Supply Of CABLE 25 SQ MM YELLOW & BLUE 1.8 KV
Tender Overview
Project Description
Supply Of cable 25 sq mm yellow & blue 1.8 kv , 25 sq.mm, blue colour, electron beam irradiation curing process or chemic al curing process thin walled flexible elastomeric cable with copper conductor suita ble for rolling stock application conforming to rdso spec. no.elrs/spec/elc/0019, rev.4 feb-2018, 1.8 kv grade. note:- cables shall be supplied in coils of 500 metres length and leftover quantity in multiples of 100 metres with a tolerance of +/-5% on the length. [ warranty period: 30 months after the date of delivery ] ] , 25 sq.mm, yellow colour, electron beam irradiation curing process or che mical curing process thin walled flexible elastomeric cable with copper conductor su itable for rolling stock application conforming to rdso spec. no.elrs/spec/elc/0019, re v.4, feb-2018, 1.8 kv grade. note:- cables shall be supplied in coils of 500 metres length and leftover quantity in multiples of 100 metres with a tolerance of +/-5% on the leng th. [ warranty period: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | 25 SQ.MM, BLUE COLOUR, ELECTRON BEAM IRRADIATION CURING PROCESS OR CHEMIC AL CURING PROCESS THIN WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SUITA BLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC. NO.ELRS/SPEC/ELC/0019, REV.4 FEB-2018, 1.8 KV GRADE. NOTE:- CABLES SHALL BE SUPPLIED IN COILS OF 500 METRES LENGTH AND LEFTOVER QUANTITY IN MULTIPLES OF 100 METRES WITH A TOLERANCE OF +/-5% ON THE LENGTH. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | 25 SQ.MM, YELLOW COLOUR, ELECTRON BEAM IRRADIATION CURING PROCESS OR CHE MICAL CURING PROCESS THIN WALLED FLEXIBLE ELASTOMERIC CABLE WITH COPPER CONDUCTOR SU ITABLE FOR ROLLING STOCK APPLICATION CONFORMING TO RDSO SPEC. NO.ELRS/SPEC/ELC/0019, RE V.4, FEB-2018, 1.8 KV GRADE. NOTE:- CABLES SHALL BE SUPPLIED IN COILS OF 500 METRES LENGTH AND LEFTOVER QUANTITY IN MULTIPLES OF 100 METRES WITH A TOLERANCE OF +/-5% ON THE LENG TH. [ Warranty Period: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender