Tender For Ttps - Mech.Ii - Tm I - Unit-Iii - Conducting Tube Cleaning In The Inner Surface Of The Condenser For Its Entire 10.02M Length Using A Flexible Hose Fitted With Nylon Brush And Fine Water Tube Jet Arrangement & Subsequent Jet Cleaning And
Tender Overview
Project Description
Tender for Ttps - Mech.Ii - Tm I - Unit-Iii - Conducting Tube Cleaning In The Inner Surface Of The Condenser For Its Entire 10.02M Length Using A Flexible Hose Fitted With Nylon Brush And Fine Water Tube Jet Arrangement & Subsequent Jet Cleaning And Inspection Of Governing Elements, Checking H Gap, Mop Float, Renewal Of Mop Bearings If Necessary, Overhauling Of Cvsm Pilot, Feed Back Pilot And Intermediate Pilot Valves, Mop Nrv Etc., During The Forthcoming Annual Overhaul
BOQ
| Sl. No. | Item Description |
| 1 | Condenser Brush and Jet CleaningOpening of the condenser man hole doors, removal of the visible sea growths such as shells and algae from the tube sheet, tube mouth and water box, provision of scaffolding arrangement necessary for cleaning both East &West condensers, cleaning the condensers tube inner surface one by one by inserting the flexible hose provided with a nylon brush and fine water jet arrangement, cleaning the debris from the condenser water box, removal of the scaffolding and closing the man hole doors. |
| 2 | Condenser tube water jet cleaning |
| 3 | Inspection and Overhauling of 210MW LMW Turbine Governing ElementsDismantling front pedestal cover, overhauling of main oil pump, intermediate pilot valve, Speed load control assembly, Differentiator, EGPV, turbine trip switch, CVSM feed pack pilot Control pilot & over speed striker. Dismantling of front bearing pedestal top cover, disconnecting the oil pipe lines, dismantling the gear coupling inspection & rectification dismantling of main oil pump, rotor float checking, side and top oil clearance checking. Inspection of impeller, wear ring clearance checking inspection of bearings and doing correction works, replacement of bearings, gear coupling if required. MOP & HP rotor alignment checking and correcting the same and assembling the gear coupling and MOP cover. Dismantling the MOP NRV, lapping and blue matching and assembling, Dismantling, cleaning, inspection and assembling of follow pilot, summation pilot, load/speed control pilot, speeder gear assembly, EGPV, intermediate pilot, differentiator, CVSM feedback pilot etc., Speed governor sleeve to nozzle, EGPV lever to over speed striker to rubber. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender