Tender For Maintaining Government Roads In Uthukottai (H), C&M, Sub Division Of Gummidipoondi (H), C&M, Division For The Year 2026-2027.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Oct 2026
13 days left
EMD
15000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Maintaining Government Roads In Uthukottai (H), C&M, Sub Division Of Gummidipoondi (H), C&M, Division For The Year 2026-2027.
BOQ
| Sl. No. | Item Description |
| 1 | Clearing the Light jungles including weeding outshrubs bushes, vegetables, growth etc,as perspcifications and directions of Engineer in charge (Twice times per year) |
| 2 | Road B |
| 3 | Forming and raising the Berms with carted earthwith a lead of 2 km from the approved source towork site including cost of earth, conveyancecharges and filling levelling to the lines, gradesand cross sections shown in the drawings or asindicated by the Engineer for making up theberms (Yearly one times) as directed by the dept.officers |
| 4 | Road B |
| 5 | Towards Hire Charges for supply of JCB Machinefor Low berms and High berms clearing along theroad side, providing side earthen drains, removingdebris in built-up area and clearing the vent wayof culverts. etc., complete |
| 6 | Road B |
| 7 | Providing the services of Tractor Dozer includingcost of fuel and running charges for themaintenance activities and attending emergencywork when ever the dept. officers instructed tooperate the same etc, complete |
| 8 | Road B |
| 9 | Providing the services of Tippers including cost offuel and running charges for the disposal ofsurplus earth from the road side and attendingemergency work when ever the dept. officersinstructed to operate the same etc, complete |
| 10 | Road B |
| 11 | Supply of gangs for removing the stagnated waterin the surface, attending to the earth removal andsectioning the road cut areas for maintaining theuninterrupted traffic and other miscellaneouspurpose and maintenance purpose of the road asdirected by the departmental officers etc.,complete |
| 12 | Mazdoor category I |
| 13 | Mazdoor category II |
| 14 | White washing over the existing Culverts, Parapetand minor bridge including cost of materials andlabour charges etc, comple (One time per year) |
| 15 | Road B |
| 16 | Providing, laying, spreading and compactinggraded stone aggregates for Wet Mix Macadam250mm thick, including premixing the materialswith water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site,laying in uniform layers using pavers in SubBase/ Base course on well prepared surface andcompacting with vibratory soil compactor toacheive the desired density including cost ofmaterial, labour charges, rentals for machinery,fuel and all other incidental charges etc., completeas per clause 406 of MORTH Rev-5 ( For Patches ) |
| 17 | Road B |
| 18 | Providing and laying Prime Coat over WBM/ WMMsurface using 7 Kg of Emulsion Bitumen (SS1) per10 sqm for preparatory to another bituminousconstruction over it, including cost of material,labour charges, rentals for machinery, fuel and allother incidental charges etc., complete asperClause 502 of MORTH Rev-5 |
| 19 | Road B |
| 20 | Providing and laying Tack Coat over WBM/ WMMsurface (treated with primer) using 2.50 Kg ofBitumen Emulsion (RS1) per 10 sqm forpreparatory to another bituminous constructionover it including cost of material, labour charges,rentals for machinery, fuel and all other incidentalcharges etc., complete as perClause 503 ofMORTH Rev-5 |
| 21 | Road B |
| 22 | Providing and laying Tack Coat over Existing BTsurface using 2 Kg of Bitumen Emulsion (RS1) per10 sqm for preparatory to another bituminousconstruction over it including cost of material,labour charges, rentals for machinery, fuel and allother incidental charges etc., complete asperClause 503 of MORTH Rev-5 |
| 23 | Road B |
| 24 | Providing, laying 50mm consolidated thickBituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and0.08cum of 2.36mm & below size IRC metal with37 Kgs of VG30 Grade bitumen for premixing per10sqm including cost and conveyance of allmaterials to CMP site, heating the bitumen,aggregate and mixing them in requiredtemperature using Central hot mix plant 20-30toncapacity, conveying the mix by tipper trucks topaver site, spreading the mix to uniform thicknessof 50mm with mechanical paver to the specifiedgrades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required densityetc., including labour for attending to paver to siteetc., including hire and fuel charges for 20-30tCMP with bitumen boiler, tipper trucks, PaverFinisher, Vibratory roller and all other tools andplant required, including all other incidentalcharges etc., complete as per specification usingCMP as per clause 504 of MORTH Rev-5 |
| 25 | Road B |
| 26 | Providing and laying Bituminous Concrete to30/40mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cumof 2.36 and below with 50.30kgs of VG30 bitumenfor premixing per 10sqm including cost andconveyance of all materials to CMP site, heatingthe bitumen and aggregate to requiredtemperature and mixing them in requiredtemperature in central hot mix plant 20-30 toncapacity, conveying the mix by tipper trucks topaver site, spreading the mix to uniformthickness of 40mm with mechanical paver tothe specified grades and cross sections andconsolidated by 8-10 tonne Vibratory to therequired density etc., including labour forattending to paver to site etc., including hirecharges and fuel charges for 20-30 t CMP withbitumen boiler, tipper trucks, Paver Finisher,Vibratory roller and all other tools and plantrequired, including fuel and all other incidentalcharges etc., complete as per specification usingCMP as per clause 507 of MORTH Rev-5 |
| 27 | Road B |
| 28 | Calculation of SubTotal, GST and Total Amount carried out by system automatically |
| 29 | Basic cost of value put to tender as per estimate |
| 30 | Add GST at 18% |
| 31 | Total Value put to Tender |
| 32 | Quoted value |
| 33 | Final Quoted Value |
| 34 | Add GST at 18% of Final Quoted Value |
| 35 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
| 36 | Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 15, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 13 daysOct 15, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender