Power Government Departments Closing in 2 days TDR #57819978

Tender For Tender For providing Sop To Drip Irrigation System Under Hpshiva Project At Cluster Seoh In (E) Section Sidhpur Uesd Hpsebl Dhar Ur.

Issued by Government Departments · Mandi, Himachal Pradesh
Tender Value
8.34 Lakhs
Estimated cost
Bid Submission
08 Oct 2026
2 days left
EMD
8345
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mandi → Himachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Tender For providing Sop To Drip Irrigation System Under Hpshiva Project At Cluster Seoh In (E) Section Sidhpur Uesd Hpsebl Dhar Ur.

BOQ

Name of Work:- Tender for prov. SOP to Drip Irrigation System under HPSHIVA project at Cluster Seoh in (E) Section Sidhpur UESD HPSEBL Dhar ur.
Sl. No. Item Description
1Erection Part 25 KVA DTR (TS. No. 55/2026-27 W.B.S. D-26-0999)
2Erection of 25 KVA DTR, LT Box, Cable and Energy meter complete in all respect.
3Transportation Charges for complete Material
4(Supply Part 25 KVA DTR)
5Distribution Transformer (Ordinary), 11/0.4 kV, 25 KVA
6Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
7Muffs (2000mm) with concerete filling
8X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
9MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's
10X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
11X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
12X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
13MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
14MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos
15MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
16MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
17MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
18GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
19GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
20D.O Fuse Unit
21Surge Arrester, 9 kV Station Class (Porcelain Type)
22Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
23Stay set complete (i/c Stay Clamps)
24Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
25Pipe Earthing Set
266 SWG GI wire For Earthing
27LT Distribution Panel Box 25 KVA DTR with (MCCB 50 amp 4P 25kA & ICS 100% ICU KIT-KAT 200 Amp(16 No. rewirable)
28Half Clamp (M.S. Flat 50X6 mm)
29Full Clamps (M.S. Flat 50X6 mm)
30Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
31Aluminium Thimble
32Copper Thimble 35 mm2
33Danger Plate
34Barbed Wire
35LT Cable (3.5 Core) 35 mm²
36Energy Meter (3-Phase, 4-Wire) DLMS compliant 50 A CT Type for 25KVA Transformer
37Aluminium Paint.
38Red Oxide
39Erection Part HT Line (TS. No. 55/2026-27 W.B.S. D-26-0999)
40Erection of S/T pole 10 mtr long,(Double pole structure) with RCC muff Including Concreating digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor).
41Erection of S/T pole 10 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor).
42Erection of HT earthing set comprising digging of pit, fixing of GI wire to the earth system,and filling of pit complete in all respects.
43Erection of stay set HT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects.
44Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects.
45Erection of H T line with AAAC/ACSR Conductor 6/1/3.35 mm2 (50mm2) such as stringing, tensioning and sagging,jointing and fastening .
46(Supply Part HT LIne)
47ACSR 6/1/3.35 mm (50 mm² {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage)}
48Steel Tubular Poles 10 m
49Muffs (2000mm) with concerete filling
50X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 1270mm x 2 Nos
51Angle Iron: 50X50x6, Length: 750mm x 2 Nos 8 Structure
52Pole Top Bracket MS Channel Iron: 100X50x6, Length: 100mm
5311 kV Pin Insulators with GI Pin(Porcelain, 12 kV, 10 kN): 6 No per structure
54X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340mm x 2 Nos
5511 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 6 No per structure
56Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (6 No. conductors) x (2 No. sides)
57X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
58Belt Set - MS Angle Iron: 50x50x6, Length [(1800 x 2 No.]
59X-Arm (Horizontal) - MS Channel Iron: 75X40x6 mm, Length: 2800mm x 4 Nos for supporting DO fuse unit and GO Switch
60GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
61GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
62D.O Fuse Unit
63Stay set complete in all respect (i/c Stay Clamp) (1No. / Single Pole , 4 No. / Double Pole Structures)
64Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
65HT Earthing set complete
66Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road and wastage)} @ 0.102 kg/m
67Eye Hook for earth wire
68Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ]
69MS Angle Iron 50x50x6, Length: 2800 mm for guarding
70Barbed wire
71Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No]
72Danger Plate (250X200X1.6 mm)
73Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
74Aluminium Paint
75Tong Tester Clipon Type
76Erection Part LT Line (TS. No. 55/2026-27 W.B.S. D-26-0999)
77Erection of S/T pole 9 mtr long,(Single pole structure) with RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor).
78Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects.
79Add Erection Charges for LT Earthing Set
80Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying of Conductor, stringing & sagging, binding with insulator complete in all respects.
81Erection of LT line with ACSR 30 mm² 6/1/2.59 mm such as stringing, tensioning and sagging,jointing and fastening .
82Add Manual Carriage
83Transportation Charges for complete Material of LT line
84(Supply Part LT LIne)
85ACSR 6/1/2.59 mm (30 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage}
86Steel Tubular Poles (9 m, Working Load>200kgf/m²) (with Ruling Span 67 m)
87Muffs with concerete filling
88Shackle Insulator (16 kN)
89D-Iron (U- Clamps)
90Earth Knob complete
91LT Stay Set
92Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
93Full Clamps
94Earthing Set complete
95Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m
96Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
97Aluminium Paint
98Spiral PVC Spacer
99Chief Electrical Inspection fee (For DTR, HT and LT Line) Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57819978
AUTHORITY Government Departments
TENDER VALUE 8.34 Lakhs
LAST DATE 08-10-2026
Authority
Authority Name Himachal Pradesh State Electricity Board
Work Description Tender for Tender For providing Sop To Drip Irrigation System Under Hpshiva Project At Cluster Seoh In (E) Section Sidhpur Uesd Hpsebl Dhar Ur.
Basic Detail
Tender No 27/2026-27
Bidding Type Tender
Location
City Mandi
State Himachal Pradesh
Key Dates
Publish Date 01 Oct 2026
Submission Date 08 Oct 2026
Open Date 08 Oct 2026
Finance
Tender Value 8.34 Lakhs
Tender Fee 590
EMD 8345
Exemption Not Available
Document List
a6522e17-eff8-4189-9853-b57a29b929a5.html
BOQ_215519.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 08, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Oct 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 2 days

Tender Documents

Download All (ZIP) ↓
html

a6522e17-eff8-4189-9853-b57a29b929a5.html

xls

BOQ_215519.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders