Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi-Turnkey - St Pole 11 Mtr Long , Pcc Pole 8.5 Mtr Long , 11 Kv Xlpe Cable 3X185 Sq Mm , 11 Kv Xlpe Cable 3X70 Sq Mm , Lt Xlpe Cable Al 3.5*70 , Distribution Box , Lt Distribution Pannel C-Typye , Safe Cartage Of Line Material Viz. Conductor, Gi Earth Wire, Cross Arm, Angle, Channel, Insulator, Abc, Lt Cable And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Also Including The Work Of Dragging. , Erection Of Double Pole (11 Mtr Stp/8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Double Pole (11 Mtr Stp/8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection Of Singal Pole (11 Mtr Stp/8.5 Mtr Pcc) Including Complete. H.T/L.T Fittings As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Grouting Of Singal Pole (11 Mtr Stp/8.5 Mtr Pcc) Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work.(All Civil Material Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of 33 Kv Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Erection And Grouting Of Stay Set Completed Including The Work Of Nozelling Etc. As Per Respo Manual And Also Including The Cost Of All Grouting Material, Labour, T&P Etc Required For Proper Completion Of Work. (All Civil Material & Cl S Shall Be Arranged By Contractor On His Own Cost) , Laying, Sagging And Binding & Jumpring Of Acsr Dog Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying, Sagging And Binding & Jumpring Of Acsr Weasel Conductor Conductor As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying Of 11 Kv Xlpe Cable 3X185 Sqmm By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of 11 Kv Xlpe Cable 3X70 Sqmm By Digging Of Hdd Method With Hdpe Pipe (All Civil &Hdpe/Gi Pipe Material Shall Be Arranged By Contractor On His Own Cost) , Laying Of L.T. Abc (3*120+1*95+1*16) Sq Mm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of L.T. Abc (3X95)+(1X70)+(1X16)Sq M.M. By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of Lt Abc Cable (1*35+1*16) Sq Mm By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Laying Of Lt Xlpe Cable Al 3.5*70 By Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Earthing Rod Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Box Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of Distribution Pannel C-Typye Complete As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. , Fixing & Commisioning Of 11 Kv Cable 3X185 Jointing Kit(H/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of 11 Kv Cable 3X70 Jointing Kit(I/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Fixing & Commisioning Of Lt Xlpe Cable Al 3.5*70 Jointing Kit(I/O) (3X300sqmm) As Per Norms Complete In All Respect As Per Respo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T&P And Carrier Etc. Required For Proper Completion Of Work. (Jointing Kit Shall Be Arranged By Contractor On His Own Cost) , Shifting Of 25Kva Existing, Dt , Dismental Of Old Material , Fabication Of Hardware Items
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | ST Pole 11 Mtr Long | ST Pole 11 Mtr Long |
| 2 | PCC Pole 8.5 Mtr Long | PCC Pole 8.5 Mtr Long |
| 3 | 11 KV XLPE Cable 3X185 SQ MM | 11 KV XLPE Cable 3X185 SQ MM |
| 4 | 11 KV XLPE Cable 3X70 SQ MM | 11 KV XLPE Cable 3X70 SQ MM |
| 5 | LT XLPE CABLE AL 3.5*70 | LT XLPE CABLE AL 3.5*70 |
| 6 | DISTRIBUTION BOX | DISTRIBUTION BOX |
| 7 | LT DISTRIBUTION PANNEL C-TYPYE | LT DISTRIBUTION PANNEL C-TYPYE |
| 8 | Safe cartage of line material viz. conductor, GI earth wire, cross arm, angle, channel, insulator, ABC, LT Cable and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. | Safe cartage of line material viz. conductor, GI earth wire, cross arm, angle, channel, insulator, ABC, LT Cable and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging. |
| 9 | Erection of Double Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of Double Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 10 | Grouting of Double Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost) | Grouting of Double Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost) |
| 11 | Erection of Singal Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Erection of Singal Pole (11 MTR STP/8.5 MTR PCC) including complete. H.T/L.T fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 12 | Grouting of Singal Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost) | Grouting of Singal Pole (11 MTR STP/8.5 MTR PCC) per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.(All Civil Material shall be arranged by contractor on his own cost) |
| 13 | Erection and Grouting of 33 KV Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) | Erection and Grouting of 33 KV Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) |
| 14 | Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) | Erection and Grouting of Stay set Completed including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. (All Civil Material & Clamps shall be arranged by contractor on his own cost) |
| 15 | Laying, Sagging and Binding & Jumpring of ACSR Dog Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. | Laying, Sagging and Binding & Jumpring of ACSR Dog Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 16 | Laying, Sagging and Binding & Jumpring of ACSR Weasel Conductor Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. | Laying, Sagging and Binding & Jumpring of ACSR Weasel Conductor Conductor as per direction of Supervising Engineer. It including the cost of Labour T&P carrier etc required for proper completion of work. |
| 17 | Laying of 11 KV XLPE Cable 3X185 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost) | Laying of 11 KV XLPE Cable 3X185 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost) |
| 18 | Laying of 11 KV XLPE Cable 3X70 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost) | Laying of 11 KV XLPE Cable 3X70 sqmm by digging of HDD Method With HDPE PIPE (all civil &HDPE/GI PIPE Material shall be arranged by contractor on his own cost) |
| 19 | Laying of L.T. ABC (3*120+1*95+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Laying of L.T. ABC (3*120+1*95+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 20 | Laying of L.T. ABC (3X95)+(1X70)+(1X16)SQ M.M. by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Laying of L.T. ABC (3X95)+(1X70)+(1X16)SQ M.M. by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 21 | Laying of LT ABC CABLE (1*35+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Laying of LT ABC CABLE (1*35+1*16) SQ MM by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 22 | Laying of LT XLPE CABLE AL 3.5*70 by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Laying of LT XLPE CABLE AL 3.5*70 by Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 23 | Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Fixing & Commisioning of Earthing Rod Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 24 | Fixing & Commisioning of DISTRIBUTION BOX Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Fixing & Commisioning of DISTRIBUTION BOX Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 25 | Fixing & Commisioning of DISTRIBUTION PANNEL C-TYPYE Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. | Fixing & Commisioning of DISTRIBUTION PANNEL C-TYPYE Complete as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 26 | Fixing & Commisioning of 11 KV CABLE 3X185 JOINTING KIT(H/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost) | Fixing & Commisioning of 11 KV CABLE 3X185 JOINTING KIT(H/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost) |
| 27 | Fixing & Commisioning of 11 KV CABLE 3X70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost) | Fixing & Commisioning of 11 KV CABLE 3X70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost) |
| 28 | Fixing & Commisioning of LT XLPE CABLE AL 3.5*70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost) | Fixing & Commisioning of LT XLPE CABLE AL 3.5*70 JOINTING KIT(I/O) (3X300SQMM) as per norms complete in all respect as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. (JOINTING KIT Shall be arranged by contractor on his own cost) |
| 29 | Shifting of 25kva Existing, DT | Shifting of 25kva Existing, DT |
| 30 | Dismental of OLD Material | Dismental of OLD Material |
| 31 | Fabication of Hardware items | Fabication of Hardware items |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender