Public Administrative Department Local Bodies Closing in 3 days TDR #57841005

Tender For Providing/ Conducting Complete Electrical Safety Audit Of ? Wp Various Panvel Municipal Corporation Buildings Such As Hospitals, Pmc School,Adm. Buildings, Auditorium Etc. The Audit Will Include Verification, Monitoring And Analysis Of Electric

Issued by Local Bodies · panvel, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Oct 2026
3 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Offline

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
panvel → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Providing/ Conducting Complete Electrical Safety Audit Of ? Wp Various Panvel Municipal Corporation Buildings Such As Hospitals, Pmc School,Adm. Buildings, Auditorium Etc. The Audit Will Include Verification, Monitoring And Analysis Of Electrical Safety Including Submission Of Technical Report Containing Recommendations For Complete Electrical Safety With Cost Benifit Analysis And Action Plan For Complete Electrical Safety For The Whole Premises Of Buildings From Incoming Supply Line To Light Fixtures And Verious Appliances Complete Upto Electrical Energy Consumption Point The Scope Of Work Includes Following -1. All Electric Equipment Of Building Fall Under Scope Of Work (Eg. Ht Panels, Lt Panels, Hvac, Split Acs, Dg Sets, Ups, Electric Panels, Transformers, Earthing, Lighting Arrestor Etc. 2. Physical Inspection Of The Electrical System In The Building With Reference To Applicable Indian Standards, Indian Electricity Rules And Other Relevant Codes Of Practice And Identifying Electrical Hazards (Shocks Etc. ) 3. Review And Testing Of Protection Devices/Systems Of All Electrical Installations In The Building 4. Review And Testing Of Adequacy Of Cables/Motors Based On Actual Load Current Measurements And Cable Current Carrying Capacities. Insulation Resistance Test And Earth Leakage Resistance Testing Should Be Done. 5 Examination And Testing For Adequacy Of Lighting Protection System In The Building As Per Electric Standards. 6 Checking Of All Pumps, Connector, Compressor Units Reducing Load Factor In Air Conditioning System /Hvac System. 7.Performance And Testing Of Bus Bar, Safety Device Like Mcb, Mccb, Rcb, Elcb, Switches And Electric Distribution Panel Of Various Electrical Units, Air Conditioning Units Etc 8. Evaluation Ofelectric Preventive Maintenance (Epm) Programme In The Building To Examine Documentation, Checklists, Work Permit, Test Records Etc. And If Epm Is Not In Place Of Inadequate, Recommend And Design Epm As Per Applicable Standards.. 9.Evaluation Of Voltage,Ampere, Resistance, Earthing Strength Of Capacitor, Potential Of Capacitor Of All Split Acs. 10. Evaluation Of Condenser Coil, Compressor And Refrigerants Pressure With Copper Wire Piping Of All Standalone Ac Units. 11. Training Of Electricians From The Point Of Electrical Safety 12. Testing Should Be Done Appropriately With Help Of Internal Team Of Supervisor/Electrician./Engine Er 13. Evaluation Of Ups Battery System. Calculation Of Existing Load On Each Ups Under On Load And Off Load Position.14. Evaluation Of Battery Backup, Voltage, Ampere And Ah Of All Batteries. 15. Thermography/Temperature Detection Should Be Done For Hot Spot Detection In Electric Panel, EquipmentS Etc. 16. Earthing System Should Be Tested Appropriately And Evaluation. Earth Electric Resistance, Earth Fault Loop Impendence Should Be Tested. 17. Inspection Of All The Installation To Identify Potential Hazards Keeping In View Good 18. Any Other Points Related With Electrical Fire Safety Ofbuildings, 19. Inspection Of All The Installations To Identify Potential Hazards Keeping In View Good Engineerir`G Practices And Various Provisions In Safety Regulations And Various Indian Standards. 20. Identify Fire Hazards In Ups Room/Battery Room, Lt Room And Other Electrical Area. Checking Of Sops, If Any, Regarding Handling Any Emergency Due To Electrical Mishaps. The Electrical Safety Audit Shall Be As Above But Shall Not Be Limited To It. It Shall Be Carried Out Keeping In View Provlsions Of Is 732(Wiring), Is 3043 (Earthing), National Electricity Code, Central Electricity Authority(Cea) Safety Regulations, 2023 21. Verification Of Reports After Compliance Of Safety Audit Recommendations & Preparation Of Reports (Form-2/Form-3) For Onward Subm.Iss.Ion To E.I

AI Tender Summary

OUR REF NO 57841005
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 06-10-2026
Authority
Authority Name panvel municipal corporation
Work Description Tender For Providing/ Conducting Complete Electrical Safety Audit Of ? Wp Various Panvel Municipal Corporation Buildings Such As Hospitals, Pmc School,Adm. Buildings, Auditorium Etc. The Audit Will Include Verification, Monitoring And Analysis Of Electrical Safety Including Submission Of Technical Report Containing Recommendations For Complete Electrical Safety With Cost Benifit Analysis And Action Plan For Complete Electrical Safety For The Whole Premises Of Buildings From Incoming Supply Line To Light Fixtures And Verious Appliances Complete Upto Electrical Energy Consumption Point The Scope Of Work Includes Following -1. All Electric Equipment Of Building Fall Under Scope Of Work (Eg. Ht Panels, Lt Panels, Hvac, Split Acs, Dg Sets, Ups, Electric Panels, Transformers, Earthing, Lighting Arrestor Etc. 2. Physical Inspection Of The Electrical System In The Building With Reference To Applicable Indian Standards, Indian Electricity Rules And Other Relevant Codes Of Practice And Identifying Electrical Hazards (Shocks Etc. ) 3. Review And Testing Of Protection Devices/Systems Of All Electrical Installations In The Building 4. Review And Testing Of Adequacy Of Cables/Motors Based On Actual Load Current Measurements And Cable Current Carrying Capacities. Insulation Resistance Test And Earth Leakage Resistance Testing Should Be Done. 5 Examination And Testing For Adequacy Of Lighting Protection System In The Building As Per Electric Standards. 6 Checking Of All Pumps, Connector, Compressor Units Reducing Load Factor In Air Conditioning System /Hvac System. 7.Performance And Testing Of Bus Bar, Safety Device Like Mcb, Mccb, Rcb, Elcb, Switches And Electric Distribution Panel Of Various Electrical Units, Air Conditioning Units Etc 8. Evaluation Ofelectric Preventive Maintenance (Epm) Programme In The Building To Examine Documentation, Checklists, Work Permit, Test Records Etc. And If Epm Is Not In Place Of Inadequate, Recommend And Design Epm As Per Applicable Standards.. 9.Evaluation Of Voltage,Ampere, Resistance, Earthing Strength Of Capacitor, Potential Of Capacitor Of All Split Acs. 10. Evaluation Of Condenser Coil, Compressor And Refrigerants Pressure With Copper Wire Piping Of All Standalone Ac Units. 11. Training Of Electricians From The Point Of Electrical Safety 12. Testing Should Be Done Appropriately With Help Of Internal Team Of Supervisor/Electrician./Engine Er 13. Evaluation Of Ups Battery System. Calculation Of Existing Load On Each Ups Under On Load And Off Load Position.14. Evaluation Of Battery Backup, Voltage, Ampere And Ah Of All Batteries. 15. Thermography/Temperature Detection Should Be Done For Hot Spot Detection In Electric Panel, EquipmentS Etc. 16. Earthing System Should Be Tested Appropriately And Evaluation. Earth Electric Resistance, Earth Fault Loop Impendence Should Be Tested. 17. Inspection Of All The Installation To Identify Potential Hazards Keeping In View Good 18. Any Other Points Related With Electrical Fire Safety Ofbuildings, 19. Inspection Of All The Installations To Identify Potential Hazards Keeping In View Good Engineerir`G Practices And Various Provisions In Safety Regulations And Various Indian Standards. 20. Identify Fire Hazards In Ups Room/Battery Room, Lt Room And Other Electrical Area. Checking Of Sops, If Any, Regarding Handling Any Emergency Due To Electrical Mishaps. The Electrical Safety Audit Shall Be As Above But Shall Not Be Limited To It. It Shall Be Carried Out Keeping In View Provlsions Of Is 732(Wiring), Is 3043 (Earthing), National Electricity Code, Central Electricity Authority(Cea) Safety Regulations, 2023 21. Verification Of Reports After Compliance Of Safety Audit Recommendations & Preparation Of Reports (Form-2/Form-3) For Onward Subm.Iss.Ion To E.I
Basic Detail
Tender No
Bidding Type Tender
Location
City panvel
State Maharashtra
Key Dates
Publish Date 02 Oct 2026
Submission Date 06 Oct 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
9e8b91bd-e21b-40bd-b5ab-f1b0cf87eed2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 02, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 06, 2026
17:00 IST

Bid Submission Deadline

Offline submission at the designated office.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
pdf

9e8b91bd-e21b-40bd-b5ab-f1b0cf87eed2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders