Civil Aviation Boards / Undertakings / PSU Closing in 15 days TDR #57820369

Bids Are invited for Operation And Maintenance Of Fire Alarm System - Complete System - Monitoring, Operation And Maintenance Of The Existing Fire Detection And Alarm System (Fdas) Excluding The Lower Basement At Niptb Terminal-2, , On A 24×7 Basis.

Issued by Boards / Undertakings / PSU · 24 Paraganas North, West Bengal
Tender Value
1.52 Crore
Estimated cost
Bid Submission
22 Oct 2026
15 days left
EMD
3.04 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
24 Paraganas North → West Bengal
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Operation And Maintenance Of Fire Alarm System - Complete System - Monitoring, Operation And Maintenance Of The Existing Fire Detection And Alarm System (Fdas) Excluding The Lower Basement At Niptb Terminal-2, , On A 24×7 Basis. The Scope Shall Include Continuous Monitoring, Preventive And Corrective Maintenance, Replacement Of Defective Components, (Spares Will Be Provided By Aai) Configuration, Programming, Addressing, And Updating Of Graphic Software For Newly Added Devices Or System Upgrades, Maintenance Of Records And Reports, Supervision, And Ensuring The Overall Functionality Of The System As Per Approved Specifications And The Directions Of The Engineer-In-Charge.(Refer To Annexure-M1 For The Fdas Inventory, Annexure-N For Monitoring And Maintenance Activities, And Annexure-O For The Minimum Required Manpower) , Providing All-Inclusive Comprehensive Maintenance Contract (Aicmc) For The Existing Very Early Smoke Detection Apparatus (Vesda) System At Niptb Terminal-2, Including 24×7 Monitoring, Preventive And Corrective Maintenance, Fault Rectification, Replacement Of Defective Components, Maintenance Of All Requisite Records And Reports, And Ensuring The Reliable And Satisfactory Operation Of The Complete Vesda System, In Accordance With The Approved Specifications And The Directions Of The Engineer-In-Charge.(Refer To Annexure-M2 For Inventory Of Vesda System) , Sitc Of Addressable Loop Cards/Modules, Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Hardware And Accessories, Installation, Termination, Configuration, Programming, Addressing, Testing, Commissioning, And Integration With The Existing Fdas System, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Addressable Multi-Criteria Detectors, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Multi-Criteria Detectors (Model: Tc806/B3104), Compatible With The Existing Xls 3000 Fdas Panel, Including Detector Bases, Necessary Accessories And Mounting Hardware, Termination With The Existing Cables/Wires Of The Dismantled Detectors, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Addressable Heat Detector, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Heat Detectors (Model: Tc808/B3203), Compatible With The Existing Xls 3000 Fdas Panel, Including Detector Bases, Necessary Accessories And Mounting Hardware, Termination With The Existing Cables/Wires Of The Dismantled Detectors, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Manual Call Point, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Manual Call Points (Model: S464g1007), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Relay Module, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of New Addressable Relay Modules (Model: Tc810/R1024), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Fault Isolator Module, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Fault Isolator Modules (Model: Tc811/A1006), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Monitor Module, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Monitor Modules (Model: Tc809/A1059), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Supply, Laying, Dressing, Cl Ing And Termination Of 2-Core × 1.5 Sq. Mm Copper Armoured Fire Survival (Fs) Red Color Cable, Suitable For Fire Alarm System Applications, Including All Necessary Cable Glands, Lugs, Termination Accessories, Supports, Fixing Materials And Other Incidental Works, Complete In All Respects As Per The Approved Technical Specifications, Manufacturers Recommendations And The Directions Of The Engineer-In-Charge. , Supply Of Fdas Spares On An As And When Required Basis, Compatible With The Existing Xls 3000 Fdas Panel, As Per The Approved Technical Specifications And The Directions Of The Engineer-In-Charge: , Supply Of Fdas Spares On An As And When Required Basis, Compatible With The Existing Conventional Ravel Panel, As Per The Approved Technical Specifications And The Directions Of The Engineer-In-Charge:

BOQ

Sl. No. Item TitleItem Description
1Monitoring, operation and maintenance of the existing Fire Detection and Alarm System (FDAS) excluding the Lower Basement at NIPTB Terminal-2, , on a 24×7 basis. The scope shall include continuous monitoring, preventive and corrective maintenance, replacement of defective components, (Spares will be provided by AAI) configuration, programming, addressing, and updating of graphic software for newly added devices or system upgrades, maintenance of records and reports, supervision, and ensuring the overall functionality of the system as per approved specifications and the directions of the Engineer-in-Charge.(Refer to Annexure-M1 for the FDAS inventory, Annexure-N for monitoring and maintenance activities, and Annexure-O for the minimum required manpower)Monitoring, operation and maintenance of the existing Fire Detection and Alarm System (FDAS) excluding the Lower Basement at NIPTB Terminal-2, , on a 24×7 basis. The scope shall include continuous monitoring, preventive and corrective maintenance, replacement of defective components, (Spares will be provided by AAI) configuration, programming, addressing, and updating of graphic software for newly added devices or system upgrades, maintenance of records and reports, supervision, and ensuring the overall functionality of the system as per approved specifications and the directions of the Engineer-in-Charge.(Refer to Annexure-M1 for the FDAS inventory, Annexure-N for monitoring and maintenance activities, and Annexure-O for the minimum required manpower)
2Providing All-Inclusive Comprehensive Maintenance Contract (AICMC) for the existing Very Early Smoke Detection Apparatus (VESDA) system at NIPTB Terminal-2, including 24×7 monitoring, preventive and corrective maintenance, fault rectification, replacement of defective components, maintenance of all requisite records and reports, and ensuring the reliable and satisfactory operation of the complete VESDA system, in accordance with the approved specifications and the directions of the Engineer-in-Charge.(Refer to Annexure-M2 for inventory of VESDA System)Providing All-Inclusive Comprehensive Maintenance Contract (AICMC) for the existing Very Early Smoke Detection Apparatus (VESDA) system at NIPTB Terminal-2, including 24×7 monitoring, preventive and corrective maintenance, fault rectification, replacement of defective components, maintenance of all requisite records and reports, and ensuring the reliable and satisfactory operation of the complete VESDA system, in accordance with the approved specifications and the directions of the Engineer-in-Charge.(Refer to Annexure-M2 for inventory of VESDA System)
3SITC of addressable loop cards/modules, compatible with the existing XLS 3000 FDAS panel, including all necessary hardware and accessories, installation, termination, configuration, programming, addressing, testing, commissioning, and integration with the existing FDAS system, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of addressable loop cards/modules, compatible with the existing XLS 3000 FDAS panel, including all necessary hardware and accessories, installation, termination, configuration, programming, addressing, testing, commissioning, and integration with the existing FDAS system, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
4Dismantling and careful removal of the existing addressable multi-criteria detectors, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.Dismantling and careful removal of the existing addressable multi-criteria detectors, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.
5SITC of addressable multi-criteria detectors (Model: TC806/B3104), compatible with the existing XLS 3000 FDAS Panel, including detector bases, necessary accessories and mounting hardware, termination with the existing cables/wires of the dismantled detectors, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of addressable multi-criteria detectors (Model: TC806/B3104), compatible with the existing XLS 3000 FDAS Panel, including detector bases, necessary accessories and mounting hardware, termination with the existing cables/wires of the dismantled detectors, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
6Dismantling and careful removal of the existing addressable heat detector, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.Dismantling and careful removal of the existing addressable heat detector, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.
7SITC of addressable heat detectors (Model: TC808/B3203), compatible with the existing XLS 3000 FDAS Panel, including detector bases, necessary accessories and mounting hardware, termination with the existing cables/wires of the dismantled detectors, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of addressable heat detectors (Model: TC808/B3203), compatible with the existing XLS 3000 FDAS Panel, including detector bases, necessary accessories and mounting hardware, termination with the existing cables/wires of the dismantled detectors, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
8Dismantling and careful removal of the existing Manual Call Point, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.Dismantling and careful removal of the existing Manual Call Point, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.
9SITC of addressable Manual Call Points (Model: S464G1007), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of addressable Manual Call Points (Model: S464G1007), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
10Dismantling and careful removal of the existing Relay Module, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.Dismantling and careful removal of the existing Relay Module, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.
11SITC of new addressable Relay Modules (Model: TC810/R1024), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of new addressable Relay Modules (Model: TC810/R1024), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
12Dismantling and careful removal of the existing Fault Isolator Module, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.Dismantling and careful removal of the existing Fault Isolator Module, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.
13SITC of addressable Fault Isolator Modules (Model: TC811/A1006), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of addressable Fault Isolator Modules (Model: TC811/A1006), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
14Dismantling and careful removal of the existing Monitor Module, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.Dismantling and careful removal of the existing Monitor Module, including safe handling and handing over the same to AAI Stores for reuse, complete as directed by the Engineer-in-Charge.
15SITC of addressable Monitor Modules (Model: TC809/A1059), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.SITC of addressable Monitor Modules (Model: TC809/A1059), compatible with the existing XLS 3000 FDAS Panel, including all necessary accessories, mounting hardware, termination, addressing, programming, testing, commissioning, and integration with the existing FDAS network, complete as per the manufacturer’s recommendations, approved technical specifications, and the directions of the Engineer-in-Charge.
16Supply, laying, dressing, clamping and termination of 2-core × 1.5 sq. mm copper armoured Fire Survival (FS) Red Color cable, suitable for fire alarm system applications, including all necessary cable glands, lugs, termination accessories, supports, fixing materials and other incidental works, complete in all respects as per the approved technical specifications, manufacturer's recommendations and the directions of the Engineer-in-Charge.Supply, laying, dressing, clamping and termination of 2-core × 1.5 sq. mm copper armoured Fire Survival (FS) Red Color cable, suitable for fire alarm system applications, including all necessary cable glands, lugs, termination accessories, supports, fixing materials and other incidental works, complete in all respects as per the approved technical specifications, manufacturer's recommendations and the directions of the Engineer-in-Charge.
17Supply of FDAS Spares on an “As and When Required” Basis, compatible with the existing XLS 3000 FDAS Panel, as per the approved technical specifications and the directions of the Engineer-in-Charge:Supply of FDAS Spares on an “As and When Required” Basis, compatible with the existing XLS 3000 FDAS Panel, as per the approved technical specifications and the directions of the Engineer-in-Charge:
18Supply of FDAS Spares on an “As and When Required” Basis, compatible with the existing Conventional Ravel Panel, as per the approved technical specifications and the directions of the Engineer-in-Charge:Supply of FDAS Spares on an “As and When Required” Basis, compatible with the existing Conventional Ravel Panel, as per the approved technical specifications and the directions of the Engineer-in-Charge:

AI Tender Summary

OUR REF NO 57820369
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 1.52 Crore
LAST DATE 22-10-2026
Authority
Authority Name Airports Authority Of India
Work Description Bids Are invited for Operation And Maintenance Of Fire Alarm System - Complete System - Monitoring, Operation And Maintenance Of The Existing Fire Detection And Alarm System (Fdas) Excluding The Lower Basement At Niptb Terminal-2, , On A 24×7 Basis. The Scope Shall Include Continuous Monitoring, Preventive And Corrective Maintenance, Replacement Of Defective Components, (Spares Will Be Provided By Aai) Configuration, Programming, Addressing, And Updating Of Graphic Software For Newly Added Devices Or System Upgrades, Maintenance Of Records And Reports, Supervision, And Ensuring The Overall Functionality Of The System As Per Approved Specifications And The Directions Of The Engineer-In-Charge.(Refer To Annexure-M1 For The Fdas Inventory, Annexure-N For Monitoring And Maintenance Activities, And Annexure-O For The Minimum Required Manpower) , Providing All-Inclusive Comprehensive Maintenance Contract (Aicmc) For The Existing Very Early Smoke Detection Apparatus (Vesda) System At Niptb Terminal-2, Including 24×7 Monitoring, Preventive And Corrective Maintenance, Fault Rectification, Replacement Of Defective Components, Maintenance Of All Requisite Records And Reports, And Ensuring The Reliable And Satisfactory Operation Of The Complete Vesda System, In Accordance With The Approved Specifications And The Directions Of The Engineer-In-Charge.(Refer To Annexure-M2 For Inventory Of Vesda System) , Sitc Of Addressable Loop Cards/Modules, Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Hardware And Accessories, Installation, Termination, Configuration, Programming, Addressing, Testing, Commissioning, And Integration With The Existing Fdas System, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Addressable Multi-Criteria Detectors, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Multi-Criteria Detectors (Model: Tc806/B3104), Compatible With The Existing Xls 3000 Fdas Panel, Including Detector Bases, Necessary Accessories And Mounting Hardware, Termination With The Existing Cables/Wires Of The Dismantled Detectors, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Addressable Heat Detector, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Heat Detectors (Model: Tc808/B3203), Compatible With The Existing Xls 3000 Fdas Panel, Including Detector Bases, Necessary Accessories And Mounting Hardware, Termination With The Existing Cables/Wires Of The Dismantled Detectors, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Manual Call Point, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Manual Call Points (Model: S464g1007), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Relay Module, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of New Addressable Relay Modules (Model: Tc810/R1024), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Fault Isolator Module, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Fault Isolator Modules (Model: Tc811/A1006), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Dismantling And Careful Removal Of The Existing Monitor Module, Including Safe Handling And Handing Over The Same To Aai Stores For Reuse, Complete As Directed By The Engineer-In-Charge. , Sitc Of Addressable Monitor Modules (Model: Tc809/A1059), Compatible With The Existing Xls 3000 Fdas Panel, Including All Necessary Accessories, Mounting Hardware, Termination, Addressing, Programming, Testing, Commissioning, And Integration With The Existing Fdas Network, Complete As Per The Manufacturers Recommendations, Approved Technical Specifications, And The Directions Of The Engineer-In-Charge. , Supply, Laying, Dressing, Cl Ing And Termination Of 2-Core × 1.5 Sq. Mm Copper Armoured Fire Survival (Fs) Red Color Cable, Suitable For Fire Alarm System Applications, Including All Necessary Cable Glands, Lugs, Termination Accessories, Supports, Fixing Materials And Other Incidental Works, Complete In All Respects As Per The Approved Technical Specifications, Manufacturers Recommendations And The Directions Of The Engineer-In-Charge. , Supply Of Fdas Spares On An As And When Required Basis, Compatible With The Existing Xls 3000 Fdas Panel, As Per The Approved Technical Specifications And The Directions Of The Engineer-In-Charge: , Supply Of Fdas Spares On An As And When Required Basis, Compatible With The Existing Conventional Ravel Panel, As Per The Approved Technical Specifications And The Directions Of The Engineer-In-Charge:
Basic Detail
Tender No GEM/2026/B/8098804
Bidding Type Tender
Location
City 24 Paraganas North
State West Bengal
Key Dates
Publish Date 01 Oct 2026
Submission Date 22 Oct 2026
Open Date 23 Oct 2026
Finance
Tender Value 1.52 Crore
Tender Fee Ref. Documents
EMD 3.04 Lakhs
Exemption Not Available
Document List
dea6128e-f6ef-4d65-a3b9-5f9c9503994b.pdf
1790850294.xlsx
1790850362.pdf
1790850371.pdf
1790850387.pdf
DNITFinal_ff5bfce5-183d-4c85-b26f1790850750084_buycon374.aai.wb.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 22, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 15 days
Oct 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
pdf

dea6128e-f6ef-4d65-a3b9-5f9c9503994b.pdf

xlsx

1790850294.xlsx

pdf

1790850362.pdf

pdf

1790850371.pdf

pdf

1790850387.pdf

aai

DNITFinal_ff5bfce5-183d-4c85-b26f1790850750084_buycon374.aai.wb.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders