Tender For Strengthening Of Existing Reinforced Cement Concrete Retaining Slab/Wall By Providing Supporting Structure Near Hopper No.10 At Trs Under S.B. Area
Tender Overview
Project Description
Tender for Strengthening Of Existing Reinforced Cement Concrete Retaining Slab/Wall By Providing Supporting Structure Near Hopper No.10 At Trs Under S.B. Area
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-Oct-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 17-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Strengthening of Existing RCC Retaining Slab/Wall by Providing Supporting Structure near Hopper no.10 at TRS under S.B. Area |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 4 | P/L in position cement concrete of specified grade excluding the Cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 5 | P/L in position specified grade of reinforced cement concrete, excluding the Cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete |
| 8 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 9 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender