Power Government Departments Closing in 8 days TDR #57824526

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - St Pole 11 Mtr Long , Pcc Pole 8.5 Mtr Long , 11 Kv Xlpe Cable 3X185 Sq Mm , 11 Kv Xlp

Issued by Government Departments · Chitrakoot, Uttar Pradesh
Tender Value
11 Lakhs
Estimated cost
Bid Submission
12 Oct 2026
8 days left
EMD
11000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Chitrakoot → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - St Pole 11 Mtr Long , Pcc Pole 8.5 Mtr Long , 11 Kv Xlpe Cable 3X185 Sq Mm , 11 Kv Xlpe Cable 3X70 Sq Mm , Lt Xlpe Cable Al 3.5*70 , Distribution Box , Lt Distribution Pannel C-Typye , Safe Cartage Of Line Material Viz. Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Abc, Lt Cable And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging. , Erection Of Double Pole (11 Mtr Stp/8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Double Pole (11 Mtr Stp/8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection Of Singal Pole (11 Mtr Stp/8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Singal Pole (11 Mtr Stp/8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of 33 Kv Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Laying, Sagging And Binding & Jumpring Of Acsr Dog Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable 3X185 Sqmm By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of 11 Kv Xlpe Cable 3X70 Sqmm By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of L.T. Abc (3*120+1*95+1*16) Sq Mm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of L.T. Abc (3X95)+(1X70)+(1X16)Sq M.M. By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of Lt Abc Cable (1*35+1*16) Sq Mm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of Lt Xlpe Cable Al 3.5*70 By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing Rod Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Box Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Pannel C-Typye Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of 11 Kv Cable 3X185 Jointing Kit(H/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of 11 Kv Cable 3X70 Jointing Kit(I/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of Lt Xlpe Cable Al 3.5*70 Jointing Kit(I/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Shifting Of 25Kva Existing, Dt , Dismental Of Old Material , Fabication Of Hardware Items

BOQ

Sl. No. Item TitleItem Description
1ST Pole 11 Mtr LongST Pole 11 Mtr Long
2PCC Pole 8.5 Mtr LongPCC Pole 8.5 Mtr Long
311 KV XLPE Cable 3X185 SQ MM11 KV XLPE Cable 3X185 SQ MM
411 KV XLPE Cable 3X70 SQ MM11 KV XLPE Cable 3X70 SQ MM
5LT XLPE CABLE AL 3.5*70LT XLPE CABLE AL 3.5*70
6DISTRIBUTION BOXDISTRIBUTION BOX
7LT DISTRIBUTION PANNEL C-TYPYELT DISTRIBUTION PANNEL C-TYPYE
8Safe cartage of line material viz. conductor, GI earth wire, cross arm, angle, channel, insulator, ABC, LT Cable and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.Safe cartage of line material viz. conductor, GI earth wire, cross arm, angle, channel, insulator, ABC, LT Cable and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.
9Erection of Double Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Erection of Double Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
10Grouting of Double Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost)Grouting of Double Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost)
11Erection of Singal Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Erection of Singal Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
12Grouting of Singal Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost)Grouting of Singal Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost)
13Erection and Grouting of 33 KV Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)Erection and Grouting of 33 KV Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)
14Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost)
15Laying, Sagging and Binding & Jumpring of ACSR Dog Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.Laying, Sagging and Binding & Jumpring of ACSR Dog Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
16Laying, Sagging and Binding & Jumpring of ACSR Weasel Conductor Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.Laying, Sagging and Binding & Jumpring of ACSR Weasel Conductor Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work.
17Laying of 11 KV XLPE Cable 3X185 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost)Laying of 11 KV XLPE Cable 3X185 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost)
18Laying of 11 KV XLPE Cable 3X70 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost)Laying of 11 KV XLPE Cable 3X70 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost)
19Laying of L.T. ABC (3*120+1*95+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Laying of L.T. ABC (3*120+1*95+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
20Laying of L.T. ABC (3X95)+(1X70)+(1X16)SQ M.M. by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Laying of L.T. ABC (3X95)+(1X70)+(1X16)SQ M.M. by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
21Laying of LT ABC CABLE (1*35+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Laying of LT ABC CABLE (1*35+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
22Laying of LT XLPE CABLE AL 3.5*70 by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Laying of LT XLPE CABLE AL 3.5*70 by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
23Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
24Fixing & Commisioning of DISTRIBUTION BOX Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of DISTRIBUTION BOX Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
25Fixing & Commisioning of DISTRIBUTION PANNEL C-TYPYE Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.Fixing & Commisioning of DISTRIBUTION PANNEL C-TYPYE Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
26Fixing & Commisioning of 11 KV CABLE 3X185 JOINTING KIT(H/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)Fixing & Commisioning of 11 KV CABLE 3X185 JOINTING KIT(H/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)
27Fixing & Commisioning of 11 KV CABLE 3X70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)Fixing & Commisioning of 11 KV CABLE 3X70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)
28Fixing & Commisioning of LT XLPE CABLE AL 3.5*70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)Fixing & Commisioning of LT XLPE CABLE AL 3.5*70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost)
29Shifting of 25kva Existing, DTShifting of 25kva Existing, DT
30Dismental of OLD MaterialDismental of OLD Material
31Fabication of Hardware itemsFabication of Hardware items

AI Tender Summary

OUR REF NO 57824526
AUTHORITY Government Departments
TENDER VALUE 11 Lakhs
LAST DATE 12-10-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - St Pole 11 Mtr Long , Pcc Pole 8.5 Mtr Long , 11 Kv Xlpe Cable 3X185 Sq Mm , 11 Kv Xlpe Cable 3X70 Sq Mm , Lt Xlpe Cable Al 3.5*70 , Distribution Box , Lt Distribution Pannel C-Typye , Safe Cartage Of Line Material Viz. Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Abc, Lt Cable And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging. , Erection Of Double Pole (11 Mtr Stp/8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Double Pole (11 Mtr Stp/8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection Of Singal Pole (11 Mtr Stp/8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Singal Pole (11 Mtr Stp/8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of 33 Kv Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Laying, Sagging And Binding & Jumpring Of Acsr Dog Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable 3X185 Sqmm By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of 11 Kv Xlpe Cable 3X70 Sqmm By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of L.T. Abc (3*120+1*95+1*16) Sq Mm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of L.T. Abc (3X95)+(1X70)+(1X16)Sq M.M. By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of Lt Abc Cable (1*35+1*16) Sq Mm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of Lt Xlpe Cable Al 3.5*70 By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing Rod Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Box Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Pannel C-Typye Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of 11 Kv Cable 3X185 Jointing Kit(H/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of 11 Kv Cable 3X70 Jointing Kit(I/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of Lt Xlpe Cable Al 3.5*70 Jointing Kit(I/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Shifting Of 25Kva Existing, Dt , Dismental Of Old Material , Fabication Of Hardware Items
Basic Detail
Tender No GEM/2026/B/8109736
Bidding Type Tender
Location
City Chitrakoot
State Uttar Pradesh
Key Dates
Publish Date 01 Oct 2026
Submission Date 12 Oct 2026
Open Date 13 Oct 2026
Finance
Tender Value 11 Lakhs
Tender Fee Ref. Documents
EMD 11000
Exemption Not Available
Document List
b78cf75b-ff86-430a-b239-fc19c57b3fdc.pdf
1790856704.xlsx
1790856718.pdf
1790856726.pdf
1790856744.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Oct 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

b78cf75b-ff86-430a-b239-fc19c57b3fdc.pdf

xlsx

1790856704.xlsx

pdf

1790856718.pdf

pdf

1790856726.pdf

pdf

1790856744.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders