Power Boards / Undertakings / PSU Closing in 4 days TDR #57818821

Tender For Nctps-I - Es Circle - Em-I Dn - S.Dn-Iv - Annual Overhauling Of Lt Motors And 6.6Kv, 3500Kw Bfp Motor Cooler 1B & 1A Checking Work At Unit I During The Year 2026-27

Issued by Boards / Undertakings / PSU · Thiruvallur, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Oct 2026
4 days left
EMD
6700
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Nctps-I - Es Circle - Em-I Dn - S.Dn-Iv - Annual Overhauling Of Lt Motors And 6.6Kv, 3500Kw Bfp Motor Cooler 1B & 1A Checking Work At Unit I During The Year 2026-27

BOQ

Name of Work:- NCTPS-I - ES Circle - EM-I Dn - S.Dn-IV – Annual Overhauling of LT motors and 6.6KV, 3500KW BFP motor cooler 1B & 1A checking work at unit I during the year 2026-27
Sl. No. Item Description
1Overhauling of LT Motors Overhauling of Auxiliary Oil Pump (MOT) Motor-1B (100 kW)
2Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
3Brazing of new terminal leads from winding, its terminal works (Optional)
4Overhauling of Auxiliary cooling water pump motor - 1A & 1D (110 KW LT Motor)
5Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
6Brazing of new terminal leads from winding (Optional)
7Overhauling of Sea water booster pump motor - 1A & 1D (55 KW LT Motor)
8Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side, checking of bearing housings ,providing sleeves in the end cover of one side (optional)
9Brazing of new terminal leads from winding, its terminal works and provision of new terminal block for 3 phase, 415V 55KW Sea Water Booster Pump motor (optional)
10Overhauling of Ash water supply pump motor-1B (37 KW)
11Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional).
12Brazing of new terminal leads from winding, its termination works and provision of New Terminal Block for 3 phase, 415 V, 37KW Ash Water Booster Pump motor (Optional).
13Overhauling of Instrument air compressor motor- 1A (150KW)
14Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
15Brazing of new terminal leads from winding, its termination works (150 KW Instrument Air Compressor motor) (Optional)
16Charges for overhauling of Service air compressor motor- 1C (150KW)
17Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides,checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
18Brazing of new terminal leads from winding, its termination works (150 KW Service Air Compressor motor) (Optional)
19Overhauling of Vacuum pump motor -1A (93 KW)
20Labour required for Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces on DE & NDE sides, checking of bearings housings, providing sleeves in the end covers on DE & NDE (optional)
21Brazing of new terminal leads from winding, its terminal works (Optional).
22Overhauling of Stator water pump motor - 1B (9.3KW)
23Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
24Overhauling of AC seal oil pump motor (5.5KW)
25Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
26Overhauling of Auxiliary Oil Pump (BFP) Motor-1C (5.5 KW)
27Metal filling ,machining and repairing of worn out shafts/bearing seating surfaces of one side, checking of bearing housings ,providing sleeves in the end cover of one side (optional)
28Overhauling of Jack oil pump motor-1A (30KW)
29Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
30Overhauling of Debris Flushing Pump Motor -1A (11KW)
31Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings ,providing sleeves in the end cover of one side (optional)
32Overhauling of Priming Pump motor (11 KW)
33Metal filling ,machining and repairing of worn out shafts / bearing seating surfaces of one side,checking of bearing housings providing sleeves in the end cover of one side (optional)
34Removal of water line pipes, cooler assembly and lifting the cooler unit to a convenient location.
35Cleaning the cooler tubes, checking the coolers by hydraulic testing, reconditioning of cooler flanges, replacement of gasket etc,
36Lifting the cooler assembly ,fixing with motor and connecting the water line pipes, etc.,
37Material cost and fabrication of ACWP motor terminal bolts, nuts and washer.
38Motor Terminal Block (110 KW).
39Material cost and fabrication of SWBP motor terminal bolts, nuts and washer.
40Motor Terminal Block (55 KW)
41Material cost and fabrication of AWSP motor terminal bolts, nuts and washer.
42Special Consumables 6318 C3 (for 100 KW DE & NDE Side)Make:NTN Imported; Cage: Steel
43N 321 (for 150 KW DE Side)Make:NTN Imported; Cage: Brass
446318 (for 150 KW NDE Side)Make:NTN Imported; Cage: Steel
456319 C3 (for 110KW NDE Side & 93KW NDE side)Make: NTN Imported; Cage: Steel
46NU 319 (for 93 KW DE Side)Make:NTN Imported; Cage: Brass
47NU 319 (for 110 KW DE Side)Make: FAG; Cage: Brass
486215 C3(for 55KW & 37KW NDE Side)Make:NTN Imported; Cage: Steel
49NU 215 (for 55KW & 37KW DE Side)Make:NTN Imported; Cage: Brass
50Consumable & T&P Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57818821
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 07-10-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender for Nctps-I - Es Circle - Em-I Dn - S.Dn-Iv - Annual Overhauling Of Lt Motors And 6.6Kv, 3500Kw Bfp Motor Cooler 1B & 1A Checking Work At Unit I During The Year 2026-27
Basic Detail
Tender No CE/NCTPS-I/SE/ES/WC-62/2026-27
Bidding Type Tender
Location
City Thiruvallur
State Tamil Nadu
Key Dates
Publish Date 01 Oct 2026
Submission Date 07 Oct 2026
Open Date 08 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 6700
Exemption Available
Document List
BOQ_853226.xls
f3634cc0-7a70-4fe5-88af-c5e7920bba69.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Oct 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_853226.xls

html

f3634cc0-7a70-4fe5-88af-c5e7920bba69.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders