Tender For Operation & Maintenance Of E&M Work Of Cdc & Iesd Building At B.H.U., Varanasi.
Tender Value
3.15 Crore
Estimated cost
Bid Submission
09 Oct 2026
4 days left
EMD
6.30 Lakhs
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Varanasi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Operation & Maintenance Of E&M Work Of Cdc & Iesd Building At B.H.U., Varanasi.
BOQ
| Sl. No. | Item Description |
| 1 | SH-I (Manpower)Providing manpower for operation and maintenance of electrical installation including fans, compound/security lights and attending day to day electrical complaints, cleaning of ceiling fans & other electrical accessories, operation of water pump sets, DG sets, UPS, Electrical work related with running/ maintenance of electrical substation, HT & LT Panel on all days including sunday & holidays at CDC Building & IESD Building, BHU, Varanasi as required by Engineer in charge. |
| 2 | Skilled Supervisor-01 No. (1 No. in general Shift 10:00 AM to 6:00 PM) First year (12 Months) |
| 3 | Skilled Supervisor-01 No. (1 No. in general Shift 10:00 AM to 6:00 PM) Second year (12 Months) |
| 4 | Skilled Supervisor-01 No. (1 No. in general Shift 10:00 AM to 6:00 PM) Third year (12 Months) |
| 5 | Wiremen/Skilled- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Fisrt year (12 Months) |
| 6 | Wiremen/Skilled- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Second year (12 Months) |
| 7 | Wiremen/Skilled- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Third year (12 Months) |
| 8 | Helper/Unskilled- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Fisrt year (12 Months) |
| 9 | Helper/Unskilled- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Second year (12 Months) |
| 10 | Helper/Unskilled- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Third year (12 Months) |
| 11 | Providing manpower for operation of the Fire Fighting System & Fire Alarm System installed at CDC Building & IESD Building, BHU, Varanasi (U.P.) i/c provision of daily consumable items such as battery water, washer for coupling etc. gaskets, nut-bolts, packing, glands, thimbles, ICs, fuses etc. as required and deployment of the following manpower. |
| 12 | Skilled Operator- 2 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM) Fisrt year (12 Months) |
| 13 | Skilled Operator- 2 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM) Second year (12 Months) |
| 14 | Skilled Operator- 2 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM) Third year (12 Months) |
| 15 | Helper/Unskilled-- 2 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM) First year (12 Months) |
| 16 | Helper/Unskilled-- 2 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM) Second year (12 Months) |
| 17 | Helper/Unskilled-- 2 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM) Third year (12 Months) |
| 18 | Providing manpower for operation of the HVAC system, installed at CDC Building, BHU, Varanasi (U.P.) i/c deployment of the following manpower |
| 19 | Skilled Operator- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Fisrt year (12 Months) |
| 20 | Skilled Operator- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Second year (12 Months) |
| 21 | Skilled Operator- 3 Nos. (1 No. in each shift i.e.Shift 6:00AM-2:00PM, 2:00PM-10:00PM, 10:00PM-6:00AM) Third year (12 Months) |
| 22 | Helper/Unskilled-- 1 No. (1 No. in General shift i.e.Shift 10:00AM to 6:00PM) First year (12 Months) |
| 23 | Helper/Unskilled-- 1 No. (1 No. in General shift i.e.Shift 10:00AM to 6:00PM) Second year (12 Months) |
| 24 | Helper/Unskilled-- 1 No. (1 No. in General shift i.e.Shift 10:00AM to 6:00PM) Third year (12 Months) |
| 25 | SH-II (Material)Supply, Installation, testing & commissioning of following materials (as per existing make & model installed at site.) |
| 26 | 5/6 A Modular type switch |
| 27 | 15/16 A Modular type switch |
| 28 | 5/6 A Modular type socket outlet (2 module). |
| 29 | 15/16 A Modular type socket outlet (3 module). |
| 30 | Telephone socket outlet (RJ - 11) |
| 31 | Internet socket outlet (RJ - 45) |
| 32 | 6-module PVC box with modular cover plate. |
| 33 | 4 module PVC box with modular cover plate. |
| 34 | 1 module PVC box with modular cover plate. |
| 35 | MCB, 6-32A, Single Pole, 10 KA |
| 36 | MCB, Single Pole, 40A, 10 KA |
| 37 | MCB, Tripple Pole 63A,10 KA |
| 38 | MCB, Tripple Pole with Neutral, 63A, 10 KA |
| 39 | LED Down lighter surface/recess, with PDC aluminium housing and high translucent frosted plastic diffuser,Efficacy ≥100 lm/W. |
| 40 | LED Batten,20W, 220-240V AC, Extruded aluminium housing, Efficacy ≥110 lm/W. |
| 41 | 2x2 LED fitting Surface/ recess, Extruded aluminium housing, 36-40W, 220-240V AC, Efficacy ≥110 lm/W. |
| 42 | Fresh-air Exhaust fan 250 mm sweep, RPM>1200, Min Wattage-30W, High Speed, Glass Finish |
| 43 | 1.5 sqmm. Wire, PVC Insulated, Copper Conductor (FRLS) |
| 44 | 4.0 sqmm. Wire, PVC Insulated, Copper Conductor (FRLS) |
| 45 | 6.0 sqmm. Wire, PVC Insulated, Copper Conductor (FRLS) |
| 46 | 10.0 sqmm. Wire, PVC Insulated, Copper Conductor (FRLS) |
| 47 | SH-III AMC and CMC |
| 48 | Annual maintenance contract of 4 x 750 KVA DG installed at CDC Building at BHU, Varanasi (The AMC shall include servicing, routien site visit as per CPWD Norms). Fisrt Year (12 Months) |
| 49 | Annual maintenance contract of 4 x 750 KVA DG installed at CDC Building at BHU, Varanasi (The AMC shall include servicing, routien site visit as per CPWD Norms). Second Year (12 Months) |
| 50 | Annual maintenance contract of 4 x 750 KVA DG installed at CDC Building at BHU, Varanasi (The AMC shall include servicing, routien site visit as per CPWD Norms). Third Year (12 Months) |
| 51 | Annual comprehensive maintenance contract of 3 x 120 KVA UPS installed at CDC Building at BHU, Varanasi (The CMC shall include UPS, Battery etc. complete in all respect as per requirement as per CPWD Norms).First Year (12 Months) |
| 52 | Annual comprehensive maintenance contract of 3 x 120 KVA UPS installed at CDC Building at BHU, Varanasi (The CMC shall include UPS, Battery etc. complete in all respect as per requirement as per CPWD Norms).Second Year |
| 53 | Annual comprehensive maintenance contract of 3 x 120 KVA UPS installed at CDC Building at BHU, Varanasi (The CMC shall include UPS, Battery etc. complete in all respect as per requirement as per CPWD Norms).Third Year (12 Months) |
| 54 | Annual maintenance contract of 2 x 82.5 KVA DG installed at IESD Building at BHU, Varanasi (The AMC shall include servicing, routine site visit complete in all respect as per CPWD Norms).First Year |
| 55 | Annual maintenance contract of 2 x 82.5 KVA DG installed at IESD Building at BHU, Varanasi (The AMC shall include servicing, routine site visit complete in all respect as per CPWD Norms).Second Year (12 Months) |
| 56 | Annual maintenance contract of 2 x 82.5 KVA DG installed at IESD Building at BHU, Varanasi (The AMC shall include servicing, routine site visit complete in all respect as per CPWD Norms).Third Year (12 Months) |
| 57 | Comprehensive Maintenance contract of 3x225 TR compressor screw water chilling machine (Sr. No. 5003835218800001, 500383547188000008 & 500383521188000003) installed at CDC building, BHU, Varanasi (The CMC shall include servicing, routine site visit i/c all other consumable item complete in all respect as per requirement as per CPWD Norms) First Year (12 Months) |
| 58 | Comprehensive Maintenance contract of 3x225 TR compressor screw water chilling machine (Sr. No. 5003835218800001, 500383547188000008 & 500383521188000003) installed at CDC building, BHU, Varanasi (The CMC shall include servicing, routine site visit i/c all other consumable item complete in all respect as per requirement as per CPWD Norms) Second Year (12 Months) |
| 59 | Comprehensive Maintenance contract of 3x225 TR compressor screw water chilling machine (Sr. No. 5003835218800001, 500383547188000008 & 500383521188000003) installed at CDC building, BHU, Varanasi (The CMC shall include servicing, routine site visit i/c all other consumable item complete in all respect as per requirement as per CPWD Norms) Third Year (12 Months) |
| 60 | SH-IV DG Repairing work |
| 61 | Servicing of 82.5KVA Jakson (Cummins) make DG Set as following- 1- Replacement of Diesel filter 2- Replacement of Mobile filter3- Replacement of Air filter4- Replacement & refilling of Coolant5- Replacement & refilling of 15W40 Lube Oil 6- Cleaning of radiator.7- Replacement of hoses, gasket, control wire,steel wire, cover, battery lugs etc as required.8- checking & rectification of leakage of oil/water, electrical connection.9-Fasteniing of nut & bolts, replacement of warn out nut & bolts 10- Servicing & repair of Electrical Starter Note- All old & unserviceable items will be credited back to the contractor. First Year |
| 62 | Servicing of 82.5KVA Jakson (Cummins) make DG Set as following- 1- Replacement of Diesel filter 2- Replacement of Mobile filter3- Replacement of Air filter4- Replacement & refilling of Coolant5- Replacement & refilling of 15W40 Lube Oil 6- Cleaning of radiator.7- Replacement of hoses, gasket, control wire,steel wire, cover, battery lugs etc as required.8- checking & rectification of leakage of oil/water, electrical connection.9-Fasteniing of nut & bolts, replacement of warn out nut & bolts 10- Servicing & repair of Electrical Starter Note- All old & unserviceable items will be credited back to the contractor. Second Year |
| 63 | Servicing of 82.5KVA Jakson (Cummins) make DG Set as following- 1- Replacement of Diesel filter 2- Replacement of Mobile filter3- Replacement of Air filter4- Replacement & refilling of Coolant5- Replacement & refilling of 15W40 Lube Oil 6- Cleaning of radiator.7- Replacement of hoses, gasket, control wire,steel wire, cover, battery lugs etc as required.8- checking & rectification of leakage of oil/water, electrical connection.9-Fasteniing of nut & bolts, replacement of warn out nut & bolts 10- Servicing & repair of Electrical Starter Note- All old & unserviceable items will be credited back to the contractor. Third Year Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 09, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysOct 13, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender