Tender for Pre-bid Tie up of Dampers for Nuclear Ventilation System for 4X700 MWe ASHVINI MAHI BANSWARA UNIT 1-4 (NIMEP) projects as per tender documents
Tender Overview
Project Description
pre-bid tie up of dampers for nuclear ventilation system for 4x700 mwe ashvini mahi banswara unit 1-4 (nimep) projects as per tender documents , dampers for nuclear ventilation system for 4x700 mwe ashvini mahi bansiwara nuclear island mega epc as per technical specification no- pe-ts-551-580-003-a001 , total lump sum firm price for supply part, supervision of erection & commissioning , mandatory spares and engineering charges for critical / containment isolation dampers comprising of design (i.e. preparation and submission of drawing /documents including “as built” drawings and o&m manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site , supervision for erection & commissioning, trial run at site and carrying out performance guarantee / functional / demonstration tests at site (as applicable), training of customer/client o&m staff at site, and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification as specified above, amendment & agreements till placement of order. (refer annexure c1 to nit for detailed boq cum price format) , total lump sum firm price supply part, supervision of erection & commissioning and engineering charges for fire dampers comprising of design (i.e. preparation and submission of drawing /documents including “as built” drawings and o&m manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site , supervision for erection & commissioning, trial run at site and carrying out performance guarantee/ functional / demonstration tests at site (as applicable), training of customer/client o&m staff at site, and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification as specified above, amendment & agreements till placement of order. (refer annexure c2 to nit for detailed boq cum price format) , total lump sum firm price for supply part, supervision of erection & commissioning and engineering charges for dampers comprising of design (i.e. preparation and submission of drawing /documents including “as built” drawings and o&m manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site , supervision for erection & commissioning, trial run at site and carrying out performance guarantee/ functional / demonstration tests at site (as applicable), training of customer/client o&m staff at site, and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per bhel nit & tender technical specification as specified above, amendment & agreements till placement of order. (refer annexure c3 to nit for detailed boq cum price format)
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 12-Oct-2026 | Corrigenda 01 | Date | 19-Oct-2026 |
| 2 | 19-Oct-2026 | Corrigenda 02 | Date | 26-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | DAMPERS FOR NUCLEAR VENTILATION SYSTEM for 4X700 MWe ASHVINI MAHI BANSIWARA NUCLEAR ISLAND MEGA EPC as per Technical Specification no- PE-TS-551-580-003-A001 |
| 2 | Total lump sum firm price for Supply part, Supervision of erection & commissioning , Mandatory spares and Engineering charges for Critical / Containment Isolation Dampers comprising of design (i.e. Preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site , supervision for erection & commissioning, trial run at site and carrying out Performance guarantee / Functional / Demonstration tests at site (as applicable), training of customer/client O&M staff at site, and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order.(Refer ANNEXURE C1 to NIT for Detailed BOQ cum price format) |
| 3 | Total lump sum firm price Supply part, Supervision of erection & commissioning and Engineering Charges for Fire Dampers comprising of design (i.e. Preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site , supervision for erection & commissioning, trial run at site and carrying out Performance guarantee/ Functional / Demonstration tests at site (as applicable), training of customer/client O&M staff at site, and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order.(Refer ANNEXURE C2 to NIT for Detailed BOQ cum price format) |
| 4 | Total lump sum firm price for Supply part, Supervision of erection & commissioning and Engineering Charges for Dampers comprising of design (i.e. Preparation and submission of drawing /documents including “As Built” drawings and O&M manuals), engineering, manufacture, fabrication, assembly, supply / procurement, inspection and testing at vendor’s / sub vendor’s / manufacturer’s works, obtaining necessary statutory clearances, painting, maintenance tools & tackles (as applicable), fill of lubricants & consumables (as applicable), mandatory spares along with spares for erection, start-up and commissioning as required, forwarding, proper packing and shipment and delivery at site , supervision for erection & commissioning, trial run at site and carrying out Performance guarantee/ Functional / Demonstration tests at site (as applicable), training of customer/client O&M staff at site, and handover in flawless condition of the package to the end customer complete with all accessories for the total scope defined as per BHEL NIT & tender technical specification as specified above, amendment & agreements till placement of order.(Refer ANNEXURE C3 to NIT for Detailed BOQ cum price format) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 3 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender