Defence Government Departments Closing in 9 days TDR #57818372

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships; Rate Contract Of Removal Overhaul And Fitment Of Underwater Valves, Size – (125 Mm And Above) Type – Nrp/Sdnr For Two Years – In S

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
22 Oct 2026
9 days left
EMD
6.60 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships; Rate Contract Of Removal Overhaul And Fitment Of Underwater Valves, Size – (125 Mm And Above) Type – Nrp/Sdnr For Two Years – In Ships; Service Provide.. - Degutting Of Valves:-Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. , Repair/ Renewal:-Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Reassembly:-Reassemble Valve With New Gaskets And Packing. Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Testing At Workshop:-Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard:-Refit Overhauled Valves Onboard With New Joint Gaskets. Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Degutting Of Valves :Disconnect Pipelines, Actuators, Hand Wheels And Linkages, Remove Foundation Bolts/Studs, Provide Blanking Of Open Pipe Ends/Valve Chest After Removal, Tag Type And Location Of Valve, Lift And Transport Valves Safely To Workshop. , Repair/ Renewal :-Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Reassembly:-Reassemble Valve With New Gaskets And Packing. Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Testing At Workshop:-Conduct Hydrostatic Body Pressure Test. Conduct Seat Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard:-Refit Overhauled Valves Onboard With New Joint Gaskets, Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification, Reconnect Actuators/Linkages And Restore System, Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Degutting Of Valves :Disconnect Pipelines, Actuators, Hand Wheels And Linkages, Remove Foundation Bolts/Studs, Provide Blanking Of Open Pipe Ends/Valve Chest After Removal, Tag Type And Location Of Valve, Lift And Transport Valves Safely To Workshop. , Repair/ Renewal :-Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Reassembly:-Reassemble Valve With New Gaskets And Packing. Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Testing At Workshop:-Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard:-Refit Overhauled Valves Onboard With New Joint Gaskets. Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any.

BOQ

Sl. No. Item TitleItem Description
1Degutting of Valves:-Disconnect pipelines, actuators, hand wheels and linkages. Remove foundation bolts/studs. Provide blanking of open pipe ends/valve chest after removal. Tag type and location of valve. Lift and transport valves safely to workshop.Degutting of Valves:-Disconnect pipelines, actuators, hand wheels and linkages. Remove foundation bolts/studs. Provide blanking of open pipe ends/valve chest after removal. Tag type and location of valve. Lift and transport valves safely to workshop.
2Repair/ Renewal:-Completely dismantle/degut the valve including body, bonet, spindle/stem, disc, seat rings, bushes, gland packing, seals, fasteners etc. Clean all components and carry out detailed inspection. Renew defective/worn out parts such as spindle, disc, seat rings, bushes, bearings, studs, nuts, seals and packing. Carry out machining, lapping of seats/discs and approved welding/ build-up if required. Replace all rubber components and sealing elements with new ones.Repair/ Renewal:-Completely dismantle/degut the valve including body, bonet, spindle/stem, disc, seat rings, bushes, gland packing, seals, fasteners etc. Clean all components and carry out detailed inspection. Renew defective/worn out parts such as spindle, disc, seat rings, bushes, bearings, studs, nuts, seals and packing. Carry out machining, lapping of seats/discs and approved welding/ build-up if required. Replace all rubber components and sealing elements with new ones.
3Reassembly:-Reassemble valve with new gaskets and packing. Ensure correct alignment and clearances, Lubricate with approved grade lubricants. Conduct hydrostatic body pressure test.Reassembly:-Reassemble valve with new gaskets and packing. Ensure correct alignment and clearances, Lubricate with approved grade lubricants. Conduct hydrostatic body pressure test.
4Testing at workshop:-Conduct hydrostatic body pressure test. Conduct sea leakage test. Carryout functional / operational testing at 2 times of working pressure.Testing at workshop:-Conduct hydrostatic body pressure test. Conduct sea leakage test. Carryout functional / operational testing at 2 times of working pressure.
5Refitting Onboard:-Refit overhauled valves onboard with new joint gaskets. Tighten all connections and foundation bolts, Renew worn out foundation studs/ bolts. All fasteners shall be replaced with new corrosion-resistant, marine grade fasteners suitable for continuous sweater exposure, as per specification. Reconnect actuators/linkages and restore system. Carry out system pressure testing and operational trial onboard. Rectify defects if any.Refitting Onboard:-Refit overhauled valves onboard with new joint gaskets. Tighten all connections and foundation bolts, Renew worn out foundation studs/ bolts. All fasteners shall be replaced with new corrosion-resistant, marine grade fasteners suitable for continuous sweater exposure, as per specification. Reconnect actuators/linkages and restore system. Carry out system pressure testing and operational trial onboard. Rectify defects if any.
6Degutting of Valves :Disconnect pipelines, actuators, hand wheels and linkages, Remove foundation bolts/studs, Provide blanking of open pipe ends/valve chest after removal, Tag type and location of valve, Lift and transport valves safely to workshop.Degutting of Valves :Disconnect pipelines, actuators, hand wheels and linkages, Remove foundation bolts/studs, Provide blanking of open pipe ends/valve chest after removal, Tag type and location of valve, Lift and transport valves safely to workshop.
7Repair/ Renewal :-Completely dismantle/degut the valve including body, bonet, spindle/stem, disc, seat rings, bushes, gland packing, seals, fasteners etc. Clean all components and carry out detailed inspection. Renew defective/worn out parts such as spindle, disc, seat rings, bushes, bearings, studs, nuts, seals and packing. Carry out machining, lapping of seats/discs and approved welding/ build-up if required. Replace all rubber components and sealing elements with new ones.Repair/ Renewal :-Completely dismantle/degut the valve including body, bonet, spindle/stem, disc, seat rings, bushes, gland packing, seals, fasteners etc. Clean all components and carry out detailed inspection. Renew defective/worn out parts such as spindle, disc, seat rings, bushes, bearings, studs, nuts, seals and packing. Carry out machining, lapping of seats/discs and approved welding/ build-up if required. Replace all rubber components and sealing elements with new ones.
8Reassembly:-Reassemble valve with new gaskets and packing. Ensure correct alignment and clearances. Lubricate with approved grade lubricants. Conduct hydrostatic body pressure test.Reassembly:-Reassemble valve with new gaskets and packing. Ensure correct alignment and clearances. Lubricate with approved grade lubricants. Conduct hydrostatic body pressure test.
9Testing at workshop:-Conduct hydrostatic body pressure test. Conduct seat leakage test. Carryout functional / operational testing at 2 times of working pressure.Testing at workshop:-Conduct hydrostatic body pressure test. Conduct seat leakage test. Carryout functional / operational testing at 2 times of working pressure.
10Refitting Onboard:-Refit overhauled valves onboard with new joint gaskets, Tighten all connections and foundation bolts, Renew worn out foundation studs/ bolts. All fasteners shall be replaced with new corrosion-resistant, marine grade fasteners suitable for continuous sweater exposure, as per specification, Reconnect actuators/linkages and restore system, Carry out system pressure testing and operational trial onboard. Rectify defects if any.Refitting Onboard:-Refit overhauled valves onboard with new joint gaskets, Tighten all connections and foundation bolts, Renew worn out foundation studs/ bolts. All fasteners shall be replaced with new corrosion-resistant, marine grade fasteners suitable for continuous sweater exposure, as per specification, Reconnect actuators/linkages and restore system, Carry out system pressure testing and operational trial onboard. Rectify defects if any.
11Degutting of Valves :Disconnect pipelines, actuators, hand wheels and linkages, Remove foundation bolts/studs, Provide blanking of open pipe ends/valve chest after removal, Tag type and location of valve, Lift and transport valves safely to workshop.Degutting of Valves :Disconnect pipelines, actuators, hand wheels and linkages, Remove foundation bolts/studs, Provide blanking of open pipe ends/valve chest after removal, Tag type and location of valve, Lift and transport valves safely to workshop.
12Repair/ Renewal :-Completely dismantle/degut the valve including body, bonet, spindle/stem, disc, seat rings, bushes, gland packing, seals, fasteners etc. Clean all components and carry out detailed inspection. Renew defective/worn out parts such as spindle, disc, seat rings, bushes, bearings, studs, nuts, seals and packing. Carry out machining, lapping of seats/discs and approved welding/ build-up if required. Replace all rubber components and sealing elements with new ones.Repair/ Renewal :-Completely dismantle/degut the valve including body, bonet, spindle/stem, disc, seat rings, bushes, gland packing, seals, fasteners etc. Clean all components and carry out detailed inspection. Renew defective/worn out parts such as spindle, disc, seat rings, bushes, bearings, studs, nuts, seals and packing. Carry out machining, lapping of seats/discs and approved welding/ build-up if required. Replace all rubber components and sealing elements with new ones.
13Reassembly:-Reassemble valve with new gaskets and packing. Ensure correct alignment and clearances. Lubricate with approved grade lubricants. Conduct hydrostatic body pressure test.Reassembly:-Reassemble valve with new gaskets and packing. Ensure correct alignment and clearances. Lubricate with approved grade lubricants. Conduct hydrostatic body pressure test.
14Testing at workshop:-Conduct hydrostatic body pressure test. Conduct sea leakage test. Carryout functional / operational testing at 2 times of working pressure.Testing at workshop:-Conduct hydrostatic body pressure test. Conduct sea leakage test. Carryout functional / operational testing at 2 times of working pressure.
15Refitting Onboard:-Refit overhauled valves onboard with new joint gaskets. Tighten all connections and foundation bolts. Renew worn out foundation studs/ bolts. All fasteners shall be replaced with new corrosion-resistant, marine grade fasteners suitable for continuous sweater exposure, as per specification. Reconnect actuators/linkages and restore system. Carry out system pressure testing and operational trial onboard. Rectify defects if any.Refitting Onboard:-Refit overhauled valves onboard with new joint gaskets. Tighten all connections and foundation bolts. Renew worn out foundation studs/ bolts. All fasteners shall be replaced with new corrosion-resistant, marine grade fasteners suitable for continuous sweater exposure, as per specification. Reconnect actuators/linkages and restore system. Carry out system pressure testing and operational trial onboard. Rectify defects if any.

AI Tender Summary

OUR REF NO 57818372
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 22-10-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships; Rate Contract Of Removal Overhaul And Fitment Of Underwater Valves, Size – (125 Mm And Above) Type – Nrp/Sdnr For Two Years – In Ships; Service Provide.. - Degutting Of Valves:-Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. , Repair/ Renewal:-Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Reassembly:-Reassemble Valve With New Gaskets And Packing. Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Testing At Workshop:-Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard:-Refit Overhauled Valves Onboard With New Joint Gaskets. Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Degutting Of Valves :Disconnect Pipelines, Actuators, Hand Wheels And Linkages, Remove Foundation Bolts/Studs, Provide Blanking Of Open Pipe Ends/Valve Chest After Removal, Tag Type And Location Of Valve, Lift And Transport Valves Safely To Workshop. , Repair/ Renewal :-Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Reassembly:-Reassemble Valve With New Gaskets And Packing. Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Testing At Workshop:-Conduct Hydrostatic Body Pressure Test. Conduct Seat Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard:-Refit Overhauled Valves Onboard With New Joint Gaskets, Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification, Reconnect Actuators/Linkages And Restore System, Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Degutting Of Valves :Disconnect Pipelines, Actuators, Hand Wheels And Linkages, Remove Foundation Bolts/Studs, Provide Blanking Of Open Pipe Ends/Valve Chest After Removal, Tag Type And Location Of Valve, Lift And Transport Valves Safely To Workshop. , Repair/ Renewal :-Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Reassembly:-Reassemble Valve With New Gaskets And Packing. Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Testing At Workshop:-Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard:-Refit Overhauled Valves Onboard With New Joint Gaskets. Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any.
Basic Detail
Tender No GEM/2026/B/8052861
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 01 Oct 2026
Submission Date 22 Oct 2026
Open Date 23 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 6.60 Lakhs
Exemption Not Available
Document List
2724b69e-e503-431e-ac42-f2b5b35705f4.pdf
1790831937.xlsx
1790745103.pdf
1790745105.pdf
FINAL_63b649e2-5a7f-4b7c-8b001790844645688_SMCOM.pdf
safetycl_7223baa8-9b32-465d-a0921790747226903_SMCOM.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 22, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Oct 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

2724b69e-e503-431e-ac42-f2b5b35705f4.pdf

xlsx

1790831937.xlsx

pdf

1790745103.pdf

pdf

1790745105.pdf

pdf

FINAL_63b649e2-5a7f-4b7c-8b001790844645688_SMCOM.pdf

pdf

safetycl_7223baa8-9b32-465d-a0921790747226903_SMCOM.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders