Tender For Repair And Renovation Of Epcos Make Capacity 2 X 610Kvar +120 Kvar Apfc Panel Alongwith annual maintenance contract Of 1 Year At Chandrawal Water Works-I
Tender Value
Ref. Documents
Estimated cost
Bid Submission
08 Oct 2026
3 days left
EMD
38500
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair And Renovation Of Epcos Make Capacity 2 X 610Kvar +120 Kvar Apfc Panel Alongwith annual maintenance contract Of 1 Year At Chandrawal Water Works-I
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of defective capacitor units from the APFC panel after suitably discharging the left-over charge on capacitors, including dismantling of APFC relay, indication lights, meters, A/M switches, MCBs, terminations, existing hardware and rusted parts and various other items requiring change in the panel as required at site. |
| 2 | Replacement of defective PhaseCap Super Heavy Duty Capacitor units of various capacities with new capacitor units, rated at 440 V, 3 phase, 50 Hz, complete with terminal cover, cable end entry, mounting structure and hardware etc. – Make TDK |
| 3 | Banking of capacitors of various capacities with multistrand copper wires & lugs / aluminium bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank. |
| 4 | Replacement of defective APFC relay, with new microprocessor based BR5600R APFC Relay having digital display of power factor and other parameters to sense power factor through control CT and give phased impulses to contactor coils for switching ON-OFF required number of capacitors as per requirement to achieve target power factor. Make - TDK |
| 5 | Programming of APFC relay for target power factor including setting of various parameters and keeping updated indications of the efficiency of electrical power usage, and improving it for reducing the power losses and avoid penalties from utility companies. |
| 6 | Replacement of defective capacitor duty contactors suitable for 50 KVAr capacitors with new capacitor duty contactor. Make TDK |
| 7 | Replacement of defective capacitor duty contactors suitable for 25 KVAr capacitors with new capacitor duty contactor. Make TDK |
| 8 | Replacement of defective capacitor duty contactors suitable for 12.5 KVAr capacitor with new capacitor duty contactor. Make TDK |
| 9 | Replacement of defective triple pole MCB of 32 A capacity with new MCB for operation and safety of individual capacitor bank - make Standard/L&K |
| 10 | Replacement of defective triple pole MCB of 63 A capacity with new MCB for operation and safety of individual capacitor bank - make Standard/L&K |
| 11 | Replacement of defective 0-200 A Ammeter with new ammeter complete with selector switch and set of 3 nos. CTs for monitoring health of capacitor bank, make - AE/HPL/Standard |
| 12 | Replacement of 0-500V digital Voltmeter with selector switch make–AE/HPL/Standard |
| 13 | Replacement of defective Auto Manual with selector switch. with new A/M switch Make – AE/Standard |
| 14 | Replacement of defective/burnt out LED indication lights of various colours with new indication lights, make -Standard |
| 15 | Power wiring with 10 sq. mm multistrand copper wires for connection between capacitors and bus bar using copper lugs and necessary hardware etc. as required at site. |
| 16 | Monitoring of Power Factor during warranty period including checking of efficiency of capacitors and other equipment to ensure that APFC panel is working to its highest capacity for achieving target power factor. |
| 17 | Installation of all above components in the existing capacitor banks with suitable fabrication work to accommodate new items in the existing enclosure / structure for alignment of components and ease of termination, complete with hardware on the mounting structure and termination of existing cables with lugs, tapes etc. complete with earthing of the capacitor banks, touching the rusted parts of the panel structure with paint for protection from moisture etc. as required at site. |
| 18 | Servicing of APFC panels including complete dusting of the panel, cleaning of contact points, Decarbonising of joints, alignment of doors, checking of all nuts & bolts, control circuit and power circuit wiring dressing and renovation of control and power terminations etc. as required at site. |
| 19 | Testing & Commissioning of complete APFC Panel installation including following:01. Meggering of complete capacitor installation using 500Vmegger02. Continuity test for checking continuity of all circuits toensure that all circuits are properly wired.03. Checking function and efficiency of various componentsof APFC panel04. All function tests. |
| 20 | Comprehensive Annual maintenance of following Capacitors banks:01. 610 kVAr APFC panels: 02 nos. 02. 120 kVAr APFC panel: 01 no.03. Fixed capacitor bank of 140 kVAr of 500: 01 no. 04. Fixed Capacitor banks of 140 kVAr of 550 HP motor: 01 no. 05. Fixed capacitor bank of 120 kVAr of 300HP motors: 03 nos. 06. Static Capacitor bank of 120 kVAr of Transformers: 02 nos. AMC will include regular visits of our Engineer to the site to monitor power factor and to and repair/ replace defective parts during the AMC period. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender