Tender For Name Of The Work:- Construction Of Flood Protection Works In Doda East Constituency At Various Spots Falling Under The Jurisdiction Of (I&Fc) Division Doda Phase-I
Tender Value
95.66 Lakhs
Estimated cost
Bid Submission
08 Oct 2026
6 days left
EMD
1.91 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Doda → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Name Of The Work:- Construction Of Flood Protection Works In Doda East Constituency At Various Spots Falling Under The Jurisdiction Of (I&Fc) Division Doda Phase-I
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: In All kind of soil, lead upto 1 meter. |
| 2 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing in 1:2:4 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth without bond stones |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. |
| 10 | Dumping stone excluding cost of stones in horizontal on level |
| 11 | Cost of crates @ 5500 / crate |
| 12 | Supply of stones |
| 13 | P/L of 40mm thick flooring in 1:2:4 mix including curing complete |
| 14 | P/L of 12mm Cement plaster of mix 1 : 4 including curing complete |
| 15 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 16 | Random Rubble masonry with hard stone in superstructure above plinthlevel and upto floor five level, including levelling up with cement concrete1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mmnominal size) and curing complete at window sills, ceiling level and the like :Cement mortar 1:6 (1 Cement : 6 coarse sand) Using Nallah Stone |
| 17 | Hand-packing of stones in wire-crates; excluding cost of crates and stones |
| 18 | C/o Cement at an average distance of 15 Km by MT & 200m by H/L |
| 19 | C/o Sand & Bajri at an average distance of 15 Km by MT & 200m by H/L |
| 20 | C/o Cement at an average distance of 1 Km by MT & 300m by H/L |
| 21 | C/o Aggregate at an average distance of 5Km by MT & 300m by H/L |
| 22 | C/o Stones at an average distance of 3Km by MT & 300m by H/L |
| 23 | C/o Cement at an average distance of 25 Km by MT & 50m by H/L |
| 24 | C/o Aggregate at an average distance of 25Km by MT & 50m by H/L |
| 25 | C/o Stones at an average distance of 4 Km by MT & 50m by H/L |
| 26 | C/o Crates at an average distance of 30 Km by MT & 200m by H/L |
| 27 | C/o Stones at an average distance of 350m by H/L |
| 28 | C/o Cement at an average distance of 28 Km by MT & 200m by H/L |
| 29 | C/o Aggregate at an average distance of 28 Km by MT & 200 m by H/L |
| 30 | C/o Stones at an average distance of 1 Km by MT & 300 m by H/L |
| 31 | C/o Stones at an average distance of 450 m by H/L |
| 32 | C/o Cement at an average distance of 10 Km by MT & 500m by H/L |
| 33 | C/o Aggregate at an average distance of 25Km by MT & 500 m by H/L |
| 34 | C/o Stones at an average distance of 4 Km by MT & 500 m by H/L |
| 35 | C/o Cement at an average distance of 1 Km by MT & 200m by H/L |
| 36 | C/o Aggregate at an average distance of 5Km by MT & 200 m by H/L |
| 37 | C/o Stones at an average distance of 5 Km by MT & 200 m by H/L |
| 38 | C/o Cement at an average distance of 2 Km by MT & 200m by H/L |
| 39 | C/o Aggregate at an average distance of 26 Km by MT & 200 m by H/L |
| 40 | C/o Stones at an average distance of 5 Km by MT & 250 m by H/L |
| 41 | C/o Cement at an average distance of 32 Km by MT & 300m by H/L |
| 42 | C/o Aggregate at an average distance of 32 Km by MT & 300 m by H/L |
| 43 | C/o Stones at an average distance of 300 m by H/L |
| 44 | C/o Cement at an average distance of 20 Km by MT & 200m by H/L |
| 45 | C/o Aggregate at an average distance of 20 Km by MT & 200 m by H/L |
| 46 | C/o Stones at an average distance of 200 m by H/L |
| 47 | C/o Stones at an average distance of 150 m by H/L |
| 48 | C/o Cement at an average distance of 7 Km by MT & 200m by H/L |
| 49 | C/o Aggregate at an average distance of 7 Km by MT & 200m by H/L |
| 50 | C/o Sand & Bajri(20mm) at an average distance of 45 Km by MT |
| 51 | C/o Cement at an average distance of 40 Km by MT |
| 52 | C/o Sand & Bajri at an average distance of 25 Km by MT & 1200 m by H/L |
| 53 | C/o Cement at an average distance of 20 Km by MT & 1200m by H/L |
| 54 | C/o Stones at an average distance of 400 m by H/L |
| 55 | C/o Sand & Bajri(20mm) at an average distance of 50 Km by MT & 800 m by H/L |
| 56 | C/o Cement at an average distance of 50 Km by MT & 800 m by H/L |
| 57 | C/o Sand & Bajri at an average distance of 500 m by H/L |
| 58 | C/o Cement at an average distance of 500 m by H/L Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 01, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender