On Lv/Secondary Side Suitable To Terminate Sandwich Al.Bus Duct F Painting - Pebble Grey Shade Ral 7032 6 Nos Thermistor For Alarm Trip 1No Winding Temperature Relay Unit With Rs485 1No Winding Temperature Indicator With Rs485 Ae) Limit Switches For Transfomer Door Open Trip Af) 1 Set Of Surge Arrestor Ag) Supply Of Rtcc Panel To Be Operated Along With Oltc As Per Specifications Standards As Per Is 2026 And Other Authorities Like Ceig, Fire Regulations Etc. Percentage Impedance - - 6% With Is Tol (+/- 10%) Tolerance Above Impedance - - As Per Is. Impulse Voltage (For Voltage Withstand Insulation Test) - As Per Is For 33Kv Power Frequency Withstand Voltage For Hv - As Per Is For 33Kv Switching Impulse Withstand Voltage - As Per Is For 33Kv Windings : Copper Wound And Uniformly Insulated. Accessories & Fittings : 1) 1 No. Pt 100 Type Temperatre Scanner And Conection With Marshal Box 2) Terminals Complete With Connectors For External Conductors. 3) 2 Nos. Earthing Terminals. 4) Lifting Lugs For Complete Transformer And Other Components, Wherever Necessary. 5) Jacking Pads, Underbase Provided With Channels For Fixing Rollers, 4 Nos Of Bi-Directional Rollers In Base Frame. 6) Marshalling Box Complete With Wiring, Illumination Lamp,Space Heater And Suitable Cable Glands And Lugs. 7) Ratings And Terminal Marking Plate 8) Marshal Box With Wiring And Terminal And Temperature Scanner. 9) Rtcc Panel To Be Provided Transformer Losses At 50% & 100% Loads & Impedance Shall Be As Per Ecbc Building Norms Complete Transformer, Oltc, Rtcc Panel And Accessories Shall Be Guaranteed For 24 Months From Successful Commissioning Or 30 Months From Delivery, Whichever Is Earlier. Defects Shall Be Rectified/Replaced Free Of Cost, Including Labour, Transport And Testing. All The Temperature Parameters, Oltc Taps & Rtcc Panel Shall Be Provided With Necessary Provisions For Integrating With Scada System Factory Inspection And Witnessing Of Routine Tests Shall Be Mandatory Prior To Dispatch. One Representative From Accf And One Representative From Pmc Shall Visit The Manufacturers Works For Fat. The Successful Bidder Shall Make All Necessary Arrangements And Bear All Expenses Towards Travel, Local Transportation, Boarding And Lodging For The Visiting Accf And Pmc Representatives. No Material Shall Be Dispatched Without Obtaining Fat Clearance From The Employer/Pmc. (I) 1600 Kva Cast Resin Indoor Dry Type Distribution Transformer Set 1.0 Universal/Voltamp/Hitachi/Kirloskar 0.0 , Distribution Transformers (Indoor Dry Type) Supply, Delivery, Testing And Commissioning Of The Following Indoor (Ip 23 ) Type 33Kv/433V, 50Hz, Cast Resin Dry Type, Air-Cooled Distribution Transformer With Class H Including All Accessories And Components As Required. The Rate Shall Be Inclusive Of Transportation, Bottom Mounting Channels, Foundation Bolts, Routine Test, And Type Test As Per Standards And As Per The Following Specifications: A) Continuous Rating - 1250Kva B) Service - Indoor (Ip 23) C) Mounting - Plinth / Floor Mounting Type D) Type - Dry Type (Cast Resin) E) Hv Winding - Hv Copper Winding F) Lv Windig - Lv Copper Coil Winding. G) Design Temperature - The Temperature Rise Of The Winding Shall Not Exceed 115 Deg C On Continuous Full Load Above Maximum Ambient Temperature Of 50 Deg C H) Cooling - An I)Maximum Ambient Temperature - 50 Deg C. J) Minimum Ambient Temperature : ( -5) Deg C K) Degree Of Protection Ip - 23 L) Primary Side Connection - Delta M) Primary Side Voltage - 33000 Volts. N) Primary Side Frequency - 50 Hz. O) Primary Side Phases- 3 P) Primary Side Wires - 3 Q) Secondary Side Connection - Star R) Secondary Side Voltage - 433 Volts S) Secondary Side Wires - 4 T) Secondary Side Phases - 3 U) Vector Diagram - Dyn-11 V) On Load Circuit Tap Changing With Avr Arrangement On H.V Side Is To Be Provided 5% To - 15% Steps Of 2.5% Padlocking Facilities In Each Tap, In Steps Of 2.5%. W)Type Of Loading - Mixed X) Adapter Cable Box On Ht/Primary Side Suitable To Terminate 33Kv (E) Grade, 2R - 3C X 300 Sqmm Xlpe Cable/Suitable For 33Kv Suitable Current Bus Trunking. Y) Adapter Cable Box On Lv/Secondary Side Suitable To Terminate Sandwich Al.Bus Duct F Painting - Pebble Grey Shade Ral 7032 6 Nos Thermistor For Alarm Trip 1No Winding Temperature Relay Unit With Rs485 1No Winding Temperature Indicator With Rs485 Ae) Limit Switches For Transfomer Door Open Trip Af) 1 Set Of Surge Arrestor Ag) Supply Of Rtcc Panel To Be Operated Along With Oltc As Per Specifications Standards As Per Is 2026 And Other Authorities Like Ceig, Fire Regulations Etc. Percentage Impedance - 5% With Is Tol (+/- 10%) Tolerance Above Impedance - - As Per Is. Impulse Voltage (For Voltage Withstand Insulation Test) - As Per Is For 33Kv Power Frequency Withstand Voltage For Hv - As Per Is For 33Kv Switching Impulse Withstand Voltage - As Per Is For 33Kv Windings : Copper Wound And Uniformly Insulated. Accessories & Fittings : 1) 1 No. Pt 100 Type Temperatre Scanner And Conection With Marshal Box 2) Terminals Complete With Connectors For External Conductors. 3) 2 Nos. Earthing Terminals. 4) Lifting Lugs For Complete Transformer And Other Components, Wherever Necessary. 5) Jacking Pads, Underbase Provided With Channels For Fixing Rollers, 4 Nos Of Bi-Directional Rollers In Base Frame. 6) Marshalling Box Complete With Wiring, Illumination Lamp,Space Heater And Suitable Cable Glands And Lugs. 7) Ratings And Terminal Marking Plate 8) Marshal Box With Wiring And Terminal And Temperature Scanner. 9) Rtcc Panel To Be Provided Transformer Losses At 50% & 100% Loads & Impedance Shall Be As Per Ecbc Building Norms Complete Transformer, Oltc, Rtcc Panel And Accessories Shall Be Guaranteed For 24 Months From Successful Commissioning Or 30 Months From Delivery, Whichever Is Earlier. Defects Shall Be Rectified/Replaced Free Of Cost, Including Labour, Transport And Testing. All The Temperature Parameters, Oltc Taps & Rtcc Panel Shall Be Provided With Necessary Provisions For Integrating With Scada System Factory Inspection And Witnessing Of Routine Tests Shall Be Mandatory Prior To Dispatch. One Representative From Accf And One Representative From Pmc Shall Visit The Manufacturers Works For Fat. The Successful Bidder Shall Make All Necessary Arrangements And Bear All Expenses Towards Travel, Local Transportation, Boarding And Lodging For The Visiting Accf And Pmc Representatives. No Material Shall Be Dispatched Without Obtaining Fat Clearance From The Employer/Pmc. (I) 1250 Kva Cast Resin Indoor Dry Type Distribution Transformer Set 1.0 Universal/Voltamp/Hitachi/Kirloskar 0.0 Grand Total 0.0 0.0 0.0
Basic Detail
Tender No ACCF/Transformers/26-27/140
Bidding Type Tender
Location
City Kamrup Metro
State Assam
Key Dates
Publish Date 03 Oct 2026
Submission Date 26 Oct 2026
Open Date 26 Oct 2026
Finance
Tender Value 1.83 Crore
Tender Fee 1000
EMD 3 Lakhs
Exemption Not Available
Document List
61289450-2b19-4ff8-8d4c-2104007b022c.html
BOQ_85191.xls
RFP.pdf
TechnicalSpecification.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 03, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 26, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 21 days
Oct 26, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
html

61289450-2b19-4ff8-8d4c-2104007b022c.html

xls

BOQ_85191.xls

pdf

RFP.pdf

pdf

TechnicalSpecification.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders