Power Government Departments Closing in 0 days TDR #57834042

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - Cartage Of Pole & Material From Store Centre From Any Other Place To The Respective Si

Issued by Government Departments · Chitrakoot, Uttar Pradesh
Tender Value
3.80 Lakhs
Estimated cost
Bid Submission
12 Oct 2026
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chitrakoot → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - Cartage Of Pole & Material From Store Centre From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Inclading The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Pcc Pole 8.5 Mtr Long , 11 Kv 3X70 Sqmm Xlpe Cable 2X290 , Distribution Transformer 11/0.4 63 Kva , Safe Cartage Of Line Material Viz. Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Abc, Lt Cable And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging. , Erection Of Double Pole (8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Double Pole (8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of 11 Kv Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv 3X70 Sqmm Xlpe Cable 2X290 By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of Lt Pvc Cable 3.5X70 Sqmm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing For Transformer Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Transformer 11/0.4 63 Kva Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing Rod Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Stone Pad 300X300x75mm Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Smc Fuse Set For 63 Kva Tf (L/S) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Smc Fuse Set Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of 7X70 H/S 11 Kv Jointing Kit As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fabication Of Hardware Items

BOQ

Sl. No. Item TitleItem Description
1Cartage of Pole & material from store centre from any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.Cartage of Pole & material from store centre from any other place to the respective site of work through the Kachha Pacca road inclading the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work.
2PCC Pole 8.5 Mtr LongPCC Pole 8.5 Mtr Long
311 KV 3x70 Sqmm XLPE Cable 2x29011 KV 3x70 Sqmm XLPE Cable 2x290
4DISTRIBUTION TRANSFORMER 11/0.4 63 KVADISTRIBUTION TRANSFORMER 11/0.4 63 KVA
5Safe cartage of line material viz. conductor, GI earth wire, cross arm, angle, channel, insulator, ABC, LT Cable and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.Safe cartage of line material viz. conductor, GI earth wire, cross arm, angle, channel, insulator, ABC, LT Cable and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.
6Erection of Double Pole (8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Erection of Double Pole (8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
7Grouting of Double Pole (8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost)Grouting of Double Pole (8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost)
8Erection and Grouting of 11 KV Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)Erection and Grouting of 11 KV Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)
9Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)
10Laying, Sagging and Binding & Jumpring of ACSR Weasel Conductor Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.Laying, Sagging and Binding & Jumpring of ACSR Weasel Conductor Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
11Laying of 11 KV 3x70 Sqmm XLPE Cable 2x290 by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost)Laying of 11 KV 3x70 Sqmm XLPE Cable 2x290 by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost)
12Laying of LT PVC Cable 3.5X70 Sqmm by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Laying of LT PVC Cable 3.5X70 Sqmm by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
13Fixing & Commisioning of Earthing For Transformer Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of Earthing For Transformer Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
14Fixing & Commisioning of DISTRIBUTION TRANSFORMER 11/0.4 63 KVA Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of DISTRIBUTION TRANSFORMER 11/0.4 63 KVA Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
15Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
16Fixing & Commisioning of Stone Pad 300x300x75MM Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of Stone Pad 300x300x75MM Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
17Fixing & Commisioning of SMC Fuse Set For 63 KVA TF (L/S) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (SMC Fuse Set Shall be arranged by contractor on his own cost)Fixing & Commisioning of SMC Fuse Set For 63 KVA TF (L/S) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (SMC Fuse Set Shall be arranged by contractor on his own cost)
18Fixing & Commisioning of 7X70 H/S 11 KV JOINTING KIT as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)Fixing & Commisioning of 7X70 H/S 11 KV JOINTING KIT as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)
19Fabication of Hardware itemsFabication of Hardware items

AI Tender Summary

OUR REF NO 57834042
AUTHORITY Government Departments
TENDER VALUE 3.80 Lakhs
LAST DATE 12-10-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - Cartage Of Pole & Material From Store Centre From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Inclading The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour, T&P Carrier Etc. Required For Proper Completion Of Work. , Pcc Pole 8.5 Mtr Long , 11 Kv 3X70 Sqmm Xlpe Cable 2X290 , Distribution Transformer 11/0.4 63 Kva , Safe Cartage Of Line Material Viz. Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Abc, Lt Cable And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging. , Erection Of Double Pole (8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Double Pole (8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of 11 Kv Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv 3X70 Sqmm Xlpe Cable 2X290 By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of Lt Pvc Cable 3.5X70 Sqmm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing For Transformer Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Transformer 11/0.4 63 Kva Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing Rod Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Stone Pad 300X300x75mm Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Smc Fuse Set For 63 Kva Tf (L/S) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Smc Fuse Set Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of 7X70 H/S 11 Kv Jointing Kit As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fabication Of Hardware Items
Basic Detail
Tender No GEM/2026/B/8109979
Bidding Type Tender
Location
City Chitrakoot
State Uttar Pradesh
Key Dates
Publish Date 01 Oct 2026
Submission Date 12 Oct 2026
Open Date 13 Oct 2026
Finance
Tender Value 3.80 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
9a44f4ee-3913-4a3b-af48-d51504a00c66.pdf
1790858853.xlsx
1790858867.pdf
1790858873.pdf
1790858881.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Oct 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

9a44f4ee-3913-4a3b-af48-d51504a00c66.pdf

xlsx

1790858853.xlsx

pdf

1790858867.pdf

pdf

1790858873.pdf

pdf

1790858881.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender