Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Bpt 3; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
22 Oct 2026
15 days left
EMD
18.36 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Bpt 3; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth Service Cost , U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth Material Cost , Ultrasonic Gauging Readings At Under Water, Above Water And Weather Deck Areas And Fittings, Tanks And All Associated Fittings Tanks, U/W And B/T Area To Be Carried Out Report For The Same To Be Provided Service Cost , Ultrasonic Gauging Readings At Under Water, Above Water And Weather Deck Areas And Fittings, Tanks And All Associated Fittings Tanks, U/W And B/T Area To Be Carried Out Report For The Same To Be Provided Material Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted Paint Scheme As Follow:- 1 Fc Interguard 269 : Dft 50 Micron, 2 Fc Intershield 300 : Dft 2*150 Micron, 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc : Dft 3* 150M. B/T Paint Scheme:- 1 Fc Interguard 263: Dft 1*125 M, 3Fc Antifouling Intersmooth 360Spc Dft 3*150 M, Last Coat Black Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Interguard 269: Dft 50 Micron, 2 Fc Intershield 300: Dft 2*150 Micron , 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360 Spc: Dft 3*150 M. B/T Paint Scheme :- 1 Fc Interguard 269; Dft 1*50 M , 2 Fc Intershield 300; Dft 2*150 M , 1 Fc Interguard 263 : Dft 1*125 M , 3 Fc Antifouling Intersmooth 360Spc Dft 3*150 M, Last Coat Black Material Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Interguard 259: Dft 1*50M, 2Nd & 3Rd Coat Inter Tuff 265:Dft2*125M, 4Th Full Coat Interthane 990:Dft 2*60 M. Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow :- 1St Coat Interguard 259: Dft 1*50M, 2Nd & 3Rd Coat Inter Tuff 265:Dft2*125M, 4Th Full Coat Interthane 990:Dft 2*60 M. Material Cost. , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Interguard 269:Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800M. Service Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Interguard 269:Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800M. Material Cost , General Dry Compartments To Be Cleaned And Paint Tough Up To Be Undertaken Paint Scheme As Follows:- 1St Coat Inter Prime 538 : Dft 1*75 M , 2 Fc Interlace 665: Dft 2*50 M Service Cost , General Dry Compartments To Be Cleaned And Paint Tough Up To Be Undertaken Paint Scheme As Follows:- 1St Coat Inter Prime 538 : Dft 1*75 M , 2 Fc Interlace 665: Dft 2*50 M Material Cost , Void Spaces To Be Cleaned And Painted Internally. Surface To Be Prepared To Sa 2.5. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1St Coat Inter Prime 538:Dft 1*80 M, 2 Fc Interlace 665: Dft 2*40 M Service Cost , Void Spaces To Be Cleaned And Painted Internally. Surface To Be Prepared To Sa 2.5. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1St Coat Inter Prime 538:Dft 1*80 M, 2 Fc Interlace 665: Dft 2*40 M Material Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate. Surface To Be Prepared To Sa 2.5 Prior Painting Paint Scheme As Follows:- 2 Coats Of Tank Guard Hb Light Grey And Greyish Green. Dft 2 X 150 Microns Service Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate. Surface To Be Prepared To Sa 2.5 Prior Painting Paint Scheme As Follows:- 2 Coats Of Tank Guard Hb Light Grey And Greyish Green. Dft 2 X 150 Microns Material Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Interguard 269 1 Fc Intershield 300 Service Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1 F/C Interguard 269 1 Fc Intershield 300 Material Cost , Sea Chest Grating To Be Opened,Cleaned, Painted & Refitted ( As Per U/W Paint Scheme). Service Cost , Sea Chest Grating To Be Opened,Cleaned, Painted & Refitted ( As Per U/W Paint Scheme). Material Cost , Post Hammer/Usg Survey Of Steel Structure Consisting External U/W Area, Internal U/W Area, Weather Deck Including Fittings , Ship Side Port And Stbd, Tanks And All Associated Fittings, Renewal Of The Affected Areas (As Per Survey) To Be Undertaken Service Cost , Post Hammer/Usg Survey Of Steel Structure Consisting External U/W Area, Internal U/W Area, Weather Deck Including Fittings , Ship Side Port And Stbd, Tanks And All Associated Fittings, Renewal Of The Affected Areas (As Per Survey) To Be Undertaken Material Cost , Pits Build Up At Various U/W Hull And Decks As Per Surveys Report 1 Pts = 1 Sq Cm Service Cost , Pits Build Up At Various U/W Hull And Decks As Per Surveys Report 1 Pts = 1 Sq Cm Material Cost , Renew Sacrificial Anodes As Per Anode Plan Qty Of Anodes-Mk Ii - 16 In Nos And Mk Iii - 38 In Nos Service Cost , Renew Sacrificial Anodes As Per Anode Plan Qty Of Anodes-Mk Ii - 16 In Nos And Mk Iii - 38 In Nos Material Cost , Fender Securing Rail To Be Renewed Service Cost , Fender Securing Rail To Be Renewed Material Cost , Vertical Ladders (02 In Nos Between Fr Stn 0-45), 02 In Nos In Void Tank 7 (S), 02 In Nos Void Tank 8(S) And 01 In Nos Transverse Ladder Of Length 2000X800x500 Mm With Stanching Height 1100 Mm At Main Deck To Be Renewed And Painted Service Cost , Vertical Ladders (02 In Nos Between Fr Stn 0-45), 02 In Nos In Void Tank 7 (S), 02 In Nos Void Tank 8(S) And 01 In Nos Transverse Ladder Of Length 2000X800x500 Mm With Stanching Height 1100 Mm At Main Deck To Be Renewed And Painted Material Cost , Port And Stbd Fender Securing Foundations To Be Renewed Service Cost , Port And Stbd Fender Securing Foundations To Be Renewed Material Cost , Water Tight Hatches And Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Service Cost , Water Tight Hatches And Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Material Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved Service Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved Material Cost , Poles Of The Lattice Structure And Light Poles (Dia 3 Inch, Length -20 Feet ) To Be Renewed Service Cost , Poles Of The Lattice Structure And Light Poles (Dia 3 Inch, Length -20 Feet ) To Be Renewed Material Cost , Repair Crafts Illuminated Name Board Service Cost , Repair Crafts Illuminated Name Board Service Cost , Replacement And Load Test Of Towing Pendents And Their Accessories Including Shackle And Panama Plate Service Cost , Replacement And Load Test Of Towing Pendents And Their Accessories Including Shackle And Panama Plate Material Cost , Deck Lockers (Ms And Grp) To Be Renewed Service Cost , Deck Lockers (Ms And Grp) To Be Renewed Material Cost , Air Pressure Testing Of All Affected Tanks And Compartments Post Completion Of Hot Work Service Cost , Air Pressure Testing Of All Affected Tanks And Compartments Post Completion Of Hot Work Material Cost , Renew Jack Staff And Ensign Staff Support Pipe With Socket And Shoe In Forecastle And Quarter Deck As Per S Le Mat- Gi Pipe 50 Nb Service Cost , Renew Jack Staff And Ensign Staff Support Pipe With Socket And Shoe In Forecastle And Quarter Deck As Per S Le Mat- Gi Pipe 50 Nb Material Cost , Netting/Mesh To Be Renewed As Per S Le Material 16 Mm Rope Service Cost , Netting/Mesh To Be Renewed As Per S Le Material 16 Mm Rope Material Cost , Fire Hose Box And Brackets To Be Renewed Matl Frp Service Cost , Fire Hose Box And Brackets To Be Renewed Matl Frp Material Cost , Layout Anchor And Chain Cable On Deck. Range Anchor, Chain Cable Joining Shackles Change Cable Ends And Re-Mark Cable Lengths Lubricate Anchor Flukes And Survey Of Cable Clench To Be Carried Out Service Cost , Layout Anchor And Chain Cable On Deck. Range Anchor, Chain Cable Joining Shackles Change Cable Ends And Re-Mark Cable Lengths Lubricate Anchor Flukes And Survey Of Cable Clench To Be Carried Out Service Cost , Anchor And Chain Cable To Be Surveyed By Class Surveyor Defective Cable Lengths To Be Renewed On Completion Painting To Be Done.; Paint Scheme: 3 Coatsbitumi8nous Solution Each Coat 30 Microns Each Service Cost , Anchor And Chain Cable To Be Surveyed By Class Surveyor Defective Cable Lengths To Be Renewed On Completion Painting To Be Done.; Paint Scheme: 3 Coats Bituminous Solution Each Coat 30 Microns Each Material Cost , Deck Plates Of Switch Board, Battery And Fwd Stores Compartment Deformed And Damaged Service Cost , Deck Plates Of Switch Board, Battery And Fwd Stores Compartment Deformed And Damaged Material Cost , Inclining Ladders Of Switch Board Compartment, Fwd Store Deformed And Damaged Service Cost , Inclining Ladders Of Switch Board Compartment, Fwd Store Deformed And Damaged Material Cost , Vent Heads For Switch Board Battery And Battery Compartments Damaged Service Cost , Vent Heads For Switch Board Battery And Battery Compartments Damaged Material Cost , Catamarans Supporting Pipe And Pillar At Mid Section Broken, Damaged Deformed Service Cost , Catamarans Supporting Pipe And Pillar At Mid Section Broken, Damaged Deformed Material Cost , Manhole Covers And Coming Of Foam Filled Tanks Deformed And Damaged Service Cost , Manhole Covers And Coming Of Foam Filled Tanks Deformed And Damaged Material Cost , Cargo Nets With Frame Deformed And Damaged (Rope- 16 Mm Pp Rope ) Dimension- 50 M X 12 M Service Cost , Cargo Nets With Frame Deformed And Damaged (Rope- 16 Mm Pp Rope ) Dimension- 50 M X 12 M Material Cost , Reflectors Alongwith, Stands/ Pipes Found Deformed And Damaged Service Cost , Reflectors Alongwith, Stands/ Pipes Found Deformed And Damaged Material Cost , Operating Panels & Gear Box Of Anchors Windlass Defective View Water Ingress Repair/Renewal To Be Carried Out Service Cost , Operating Panels & Gear Box Of Anchors Windlass Defective View Water Ingress Repair/Renewal To Be Carried Out Material Cost , Twin/Towing Bollard Found Deformed Repair/ Renewal To Be Carried Out Load Test As Per Class To Be Undertaken Certificate For The Same To Be Provided Service Cost , Twin/Towing Bollard Found Deformed Repair/ Renewal To Be Carried Out Load Test As Per Class To Be Undertaken Certificate For The Same To Be Provided Material Cost , Foundation Of Anchor Windlass Deformed Repair/ Renewal To Be Carried Out Service Cost , Foundation Of Anchor Windlass Deformed Repair/Renewal To Be Carried Out Material Cost , Bulwark Alongwith Found Deformed Repair/ Renewal To Be Carried Out Service Cost , Bulwark Alongwith Found Deformed Repair/ Renewal To Be Carried Out Material Cost , Dg Service Tank Found Deformed And Damaged Repair/Renewal To Be Carried Out Service Cost , Dg Service Tank Found Deformed And Damaged Repair/Renewal To Be Carried Out Material Cost , Repair And Refurbishment Of Mushroom Head Service Cost , Repair And Refurbishment Of Mushroom Head Material Cost , Undertake Removal, Repairs & Fitment Of Pipes From Exhaust Manifold Of Both Dg Exhaust Trunking Dia - 100Mm (Nb) Chemical Cleaning And Pressure Testing (2.5Kg/Cm2) Service Cost , Undertake Removal, Repairs & Fitment Of Pipes From Exhaust Manifold Of Both Dg Exhaust Trunking Dia - 100Mm (Nb) Chemical Cleaning And Pressure Testing (2.5Kg/Cm2) Material Cost , Painting & Re-Lagging Of Exhaust System Of Both Dgs(Paint H.R Aluminium Paint, Lagging Material Cerawool Blanket And Fiberglass Cloth Service Cost , Painting & Re-Lagging Of Exhaust System Of Both Dgs(Paint H.R Aluminium Paint, Lagging Material Cerawool Blanket And Fiberglass Cloth Material Cost , Renewal Of Exhaust Compensator Of Both Main Engines Mat Ss Dia 300Mm Service Cost , Renewal Of Exhaust Compensator Of Both Main Engines Mat Ss Dia 300Mm Material Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M154 T Service Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M154 T Material Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M100 M Service Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M100 M Material Cost , Renew And Fit Firemain System Pipes (Dia-80Mm) Service Cost , Renew And Fit Firemain System Pipes (Dia-80Mm) Material Cost , Sea Water Inlet Strainer Of Sea Water System To Be Renewed (Dia-40 Mm, Mat-Cuni) Service Cost , Sea Water Inlet Strainer Of Sea Water System To Be Renewed (Dia-40 Mm, Mat-Cuni) Service Cost , Renew Fuel Lines From Ru Tank To Da Inlet And Return Line From Da To Ru Tank For Both Das (Mat- Ms, Dia-15 Mm) Service Cost. , Renew Fuel Lines From Ru Tank To Da Inlet And Return Line From Da To Ru Tank For Both Das (Mat- Ms, Dia-15 Mm) Material Cost. , Renew Fuel Ru Tank Filing Pipe Alongwith Cap From Main Deck To Ru Tank (Dia-50 Mm, Mat- Ms Service Cost , Renew Fuel Ru Tank Filing Pipe Alongwith Cap From Main Deck To Ru Tank (Dia-50 Mm, Mat- Ms Material Cost , Renew Fuel Ru Tank Breather Pipe With Alternate Filling Adapter In Y Shape From Main Deck To Ru Tank Main Pipe Dia-50 Mm, Mat- Ms Branch Pipe With Adapter Dia-25Mm Service Cost , Renew Fuel Ru Tank Breather Pipe With Alternate Filling Adapter In Y Shape From Main Deck To Ru Tank Main Pipe Dia-50 Mm, Mat- Ms Branch Pipe With Adapter Dia-25Mm Material Cost , Fuel Ru Tank Drain And Valves To Be Provided (Type- Spring Loaded S ) Service Cost , Fuel Ru Tank Drain And Valves To Be Provided (Type- Spring Loaded S ) Material Cost , Renew Dd Pump Inlet And Outlet Pipes (Dia-80Mm, Mat- Cuni) Service Cost , Renew Dd Pump Inlet And Outlet Pipes (Dia-80Mm, Mat- Cuni) Material Cost , Dd Pump Inlet Strainer To Be Provided (Type-Gate Valve, Dia 80Mm) Service Cost , Dd Pump Inlet Strainer To Be Provided (Type-Gate Valve, Dia 80Mm) Material Cost , Dd Pump Strainer Purging Cock To Be Provided (Dia-15 Mm) Service Cost , Dd Pump Strainer Purging Cock To Be Provided (Dia-15 Mm) Service Cost , Dd Pump Discharge Line To Firemain System To Be Provided (Dia-80Mm, Mat-Cuni) Service Cost , Dd Pump Discharge Line To Firemain System To Be Provided (Dia-80Mm, Mat-Cuni) Service Cost , Renew Dd Pump Flexible Exhaust Piping (Dia-50 Mm, Mat- Ms) Service Cost , Renew Dd Pump Flexible Exhaust Piping (Dia-50 Mm, Mat- Ms) Material Cost , O/H Hand Pump Fitted On Forecastle And Quarter Deck And Renew Handles (Size As Per S Le) Service Cost , O/H Hand Pump Fitted On Forecastle And Quarter Deck And Renew Handles (Size As Per S Le) Material Cost , Tank Sounding Cap To Be Renewed. Mat Brass Service Cost , Tank Sounding Cap To Be Renewed. Mat Brass Material Cost , Mushroom Heads Of Various Sizes To Be Overhauled And Repaired Spindle To Be Renewed Service Cost , Mushroom Heads Of Various Sizes To Be Overhauled And Repaired Spindle To Be Renewed Material Cost , Heavy Sea Water Ingress In Fuel System, Lub Oil System And Fresh Water System On Both Dgs Repair/Renewal To Be Carried Out Service Cost , Heavy Sea Water Ingress In Fuel System, Lub Oil System And Fresh Water System On Both Dgs Repair/ Renewal To Be Carried Out Material Cost , Port Dg Fuel Pipeline From Service Tank To Dg To Be Renewed Service Cost , Port Dg Fuel Pipeline From Service Tank To Dg To Be Renewed Material Cost , Port Dg Control Panel Missing/Damaged And To Be Renewed Service Cost , Port Dg Control Panel Missing/Damaged And To Be Renewed Material Cost , Both Dd Fire Pump To Be Replaced Service Cost , Both Dd Fire Pump To Be Replaced Material Cost , Dd Fire Pump System Pipe Line To Be Renewed Including Bellows Service Cost , Dd Fire Pump System Pipe Line To Be Renewed Including Bellows Material Cost , Fuel Line From Sequence Tank To Dg Head Valve Damaged. Repair/ Replacement Required Service Cost , Fuel Line From Sequence Tank To Dg Head Valve Damaged. Repair/ Replacement Required Material Cost , Water Ingress In Both Dgs Major Overhauling Required Service Cost , Water Ingress In Both Dgs Major Overhauling Required Material Cost , Multiple Pipe Lines Pertaining To Fresh Water, Sea Water & Fuel Damaged And Is To Be Repaired/Replaced Service Cost , Multiple Pipe Lines Pertaining To Fresh Water, Sea Water & Fuel Damaged And Is To Be Repaired/ Replaced Material Cost , Electrical Conduit Pipes To Be Renewed Service Cost , Electrical Conduit Pipes To Be Renewed Material Cost , Undertake Functional Checks Of Main Engine Local Control Panel Replace/ Rectify Defective Instrumentation Wiring Indications Switches Alarms Etc Service Cost , Undertake Functional Checks Of Main Engine Local Control Panel Replace/ Rectify Defective Instrumentation Wiring Indications Switches Alarms Etc Material Cost , Overhauling And Serviceability Checks Of Dg Alternator Assembly And Battery Charging Alternator Undertake Complete Rewinding Of Stator And Rotor Winding Renewal Of Bearings, Renewal Of Avr. Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50Hz Alternator (Make-Kirlkosar) Service Cost , Overhauling And Serviceability Checks Of Dg Alternator Assembly And Battery Charging Alternator Undertake Complete Rewinding Of Stator And Rotor Winding Renewal Of Bearings, Renewal Of Avr. Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50Hz Alternator (Make-Kirlkosar) Material Cost , Serviceability Checks Of Sensors/ Cut Offs (I.E Fw, Lub Oil And Alternator Temperature Sensors, Low Lub Oil Pressure Sensor) Service Cost , Serviceability Checks Of Sensors/ Cut Offs (I.E Fw, Lub Oil And Alternator Temperature Sensors, Low Lub Oil Pressure Sensor) Material Cost , Renewal Of 12V Dc Dg Sel Starter Service Cost , Renewal Of 12V Dc Dg Sel Starter I Material Cost , Renewal Of Control Wiring Front Panel Of Lcp (20X1.5 Sqmm, Cu Multi Strand Cable) Service Cost , Renewal Of Control Wiring Front Panel Of Lcp (20X1.5 Sqmm, Cu Multi Strand Cable) Material Cost , Dg Starting Batteries (12V Dc) To Be Replaced Service Cost , Dg Starting Batteries (12V Dc) To Be Replaced Material Cost , Renew Tube Fittings In Dg Compt-06 Nos, Overhead Tub Light Fittings (Wt Industrial Type) 20W X 2 -10 Nos, Halogen L S (203V,500W) Alongwith Fittings On Weather Deck-10 Nos, Bpt Name Board Tube Light Fittings Alongwith Switches (230V, 20W)-02 Nos, Twin Tube Light(220V,20W)-10 Nos, Flood Lights-04 Nos Service Cost , Renew Tube Fittings In Dg Compt-06 Nos, Overhead Tub Light Fittings (Wt Industrial Type) 20W X 2 -10 Nos, Halogen L S (203V,500W) Alongwith Fittings On Weather Deck-10 Nos, Bpt Name Board Tube Light Fittings Alongwith Switches (230V, 20W)-02 Nos, Twin Tube Light(220V,20W)-10 Nos, Flood Lights-04 Nos Material Cost , Tube Light And Foundation Are Missing/ Damaged Renewal/ Replacement Required Service Cost , Tube Light And Foundation Are Missing/ Damaged Renewal/ Replacement Required Material Cost , Undertake Complete Renewal Of Main Switchboard Comprising 3 Vertical Sections Viz. (I) Generator Section G1, G2 36Kw, 415V, 3Ph, 50Hz And Shore Supply 40A, 415V, 3Ph, 50 Hz (Ii) Distribution Section 415V, 3Ph, 50Hz (Iii) Distribution Section 240V, 3Ph, 50Hz And Trans-Rectifier Unit (Tru). Fabrication Of New Msb Foundation And Brackets. Renewal Of Wiring Alongwith Cable Trays. Details Of Electrical Components And Equipments Are As Follows:- (A) Transformer 1 (40Kva) (B) Transformer 2 (35Kva) (C) Generator Protection Circuit Breaker (D) Triple Pole Molded Case Circuit Breaker Rated 100A With Micro Logic 2.2G Trip Unit - 16 Nos (E) Triple Pole Molded Case Circuit Breaker Rated 50A - 08 Nos (F) Triple Pole Molded Case Circuit Breaker Rated 100A - 06 Nos (G) Shrouded Pushbutton Yellow Colour With 1No Contact- 11 Nos (H) Illuminated Selector Switch Blue Colour, 230V Ac, 2 Maintained Position With 1No Contact - 02 Nos (I) Ammeter Selector Switch Rated 6A - 02 Nos (J) Voltmeter Selector Switch Rated 6A, Line To Line - 02 Nos (K) Triple Pole Three Way Without Rotary Switch Rated 6A - 01 Nos (I) Auxiliary Contactor Rated 10A, 220V Ac Coil With 2No + 2 Nc - 03 Nos (M) 2No + 2Nc Contacts Add On Block, Front Mounted - 03 Nos (N) Electronic Timer Range 0.1 Sec To 100Hrs With 2 C/O Contacts - 01 Nos (O) Triple Pole Miniature Circuit Breaker Rated 63A - 01 Nos (P) Triple Pole Miniature Circuit Breaker Rated 50A - 01 Nos (Q) Triple Pole Miniature Circuit Breaker Rated 25A - 04 Nos (R) Triple Pole Miniature Circuit Breaker Rated 16A - 01 Nos (S) Triple Pole Miniature Circuit Breaker Rated 10A-05 Nos (T) Triple Pole Miniature Circuit Breaker Rated 6A-06 Nos (U) Triple Pole Miniature Circuit Breaker Rated 2A-03 Nos (V) Double Pole Miniature Circuit Breaker Rated 32A - 06 Nos (W) Mx + Of Shunt Rel. 110-415V Ac - 05 Nos (X) Double Pole Miniature Circuit Breaker Rated 10A - 01 Nos (Y) Double Pole Miniature Circuit Breaker Rated 6A - 13 Nos (Z) Double Pole Miniature Circuit Breaker Rated 4A - 14Nos (Aa) Double Pole Miniature Circuit Breaker Rated 2A - 05 Nos (Bb) Current Transformer 100/5A, 5Va, Class 1 Accuracy-06 Nos (Cx) Insulation Motor, Size 96X96 -02Nos (Dd) Kilo-Wattmeter 0-50Kw, 3 Wire 2 Elements, Size 96X96 -01 Nos (Ee) Ammeter 0-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 62A -01 Nos 9 (Ff) Frequency Meter 45-50-55Hz 400V, Size 96X96xmm Red At 50Hz, 415V-01 Nos (Gg) Ac Voltmeter 0-500V, Size 96X96 Mm Red Mark At 415V, 50Hz -01 Nos (Hh) Ac Voltmeter 0-300V, Size 96X96 Mm Red Mark At 240V, 50Hz-01 Nos (Ii) Ammeter 01-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 84A -01 Nos (Ii) Indicating L Integral Led White Colour, 230V Ac -07 Nos (Kk) Indicating L Integral Led White Colour, 24V Ac/Dc-01 Nos (Ii) Indicating L Integral Led Green Colour , 230V Ac-04 Nos (Mm) Indicating Led Red Colour, 230V Ac-05 Nos (Nn) Indicating L Integral Led Red Colour,24V Ac/Dc - 01 Nos (Oo) Indicating L Integral Led Yellow Colour, 24V Ac/Dc-01 Nos (Gg) Indicating L Integral Led White Colour, 24V Ac/Dc-04 Nos (Rr) Indicating L Integral Led Amber Colour , 230V Ac-02 Nos (Ss) Single Phase Double Wound Control Transformer 415/24V,5Va,50/60Hz -06 Nos (Tt) Single Phase Double Wound Control Transformer, Primary: 440/415/380V Secondary:230/220/24V, 100 Va 50/60Hz-03 Nos (Uu) Clip On Type Terminal 4 Sqmm--38 Nos(Vv) Stud Type Terminal 6-35 Sqmm-03 Nos (Ww) Phase Sequence Indicator 50-500V , Size 96X96mm-01 Nos (Xx) Cable Entry Gland-01 Nos (Yy) Four Pole Contactor Rated 9A,220V,50/60Hz Ac Coil With 2No+2Nc-01 Nos (Zz) Navigational Light Panel, 230V Ac-01 Nos (Aaa) Fuse Terminal Block 6A-06 Nos (Bbb) Smps, 500W-01 Nos And Renewal Of Cabling From Distribution Section 415V,3Ph,50Hz To Following Equipments:- (A) Generator -1 415V,3Ph,50Hz (B) Generator-2 415V,3Ph,50Hz (C) Shore Supply Connection (D) Ups System 40Kva (E) Anchor Windlass No.1 (F) Anchor Windlass No 2 (G) Anchor Windlass No.3 (H) Anchor Windlass No 4, Cabling From Distribution Section 240V, 3Ph, 50Hz To Following Equipments (A) Primary Of Transformer 35Kva, 415/240V 50Hz (B) Transformer -2 40 Kva, 415/240C , 3Ph, 50Hz (C) Transformer 2 35Kva,415/340V 3Ph, 50Hz (D) Ir Source No.1 (E) Ir Source No 2 (F) Ir Source No 3 (G) Ir Source No. 4 (H) Ir Source No .5 (I) Video Camera Recording (I) Fan Switchboard (K) Navigational Light Panel (I) Flood Light Fwd (M) Flood Light Aft (N) Lighting Swbd & Dg Rooms (O) Receptacle In Switchboard & Dg Rooms (P) Lighting In Battery (S) & Electrical Room (P) (Q) Gsp- Ventilation Fans (R) Tru Cum Dcdb (S) Fans In Batteries Room P & S Cabling Form Tru Cum To :- (A) Electric Horn (B) Video Camera 1,2,3,4,5,6 (C) Incoming Supply From Msb 240V, 1Ph, 50Hz, Cabling From Navigational Light Panel To :- (A) Stern Light (B) Anchor Light (Fwd) (C) Port Side Light (D) Stbd Side Light (E) Anchor Light (Aft) And Main Switchboard To Shore Supply Connection Box Service Cost , Undertake Complete Renewal Of Main Switchboard Comprising 3 Vertical Sections Viz. (I) Generator Section G1, G2 36Kw, 415V, 3Ph, 50Hz And Shore Supply 40A, 415V, 3Ph, 50 Hz (Ii) Distribution Section 415V, 3Ph, 50Hz (Iii) Distribution Section 240V, 3Ph, 50Hz And Trans-Rectifier Unit (Tru). Fabrication Of New Msb Foundation And Brackets. Renewal Of Wiring Alongwith Cable Trays. Details Of Electrical Components And Equipments Are As Follows :- (A) Transformer 1 (40Kva) (B) Transformer 2 (35Kva) (C) Generator Protection Circuit Breaker (D) Triple Pole Molded Case Circuit Breaker Rated 100A With Micro Logic 2.2G Trip Unit - 16 Nos (E) Triple Pole Molded Case Circuit Breaker Rated 50A - 08 Nos (F) Triple Pole Molded Case Circuit Breaker Rated 100A - 06 Nos (G) Shrouded Pushbutton Yellow Colour With 1No Contact- 11 Nos (H) Illuminated Selector Switch Blue Colour, 230V Ac, 2 Maintained Position With 1No Contact - 02 Nos (I) Ammeter Selector Switch Rated 6A - 02 Nos (J) Voltmeter Selector Switch Rated 6A, Line To Line - 02 Nos (K) Triple Pole Three Way Without Rotary Switch Rated 6A - 01 Nos (I) Auxiliary Contactor Rated 10A, 220V Ac Coil With 2No + 2 Nc - 03 Nos (M) 2No + 2Nc Contacts Add On Block, Front Mounted - 03 Nos (N) Electronic Timer Range 0.1 Sec To 100Hrs With 2 C/O Contacts - 01 Nos (O) Triple Pole Miniature Circuit Breaker Rated 63A - 01 Nos (P) Triple Pole Miniature Circuit Breaker Rated 50A - 01 Nos (Q) Triple Pole Miniature Circuit Breaker Rated 25A - 04 Nos (R) Triple Pole Miniature Circuit Breaker Rated 16A - 01 Nos (S) Triple Pole Miniature Circuit Breaker Rated 10A-05 Nos (T) Triple Pole Miniature Circuit Breaker Rated 6A-06 Nos (U) Triple Pole Miniature Circuit Breaker Rated 2A-03 Nos (V) Double Pole Miniature Circuit Breaker Rated 32A - 06 Nos (W) Mx + Of Shunt Rel. 110-415V Ac - 05 Nos (X) Double Pole Miniature Circuit Breaker Rated 10A - 01 Nos (Y) Double Pole Miniature Circuit Breaker Rated 6A - 13 Nos (Z) Double Pole Miniature Circuit Breaker Rated 4A - 14Nos (Aa) Double Pole Miniature Circuit Breaker Rated 2A - 05 Nos (Bb) Current Transformer 100/5A, 5Va, Class 1 Accuracy-06 Nos (Cx) Insulation Motor, Size 96X96 -02Nos (Dd) Kilo Wattmeter 0-50Kw, 3 Wire 2 Elements, Size 96X96 -01 Nos (Ee) Ammeter 0-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 62A -01 Nos 9 (Ff) Frequency Meter 45-50-55Hz 400V, Size 96X96xmm Red At 50Hz, 415V-01 Nos (Gg) Ac Voltmeter 0-500V, Size 96X96 Mm Red Mark At 415V, 50Hz -01 Nos (Hh) Ac Voltmeter 0-300V, Size 96X96 Mm Red Mark At 240V, 50Hz-01 Nos (Ii) Ammeter 01-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 84A -01 Nos (Ii) Indicating L Integral Led White Colour, 230V Ac -07 Nos (Kk) Indicating L Integral Led White Colour, 24V Ac/Dc-01 Nos (Ii) Indicating L Integral Led Green Colour , 230V Ac-04 Nos (Mm) Indicating Led Red Colour, 230V Ac-05 Nos (Nn) Indicating L Integral Led Red Colour,24V Ac/Dc - 01 Nos (Oo) Indicating L Integral Led Yellow Colour, 24V Ac/Dc-01 Nos (Gg) Indicating L Integral Led White Colour, 24V Ac/Dc-04 Nos (Rr) Indicating L Integral Led Amber Colour , 230V Ac-02 Nos (Ss) Single Phase Double Wound Control Transformer 415/24V,5Va,50/60Hz -06 Nos (Tt) Single Phase Double Wound Control Transformer, Primary: 440/415/380V Secondary:230/220/24V, 100 Va 50/60Hz-03 Nos (Uu) Clip On Type Terminal 4 Sqmm--38 Nos(Vv) Stud Type Terminal 6-35 Sqmm-03 Nos (Ww) Phase Sequence Indicator 50-500V, Size 96X96mm-01 Nos (Xx) Cable Entry Gland-01 Nos (Yy) Four Pole Contactor Rated 9A,220V,50/60Hz Ac Coil With 2No+2Nc-01 Nos (Zz) Navigational Light Panel, 230V Ac-01 Nos (Aaa) Fuse Terminal Block 6A-06 Nos (Bbb) Smps, 500W-01 Nos And Renewal Of Cabling From Distribution Section 415V,3Ph,50Hz To Following Equipments:- (A) Generator -1 415V,3Ph,50Hz (B) Generator-2 415V,3Ph,50Hz (C) Shore Supply Connection (D) Ups System 40Kva (E) Anchor Windlass No.1 (F) Anchor Windlass No 2 (G) Anchor Windlass No.3 (H) Anchor Windlass No 4, Cabling From Distribution Section 240V, 3Ph, 50Hz To Following Equipments (A) Primary Of Transformer 35Kva, 415/240V 50Hz (B) Transformer -2 40 Kva, 415/240C , 3Ph, 50Hz (C) Transformer 2 35Kva,415/340V 3Ph, 50Hz (D) Ir Source No.1 (E) Ir Source No 2 (F) Ir Source No 3 (G) Ir Source No. 4 (H) Ir Source No .5 (I) Video Camera Recording (I) Fan Switchboard (K) Navigational Light Panel (I) Flood Light Fwd (M) Flood Li9ght Aft (N) Lighting Swbd & Dg Rooms (O) Receptacle In Switchboard & Dg Rooms (P) Lighting In Battery (S) & Electrical Room (P) (Q) Gsp- Ventilation Fans (R) Tru Cum Dcdb (S) Fans In Batteries Room P & S Cabling Form Tru Cum To :- (A) Electric Horn (B) Video Camera 1,2,3,4,5,6 (C) Incoming Supply From Msb 240V, 1Ph, 50Hz, Cabling From Navigational Light Panel To :- (A) Stern Light (B) Anchor Light (Fwd) (C) Port Side Light (D) Stbd Side Light (E) Anchor Light (Aft) And Main Switchboard To Shore Supply Connection Box Material Cost , Renew Cabling Form Dg To Switch Board (Wire 3X25sqmm, Cu Multi Strand Cable -150 Meters), Main Switchboard (Msb) Distribution Panel (Dp) Various Fittings On Both Port And Stbd Side Of Weather Deck (Wre 2X1.5 Sqmm, Cu Multi Strand Cable -300 Meters) Main Switchboard To Capstan Control Panels (3X4 Sqmm, Cu Multi Strand Cable -200 Mtrs) Service Cost , Renew Cabling Form Dg To Switch Board (Wire 3X25sqmm, Cu Multi Strand Cable -150 Meters), Main Switchboard (Msb) Distribution Panel (Dp) Various Fittings On Both Port And Stbd Side Of Weather Deck (Wre 2X1.5 Sqmm, Cu Multi Strand Cable -300 Meters) Main Switchboard To Capstan Control Panels (3X4 Sqmm, Cu Multi Strand Cable -200 Mtrs) Material Cost , Exhaust Motors To Be Renewed (415V,3Ph,1Hp) Service Cost , Exhaust Motors To Be Renewed (415V,3Ph,1Hp) Material Cost , Serviceability Checks Of 04 In Nos High Speed Cameras (Make- Mega Speed Corporation ) And 01 In Nos Camera Display Unit Service Cost , Serviceability Checks Of 04 In Nos High Speed Cameras (Make- Mega Speed Corporation ) And 01 In Nos Camera Display Unit Material Cost , Replacement Of Pole (Dia -5 Inch, Length- 20 Feet) And Fitting For Camera Service Cost , Replacement Of Pole (Dia -5 Inch, Length- 20 Feet) And Fitting For Camera Material Cost , All Navigational Light Fittings To Be Renewed Alongwith Nav Light Holders (02 Stair Type) Service Cost , All Navigational Light Fittings To Be Renewed Alongwith Nav Light Holders (02 Stair Type) Material Cost , Serviceability Checks Of Both Port And Stbd Capstan Control Panel And Undertake Insulation Checks Of Cabling (100 Meters) Service Cost , Serviceability Checks Of Both Port And Stbd Capstan Control Panel And Undertake Insulation Checks Of Cabling (100 Meters) Material Cost , Serviceability Checks Of Anchor Drives Service Cost , Serviceability Checks Of Anchor Drives Material Cost , Shore Supply Connection Box To Be Overhauled, Proved Onboard. Renew Following:- (A) Voltmeter-0-500V Ac -01 Nos (B) Phase Consequence Indicator Meter -01 No (C) 3 Pole Mccb-50 S-01 Nos (D) Indicating L -03 No. 9 (E) Voltmeter Selector Switch -01 Nos Service Cost , Shore Supply Connection Box To Be Overhauled, Proved Onboard. Renew Following:- (A) Voltmeter-0-500V Ac -01 Nos (B) Phase Consequence Indicator Meter -01 No (C) 3 Pole Mccb-50 S-01 Nos (D) Indicating L -03 No. (E) Voltmeter Selector Switch -01 Nos Material Cost , Provide Shore Supply 3 Corex16 Sq Mm (Shielded) 100 Mtrs Cable With Lugs Crimping At Both Ends Service Cost , Provide Shore Supply 3 Corex16 Sq Mm (Shielded) 100 Mtrs Cable With Lugs Crimping At Both Ends Material Cost , Renew Ir Source Exide Power Safe Sealed Maintenance Free Vrla Batteries In Room. Model Upst- 12 V, 320Ah, 180 Cells Service Cost , Renew Ir Source Exide Power Safe Sealed Maintenance Free Vrla Batteries In Room. Model Upst- 12 V, 320Ah, 180 Cells Material Cost , Renew Cable For Flood L S (Dia 02 X 1.5 Sqmm)-80 Mtrs), For Fitment Of Tube Lights (Dia 02X1.5 Sqmm-80 Mtrs) And 05 Sets Of Cables (1.5 Sqmm, Shielded Two Core Cable-200 Meters) On Weather Deck For Navigational Lights Service Cost , Renew Cable For Flood L S (Dia 02 X 1.5 Sqmm)-80 Mtrs), For Fitment Of Tube Lights (Dia 02X1.5 Sqmm-80 Mtrs) And 05 Sets Of Cables (1.5 Sqmm, Shielded Two Core Cable-200 Meters) On Weather Deck For Navigational Lights Material Cost , Renew Fwd (Stbd And Port) And Aft (Stbd And Port) Anchor Capstan Motors (9.3 Kw, 12.5 Hp, 415 V, 3Ph 50 Hz, Frame 160M Make- Narhari) Service Cost , Renew Fwd (Stbd And Port) And Aft (Stbd And Port) Anchor Capstan Motors (9.3 Kw, 12.5 Hp, 415 V, 3Ph 50 Hz, Frame 160M Make- Narhari) Material Cost , Overhaul Anchor Windlass (Port Fwd, Stbd Fwd, Port Aft, Stbd Aft), Make Geeta Engineering Along With Motors And Fittings Service Cost , Overhaul Anchor Windlass (Port Fwd, Stbd Fwd, Port Aft, Stbd Aft), Make Geeta Engineering Along With Motors And Fittings Material Cost , Battery Chargers To Be Overhauled And Tested Onboard 415 V 3 Ph 50 Hz, Output V 24V Service Cost , Battery Chargers To Be Overhauled And Tested Onboard 415 V 3 Ph 50 Hz, Output V 24V Material Cost , Renewal Of All Temperature Gauges Of The Systems. Service Cost , Renewal Of All Temperature Gauges Of The Systems. Material Cost , Overhauling Of 02 In Nos Transformers (I) 35 Kva (Make Marine Electricals (I) Pvt Ltd, Sl No-21081/1/7/5163) To Be Carried Out And Insulation To Be Improved Service Cost , Overhauling Of 02 In Nos Transformers (I) 35 Kva (Make Marine Electricals (I) Pvt Ltd, Sl No-21081/1/7/5163) To Be Carried Out And Insulation To Be Improved Material Cost , Undertake Checks Of Electrical Horn (Make-Mjr Corporations, Type-Sewn 50K-Ws) And Prove Its Operation Service Cost , Undertake Checks Of Electrical Horn (Make-Mjr Corporations, Type-Sewn 50K-Ws) And Prove Its Operation Material Cost , Carry Out Overhauling Of Magnetic Compass ( Cassens & Plath Type 51) And Renew Supporting Liquid Post Overhauling Undertake Swing Check And Calibrate The Compass Service Cost , Carry Out Overhauling Of Magnetic Compass ( Cassens & Plath Type 51) And Renew Supporting Liquid Post Overhauling Undertake Swing Check And Calibrate The Compass Material Cost , Nlcp Box Entirely Damaged. Renewal/ Replacement Required Along With Cabling From Panel To Respective Equipment Service Cost , Nlcp Box Entirely Damaged. Renewal/ Replacement Required Along With Cabling From Panel To Respective Equipment Material Cost , Remote Control Panel Of Both Dgs Are Missing/ Damaged Renewal/ Replacement Required Service Cost , Remote Control Panel Of Both Dgs Are Missing/ Damaged Renewal/ Replacement Required Material Cost , 24V Db Along With Internal And External Wiring Near Compartment Ladder Missing/ Damaged Renewal/ Replacement Required Service Cost , 24V Db Along With Internal And External Wiring Near Compartment Ladder Missing/ Damaged Renewal/ Replacement Required Material Cost , Batteries (2V, 54Ah) Are Burnt Out/ Damaged Renewal/ Replacement Required Service Cost , Batteries (2V, 54Ah) Are Burnt Out/Damaged Renewal/Replacement Required Material Cost , Ups (4Kva) Found Damaged Along With Heavy Water Ingress. Repairs/ Replacement Required. Input -340V-460V Ac 3Ph, Output-415V Ac, 3Ph, 60Hz Service Cost , Ups (4Kva) Found Damaged Along With Heavy Water Ingress. Repairs/ Replacement Required. Input -340V-460V Ac 3Ph, Output-415V Ac, 3Ph, 60Hz Material Cost , Cabling From Battery To Ups And Connection Of Battery Are Burnt Out/ Damaged Renewal/Replacement Required Service Cost , Cabling From Battery To Ups And Connection Of Battery Are Burnt Out/ Damaged Renewal/ Replacement Required Material Cost , Side Light (Starboard) Along With Foundation Heavily Damaged. Renewal/ Replacement Required Service Cost , Side Light (Starboard) Along With Foundation Heavily Damaged. Renewal/ Replacement Required Material Cost , Voltmeter, Shore Supply Meter And Synchro-Scope Meter Of Shore Supply Panel Damaged/ Defective Repair/ Replacement Required Service Cost , Voltmeter, Shore Supply Meter And Synchro-Scope Meter Of Shore Supply Panel Damaged/ Defective Repair/ Replacement Required Material Cost , Docking In Ver-I & Ii For 20 Days As Per Docking Plan Joint Insp With Paint Oem/Ss & Insp Agency To And For Towing From Nd(Mbi) To Shipyard & Back Service Cost , Qc Coverage By Irs Service Cost , Voyage Insurance Of The Vessel Considering Cost Of Vessel As Rs. 19 Cr Service Cost , Wet Basin/Wharfage Facility For Duration Of 30 Days Service Cost

BOQ

Sl. No. Item TitleItem Description
1U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH SERVICE COSTU/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH SERVICE COST
2U/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH MATERIAL COSTU/W HULL & B/T AREA, APPENDAGES TO BE CLEANED WITH HP F/W JET TO REMOVE SALT, DIRT, OIL & SEA GROWTH MATERIAL COST
3ULTRASONIC GAUGING READINGS AT UNDER WATER, ABOVE WATER AND WEATHER DECK AREAS AND FITTINGS, TANKS AND ALL ASSOCIATED FITTINGS TANKS, U/W AND B/T AREA TO BE CARRIED OUT REPORT FOR THE SAME TO BE PROVIDED SERVICE COSTULTRASONIC GAUGING READINGS AT UNDER WATER, ABOVE WATER AND WEATHER DECK AREAS AND FITTINGS, TANKS AND ALL ASSOCIATED FITTINGS TANKS, U/W AND B/T AREA TO BE CARRIED OUT REPORT FOR THE SAME TO BE PROVIDED SERVICE COST
4ULTRASONIC GAUGING READINGS AT UNDER WATER, ABOVE WATER AND WEATHER DECK AREAS AND FITTINGS, TANKS AND ALL ASSOCIATED FITTINGS TANKS, U/W AND B/T AREA TO BE CARRIED OUT REPORT FOR THE SAME TO BE PROVIDED MATERIAL COSTULTRASONIC GAUGING READINGS AT UNDER WATER, ABOVE WATER AND WEATHER DECK AREAS AND FITTINGS, TANKS AND ALL ASSOCIATED FITTINGS TANKS, U/W AND B/T AREA TO BE CARRIED OUT REPORT FOR THE SAME TO BE PROVIDED MATERIAL COST
5U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED PAINT SCHEME AS FOLLOW:- 1 FC INTERGUARD 269 : DFT 50 MICRON, 2 FC INTERSHIELD 300 : DFT 2*150 MICRON, 1 FC INTERGUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC : DFT 3* 150M. B/T PAINT SCHEME:- 1 FC INTERGUARD 263: DFT 1*125 M, 3FC ANTIFOULING INTERSMOOTH 360SPC DFT 3*150 M, LAST COAT BLACK SERVICE COSTU/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED PAINT SCHEME AS FOLLOW:- 1 FC INTERGUARD 269 : DFT 50 MICRON, 2 FC INTERSHIELD 300 : DFT 2*150 MICRON, 1 FC INTERGUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360SPC : DFT 3* 150M. B/T PAINT SCHEME:- 1 FC INTERGUARD 263: DFT 1*125 M, 3FC ANTIFOULING INTERSMOOTH 360SPC DFT 3*150 M, LAST COAT BLACK SERVICE COST
6U/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTERGUARD 269: DFT 50 MICRON, 2 FC INTERSHIELD 300: DFT 2*150 MICRON , 1 FC INTERGUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360 SPC: DFT 3*150 M. B/T PAINT SCHEME :- 1 FC INTERGUARD 269; DFT 1*50 M , 2 FC INTERSHIELD 300; DFT 2*150 M , 1 FC INTERGUARD 263 : DFT 1*125 M , 3 FC ANTIFOULING INTERSMOOTH 360SPC DFT 3*150 M, LAST COAT BLACK MATERIAL COSTU/W HULL AND B/T AREA TO BE BLASTED TO SA 2.5 AND PAINTED. PAINT SCHEME AS FOLLOW:- 1 FC INTERGUARD 269: DFT 50 MICRON, 2 FC INTERSHIELD 300: DFT 2*150 MICRON , 1 FC INTERGUARD 263: DFT 1*125 MICRON, 3 FC ANTIFOULING INTERSMOOTH 360 SPC: DFT 3*150 M. B/T PAINT SCHEME :- 1 FC INTERGUARD 269; DFT 1*50 M , 2 FC INTERSHIELD 300; DFT 2*150 M , 1 FC INTERGUARD 263 : DFT 1*125 M , 3 FC ANTIFOULING INTERSMOOTH 360SPC DFT 3*150 M, LAST COAT BLACK MATERIAL COST
7SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGUARD 259: DFT 1*50M, 2ND & 3RD COAT INTER TUFF 265:DFT2*125M, 4TH FULL COAT INTERTHANE 990:DFT 2*60 M. SERVICE COSTSHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW:- 1ST COAT INTERGUARD 259: DFT 1*50M, 2ND & 3RD COAT INTER TUFF 265:DFT2*125M, 4TH FULL COAT INTERTHANE 990:DFT 2*60 M. SERVICE COST
8SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW :- 1ST COAT INTERGUARD 259: DFT 1*50M, 2ND & 3RD COAT INTER TUFF 265:DFT2*125M, 4TH FULL COAT INTERTHANE 990:DFT 2*60 M. MATERIAL COST.SHIP SIDE SURFACE INCLUDING STEM AND TRANSOM TO BE BLASTED TO SA 2.5 & PAINTED. PAINT SCHEME AS FOLLOW :- 1ST COAT INTERGUARD 259: DFT 1*50M, 2ND & 3RD COAT INTER TUFF 265:DFT2*125M, 4TH FULL COAT INTERTHANE 990:DFT 2*60 M. MATERIAL COST.
9WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGUARD 269:DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800M. SERVICE COSTWEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGUARD 269:DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800M. SERVICE COST
10WEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGUARD 269:DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800M. MATERIAL COSTWEATHER DECK TO BE PREPARED TO ST 3 AND PAINTED. PAINT SCHEME AS FOLLOWS:- 1FC OF INTERGUARD 269:DFT 1*50M, 1 FC OF INTERSHIELD 300: DFT1*200 M, 1 FC OF INTERSHIELD 852 ANTI SKID: DFT 1*800M. MATERIAL COST
11GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINT TOUGH UP TO BE UNDERTAKEN PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538 : DFT 1*75 M , 2 FC INTERLACE 665: DFT 2*50 M SERVICE COSTGENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINT TOUGH UP TO BE UNDERTAKEN PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538 : DFT 1*75 M , 2 FC INTERLACE 665: DFT 2*50 M SERVICE COST
12GENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINT TOUGH UP TO BE UNDERTAKEN PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538 : DFT 1*75 M , 2 FC INTERLACE 665: DFT 2*50 M MATERIAL COSTGENERAL DRY COMPARTMENTS TO BE CLEANED AND PAINT TOUGH UP TO BE UNDERTAKEN PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538 : DFT 1*75 M , 2 FC INTERLACE 665: DFT 2*50 M MATERIAL COST
13VOID SPACES TO BE CLEANED AND PAINTED INTERNALLY. SURFACE TO BE PREPARED TO SA 2.5. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538:DFT 1*80 M, 2 FC INTERLACE 665: DFT 2*40 M SERVICE COSTVOID SPACES TO BE CLEANED AND PAINTED INTERNALLY. SURFACE TO BE PREPARED TO SA 2.5. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538:DFT 1*80 M, 2 FC INTERLACE 665: DFT 2*40 M SERVICE COST
14VOID SPACES TO BE CLEANED AND PAINTED INTERNALLY. SURFACE TO BE PREPARED TO SA 2.5. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538:DFT 1*80 M, 2 FC INTERLACE 665: DFT 2*40 M MATERIAL COSTVOID SPACES TO BE CLEANED AND PAINTED INTERNALLY. SURFACE TO BE PREPARED TO SA 2.5. RENEWAL OF ALL MANHOLE COVER GASKETS, NUT BOLT, WASHERS TO BE UNDERTAKEN. PAINT SCHEME AS FOLLOWS:- 1ST COAT INTER PRIME 538:DFT 1*80 M, 2 FC INTERLACE 665: DFT 2*40 M MATERIAL COST
15FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANK GUARD HB LIGHT GREY AND GREYISH GREEN. DFT 2 x 150 MICRONS SERVICE COSTFO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANK GUARD HB LIGHT GREY AND GREYISH GREEN. DFT 2 x 150 MICRONS SERVICE COST
16FO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANK GUARD HB LIGHT GREY AND GREYISH GREEN. DFT 2 x 150 MICRONS MATERIAL COSTFO TANKS, FO RU TANKS, LO TANK, FO OVERFLOW TANK, DIRTY OIL TANK, BILGE HOLDING TANK OPEN & VENTILATE. SURFACE TO BE PREPARED TO SA 2.5 PRIOR PAINTING PAINT SCHEME AS FOLLOWS:- 2 COATS OF TANK GUARD HB LIGHT GREY AND GREYISH GREEN. DFT 2 x 150 MICRONS MATERIAL COST
17SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGUARD 269 1 FC INTERSHIELD 300 SERVICE COSTSURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1F/C INTERGUARD 269 1 FC INTERSHIELD 300 SERVICE COST
18SURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1 F/C INTERGUARD 269 1 FC INTERSHIELD 300 MATERIAL COSTSURVEY NAVAL PIPE, HAWSE PIPE AND CABLE LOCKER UNDER SUPERVISION OF CLASS SURVEYOR. PAINT AS FOLLOWS:- 1 F/C INTERGUARD 269 1 FC INTERSHIELD 300 MATERIAL COST
19SEA CHEST GRATING TO BE OPENED,CLEANED, PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). SERVICE COSTSEA CHEST GRATING TO BE OPENED,CLEANED, PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). SERVICE COST
20SEA CHEST GRATING TO BE OPENED,CLEANED, PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). MATERIAL COSTSEA CHEST GRATING TO BE OPENED,CLEANED, PAINTED & REFITTED ( AS PER U/W PAINT SCHEME). MATERIAL COST
21POST HAMMER/USG SURVEY OF STEEL STRUCTURE CONSISTING EXTERNAL U/W AREA, INTERNAL U/W AREA, WEATHER DECK INCLUDING FITTINGS , SHIP SIDE PORT AND STBD, TANKS AND ALL ASSOCIATED FITTINGS, RENEWAL OF THE AFFECTED AREAS (AS PER SURVEY) TO BE UNDERTAKEN SERVICE COSTPOST HAMMER/USG SURVEY OF STEEL STRUCTURE CONSISTING EXTERNAL U/W AREA, INTERNAL U/W AREA, WEATHER DECK INCLUDING FITTINGS , SHIP SIDE PORT AND STBD, TANKS AND ALL ASSOCIATED FITTINGS, RENEWAL OF THE AFFECTED AREAS (AS PER SURVEY) TO BE UNDERTAKEN SERVICE COST
22POST HAMMER/USG SURVEY OF STEEL STRUCTURE CONSISTING EXTERNAL U/W AREA, INTERNAL U/W AREA, WEATHER DECK INCLUDING FITTINGS , SHIP SIDE PORT AND STBD, TANKS AND ALL ASSOCIATED FITTINGS, RENEWAL OF THE AFFECTED AREAS (AS PER SURVEY) TO BE UNDERTAKEN MATERIAL COSTPOST HAMMER/USG SURVEY OF STEEL STRUCTURE CONSISTING EXTERNAL U/W AREA, INTERNAL U/W AREA, WEATHER DECK INCLUDING FITTINGS , SHIP SIDE PORT AND STBD, TANKS AND ALL ASSOCIATED FITTINGS, RENEWAL OF THE AFFECTED AREAS (AS PER SURVEY) TO BE UNDERTAKEN MATERIAL COST
23PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEYS REPORT 1 PTS = 1 SQ CM SERVICE COSTPITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEYS REPORT 1 PTS = 1 SQ CM SERVICE COST
24PITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEYS REPORT 1 PTS = 1 SQ CM MATERIAL COSTPITS BUILD UP AT VARIOUS U/W HULL AND DECKS AS PER SURVEYS REPORT 1 PTS = 1 SQ CM MATERIAL COST
25RENEW SACRIFICIAL ANODES AS PER ANODE PLAN QTY OF ANODES-MK II - 16 IN NOS AND MK III - 38 IN NOS SERVICE COSTRENEW SACRIFICIAL ANODES AS PER ANODE PLAN QTY OF ANODES-MK II - 16 IN NOS AND MK III - 38 IN NOS SERVICE COST
26RENEW SACRIFICIAL ANODES AS PER ANODE PLAN QTY OF ANODES-MK II - 16 IN NOS AND MK III - 38 IN NOS MATERIAL COSTRENEW SACRIFICIAL ANODES AS PER ANODE PLAN QTY OF ANODES-MK II - 16 IN NOS AND MK III - 38 IN NOS MATERIAL COST
27FENDER SECURING RAIL TO BE RENEWED SERVICE COSTFENDER SECURING RAIL TO BE RENEWED SERVICE COST
28FENDER SECURING RAIL TO BE RENEWED MATERIAL COSTFENDER SECURING RAIL TO BE RENEWED MATERIAL COST
29VERTICAL LADDERS (02 IN NOS BETWEEN FR STN 0-45), 02 IN NOS IN VOID TANK 7 (S), 02 IN NOS VOID TANK 8(S) AND 01 IN NOS TRANSVERSE LADDER OF LENGTH 2000X800X500 MM WITH STANCHING HEIGHT 1100 MM AT MAIN DECK TO BE RENEWED AND PAINTED SERVICE COSTVERTICAL LADDERS (02 IN NOS BETWEEN FR STN 0-45), 02 IN NOS IN VOID TANK 7 (S), 02 IN NOS VOID TANK 8(S) AND 01 IN NOS TRANSVERSE LADDER OF LENGTH 2000X800X500 MM WITH STANCHING HEIGHT 1100 MM AT MAIN DECK TO BE RENEWED AND PAINTED SERVICE COST
30VERTICAL LADDERS (02 IN NOS BETWEEN FR STN 0-45), 02 IN NOS IN VOID TANK 7 (S), 02 IN NOS VOID TANK 8(S) AND 01 IN NOS TRANSVERSE LADDER OF LENGTH 2000X800X500 MM WITH STANCHING HEIGHT 1100 MM AT MAIN DECK TO BE RENEWED AND PAINTED MATERIAL COSTVERTICAL LADDERS (02 IN NOS BETWEEN FR STN 0-45), 02 IN NOS IN VOID TANK 7 (S), 02 IN NOS VOID TANK 8(S) AND 01 IN NOS TRANSVERSE LADDER OF LENGTH 2000X800X500 MM WITH STANCHING HEIGHT 1100 MM AT MAIN DECK TO BE RENEWED AND PAINTED MATERIAL COST
31PORT AND STBD FENDER SECURING FOUNDATIONS TO BE RENEWED SERVICE COSTPORT AND STBD FENDER SECURING FOUNDATIONS TO BE RENEWED SERVICE COST
32PORT AND STBD FENDER SECURING FOUNDATIONS TO BE RENEWED MATERIAL COSTPORT AND STBD FENDER SECURING FOUNDATIONS TO BE RENEWED MATERIAL COST
33WATER TIGHT HATCHES AND RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. SERVICE COSTWATER TIGHT HATCHES AND RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. SERVICE COST
34WATER TIGHT HATCHES AND RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. MATERIAL COSTWATER TIGHT HATCHES AND RUBBER COAMING ON WEATHER DECK TO BE RENEWED AND PROVED. CHALK TEST TO BE CARRIED OUT POST RENEWAL. MATERIAL COST
35ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED SERVICE COSTROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED SERVICE COST
36ROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED MATERIAL COSTROPE REEL ON WEATHER DECK DRUM TO BE OVERHAULED AND PROVED MATERIAL COST
37POLES OF THE LATTICE STRUCTURE AND LIGHT POLES (DIA 3 INCH, LENGTH -20 FEET ) TO BE RENEWED SERVICE COSTPOLES OF THE LATTICE STRUCTURE AND LIGHT POLES (DIA 3 INCH, LENGTH -20 FEET ) TO BE RENEWED SERVICE COST
38POLES OF THE LATTICE STRUCTURE AND LIGHT POLES (DIA 3 INCH, LENGTH -20 FEET ) TO BE RENEWED MATERIAL COSTPOLES OF THE LATTICE STRUCTURE AND LIGHT POLES (DIA 3 INCH, LENGTH -20 FEET ) TO BE RENEWED MATERIAL COST
39REPAIR CRAFTS ILLUMINATED NAME BOARD SERVICE COSTREPAIR CRAFTS ILLUMINATED NAME BOARD SERVICE COST
40REPAIR CRAFTS ILLUMINATED NAME BOARD SERVICE COSTREPAIR CRAFTS ILLUMINATED NAME BOARD SERVICE COST
41REPLACEMENT AND LOAD TEST OF TOWING PENDENTS AND THEIR ACCESSORIES INCLUDING SHACKLE AND PANAMA PLATE SERVICE COSTREPLACEMENT AND LOAD TEST OF TOWING PENDENTS AND THEIR ACCESSORIES INCLUDING SHACKLE AND PANAMA PLATE SERVICE COST
42REPLACEMENT AND LOAD TEST OF TOWING PENDENTS AND THEIR ACCESSORIES INCLUDING SHACKLE AND PANAMA PLATE MATERIAL COSTREPLACEMENT AND LOAD TEST OF TOWING PENDENTS AND THEIR ACCESSORIES INCLUDING SHACKLE AND PANAMA PLATE MATERIAL COST
43DECK LOCKERS (MS AND GRP) TO BE RENEWED SERVICE COSTDECK LOCKERS (MS AND GRP) TO BE RENEWED SERVICE COST
44DECK LOCKERS (MS AND GRP) TO BE RENEWED MATERIAL COSTDECK LOCKERS (MS AND GRP) TO BE RENEWED MATERIAL COST
45AIR PRESSURE TESTING OF ALL AFFECTED TANKS AND COMPARTMENTS POST COMPLETION OF HOT WORK SERVICE COSTAIR PRESSURE TESTING OF ALL AFFECTED TANKS AND COMPARTMENTS POST COMPLETION OF HOT WORK SERVICE COST
46AIR PRESSURE TESTING OF ALL AFFECTED TANKS AND COMPARTMENTS POST COMPLETION OF HOT WORK MATERIAL COSTAIR PRESSURE TESTING OF ALL AFFECTED TANKS AND COMPARTMENTS POST COMPLETION OF HOT WORK MATERIAL COST
47RENEW JACK STAFF AND ENSIGN STAFF SUPPORT PIPE WITH SOCKET AND SHOE IN FORECASTLE AND QUARTER DECK AS PER SAMPLE MAT- GI PIPE 50 NB SERVICE COSTRENEW JACK STAFF AND ENSIGN STAFF SUPPORT PIPE WITH SOCKET AND SHOE IN FORECASTLE AND QUARTER DECK AS PER SAMPLE MAT- GI PIPE 50 NB SERVICE COST
48RENEW JACK STAFF AND ENSIGN STAFF SUPPORT PIPE WITH SOCKET AND SHOE IN FORECASTLE AND QUARTER DECK AS PER SAMPLE MAT- GI PIPE 50 NB MATERIAL COSTRENEW JACK STAFF AND ENSIGN STAFF SUPPORT PIPE WITH SOCKET AND SHOE IN FORECASTLE AND QUARTER DECK AS PER SAMPLE MAT- GI PIPE 50 NB MATERIAL COST
49NETTING/MESH TO BE RENEWED AS PER SAMPLE MATERIAL 16 MM ROPE SERVICE COSTNETTING/MESH TO BE RENEWED AS PER SAMPLE MATERIAL 16 MM ROPE SERVICE COST
50NETTING/MESH TO BE RENEWED AS PER SAMPLE MATERIAL 16 MM ROPE MATERIAL COSTNETTING/MESH TO BE RENEWED AS PER SAMPLE MATERIAL 16 MM ROPE MATERIAL COST
51FIRE HOSE BOX AND BRACKETS TO BE RENEWED MATL FRP SERVICE COSTFIRE HOSE BOX AND BRACKETS TO BE RENEWED MATL FRP SERVICE COST
52FIRE HOSE BOX AND BRACKETS TO BE RENEWED MATL FRP MATERIAL COSTFIRE HOSE BOX AND BRACKETS TO BE RENEWED MATL FRP MATERIAL COST
53LAYOUT ANCHOR AND CHAIN CABLE ON DECK. RANGE ANCHOR, CHAIN CABLE JOINING SHACKLES CHANGE CABLE ENDS AND RE-MARK CABLE LENGTHS LUBRICATE ANCHOR FLUKES AND SURVEY OF CABLE CLENCH TO BE CARRIED OUT SERVICE COSTLAYOUT ANCHOR AND CHAIN CABLE ON DECK. RANGE ANCHOR, CHAIN CABLE JOINING SHACKLES CHANGE CABLE ENDS AND RE-MARK CABLE LENGTHS LUBRICATE ANCHOR FLUKES AND SURVEY OF CABLE CLENCH TO BE CARRIED OUT SERVICE COST
54LAYOUT ANCHOR AND CHAIN CABLE ON DECK. RANGE ANCHOR, CHAIN CABLE JOINING SHACKLES CHANGE CABLE ENDS AND RE-MARK CABLE LENGTHS LUBRICATE ANCHOR FLUKES AND SURVEY OF CABLE CLENCH TO BE CARRIED OUT SERVICE COSTLAYOUT ANCHOR AND CHAIN CABLE ON DECK. RANGE ANCHOR, CHAIN CABLE JOINING SHACKLES CHANGE CABLE ENDS AND RE-MARK CABLE LENGTHS LUBRICATE ANCHOR FLUKES AND SURVEY OF CABLE CLENCH TO BE CARRIED OUT SERVICE COST
55ANCHOR AND CHAIN CABLE TO BE SURVEYED BY CLASS SURVEYOR DEFECTIVE CABLE LENGTHS TO BE RENEWED ON COMPLETION PAINTING TO BE DONE.; PAINT SCHEME: 3 COATSBITUMI8NOUS SOLUTION EACH COAT 30 MICRONS EACH SERVICE COSTANCHOR AND CHAIN CABLE TO BE SURVEYED BY CLASS SURVEYOR DEFECTIVE CABLE LENGTHS TO BE RENEWED ON COMPLETION PAINTING TO BE DONE.; PAINT SCHEME: 3 COATSBITUMI8NOUS SOLUTION EACH COAT 30 MICRONS EACH SERVICE COST
56ANCHOR AND CHAIN CABLE TO BE SURVEYED BY CLASS SURVEYOR DEFECTIVE CABLE LENGTHS TO BE RENEWED ON COMPLETION PAINTING TO BE DONE.; PAINT SCHEME: 3 COATS BITUMINOUS SOLUTION EACH COAT 30 MICRONS EACH MATERIAL COSTANCHOR AND CHAIN CABLE TO BE SURVEYED BY CLASS SURVEYOR DEFECTIVE CABLE LENGTHS TO BE RENEWED ON COMPLETION PAINTING TO BE DONE.; PAINT SCHEME: 3 COATS BITUMINOUS SOLUTION EACH COAT 30 MICRONS EACH MATERIAL COST
57DECK PLATES OF SWITCH BOARD, BATTERY AND FWD STORES COMPARTMENT DEFORMED AND DAMAGED SERVICE COSTDECK PLATES OF SWITCH BOARD, BATTERY AND FWD STORES COMPARTMENT DEFORMED AND DAMAGED SERVICE COST
58DECK PLATES OF SWITCH BOARD, BATTERY AND FWD STORES COMPARTMENT DEFORMED AND DAMAGED MATERIAL COSTDECK PLATES OF SWITCH BOARD, BATTERY AND FWD STORES COMPARTMENT DEFORMED AND DAMAGED MATERIAL COST
59INCLINING LADDERS OF SWITCH BOARD COMPARTMENT, FWD STORE DEFORMED AND DAMAGED SERVICE COSTINCLINING LADDERS OF SWITCH BOARD COMPARTMENT, FWD STORE DEFORMED AND DAMAGED SERVICE COST
60INCLINING LADDERS OF SWITCH BOARD COMPARTMENT, FWD STORE DEFORMED AND DAMAGED MATERIAL COSTINCLINING LADDERS OF SWITCH BOARD COMPARTMENT, FWD STORE DEFORMED AND DAMAGED MATERIAL COST
61VENT HEADS FOR SWITCH BOARD BATTERY AND BATTERY COMPARTMENTS DAMAGED SERVICE COSTVENT HEADS FOR SWITCH BOARD BATTERY AND BATTERY COMPARTMENTS DAMAGED SERVICE COST
62VENT HEADS FOR SWITCH BOARD BATTERY AND BATTERY COMPARTMENTS DAMAGED MATERIAL COSTVENT HEADS FOR SWITCH BOARD BATTERY AND BATTERY COMPARTMENTS DAMAGED MATERIAL COST
63CATAMARANS SUPPORTING PIPE AND PILLAR AT MID SECTION BROKEN, DAMAGED DEFORMED SERVICE COSTCATAMARANS SUPPORTING PIPE AND PILLAR AT MID SECTION BROKEN, DAMAGED DEFORMED SERVICE COST
64CATAMARANS SUPPORTING PIPE AND PILLAR AT MID SECTION BROKEN, DAMAGED DEFORMED MATERIAL COSTCATAMARANS SUPPORTING PIPE AND PILLAR AT MID SECTION BROKEN, DAMAGED DEFORMED MATERIAL COST
65MANHOLE COVERS AND COMING OF FOAM FILLED TANKS DEFORMED AND DAMAGED SERVICE COSTMANHOLE COVERS AND COMING OF FOAM FILLED TANKS DEFORMED AND DAMAGED SERVICE COST
66MANHOLE COVERS AND COMING OF FOAM FILLED TANKS DEFORMED AND DAMAGED MATERIAL COSTMANHOLE COVERS AND COMING OF FOAM FILLED TANKS DEFORMED AND DAMAGED MATERIAL COST
67CARGO NETS WITH FRAME DEFORMED AND DAMAGED (ROPE- 16 MM PP ROPE ) DIMENSION- 50 M X 12 M SERVICE COSTCARGO NETS WITH FRAME DEFORMED AND DAMAGED (ROPE- 16 MM PP ROPE ) DIMENSION- 50 M X 12 M SERVICE COST
68CARGO NETS WITH FRAME DEFORMED AND DAMAGED (ROPE- 16 MM PP ROPE ) DIMENSION- 50 M X 12 M MATERIAL COSTCARGO NETS WITH FRAME DEFORMED AND DAMAGED (ROPE- 16 MM PP ROPE ) DIMENSION- 50 M X 12 M MATERIAL COST
69REFLECTORS ALONGWITH, STANDS/ PIPES FOUND DEFORMED AND DAMAGED SERVICE COSTREFLECTORS ALONGWITH, STANDS/ PIPES FOUND DEFORMED AND DAMAGED SERVICE COST
70REFLECTORS ALONGWITH, STANDS/ PIPES FOUND DEFORMED AND DAMAGED MATERIAL COSTREFLECTORS ALONGWITH, STANDS/ PIPES FOUND DEFORMED AND DAMAGED MATERIAL COST
71OPERATING PANELS & GEAR BOX OF ANCHORS WINDLASS DEFECTIVE VIEW WATER INGRESS REPAIR/RENEWAL TO BE CARRIED OUT SERVICE COSTOPERATING PANELS & GEAR BOX OF ANCHORS WINDLASS DEFECTIVE VIEW WATER INGRESS REPAIR/RENEWAL TO BE CARRIED OUT SERVICE COST
72OPERATING PANELS & GEAR BOX OF ANCHORS WINDLASS DEFECTIVE VIEW WATER INGRESS REPAIR/RENEWAL TO BE CARRIED OUT MATERIAL COSTOPERATING PANELS & GEAR BOX OF ANCHORS WINDLASS DEFECTIVE VIEW WATER INGRESS REPAIR/RENEWAL TO BE CARRIED OUT MATERIAL COST
73TWIN/TOWING BOLLARD FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT LOAD TEST AS PER CLASS TO BE UNDERTAKEN CERTIFICATE FOR THE SAME TO BE PROVIDED SERVICE COSTTWIN/TOWING BOLLARD FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT LOAD TEST AS PER CLASS TO BE UNDERTAKEN CERTIFICATE FOR THE SAME TO BE PROVIDED SERVICE COST
74TWIN/TOWING BOLLARD FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT LOAD TEST AS PER CLASS TO BE UNDERTAKEN CERTIFICATE FOR THE SAME TO BE PROVIDED MATERIAL COSTTWIN/TOWING BOLLARD FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT LOAD TEST AS PER CLASS TO BE UNDERTAKEN CERTIFICATE FOR THE SAME TO BE PROVIDED MATERIAL COST
75FOUNDATION OF ANCHOR WINDLASS DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT SERVICE COSTFOUNDATION OF ANCHOR WINDLASS DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT SERVICE COST
76FOUNDATION OF ANCHOR WINDLASS DEFORMED REPAIR/RENEWAL TO BE CARRIED OUT MATERIAL COSTFOUNDATION OF ANCHOR WINDLASS DEFORMED REPAIR/RENEWAL TO BE CARRIED OUT MATERIAL COST
77BULWARK ALONGWITH FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT SERVICE COSTBULWARK ALONGWITH FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT SERVICE COST
78BULWARK ALONGWITH FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT MATERIAL COSTBULWARK ALONGWITH FOUND DEFORMED REPAIR/ RENEWAL TO BE CARRIED OUT MATERIAL COST
79DG SERVICE TANK FOUND DEFORMED AND DAMAGED REPAIR/RENEWAL TO BE CARRIED OUT SERVICE COSTDG SERVICE TANK FOUND DEFORMED AND DAMAGED REPAIR/RENEWAL TO BE CARRIED OUT SERVICE COST
80DG SERVICE TANK FOUND DEFORMED AND DAMAGED REPAIR/RENEWAL TO BE CARRIED OUT MATERIAL COSTDG SERVICE TANK FOUND DEFORMED AND DAMAGED REPAIR/RENEWAL TO BE CARRIED OUT MATERIAL COST
81REPAIR AND REFURBISHMENT OF MUSHROOM HEAD SERVICE COSTREPAIR AND REFURBISHMENT OF MUSHROOM HEAD SERVICE COST
82REPAIR AND REFURBISHMENT OF MUSHROOM HEAD MATERIAL COSTREPAIR AND REFURBISHMENT OF MUSHROOM HEAD MATERIAL COST
83UNDERTAKE REMOVAL, REPAIRS & FITMENT OF PIPES FROM EXHAUST MANIFOLD OF BOTH DG EXHAUST TRUNKING DIA - 100MM (NB) CHEMICAL CLEANING AND PRESSURE TESTING (2.5KG/CM2) SERVICE COSTUNDERTAKE REMOVAL, REPAIRS & FITMENT OF PIPES FROM EXHAUST MANIFOLD OF BOTH DG EXHAUST TRUNKING DIA - 100MM (NB) CHEMICAL CLEANING AND PRESSURE TESTING (2.5KG/CM2) SERVICE COST
84UNDERTAKE REMOVAL, REPAIRS & FITMENT OF PIPES FROM EXHAUST MANIFOLD OF BOTH DG EXHAUST TRUNKING DIA - 100MM (NB) CHEMICAL CLEANING AND PRESSURE TESTING (2.5KG/CM2) MATERIAL COSTUNDERTAKE REMOVAL, REPAIRS & FITMENT OF PIPES FROM EXHAUST MANIFOLD OF BOTH DG EXHAUST TRUNKING DIA - 100MM (NB) CHEMICAL CLEANING AND PRESSURE TESTING (2.5KG/CM2) MATERIAL COST
85PAINTING & RE-LAGGING OF EXHAUST SYSTEM OF BOTH DG'S(PAINT H.R ALUMINIUM PAINT, LAGGING MATERIAL CERAWOOL BLANKET AND FIBERGLASS CLOTH SERVICE COSTPAINTING & RE-LAGGING OF EXHAUST SYSTEM OF BOTH DG'S(PAINT H.R ALUMINIUM PAINT, LAGGING MATERIAL CERAWOOL BLANKET AND FIBERGLASS CLOTH SERVICE COST
86PAINTING & RE-LAGGING OF EXHAUST SYSTEM OF BOTH DG'S(PAINT H.R ALUMINIUM PAINT, LAGGING MATERIAL CERAWOOL BLANKET AND FIBERGLASS CLOTH MATERIAL COSTPAINTING & RE-LAGGING OF EXHAUST SYSTEM OF BOTH DG'S(PAINT H.R ALUMINIUM PAINT, LAGGING MATERIAL CERAWOOL BLANKET AND FIBERGLASS CLOTH MATERIAL COST
87RENEWAL OF EXHAUST COMPENSATOR OF BOTH MAIN ENGINES MAT SS DIA 300MM SERVICE COSTRENEWAL OF EXHAUST COMPENSATOR OF BOTH MAIN ENGINES MAT SS DIA 300MM SERVICE COST
88RENEWAL OF EXHAUST COMPENSATOR OF BOTH MAIN ENGINES MAT SS DIA 300MM MATERIAL COSTRENEWAL OF EXHAUST COMPENSATOR OF BOTH MAIN ENGINES MAT SS DIA 300MM MATERIAL COST
89OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M154 T SERVICE COSTOVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M154 T SERVICE COST
90OVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M154 T MATERIAL COSTOVERHAUL OF 40 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M154 T MATERIAL COST
91OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M100 M SERVICE COSTOVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M100 M SERVICE COST
92OVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M100 M MATERIAL COSTOVERHAUL OF 20 TPH PORTABLE SUBMERSIBLE PUMPS ALONG WITH STARTER PANEL MAKE:MODY, MODEL M100 M MATERIAL COST
93RENEW AND FIT FIREMAIN SYSTEM PIPES (DIA-80MM) SERVICE COSTRENEW AND FIT FIREMAIN SYSTEM PIPES (DIA-80MM) SERVICE COST
94RENEW AND FIT FIREMAIN SYSTEM PIPES (DIA-80MM) MATERIAL COSTRENEW AND FIT FIREMAIN SYSTEM PIPES (DIA-80MM) MATERIAL COST
95SEA WATER INLET STRAINER OF SEA WATER SYSTEM TO BE RENEWED (DIA-40 MM, MAT-CUNI) SERVICE COSTSEA WATER INLET STRAINER OF SEA WATER SYSTEM TO BE RENEWED (DIA-40 MM, MAT-CUNI) SERVICE COST
96SEA WATER INLET STRAINER OF SEA WATER SYSTEM TO BE RENEWED (DIA-40 MM, MAT-CUNI) SERVICE COSTSEA WATER INLET STRAINER OF SEA WATER SYSTEM TO BE RENEWED (DIA-40 MM, MAT-CUNI) SERVICE COST
97RENEW FUEL LINES FROM RU TANK TO DA INLET AND RETURN LINE FROM DA TO RU TANK FOR BOTH DA\\"S (MAT- MS, DIA-15 MM) SERVICE COST.RENEW FUEL LINES FROM RU TANK TO DA INLET AND RETURN LINE FROM DA TO RU TANK FOR BOTH DA\\"S (MAT- MS, DIA-15 MM) SERVICE COST.
98RENEW FUEL LINES FROM RU TANK TO DA INLET AND RETURN LINE FROM DA TO RU TANK FOR BOTH DA\\"S (MAT- MS, DIA-15 MM) MATERIAL COST.RENEW FUEL LINES FROM RU TANK TO DA INLET AND RETURN LINE FROM DA TO RU TANK FOR BOTH DA\\"S (MAT- MS, DIA-15 MM) MATERIAL COST.
99RENEW FUEL RU TANK FILING PIPE ALONGWITH CAP FROM MAIN DECK TO RU TANK (DIA-50 MM, MAT- MS SERVICE COSTRENEW FUEL RU TANK FILING PIPE ALONGWITH CAP FROM MAIN DECK TO RU TANK (DIA-50 MM, MAT- MS SERVICE COST
100RENEW FUEL RU TANK FILING PIPE ALONGWITH CAP FROM MAIN DECK TO RU TANK (DIA-50 MM, MAT- MS MATERIAL COSTRENEW FUEL RU TANK FILING PIPE ALONGWITH CAP FROM MAIN DECK TO RU TANK (DIA-50 MM, MAT- MS MATERIAL COST
101RENEW FUEL RU TANK BREATHER PIPE WITH ALTERNATE FILLING ADAPTER IN \\"Y\\" SHAPE FROM MAIN DECK TO RU TANK MAIN PIPE DIA-50 MM, MAT- MS BRANCH PIPE WITH ADAPTER DIA-25MM SERVICE COSTRENEW FUEL RU TANK BREATHER PIPE WITH ALTERNATE FILLING ADAPTER IN \\"Y\\" SHAPE FROM MAIN DECK TO RU TANK MAIN PIPE DIA-50 MM, MAT- MS BRANCH PIPE WITH ADAPTER DIA-25MM SERVICE COST
102RENEW FUEL RU TANK BREATHER PIPE WITH ALTERNATE FILLING ADAPTER IN \\"Y\\" SHAPE FROM MAIN DECK TO RU TANK MAIN PIPE DIA-50 MM, MAT- MS BRANCH PIPE WITH ADAPTER DIA-25MM MATERIAL COSTRENEW FUEL RU TANK BREATHER PIPE WITH ALTERNATE FILLING ADAPTER IN \\"Y\\" SHAPE FROM MAIN DECK TO RU TANK MAIN PIPE DIA-50 MM, MAT- MS BRANCH PIPE WITH ADAPTER DIA-25MM MATERIAL COST
103FUEL RU TANK DRAIN AND VALVES TO BE PROVIDED (TYPE- SPRING LOADED S ) SERVICE COSTFUEL RU TANK DRAIN AND VALVES TO BE PROVIDED (TYPE- SPRING LOADED S ) SERVICE COST
104FUEL RU TANK DRAIN AND VALVES TO BE PROVIDED (TYPE- SPRING LOADED S ) MATERIAL COSTFUEL RU TANK DRAIN AND VALVES TO BE PROVIDED (TYPE- SPRING LOADED S ) MATERIAL COST
105RENEW DD PUMP INLET AND OUTLET PIPES (DIA-80MM, MAT- CUNI) SERVICE COSTRENEW DD PUMP INLET AND OUTLET PIPES (DIA-80MM, MAT- CUNI) SERVICE COST
106RENEW DD PUMP INLET AND OUTLET PIPES (DIA-80MM, MAT- CUNI) MATERIAL COSTRENEW DD PUMP INLET AND OUTLET PIPES (DIA-80MM, MAT- CUNI) MATERIAL COST
107DD PUMP INLET STRAINER TO BE PROVIDED (TYPE-GATE VALVE, DIA 80MM) SERVICE COSTDD PUMP INLET STRAINER TO BE PROVIDED (TYPE-GATE VALVE, DIA 80MM) SERVICE COST
108DD PUMP INLET STRAINER TO BE PROVIDED (TYPE-GATE VALVE, DIA 80MM) MATERIAL COSTDD PUMP INLET STRAINER TO BE PROVIDED (TYPE-GATE VALVE, DIA 80MM) MATERIAL COST
109DD PUMP STRAINER PURGING COCK TO BE PROVIDED (DIA-15 MM) SERVICE COSTDD PUMP STRAINER PURGING COCK TO BE PROVIDED (DIA-15 MM) SERVICE COST
110DD PUMP STRAINER PURGING COCK TO BE PROVIDED (DIA-15 MM) SERVICE COSTDD PUMP STRAINER PURGING COCK TO BE PROVIDED (DIA-15 MM) SERVICE COST
111DD PUMP DISCHARGE LINE TO FIREMAIN SYSTEM TO BE PROVIDED (DIA-80MM, MAT-CUNI) SERVICE COSTDD PUMP DISCHARGE LINE TO FIREMAIN SYSTEM TO BE PROVIDED (DIA-80MM, MAT-CUNI) SERVICE COST
112DD PUMP DISCHARGE LINE TO FIREMAIN SYSTEM TO BE PROVIDED (DIA-80MM, MAT-CUNI) SERVICE COSTDD PUMP DISCHARGE LINE TO FIREMAIN SYSTEM TO BE PROVIDED (DIA-80MM, MAT-CUNI) SERVICE COST
113RENEW DD PUMP FLEXIBLE EXHAUST PIPING (DIA-50 MM, MAT- MS) SERVICE COSTRENEW DD PUMP FLEXIBLE EXHAUST PIPING (DIA-50 MM, MAT- MS) SERVICE COST
114RENEW DD PUMP FLEXIBLE EXHAUST PIPING (DIA-50 MM, MAT- MS) MATERIAL COSTRENEW DD PUMP FLEXIBLE EXHAUST PIPING (DIA-50 MM, MAT- MS) MATERIAL COST
115O/H HAND PUMP FITTED ON FORECASTLE AND QUARTER DECK AND RENEW HANDLES (SIZE AS PER SAMPLE) SERVICE COSTO/H HAND PUMP FITTED ON FORECASTLE AND QUARTER DECK AND RENEW HANDLES (SIZE AS PER SAMPLE) SERVICE COST
116O/H HAND PUMP FITTED ON FORECASTLE AND QUARTER DECK AND RENEW HANDLES (SIZE AS PER SAMPLE) MATERIAL COSTO/H HAND PUMP FITTED ON FORECASTLE AND QUARTER DECK AND RENEW HANDLES (SIZE AS PER SAMPLE) MATERIAL COST
117TANK SOUNDING CAP TO BE RENEWED. MAT BRASS SERVICE COSTTANK SOUNDING CAP TO BE RENEWED. MAT BRASS SERVICE COST
118TANK SOUNDING CAP TO BE RENEWED. MAT BRASS MATERIAL COSTTANK SOUNDING CAP TO BE RENEWED. MAT BRASS MATERIAL COST
119MUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED SPINDLE TO BE RENEWED SERVICE COSTMUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED SPINDLE TO BE RENEWED SERVICE COST
120MUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED SPINDLE TO BE RENEWED MATERIAL COSTMUSHROOM HEADS OF VARIOUS SIZES TO BE OVERHAULED AND REPAIRED SPINDLE TO BE RENEWED MATERIAL COST
121HEAVY SEA WATER INGRESS IN FUEL SYSTEM, LUB OIL SYSTEM AND FRESH WATER SYSTEM ON BOTH DGS REPAIR/RENEWAL TO BE CARRIED OUT SERVICE COSTHEAVY SEA WATER INGRESS IN FUEL SYSTEM, LUB OIL SYSTEM AND FRESH WATER SYSTEM ON BOTH DGS REPAIR/RENEWAL TO BE CARRIED OUT SERVICE COST
122HEAVY SEA WATER INGRESS IN FUEL SYSTEM, LUB OIL SYSTEM AND FRESH WATER SYSTEM ON BOTH DGS REPAIR/ RENEWAL TO BE CARRIED OUT MATERIAL COSTHEAVY SEA WATER INGRESS IN FUEL SYSTEM, LUB OIL SYSTEM AND FRESH WATER SYSTEM ON BOTH DGS REPAIR/ RENEWAL TO BE CARRIED OUT MATERIAL COST
123PORT DG FUEL PIPELINE FROM SERVICE TANK TO DG TO BE RENEWED SERVICE COSTPORT DG FUEL PIPELINE FROM SERVICE TANK TO DG TO BE RENEWED SERVICE COST
124PORT DG FUEL PIPELINE FROM SERVICE TANK TO DG TO BE RENEWED MATERIAL COSTPORT DG FUEL PIPELINE FROM SERVICE TANK TO DG TO BE RENEWED MATERIAL COST
125PORT DG CONTROL PANEL MISSING/DAMAGED AND TO BE RENEWED SERVICE COSTPORT DG CONTROL PANEL MISSING/DAMAGED AND TO BE RENEWED SERVICE COST
126PORT DG CONTROL PANEL MISSING/DAMAGED AND TO BE RENEWED MATERIAL COSTPORT DG CONTROL PANEL MISSING/DAMAGED AND TO BE RENEWED MATERIAL COST
127BOTH DD FIRE PUMP TO BE REPLACED SERVICE COSTBOTH DD FIRE PUMP TO BE REPLACED SERVICE COST
128BOTH DD FIRE PUMP TO BE REPLACED MATERIAL COSTBOTH DD FIRE PUMP TO BE REPLACED MATERIAL COST
129DD FIRE PUMP SYSTEM PIPE LINE TO BE RENEWED INCLUDING BELLOWS SERVICE COSTDD FIRE PUMP SYSTEM PIPE LINE TO BE RENEWED INCLUDING BELLOWS SERVICE COST
130DD FIRE PUMP SYSTEM PIPE LINE TO BE RENEWED INCLUDING BELLOWS MATERIAL COSTDD FIRE PUMP SYSTEM PIPE LINE TO BE RENEWED INCLUDING BELLOWS MATERIAL COST
131FUEL LINE FROM SEQUENCE TANK TO DG HEAD VALVE DAMAGED. REPAIR/ REPLACEMENT REQUIRED SERVICE COSTFUEL LINE FROM SEQUENCE TANK TO DG HEAD VALVE DAMAGED. REPAIR/ REPLACEMENT REQUIRED SERVICE COST
132FUEL LINE FROM SEQUENCE TANK TO DG HEAD VALVE DAMAGED. REPAIR/ REPLACEMENT REQUIRED MATERIAL COSTFUEL LINE FROM SEQUENCE TANK TO DG HEAD VALVE DAMAGED. REPAIR/ REPLACEMENT REQUIRED MATERIAL COST
133WATER INGRESS IN BOTH DGS MAJOR OVERHAULING REQUIRED SERVICE COSTWATER INGRESS IN BOTH DGS MAJOR OVERHAULING REQUIRED SERVICE COST
134WATER INGRESS IN BOTH DGS MAJOR OVERHAULING REQUIRED MATERIAL COSTWATER INGRESS IN BOTH DGS MAJOR OVERHAULING REQUIRED MATERIAL COST
135MULTIPLE PIPE LINES PERTAINING TO FRESH WATER, SEA WATER & FUEL DAMAGED AND IS TO BE REPAIRED/REPLACED SERVICE COSTMULTIPLE PIPE LINES PERTAINING TO FRESH WATER, SEA WATER & FUEL DAMAGED AND IS TO BE REPAIRED/REPLACED SERVICE COST
136MULTIPLE PIPE LINES PERTAINING TO FRESH WATER, SEA WATER & FUEL DAMAGED AND IS TO BE REPAIRED/ REPLACED MATERIAL COSTMULTIPLE PIPE LINES PERTAINING TO FRESH WATER, SEA WATER & FUEL DAMAGED AND IS TO BE REPAIRED/ REPLACED MATERIAL COST
137ELECTRICAL CONDUIT PIPES TO BE RENEWED SERVICE COSTELECTRICAL CONDUIT PIPES TO BE RENEWED SERVICE COST
138ELECTRICAL CONDUIT PIPES TO BE RENEWED MATERIAL COSTELECTRICAL CONDUIT PIPES TO BE RENEWED MATERIAL COST
139UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION WIRING INDICATIONS SWITCHES ALARMS ETC SERVICE COSTUNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION WIRING INDICATIONS SWITCHES ALARMS ETC SERVICE COST
140UNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION WIRING INDICATIONS SWITCHES ALARMS ETC MATERIAL COSTUNDERTAKE FUNCTIONAL CHECKS OF MAIN ENGINE LOCAL CONTROL PANEL REPLACE/ RECTIFY DEFECTIVE INSTRUMENTATION WIRING INDICATIONS SWITCHES ALARMS ETC MATERIAL COST
141OVERHAULING AND SERVICEABILITY CHECKS OF DG ALTERNATOR ASSEMBLY AND BATTERY CHARGING ALTERNATOR UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING RENEWAL OF BEARINGS, RENEWAL OF AVR. REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50HZ ALTERNATOR (MAKE-KIRLKOSAR) SERVICE COSTOVERHAULING AND SERVICEABILITY CHECKS OF DG ALTERNATOR ASSEMBLY AND BATTERY CHARGING ALTERNATOR UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING RENEWAL OF BEARINGS, RENEWAL OF AVR. REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50HZ ALTERNATOR (MAKE-KIRLKOSAR) SERVICE COST
142OVERHAULING AND SERVICEABILITY CHECKS OF DG ALTERNATOR ASSEMBLY AND BATTERY CHARGING ALTERNATOR UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING RENEWAL OF BEARINGS, RENEWAL OF AVR. REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50HZ ALTERNATOR (MAKE-KIRLKOSAR) MATERIAL COSTOVERHAULING AND SERVICEABILITY CHECKS OF DG ALTERNATOR ASSEMBLY AND BATTERY CHARGING ALTERNATOR UNDERTAKE COMPLETE REWINDING OF STATOR AND ROTOR WINDING RENEWAL OF BEARINGS, RENEWAL OF AVR. REPLACEMENT OF ROTATING RECTIFIER ASSEMBLY, RENEWAL OF SV MOUNTS AND FITTING BACK OF 100 KVA, 415 V, 3PH, 50HZ ALTERNATOR (MAKE-KIRLKOSAR) MATERIAL COST
143SERVICEABILITY CHECKS OF SENSORS/ CUT OFFS (I.E FW, LUB OIL AND ALTERNATOR TEMPERATURE SENSORS, LOW LUB OIL PRESSURE SENSOR) SERVICE COSTSERVICEABILITY CHECKS OF SENSORS/ CUT OFFS (I.E FW, LUB OIL AND ALTERNATOR TEMPERATURE SENSORS, LOW LUB OIL PRESSURE SENSOR) SERVICE COST
144SERVICEABILITY CHECKS OF SENSORS/ CUT OFFS (I.E FW, LUB OIL AND ALTERNATOR TEMPERATURE SENSORS, LOW LUB OIL PRESSURE SENSOR) MATERIAL COSTSERVICEABILITY CHECKS OF SENSORS/ CUT OFFS (I.E FW, LUB OIL AND ALTERNATOR TEMPERATURE SENSORS, LOW LUB OIL PRESSURE SENSOR) MATERIAL COST
145RENEWAL OF 12V DC DG SEL STARTER SERVICE COSTRENEWAL OF 12V DC DG SEL STARTER SERVICE COST
146RENEWAL OF 12V DC DG SEL STARTER I MATERIAL COSTRENEWAL OF 12V DC DG SEL STARTER I MATERIAL COST
147RENEWAL OF CONTROL WIRING FRONT PANEL OF LCP (20X1.5 SQMM, CU MULTI STRAND CABLE) SERVICE COSTRENEWAL OF CONTROL WIRING FRONT PANEL OF LCP (20X1.5 SQMM, CU MULTI STRAND CABLE) SERVICE COST
148RENEWAL OF CONTROL WIRING FRONT PANEL OF LCP (20X1.5 SQMM, CU MULTI STRAND CABLE) MATERIAL COSTRENEWAL OF CONTROL WIRING FRONT PANEL OF LCP (20X1.5 SQMM, CU MULTI STRAND CABLE) MATERIAL COST
149DG STARTING BATTERIES (12V DC) TO BE REPLACED SERVICE COSTDG STARTING BATTERIES (12V DC) TO BE REPLACED SERVICE COST
150DG STARTING BATTERIES (12V DC) TO BE REPLACED MATERIAL COSTDG STARTING BATTERIES (12V DC) TO BE REPLACED MATERIAL COST
151RENEW TUBE FITTINGS IN DG COMPT-06 NOS, OVERHEAD TUB LIGHT FITTINGS (WT INDUSTRIAL TYPE) 20W X 2 -10 NOS, HALOGEN LAMPS (203V,500W) ALONGWITH FITTINGS ON WEATHER DECK-10 NOS, BPT NAME BOARD TUBE LIGHT FITTINGS ALONGWITH SWITCHES (230V, 20W)-02 NOS, TWIN TUBE LIGHT(220V,20W)-10 NOS, FLOOD LIGHTS-04 NOS SERVICE COSTRENEW TUBE FITTINGS IN DG COMPT-06 NOS, OVERHEAD TUB LIGHT FITTINGS (WT INDUSTRIAL TYPE) 20W X 2 -10 NOS, HALOGEN LAMPS (203V,500W) ALONGWITH FITTINGS ON WEATHER DECK-10 NOS, BPT NAME BOARD TUBE LIGHT FITTINGS ALONGWITH SWITCHES (230V, 20W)-02 NOS, TWIN TUBE LIGHT(220V,20W)-10 NOS, FLOOD LIGHTS-04 NOS SERVICE COST
152RENEW TUBE FITTINGS IN DG COMPT-06 NOS, OVERHEAD TUB LIGHT FITTINGS (WT INDUSTRIAL TYPE) 20W X 2 -10 NOS, HALOGEN LAMPS (203V,500W) ALONGWITH FITTINGS ON WEATHER DECK-10 NOS, BPT NAME BOARD TUBE LIGHT FITTINGS ALONGWITH SWITCHES (230V, 20W)-02 NOS, TWIN TUBE LIGHT(220V,20W)-10 NOS, FLOOD LIGHTS-04 NOS MATERIAL COSTRENEW TUBE FITTINGS IN DG COMPT-06 NOS, OVERHEAD TUB LIGHT FITTINGS (WT INDUSTRIAL TYPE) 20W X 2 -10 NOS, HALOGEN LAMPS (203V,500W) ALONGWITH FITTINGS ON WEATHER DECK-10 NOS, BPT NAME BOARD TUBE LIGHT FITTINGS ALONGWITH SWITCHES (230V, 20W)-02 NOS, TWIN TUBE LIGHT(220V,20W)-10 NOS, FLOOD LIGHTS-04 NOS MATERIAL COST
153TUBE LIGHT AND FOUNDATION ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COSTTUBE LIGHT AND FOUNDATION ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COST
154TUBE LIGHT AND FOUNDATION ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COSTTUBE LIGHT AND FOUNDATION ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COST
155UNDERTAKE COMPLETE RENEWAL OF MAIN SWITCHBOARD COMPRISING 3 VERTICAL SECTIONS VIZ. (I) GENERATOR SECTION G1, G2 36KW, 415V, 3PH, 50HZ AND SHORE SUPPLY 40A, 415V, 3PH, 50 HZ (II) DISTRIBUTION SECTION 415V, 3PH, 50HZ (III) DISTRIBUTION SECTION 240V, 3PH, 50HZ AND TRANS-RECTIFIER UNIT (TRU). FABRICATION OF NEW MSB FOUNDATION AND BRACKETS. RENEWAL OF WIRING ALONGWITH CABLE TRAYS. DETAILS OF ELECTRICAL COMPONENTS AND EQUIPMENT'S ARE AS FOLLOWS:- (a) TRANSFORMER 1 (40KVA) (b) TRANSFORMER 2 (35KVA) (c) GENERATOR PROTECTION CIRCUIT BREAKER (d) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A WITH MICRO LOGIC 2.2G TRIP UNIT - 16 NOS (e) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 50A - 08 NOS (f) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A - 06 NOS (g) SHROUDED PUSHBUTTON YELLOW COLOUR WITH 1NO CONTACT- 11 NOS (h) ILLUMINATED SELECTOR SWITCH BLUE COLOUR, 230V AC, 2 MAINTAINED POSITION WITH 1NO CONTACT - 02 NOS (i) AMMETER SELECTOR SWITCH RATED 6A - 02 NOS (j) VOLTMETER SELECTOR SWITCH RATED 6A, LINE TO LINE - 02 NOS (k) TRIPLE POLE THREE WAY WITHOUT ROTARY SWITCH RATED 6A - 01 NOS (I) AUXILIARY CONTACTOR RATED 10A, 220V AC COIL WITH 2NO + 2 NC - 03 NOS (m) 2NO + 2NC CONTACTS ADD ON BLOCK, FRONT MOUNTED - 03 NOS (n) ELECTRONIC TIMER RANGE 0.1 SEC TO 100HRS WITH 2 C/O CONTACTS - 01 NOS (o) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 63A - 01 NOS (p) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 50A - 01 NOS (q) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 25A - 04 NOS (r) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 16A - 01 NOS (s) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 10A-05 NOS (t) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 6A-06 NOS (u) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 2A-03 NOS (v) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 32A - 06 NOS (w) mx + OF SHUNT REL. 110-415V AC - 05 NOS (x) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 10A - 01 NOS (y) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 6A - 13 NOS (z) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 4A - 14NOS (aa) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 2A - 05 NOS (bb) CURRENT TRANSFORMER 100/5A, 5VA, CLASS 1 ACCURACY-06 NOS (CX) INSULATION MOTOR, SIZE 96X96 -02NOS (DD) KILO-WATTMETER 0-50KW, 3 WIRE 2 ELEMENTS, SIZE 96X96 -01 NOS (EE) AMMETER 0-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 62A -01 NOS 9 (FF) FREQUENCY METER 45-50-55HZ 400V, SIZE 96X96XMM RED AT 50HZ, 415V-01 NOS (GG) AC VOLTMETER 0-500V, SIZE 96X96 MM RED MARK AT 415V, 50HZ -01 NOS (HH) AC VOLTMETER 0-300V, SIZE 96X96 MM RED MARK AT 240V, 50HZ-01 NOS (II) AMMETER 01-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 84A -01 NOS (II) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 230V AC -07 NOS (KK) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-01 NOS (II) INDICATING LAMP INTEGRAL LED GREEN COLOUR , 230V AC-04 NOS (MM) INDICATING LED RED COLOUR, 230V AC-05 NOS (NN) INDICATING LAMP INTEGRAL LED RED COLOUR,24V AC/DC - 01 NOS (OO) INDICATING LAMP INTEGRAL LED YELLOW COLOUR, 24V AC/DC-01 NOS (GG) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-04 NOS (RR) INDICATING LAMP INTEGRAL LED AMBER COLOUR , 230V AC-02 NOS (SS) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER 415/24V,5VA,50/60HZ -06 NOS (TT) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER, PRIMARY: 440/415/380V SECONDARY:230/220/24V, 100 VA 50/60HZ-03 NOS (UU) CLIP ON TYPE TERMINAL 4 SQMM--38 NOS(VV) STUD TYPE TERMINAL 6-35 SQMM-03 NOS (WW) PHASE SEQUENCE INDICATOR 50-500V , SIZE 96X96MM-01 NOS (XX) CABLE ENTRY GLAND-01 NOS (YY) FOUR POLE CONTACTOR RATED 9A,220V,50/60HZ AC COIL WITH 2NO+2NC-01 NOS (ZZ) NAVIGATIONAL LIGHT PANEL, 230V AC-01 NOS (AAA) FUSE TERMINAL BLOCK 6A-06 NOS (BBB) SMPS, 500W-01 NOS AND RENEWAL OF CABLING FROM DISTRIBUTION SECTION 415V,3PH,50HZ TO FOLLOWING EQUIPMENTS:- (A) GENERATOR -1 415V,3PH,50HZ (B) GENERATOR-2 415V,3PH,50HZ (C) SHORE SUPPLY CONNECTION (D) UPS SYSTEM 40KVA (E) ANCHOR WINDLASS NO.1 (F) ANCHOR WINDLASS NO 2 (G) ANCHOR WINDLASS NO.3 (H) ANCHOR WINDLASS NO 4, CABLING FROM DISTRIBUTION SECTION 240V, 3PH, 50HZ TO FOLLOWING EQUIPMENTS (A) PRIMARY OF TRANSFORMER 35KVA, 415/240V 50HZ (B) TRANSFORMER -2 40 KVA, 415/240C , 3PH, 50HZ (C) TRANSFORMER 2 35KVA,415/340V 3PH, 50HZ (D) IR SOURCE NO.1 (E) IR SOURCE NO 2 (F) IR SOURCE NO 3 (G) IR SOURCE NO. 4 (H) IR SOURCE NO .5 (I) VIDEO CAMERA RECORDING (I) FAN SWITCHBOARD (K) NAVIGATIONAL LIGHT PANEL (I) FLOOD LIGHT FWD (M) FLOOD LIGHT AFT (N) LIGHTING SWBD & DG ROOMS (O) RECEPTACLE IN SWITCHBOARD & DG ROOMS (P) LIGHTING IN BATTERY (S) & ELECTRICAL ROOM (P) (Q) GSP- VENTILATION FANS (R) TRU CUM DCDB (S) FANS IN BATTERIES ROOM P & S CABLING FORM TRU CUM TO :- (A) ELECTRIC HORN (B) VIDEO CAMERA 1,2,3,4,5,6 (C) INCOMING SUPPLY FROM MSB 240V, 1PH, 50HZ, CABLING FROM NAVIGATIONAL LIGHT PANEL TO :- (A) STERN LIGHT (B) ANCHOR LIGHT (FWD) (C) PORT SIDE LIGHT (D) STBD SIDE LIGHT (E) ANCHOR LIGHT (AFT) AND MAIN SWITCHBOARD TO SHORE SUPPLY CONNECTION BOX SERVICE COSTUNDERTAKE COMPLETE RENEWAL OF MAIN SWITCHBOARD COMPRISING 3 VERTICAL SECTIONS VIZ. (I) GENERATOR SECTION G1, G2 36KW, 415V, 3PH, 50HZ AND SHORE SUPPLY 40A, 415V, 3PH, 50 HZ (II) DISTRIBUTION SECTION 415V, 3PH, 50HZ (III) DISTRIBUTION SECTION 240V, 3PH, 50HZ AND TRANS-RECTIFIER UNIT (TRU). FABRICATION OF NEW MSB FOUNDATION AND BRACKETS. RENEWAL OF WIRING ALONGWITH CABLE TRAYS. DETAILS OF ELECTRICAL COMPONENTS AND EQUIPMENT'S ARE AS FOLLOWS:- (a) TRANSFORMER 1 (40KVA) (b) TRANSFORMER 2 (35KVA) (c) GENERATOR PROTECTION CIRCUIT BREAKER (d) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A WITH MICRO LOGIC 2.2G TRIP UNIT - 16 NOS (e) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 50A - 08 NOS (f) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A - 06 NOS (g) SHROUDED PUSHBUTTON YELLOW COLOUR WITH 1NO CONTACT- 11 NOS (h) ILLUMINATED SELECTOR SWITCH BLUE COLOUR, 230V AC, 2 MAINTAINED POSITION WITH 1NO CONTACT - 02 NOS (i) AMMETER SELECTOR SWITCH RATED 6A - 02 NOS (j) VOLTMETER SELECTOR SWITCH RATED 6A, LINE TO LINE - 02 NOS (k) TRIPLE POLE THREE WAY WITHOUT ROTARY SWITCH RATED 6A - 01 NOS (I) AUXILIARY CONTACTOR RATED 10A, 220V AC COIL WITH 2NO + 2 NC - 03 NOS (m) 2NO + 2NC CONTACTS ADD ON BLOCK, FRONT MOUNTED - 03 NOS (n) ELECTRONIC TIMER RANGE 0.1 SEC TO 100HRS WITH 2 C/O CONTACTS - 01 NOS (o) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 63A - 01 NOS (p) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 50A - 01 NOS (q) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 25A - 04 NOS (r) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 16A - 01 NOS (s) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 10A-05 NOS (t) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 6A-06 NOS (u) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 2A-03 NOS (v) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 32A - 06 NOS (w) mx + OF SHUNT REL. 110-415V AC - 05 NOS (x) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 10A - 01 NOS (y) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 6A - 13 NOS (z) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 4A - 14NOS (aa) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 2A - 05 NOS (bb) CURRENT TRANSFORMER 100/5A, 5VA, CLASS 1 ACCURACY-06 NOS (CX) INSULATION MOTOR, SIZE 96X96 -02NOS (DD) KILO-WATTMETER 0-50KW, 3 WIRE 2 ELEMENTS, SIZE 96X96 -01 NOS (EE) AMMETER 0-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 62A -01 NOS 9 (FF) FREQUENCY METER 45-50-55HZ 400V, SIZE 96X96XMM RED AT 50HZ, 415V-01 NOS (GG) AC VOLTMETER 0-500V, SIZE 96X96 MM RED MARK AT 415V, 50HZ -01 NOS (HH) AC VOLTMETER 0-300V, SIZE 96X96 MM RED MARK AT 240V, 50HZ-01 NOS (II) AMMETER 01-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 84A -01 NOS (II) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 230V AC -07 NOS (KK) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-01 NOS (II) INDICATING LAMP INTEGRAL LED GREEN COLOUR , 230V AC-04 NOS (MM) INDICATING LED RED COLOUR, 230V AC-05 NOS (NN) INDICATING LAMP INTEGRAL LED RED COLOUR,24V AC/DC - 01 NOS (OO) INDICATING LAMP INTEGRAL LED YELLOW COLOUR, 24V AC/DC-01 NOS (GG) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-04 NOS (RR) INDICATING LAMP INTEGRAL LED AMBER COLOUR , 230V AC-02 NOS (SS) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER 415/24V,5VA,50/60HZ -06 NOS (TT) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER, PRIMARY: 440/415/380V SECONDARY:230/220/24V, 100 VA 50/60HZ-03 NOS (UU) CLIP ON TYPE TERMINAL 4 SQMM--38 NOS(VV) STUD TYPE TERMINAL 6-35 SQMM-03 NOS (WW) PHASE SEQUENCE INDICATOR 50-500V , SIZE 96X96MM-01 NOS (XX) CABLE ENTRY GLAND-01 NOS (YY) FOUR POLE CONTACTOR RATED 9A,220V,50/60HZ AC COIL WITH 2NO+2NC-01 NOS (ZZ) NAVIGATIONAL LIGHT PANEL, 230V AC-01 NOS (AAA) FUSE TERMINAL BLOCK 6A-06 NOS (BBB) SMPS, 500W-01 NOS AND RENEWAL OF CABLING FROM DISTRIBUTION SECTION 415V,3PH,50HZ TO FOLLOWING EQUIPMENTS:- (A) GENERATOR -1 415V,3PH,50HZ (B) GENERATOR-2 415V,3PH,50HZ (C) SHORE SUPPLY CONNECTION (D) UPS SYSTEM 40KVA (E) ANCHOR WINDLASS NO.1 (F) ANCHOR WINDLASS NO 2 (G) ANCHOR WINDLASS NO.3 (H) ANCHOR WINDLASS NO 4, CABLING FROM DISTRIBUTION SECTION 240V, 3PH, 50HZ TO FOLLOWING EQUIPMENTS (A) PRIMARY OF TRANSFORMER 35KVA, 415/240V 50HZ (B) TRANSFORMER -2 40 KVA, 415/240C , 3PH, 50HZ (C) TRANSFORMER 2 35KVA,415/340V 3PH, 50HZ (D) IR SOURCE NO.1 (E) IR SOURCE NO 2 (F) IR SOURCE NO 3 (G) IR SOURCE NO. 4 (H) IR SOURCE NO .5 (I) VIDEO CAMERA RECORDING (I) FAN SWITCHBOARD (K) NAVIGATIONAL LIGHT PANEL (I) FLOOD LIGHT FWD (M) FLOOD LIGHT AFT (N) LIGHTING SWBD & DG ROOMS (O) RECEPTACLE IN SWITCHBOARD & DG ROOMS (P) LIGHTING IN BATTERY (S) & ELECTRICAL ROOM (P) (Q) GSP- VENTILATION FANS (R) TRU CUM DCDB (S) FANS IN BATTERIES ROOM P & S CABLING FORM TRU CUM TO :- (A) ELECTRIC HORN (B) VIDEO CAMERA 1,2,3,4,5,6 (C) INCOMING SUPPLY FROM MSB 240V, 1PH, 50HZ, CABLING FROM NAVIGATIONAL LIGHT PANEL TO :- (A) STERN LIGHT (B) ANCHOR LIGHT (FWD) (C) PORT SIDE LIGHT (D) STBD SIDE LIGHT (E) ANCHOR LIGHT (AFT) AND MAIN SWITCHBOARD TO SHORE SUPPLY CONNECTION BOX SERVICE COST
156UNDERTAKE COMPLETE RENEWAL OF MAIN SWITCHBOARD COMPRISING 3 VERTICAL SECTIONS VIZ. (I) GENERATOR SECTION G1, G2 36KW, 415V, 3PH, 50HZ AND SHORE SUPPLY 40A, 415V, 3PH, 50 HZ (II) DISTRIBUTION SECTION 415V, 3PH, 50HZ (III) DISTRIBUTION SECTION 240V, 3PH, 50HZ AND TRANS-RECTIFIER UNIT (TRU). FABRICATION OF NEW MSB FOUNDATION AND BRACKETS. RENEWAL OF WIRING ALONGWITH CABLE TRAYS. DETAILS OF ELECTRICAL COMPONENTS AND EQUIPMENT'S ARE AS FOLLOWS :- (a) TRANSFORMER 1 (40KVA) (b) TRANSFORMER 2 (35KVA) (c) GENERATOR PROTECTION CIRCUIT BREAKER (d) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A WITH MICRO LOGIC 2.2G TRIP UNIT - 16 NOS (e) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 50A - 08 NOS (f) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A - 06 NOS (g) SHROUDED PUSHBUTTON YELLOW COLOUR WITH 1NO CONTACT- 11 NOS (h) ILLUMINATED SELECTOR SWITCH BLUE COLOUR, 230V AC, 2 MAINTAINED POSITION WITH 1NO CONTACT - 02 NOS (i) AMMETER SELECTOR SWITCH RATED 6A - 02 NOS (j) VOLTMETER SELECTOR SWITCH RATED 6A, LINE TO LINE - 02 NOS (k) TRIPLE POLE THREE WAY WITHOUT ROTARY SWITCH RATED 6A - 01 NOS (I) AUXILIARY CONTACTOR RATED 10A, 220V AC COIL WITH 2NO + 2 NC - 03 NOS (m) 2NO + 2NC CONTACTS ADD ON BLOCK, FRONT MOUNTED - 03 NOS (n) ELECTRONIC TIMER RANGE 0.1 SEC TO 100HRS WITH 2 C/O CONTACTS - 01 NOS (o) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 63A - 01 NOS (p) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 50A - 01 NOS (q) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 25A - 04 NOS (r) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 16A - 01 NOS (s) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 10A-05 NOS (t) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 6A-06 NOS (u) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 2A-03 NOS (v) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 32A - 06 NOS (w) mx + OF SHUNT REL. 110-415V AC - 05 NOS (x) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 10A - 01 NOS (y) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 6A - 13 NOS (z) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 4A - 14NOS (aa) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 2A - 05 NOS (bb) CURRENT TRANSFORMER 100/5A, 5VA, CLASS 1 ACCURACY-06 NOS (CX) INSULATION MOTOR, SIZE 96X96 -02NOS (DD) KILO WATTMETER 0-50KW, 3 WIRE 2 ELEMENTS, SIZE 96X96 -01 NOS (EE) AMMETER 0-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 62A -01 NOS 9 (FF) FREQUENCY METER 45-50-55HZ 400V, SIZE 96X96XMM RED AT 50HZ, 415V-01 NOS (GG) AC VOLTMETER 0-500V, SIZE 96X96 MM RED MARK AT 415V, 50HZ -01 NOS (HH) AC VOLTMETER 0-300V, SIZE 96X96 MM RED MARK AT 240V, 50HZ-01 NOS (II) AMMETER 01-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 84A -01 NOS (II) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 230V AC -07 NOS (KK) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-01 NOS (II) INDICATING LAMP INTEGRAL LED GREEN COLOUR , 230V AC-04 NOS (MM) INDICATING LED RED COLOUR, 230V AC-05 NOS (NN) INDICATING LAMP INTEGRAL LED RED COLOUR,24V AC/DC - 01 NOS (OO) INDICATING LAMP INTEGRAL LED YELLOW COLOUR, 24V AC/DC-01 NOS (GG) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-04 NOS (RR) INDICATING LAMP INTEGRAL LED AMBER COLOUR , 230V AC-02 NOS (SS) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER 415/24V,5VA,50/60HZ -06 NOS (TT) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER, PRIMARY: 440/415/380V SECONDARY:230/220/24V, 100 VA 50/60HZ-03 NOS (UU) CLIP ON TYPE TERMINAL 4 SQMM--38 NOS(VV) STUD TYPE TERMINAL 6-35 SQMM-03 NOS (WW) PHASE SEQUENCE INDICATOR 50-500V, SIZE 96X96MM-01 NOS (XX) CABLE ENTRY GLAND-01 NOS (YY) FOUR POLE CONTACTOR RATED 9A,220V,50/60HZ AC COIL WITH 2NO+2NC-01 NOS (ZZ) NAVIGATIONAL LIGHT PANEL, 230V AC-01 NOS (AAA) FUSE TERMINAL BLOCK 6A-06 NOS (BBB) SMPS, 500W-01 NOS AND RENEWAL OF CABLING FROM DISTRIBUTION SECTION 415V,3PH,50HZ TO FOLLOWING EQUIPMENTS:- (A) GENERATOR -1 415V,3PH,50HZ (B) GENERATOR-2 415V,3PH,50HZ (C) SHORE SUPPLY CONNECTION (D) UPS SYSTEM 40KVA (E) ANCHOR WINDLASS NO.1 (F) ANCHOR WINDLASS NO 2 (G) ANCHOR WINDLASS NO.3 (H) ANCHOR WINDLASS NO 4, CABLING FROM DISTRIBUTION SECTION 240V, 3PH, 50HZ TO FOLLOWING EQUIPMENTS (A) PRIMARY OF TRANSFORMER 35KVA, 415/240V 50HZ (B) TRANSFORMER -2 40 KVA, 415/240C , 3PH, 50HZ (C) TRANSFORMER 2 35KVA,415/340V 3PH, 50HZ (D) IR SOURCE NO.1 (E) IR SOURCE NO 2 (F) IR SOURCE NO 3 (G) IR SOURCE NO. 4 (H) IR SOURCE NO .5 (I) VIDEO CAMERA RECORDING (I) FAN SWITCHBOARD (K) NAVIGATIONAL LIGHT PANEL (I) FLOOD LIGHT FWD (M) FLOOD LI9GHT AFT (N) LIGHTING SWBD & DG ROOMS (O) RECEPTACLE IN SWITCHBOARD & DG ROOMS (P) LIGHTING IN BATTERY (S) & ELECTRICAL ROOM (P) (Q) GSP- VENTILATION FANS (R) TRU CUM DCDB (S) FANS IN BATTERIES ROOM P & S CABLING FORM TRU CUM TO :- (A) ELECTRIC HORN (B) VIDEO CAMERA 1,2,3,4,5,6 (C) INCOMING SUPPLY FROM MSB 240V, 1PH, 50HZ, CABLING FROM NAVIGATIONAL LIGHT PANEL TO :- (A) STERN LIGHT (B) ANCHOR LIGHT (FWD) (C) PORT SIDE LIGHT (D) STBD SIDE LIGHT (E) ANCHOR LIGHT (AFT) AND MAIN SWITCHBOARD TO SHORE SUPPLY CONNECTION BOX MATERIAL COSTUNDERTAKE COMPLETE RENEWAL OF MAIN SWITCHBOARD COMPRISING 3 VERTICAL SECTIONS VIZ. (I) GENERATOR SECTION G1, G2 36KW, 415V, 3PH, 50HZ AND SHORE SUPPLY 40A, 415V, 3PH, 50 HZ (II) DISTRIBUTION SECTION 415V, 3PH, 50HZ (III) DISTRIBUTION SECTION 240V, 3PH, 50HZ AND TRANS-RECTIFIER UNIT (TRU). FABRICATION OF NEW MSB FOUNDATION AND BRACKETS. RENEWAL OF WIRING ALONGWITH CABLE TRAYS. DETAILS OF ELECTRICAL COMPONENTS AND EQUIPMENT'S ARE AS FOLLOWS :- (a) TRANSFORMER 1 (40KVA) (b) TRANSFORMER 2 (35KVA) (c) GENERATOR PROTECTION CIRCUIT BREAKER (d) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A WITH MICRO LOGIC 2.2G TRIP UNIT - 16 NOS (e) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 50A - 08 NOS (f) TRIPLE POLE MOLDED CASE CIRCUIT BREAKER RATED 100A - 06 NOS (g) SHROUDED PUSHBUTTON YELLOW COLOUR WITH 1NO CONTACT- 11 NOS (h) ILLUMINATED SELECTOR SWITCH BLUE COLOUR, 230V AC, 2 MAINTAINED POSITION WITH 1NO CONTACT - 02 NOS (i) AMMETER SELECTOR SWITCH RATED 6A - 02 NOS (j) VOLTMETER SELECTOR SWITCH RATED 6A, LINE TO LINE - 02 NOS (k) TRIPLE POLE THREE WAY WITHOUT ROTARY SWITCH RATED 6A - 01 NOS (I) AUXILIARY CONTACTOR RATED 10A, 220V AC COIL WITH 2NO + 2 NC - 03 NOS (m) 2NO + 2NC CONTACTS ADD ON BLOCK, FRONT MOUNTED - 03 NOS (n) ELECTRONIC TIMER RANGE 0.1 SEC TO 100HRS WITH 2 C/O CONTACTS - 01 NOS (o) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 63A - 01 NOS (p) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 50A - 01 NOS (q) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 25A - 04 NOS (r) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 16A - 01 NOS (s) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 10A-05 NOS (t) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 6A-06 NOS (u) TRIPLE POLE MINIATURE CIRCUIT BREAKER RATED 2A-03 NOS (v) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 32A - 06 NOS (w) mx + OF SHUNT REL. 110-415V AC - 05 NOS (x) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 10A - 01 NOS (y) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 6A - 13 NOS (z) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 4A - 14NOS (aa) DOUBLE POLE MINIATURE CIRCUIT BREAKER RATED 2A - 05 NOS (bb) CURRENT TRANSFORMER 100/5A, 5VA, CLASS 1 ACCURACY-06 NOS (CX) INSULATION MOTOR, SIZE 96X96 -02NOS (DD) KILO WATTMETER 0-50KW, 3 WIRE 2 ELEMENTS, SIZE 96X96 -01 NOS (EE) AMMETER 0-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 62A -01 NOS 9 (FF) FREQUENCY METER 45-50-55HZ 400V, SIZE 96X96XMM RED AT 50HZ, 415V-01 NOS (GG) AC VOLTMETER 0-500V, SIZE 96X96 MM RED MARK AT 415V, 50HZ -01 NOS (HH) AC VOLTMETER 0-300V, SIZE 96X96 MM RED MARK AT 240V, 50HZ-01 NOS (II) AMMETER 01-100A, CTR 100/5A, SIZE 96X96 MM RED MARK AT 84A -01 NOS (II) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 230V AC -07 NOS (KK) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-01 NOS (II) INDICATING LAMP INTEGRAL LED GREEN COLOUR , 230V AC-04 NOS (MM) INDICATING LED RED COLOUR, 230V AC-05 NOS (NN) INDICATING LAMP INTEGRAL LED RED COLOUR,24V AC/DC - 01 NOS (OO) INDICATING LAMP INTEGRAL LED YELLOW COLOUR, 24V AC/DC-01 NOS (GG) INDICATING LAMP INTEGRAL LED WHITE COLOUR, 24V AC/DC-04 NOS (RR) INDICATING LAMP INTEGRAL LED AMBER COLOUR , 230V AC-02 NOS (SS) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER 415/24V,5VA,50/60HZ -06 NOS (TT) SINGLE PHASE DOUBLE WOUND CONTROL TRANSFORMER, PRIMARY: 440/415/380V SECONDARY:230/220/24V, 100 VA 50/60HZ-03 NOS (UU) CLIP ON TYPE TERMINAL 4 SQMM--38 NOS(VV) STUD TYPE TERMINAL 6-35 SQMM-03 NOS (WW) PHASE SEQUENCE INDICATOR 50-500V, SIZE 96X96MM-01 NOS (XX) CABLE ENTRY GLAND-01 NOS (YY) FOUR POLE CONTACTOR RATED 9A,220V,50/60HZ AC COIL WITH 2NO+2NC-01 NOS (ZZ) NAVIGATIONAL LIGHT PANEL, 230V AC-01 NOS (AAA) FUSE TERMINAL BLOCK 6A-06 NOS (BBB) SMPS, 500W-01 NOS AND RENEWAL OF CABLING FROM DISTRIBUTION SECTION 415V,3PH,50HZ TO FOLLOWING EQUIPMENTS:- (A) GENERATOR -1 415V,3PH,50HZ (B) GENERATOR-2 415V,3PH,50HZ (C) SHORE SUPPLY CONNECTION (D) UPS SYSTEM 40KVA (E) ANCHOR WINDLASS NO.1 (F) ANCHOR WINDLASS NO 2 (G) ANCHOR WINDLASS NO.3 (H) ANCHOR WINDLASS NO 4, CABLING FROM DISTRIBUTION SECTION 240V, 3PH, 50HZ TO FOLLOWING EQUIPMENTS (A) PRIMARY OF TRANSFORMER 35KVA, 415/240V 50HZ (B) TRANSFORMER -2 40 KVA, 415/240C , 3PH, 50HZ (C) TRANSFORMER 2 35KVA,415/340V 3PH, 50HZ (D) IR SOURCE NO.1 (E) IR SOURCE NO 2 (F) IR SOURCE NO 3 (G) IR SOURCE NO. 4 (H) IR SOURCE NO .5 (I) VIDEO CAMERA RECORDING (I) FAN SWITCHBOARD (K) NAVIGATIONAL LIGHT PANEL (I) FLOOD LIGHT FWD (M) FLOOD LI9GHT AFT (N) LIGHTING SWBD & DG ROOMS (O) RECEPTACLE IN SWITCHBOARD & DG ROOMS (P) LIGHTING IN BATTERY (S) & ELECTRICAL ROOM (P) (Q) GSP- VENTILATION FANS (R) TRU CUM DCDB (S) FANS IN BATTERIES ROOM P & S CABLING FORM TRU CUM TO :- (A) ELECTRIC HORN (B) VIDEO CAMERA 1,2,3,4,5,6 (C) INCOMING SUPPLY FROM MSB 240V, 1PH, 50HZ, CABLING FROM NAVIGATIONAL LIGHT PANEL TO :- (A) STERN LIGHT (B) ANCHOR LIGHT (FWD) (C) PORT SIDE LIGHT (D) STBD SIDE LIGHT (E) ANCHOR LIGHT (AFT) AND MAIN SWITCHBOARD TO SHORE SUPPLY CONNECTION BOX MATERIAL COST
157RENEW CABLING FORM DG TO SWITCH BOARD (WIRE 3X25SQMM, CU MULTI STRAND CABLE -150 METERS), MAIN SWITCHBOARD (MSB) DISTRIBUTION PANEL (DP) VARIOUS FITTINGS ON BOTH PORT AND STBD SIDE OF WEATHER DECK (WRE 2X1.5 SQMM, CU MULTI STRAND CABLE -300 METERS) MAIN SWITCHBOARD TO CAPSTAN CONTROL PANELS (3X4 SQMM, CU MULTI STRAND CABLE -200 MTRS) SERVICE COSTRENEW CABLING FORM DG TO SWITCH BOARD (WIRE 3X25SQMM, CU MULTI STRAND CABLE -150 METERS), MAIN SWITCHBOARD (MSB) DISTRIBUTION PANEL (DP) VARIOUS FITTINGS ON BOTH PORT AND STBD SIDE OF WEATHER DECK (WRE 2X1.5 SQMM, CU MULTI STRAND CABLE -300 METERS) MAIN SWITCHBOARD TO CAPSTAN CONTROL PANELS (3X4 SQMM, CU MULTI STRAND CABLE -200 MTRS) SERVICE COST
158RENEW CABLING FORM DG TO SWITCH BOARD (WIRE 3X25SQMM, CU MULTI STRAND CABLE -150 METERS), MAIN SWITCHBOARD (MSB) DISTRIBUTION PANEL (DP) VARIOUS FITTINGS ON BOTH PORT AND STBD SIDE OF WEATHER DECK (WRE 2X1.5 SQMM, CU MULTI STRAND CABLE -300 METERS) MAIN SWITCHBOARD TO CAPSTAN CONTROL PANELS (3X4 SQMM, CU MULTI STRAND CABLE -200 MTRS) MATERIAL COSTRENEW CABLING FORM DG TO SWITCH BOARD (WIRE 3X25SQMM, CU MULTI STRAND CABLE -150 METERS), MAIN SWITCHBOARD (MSB) DISTRIBUTION PANEL (DP) VARIOUS FITTINGS ON BOTH PORT AND STBD SIDE OF WEATHER DECK (WRE 2X1.5 SQMM, CU MULTI STRAND CABLE -300 METERS) MAIN SWITCHBOARD TO CAPSTAN CONTROL PANELS (3X4 SQMM, CU MULTI STRAND CABLE -200 MTRS) MATERIAL COST
159EXHAUST MOTORS TO BE RENEWED (415V,3PH,1HP) SERVICE COSTEXHAUST MOTORS TO BE RENEWED (415V,3PH,1HP) SERVICE COST
160EXHAUST MOTORS TO BE RENEWED (415V,3PH,1HP) MATERIAL COSTEXHAUST MOTORS TO BE RENEWED (415V,3PH,1HP) MATERIAL COST
161SERVICEABILITY CHECKS OF 04 IN NOS HIGH SPEED CAMERAS (MAKE- MEGA SPEED CORPORATION ) AND 01 IN NOS CAMERA DISPLAY UNIT SERVICE COSTSERVICEABILITY CHECKS OF 04 IN NOS HIGH SPEED CAMERAS (MAKE- MEGA SPEED CORPORATION ) AND 01 IN NOS CAMERA DISPLAY UNIT SERVICE COST
162SERVICEABILITY CHECKS OF 04 IN NOS HIGH SPEED CAMERAS (MAKE- MEGA SPEED CORPORATION ) AND 01 IN NOS CAMERA DISPLAY UNIT MATERIAL COSTSERVICEABILITY CHECKS OF 04 IN NOS HIGH SPEED CAMERAS (MAKE- MEGA SPEED CORPORATION ) AND 01 IN NOS CAMERA DISPLAY UNIT MATERIAL COST
163REPLACEMENT OF POLE (DIA -5 INCH, LENGTH- 20 FEET) AND FITTING FOR CAMERA SERVICE COSTREPLACEMENT OF POLE (DIA -5 INCH, LENGTH- 20 FEET) AND FITTING FOR CAMERA SERVICE COST
164REPLACEMENT OF POLE (DIA -5 INCH, LENGTH- 20 FEET) AND FITTING FOR CAMERA MATERIAL COSTREPLACEMENT OF POLE (DIA -5 INCH, LENGTH- 20 FEET) AND FITTING FOR CAMERA MATERIAL COST
165ALL NAVIGATIONAL LIGHT FITTINGS TO BE RENEWED ALONGWITH NAV LIGHT HOLDERS (02 STAIR TYPE) SERVICE COSTALL NAVIGATIONAL LIGHT FITTINGS TO BE RENEWED ALONGWITH NAV LIGHT HOLDERS (02 STAIR TYPE) SERVICE COST
166ALL NAVIGATIONAL LIGHT FITTINGS TO BE RENEWED ALONGWITH NAV LIGHT HOLDERS (02 STAIR TYPE) MATERIAL COSTALL NAVIGATIONAL LIGHT FITTINGS TO BE RENEWED ALONGWITH NAV LIGHT HOLDERS (02 STAIR TYPE) MATERIAL COST
167SERVICEABILITY CHECKS OF BOTH PORT AND STBD CAPSTAN CONTROL PANEL AND UNDERTAKE INSULATION CHECKS OF CABLING (100 METERS) SERVICE COSTSERVICEABILITY CHECKS OF BOTH PORT AND STBD CAPSTAN CONTROL PANEL AND UNDERTAKE INSULATION CHECKS OF CABLING (100 METERS) SERVICE COST
168SERVICEABILITY CHECKS OF BOTH PORT AND STBD CAPSTAN CONTROL PANEL AND UNDERTAKE INSULATION CHECKS OF CABLING (100 METERS) MATERIAL COSTSERVICEABILITY CHECKS OF BOTH PORT AND STBD CAPSTAN CONTROL PANEL AND UNDERTAKE INSULATION CHECKS OF CABLING (100 METERS) MATERIAL COST
169SERVICEABILITY CHECKS OF ANCHOR DRIVES SERVICE COSTSERVICEABILITY CHECKS OF ANCHOR DRIVES SERVICE COST
170SERVICEABILITY CHECKS OF ANCHOR DRIVES MATERIAL COSTSERVICEABILITY CHECKS OF ANCHOR DRIVES MATERIAL COST
171SHORE SUPPLY CONNECTION BOX TO BE OVERHAULED, PROVED ONBOARD. RENEW FOLLOWING:- (A) VOLTMETER-0-500V AC -01 NOS (B) PHASE CONSEQUENCE INDICATOR METER -01 NO (C) 3 POLE MCCB-50AMPS-01 NOS (D) INDICATING LAMP-03 NO. 9 (E) VOLTMETER SELECTOR SWITCH -01 NOS SERVICE COSTSHORE SUPPLY CONNECTION BOX TO BE OVERHAULED, PROVED ONBOARD. RENEW FOLLOWING:- (A) VOLTMETER-0-500V AC -01 NOS (B) PHASE CONSEQUENCE INDICATOR METER -01 NO (C) 3 POLE MCCB-50AMPS-01 NOS (D) INDICATING LAMP-03 NO. 9 (E) VOLTMETER SELECTOR SWITCH -01 NOS SERVICE COST
172SHORE SUPPLY CONNECTION BOX TO BE OVERHAULED, PROVED ONBOARD. RENEW FOLLOWING:- (A) VOLTMETER-0-500V AC -01 NOS (B) PHASE CONSEQUENCE INDICATOR METER -01 NO (C) 3 POLE MCCB-50AMPS-01 NOS (D) INDICATING LAMP-03 NO. (E) VOLTMETER SELECTOR SWITCH -01 NOS MATERIAL COSTSHORE SUPPLY CONNECTION BOX TO BE OVERHAULED, PROVED ONBOARD. RENEW FOLLOWING:- (A) VOLTMETER-0-500V AC -01 NOS (B) PHASE CONSEQUENCE INDICATOR METER -01 NO (C) 3 POLE MCCB-50AMPS-01 NOS (D) INDICATING LAMP-03 NO. (E) VOLTMETER SELECTOR SWITCH -01 NOS MATERIAL COST
173PROVIDE SHORE SUPPLY 3 COREX16 SQ MM (SHIELDED) 100 MTRS CABLE WITH LUGS CRIMPING AT BOTH ENDS SERVICE COSTPROVIDE SHORE SUPPLY 3 COREX16 SQ MM (SHIELDED) 100 MTRS CABLE WITH LUGS CRIMPING AT BOTH ENDS SERVICE COST
174PROVIDE SHORE SUPPLY 3 COREX16 SQ MM (SHIELDED) 100 MTRS CABLE WITH LUGS CRIMPING AT BOTH ENDS MATERIAL COSTPROVIDE SHORE SUPPLY 3 COREX16 SQ MM (SHIELDED) 100 MTRS CABLE WITH LUGS CRIMPING AT BOTH ENDS MATERIAL COST
175RENEW IR SOURCE EXIDE POWER SAFE SEALED MAINTENANCE FREE VRLA BATTERIES IN ROOM. MODEL UPST- 12 V, 320AH, 180 CELLS SERVICE COSTRENEW IR SOURCE EXIDE POWER SAFE SEALED MAINTENANCE FREE VRLA BATTERIES IN ROOM. MODEL UPST- 12 V, 320AH, 180 CELLS SERVICE COST
176RENEW IR SOURCE EXIDE POWER SAFE SEALED MAINTENANCE FREE VRLA BATTERIES IN ROOM. MODEL UPST- 12 V, 320AH, 180 CELLS MATERIAL COSTRENEW IR SOURCE EXIDE POWER SAFE SEALED MAINTENANCE FREE VRLA BATTERIES IN ROOM. MODEL UPST- 12 V, 320AH, 180 CELLS MATERIAL COST
177RENEW CABLE FOR FLOOD LAMPS (DIA 02 X 1.5 SQMM)-80 MTRS), FOR FITMENT OF TUBE LIGHTS (DIA 02X1.5 SQMM-80 MTRS) AND 05 SETS OF CABLES (1.5 SQMM, SHIELDED TWO CORE CABLE-200 METERS) ON WEATHER DECK FOR NAVIGATIONAL LIGHTS SERVICE COSTRENEW CABLE FOR FLOOD LAMPS (DIA 02 X 1.5 SQMM)-80 MTRS), FOR FITMENT OF TUBE LIGHTS (DIA 02X1.5 SQMM-80 MTRS) AND 05 SETS OF CABLES (1.5 SQMM, SHIELDED TWO CORE CABLE-200 METERS) ON WEATHER DECK FOR NAVIGATIONAL LIGHTS SERVICE COST
178RENEW CABLE FOR FLOOD LAMPS (DIA 02 X 1.5 SQMM)-80 MTRS), FOR FITMENT OF TUBE LIGHTS (DIA 02X1.5 SQMM-80 MTRS) AND 05 SETS OF CABLES (1.5 SQMM, SHIELDED TWO CORE CABLE-200 METERS) ON WEATHER DECK FOR NAVIGATIONAL LIGHTS MATERIAL COSTRENEW CABLE FOR FLOOD LAMPS (DIA 02 X 1.5 SQMM)-80 MTRS), FOR FITMENT OF TUBE LIGHTS (DIA 02X1.5 SQMM-80 MTRS) AND 05 SETS OF CABLES (1.5 SQMM, SHIELDED TWO CORE CABLE-200 METERS) ON WEATHER DECK FOR NAVIGATIONAL LIGHTS MATERIAL COST
179RENEW FWD (STBD AND PORT) AND AFT (STBD AND PORT) ANCHOR CAPSTAN MOTORS (9.3 KW, 12.5 HP, 415 V, 3PH 50 HZ, FRAME 160M MAKE- NARHARI) SERVICE COSTRENEW FWD (STBD AND PORT) AND AFT (STBD AND PORT) ANCHOR CAPSTAN MOTORS (9.3 KW, 12.5 HP, 415 V, 3PH 50 HZ, FRAME 160M MAKE- NARHARI) SERVICE COST
180RENEW FWD (STBD AND PORT) AND AFT (STBD AND PORT) ANCHOR CAPSTAN MOTORS (9.3 KW, 12.5 HP, 415 V, 3PH 50 HZ, FRAME 160M MAKE- NARHARI) MATERIAL COSTRENEW FWD (STBD AND PORT) AND AFT (STBD AND PORT) ANCHOR CAPSTAN MOTORS (9.3 KW, 12.5 HP, 415 V, 3PH 50 HZ, FRAME 160M MAKE- NARHARI) MATERIAL COST
181OVERHAUL ANCHOR WINDLASS (PORT FWD, STBD FWD, PORT AFT, STBD AFT), MAKE GEETA ENGINEERING ALONG WITH MOTORS AND FITTINGS SERVICE COSTOVERHAUL ANCHOR WINDLASS (PORT FWD, STBD FWD, PORT AFT, STBD AFT), MAKE GEETA ENGINEERING ALONG WITH MOTORS AND FITTINGS SERVICE COST
182OVERHAUL ANCHOR WINDLASS (PORT FWD, STBD FWD, PORT AFT, STBD AFT), MAKE GEETA ENGINEERING ALONG WITH MOTORS AND FITTINGS MATERIAL COSTOVERHAUL ANCHOR WINDLASS (PORT FWD, STBD FWD, PORT AFT, STBD AFT), MAKE GEETA ENGINEERING ALONG WITH MOTORS AND FITTINGS MATERIAL COST
183BATTERY CHARGERS TO BE OVERHAULED AND TESTED ONBOARD 415 V 3 PH 50 HZ, OUTPUT V 24V SERVICE COSTBATTERY CHARGERS TO BE OVERHAULED AND TESTED ONBOARD 415 V 3 PH 50 HZ, OUTPUT V 24V SERVICE COST
184BATTERY CHARGERS TO BE OVERHAULED AND TESTED ONBOARD 415 V 3 PH 50 HZ, OUTPUT V 24V MATERIAL COSTBATTERY CHARGERS TO BE OVERHAULED AND TESTED ONBOARD 415 V 3 PH 50 HZ, OUTPUT V 24V MATERIAL COST
185RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. SERVICE COSTRENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. SERVICE COST
186RENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. MATERIAL COSTRENEWAL OF ALL TEMPERATURE GAUGES OF THE SYSTEMS. MATERIAL COST
187OVERHAULING OF 02 IN NOS TRANSFORMERS (I) 35 KVA (MAKE MARINE ELECTRICALS (I) PVT LTD, SL NO-21081/1/7/5163) TO BE CARRIED OUT AND INSULATION TO BE IMPROVED SERVICE COSTOVERHAULING OF 02 IN NOS TRANSFORMERS (I) 35 KVA (MAKE MARINE ELECTRICALS (I) PVT LTD, SL NO-21081/1/7/5163) TO BE CARRIED OUT AND INSULATION TO BE IMPROVED SERVICE COST
188OVERHAULING OF 02 IN NOS TRANSFORMERS (I) 35 KVA (MAKE MARINE ELECTRICALS (I) PVT LTD, SL NO-21081/1/7/5163) TO BE CARRIED OUT AND INSULATION TO BE IMPROVED MATERIAL COSTOVERHAULING OF 02 IN NOS TRANSFORMERS (I) 35 KVA (MAKE MARINE ELECTRICALS (I) PVT LTD, SL NO-21081/1/7/5163) TO BE CARRIED OUT AND INSULATION TO BE IMPROVED MATERIAL COST
189UNDERTAKE CHECKS OF ELECTRICAL HORN (MAKE-MJR CORPORATIONS, TYPE-SEWN 50K-WS) AND PROVE ITS OPERATION SERVICE COSTUNDERTAKE CHECKS OF ELECTRICAL HORN (MAKE-MJR CORPORATIONS, TYPE-SEWN 50K-WS) AND PROVE ITS OPERATION SERVICE COST
190UNDERTAKE CHECKS OF ELECTRICAL HORN (MAKE-MJR CORPORATIONS, TYPE-SEWN 50K-WS) AND PROVE ITS OPERATION MATERIAL COSTUNDERTAKE CHECKS OF ELECTRICAL HORN (MAKE-MJR CORPORATIONS, TYPE-SEWN 50K-WS) AND PROVE ITS OPERATION MATERIAL COST
191CARRY OUT OVERHAULING OF MAGNETIC COMPASS ( CASSENS & PLATH TYPE 51) AND RENEW SUPPORTING LIQUID POST OVERHAULING UNDERTAKE SWING CHECK AND CALIBRATE THE COMPASS SERVICE COSTCARRY OUT OVERHAULING OF MAGNETIC COMPASS ( CASSENS & PLATH TYPE 51) AND RENEW SUPPORTING LIQUID POST OVERHAULING UNDERTAKE SWING CHECK AND CALIBRATE THE COMPASS SERVICE COST
192CARRY OUT OVERHAULING OF MAGNETIC COMPASS ( CASSENS & PLATH TYPE 51) AND RENEW SUPPORTING LIQUID POST OVERHAULING UNDERTAKE SWING CHECK AND CALIBRATE THE COMPASS MATERIAL COSTCARRY OUT OVERHAULING OF MAGNETIC COMPASS ( CASSENS & PLATH TYPE 51) AND RENEW SUPPORTING LIQUID POST OVERHAULING UNDERTAKE SWING CHECK AND CALIBRATE THE COMPASS MATERIAL COST
193NLCP BOX ENTIRELY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED ALONG WITH CABLING FROM PANEL TO RESPECTIVE EQUIPMENT SERVICE COSTNLCP BOX ENTIRELY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED ALONG WITH CABLING FROM PANEL TO RESPECTIVE EQUIPMENT SERVICE COST
194NLCP BOX ENTIRELY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED ALONG WITH CABLING FROM PANEL TO RESPECTIVE EQUIPMENT MATERIAL COSTNLCP BOX ENTIRELY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED ALONG WITH CABLING FROM PANEL TO RESPECTIVE EQUIPMENT MATERIAL COST
195REMOTE CONTROL PANEL OF BOTH DGS ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COSTREMOTE CONTROL PANEL OF BOTH DGS ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COST
196REMOTE CONTROL PANEL OF BOTH DGS ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COSTREMOTE CONTROL PANEL OF BOTH DGS ARE MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COST
19724V DB ALONG WITH INTERNAL AND EXTERNAL WIRING NEAR COMPARTMENT LADDER MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COST24V DB ALONG WITH INTERNAL AND EXTERNAL WIRING NEAR COMPARTMENT LADDER MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COST
19824V DB ALONG WITH INTERNAL AND EXTERNAL WIRING NEAR COMPARTMENT LADDER MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COST24V DB ALONG WITH INTERNAL AND EXTERNAL WIRING NEAR COMPARTMENT LADDER MISSING/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COST
199BATTERIES (2V, 54AH) ARE BURNT OUT/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COSTBATTERIES (2V, 54AH) ARE BURNT OUT/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED SERVICE COST
200BATTERIES (2V, 54AH) ARE BURNT OUT/DAMAGED RENEWAL/REPLACEMENT REQUIRED MATERIAL COSTBATTERIES (2V, 54AH) ARE BURNT OUT/DAMAGED RENEWAL/REPLACEMENT REQUIRED MATERIAL COST
201UPS (4KVA) FOUND DAMAGED ALONG WITH HEAVY WATER INGRESS. REPAIRS/ REPLACEMENT REQUIRED. INPUT -340V-460V AC 3PH, OUTPUT-415V AC, 3PH, 60HZ SERVICE COSTUPS (4KVA) FOUND DAMAGED ALONG WITH HEAVY WATER INGRESS. REPAIRS/ REPLACEMENT REQUIRED. INPUT -340V-460V AC 3PH, OUTPUT-415V AC, 3PH, 60HZ SERVICE COST
202UPS (4KVA) FOUND DAMAGED ALONG WITH HEAVY WATER INGRESS. REPAIRS/ REPLACEMENT REQUIRED. INPUT -340V-460V AC 3PH, OUTPUT-415V AC, 3PH, 60HZ MATERIAL COSTUPS (4KVA) FOUND DAMAGED ALONG WITH HEAVY WATER INGRESS. REPAIRS/ REPLACEMENT REQUIRED. INPUT -340V-460V AC 3PH, OUTPUT-415V AC, 3PH, 60HZ MATERIAL COST
203CABLING FROM BATTERY TO UPS AND CONNECTION OF BATTERY ARE BURNT OUT/ DAMAGED RENEWAL/REPLACEMENT REQUIRED SERVICE COSTCABLING FROM BATTERY TO UPS AND CONNECTION OF BATTERY ARE BURNT OUT/ DAMAGED RENEWAL/REPLACEMENT REQUIRED SERVICE COST
204CABLING FROM BATTERY TO UPS AND CONNECTION OF BATTERY ARE BURNT OUT/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COSTCABLING FROM BATTERY TO UPS AND CONNECTION OF BATTERY ARE BURNT OUT/ DAMAGED RENEWAL/ REPLACEMENT REQUIRED MATERIAL COST
205SIDE LIGHT (STARBOARD) ALONG WITH FOUNDATION HEAVILY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED SERVICE COSTSIDE LIGHT (STARBOARD) ALONG WITH FOUNDATION HEAVILY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED SERVICE COST
206SIDE LIGHT (STARBOARD) ALONG WITH FOUNDATION HEAVILY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED MATERIAL COSTSIDE LIGHT (STARBOARD) ALONG WITH FOUNDATION HEAVILY DAMAGED. RENEWAL/ REPLACEMENT REQUIRED MATERIAL COST
207VOLTMETER, SHORE SUPPLY METER AND SYNCHRO-SCOPE METER OF SHORE SUPPLY PANEL DAMAGED/ DEFECTIVE REPAIR/ REPLACEMENT REQUIRED SERVICE COSTVOLTMETER, SHORE SUPPLY METER AND SYNCHRO-SCOPE METER OF SHORE SUPPLY PANEL DAMAGED/ DEFECTIVE REPAIR/ REPLACEMENT REQUIRED SERVICE COST
208VOLTMETER, SHORE SUPPLY METER AND SYNCHRO-SCOPE METER OF SHORE SUPPLY PANEL DAMAGED/ DEFECTIVE REPAIR/ REPLACEMENT REQUIRED MATERIAL COSTVOLTMETER, SHORE SUPPLY METER AND SYNCHRO-SCOPE METER OF SHORE SUPPLY PANEL DAMAGED/ DEFECTIVE REPAIR/ REPLACEMENT REQUIRED MATERIAL COST
209DOCKING IN VER-I & II FOR 20 DAYS AS PER DOCKING PLAN JOINT INSP WITH PAINT OEM/SS & INSP AGENCY TO AND FOR TOWING FROM ND(MBI) TO SHIPYARD & BACK SERVICE COSTDOCKING IN VER-I & II FOR 20 DAYS AS PER DOCKING PLAN JOINT INSP WITH PAINT OEM/SS & INSP AGENCY TO AND FOR TOWING FROM ND(MBI) TO SHIPYARD & BACK SERVICE COST
210QC COVERAGE BY IRS SERVICE COSTQC COVERAGE BY IRS SERVICE COST
211VOYAGE INSURANCE OF THE VESSEL CONSIDERING COST OF VESSEL AS RS. 19 CR SERVICE COSTVOYAGE INSURANCE OF THE VESSEL CONSIDERING COST OF VESSEL AS RS. 19 CR SERVICE COST
212WET BASIN/WHARFAGE FACILITY FOR DURATION OF 30 DAYS SERVICE COSTWET BASIN/WHARFAGE FACILITY FOR DURATION OF 30 DAYS SERVICE COST

AI Tender Summary

OUR REF NO 57812222
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 22-10-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - At L1 Firm Premises; Comprehensive Offloading Refit In Respect Of Bpt 3; Service Provider - U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth Service Cost , U/W Hull & B/T Area, Appendages To Be Cleaned With Hp F/W Jet To Remove Salt, Dirt, Oil & Sea Growth Material Cost , Ultrasonic Gauging Readings At Under Water, Above Water And Weather Deck Areas And Fittings, Tanks And All Associated Fittings Tanks, U/W And B/T Area To Be Carried Out Report For The Same To Be Provided Service Cost , Ultrasonic Gauging Readings At Under Water, Above Water And Weather Deck Areas And Fittings, Tanks And All Associated Fittings Tanks, U/W And B/T Area To Be Carried Out Report For The Same To Be Provided Material Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted Paint Scheme As Follow:- 1 Fc Interguard 269 : Dft 50 Micron, 2 Fc Intershield 300 : Dft 2*150 Micron, 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360Spc : Dft 3* 150M. B/T Paint Scheme:- 1 Fc Interguard 263: Dft 1*125 M, 3Fc Antifouling Intersmooth 360Spc Dft 3*150 M, Last Coat Black Service Cost , U/W Hull And B/T Area To Be Blasted To Sa 2.5 And Painted. Paint Scheme As Follow:- 1 Fc Interguard 269: Dft 50 Micron, 2 Fc Intershield 300: Dft 2*150 Micron , 1 Fc Interguard 263: Dft 1*125 Micron, 3 Fc Antifouling Intersmooth 360 Spc: Dft 3*150 M. B/T Paint Scheme :- 1 Fc Interguard 269; Dft 1*50 M , 2 Fc Intershield 300; Dft 2*150 M , 1 Fc Interguard 263 : Dft 1*125 M , 3 Fc Antifouling Intersmooth 360Spc Dft 3*150 M, Last Coat Black Material Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow:- 1St Coat Interguard 259: Dft 1*50M, 2Nd & 3Rd Coat Inter Tuff 265:Dft2*125M, 4Th Full Coat Interthane 990:Dft 2*60 M. Service Cost , Ship Side Surface Including Stem And Transom To Be Blasted To Sa 2.5 & Painted. Paint Scheme As Follow :- 1St Coat Interguard 259: Dft 1*50M, 2Nd & 3Rd Coat Inter Tuff 265:Dft2*125M, 4Th Full Coat Interthane 990:Dft 2*60 M. Material Cost. , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Interguard 269:Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800M. Service Cost , Weather Deck To Be Prepared To St 3 And Painted. Paint Scheme As Follows:- 1Fc Of Interguard 269:Dft 1*50M, 1 Fc Of Intershield 300: Dft1*200 M, 1 Fc Of Intershield 852 Anti Skid: Dft 1*800M. Material Cost , General Dry Compartments To Be Cleaned And Paint Tough Up To Be Undertaken Paint Scheme As Follows:- 1St Coat Inter Prime 538 : Dft 1*75 M , 2 Fc Interlace 665: Dft 2*50 M Service Cost , General Dry Compartments To Be Cleaned And Paint Tough Up To Be Undertaken Paint Scheme As Follows:- 1St Coat Inter Prime 538 : Dft 1*75 M , 2 Fc Interlace 665: Dft 2*50 M Material Cost , Void Spaces To Be Cleaned And Painted Internally. Surface To Be Prepared To Sa 2.5. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1St Coat Inter Prime 538:Dft 1*80 M, 2 Fc Interlace 665: Dft 2*40 M Service Cost , Void Spaces To Be Cleaned And Painted Internally. Surface To Be Prepared To Sa 2.5. Renewal Of All Manhole Cover Gaskets, Nut Bolt, Washers To Be Undertaken. Paint Scheme As Follows:- 1St Coat Inter Prime 538:Dft 1*80 M, 2 Fc Interlace 665: Dft 2*40 M Material Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate. Surface To Be Prepared To Sa 2.5 Prior Painting Paint Scheme As Follows:- 2 Coats Of Tank Guard Hb Light Grey And Greyish Green. Dft 2 X 150 Microns Service Cost , Fo Tanks, Fo Ru Tanks, Lo Tank, Fo Overflow Tank, Dirty Oil Tank, Bilge Holding Tank Open & Ventilate. Surface To Be Prepared To Sa 2.5 Prior Painting Paint Scheme As Follows:- 2 Coats Of Tank Guard Hb Light Grey And Greyish Green. Dft 2 X 150 Microns Material Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1F/C Interguard 269 1 Fc Intershield 300 Service Cost , Survey Naval Pipe, Hawse Pipe And Cable Locker Under Supervision Of Class Surveyor. Paint As Follows:- 1 F/C Interguard 269 1 Fc Intershield 300 Material Cost , Sea Chest Grating To Be Opened,Cleaned, Painted & Refitted ( As Per U/W Paint Scheme). Service Cost , Sea Chest Grating To Be Opened,Cleaned, Painted & Refitted ( As Per U/W Paint Scheme). Material Cost , Post Hammer/Usg Survey Of Steel Structure Consisting External U/W Area, Internal U/W Area, Weather Deck Including Fittings , Ship Side Port And Stbd, Tanks And All Associated Fittings, Renewal Of The Affected Areas (As Per Survey) To Be Undertaken Service Cost , Post Hammer/Usg Survey Of Steel Structure Consisting External U/W Area, Internal U/W Area, Weather Deck Including Fittings , Ship Side Port And Stbd, Tanks And All Associated Fittings, Renewal Of The Affected Areas (As Per Survey) To Be Undertaken Material Cost , Pits Build Up At Various U/W Hull And Decks As Per Surveys Report 1 Pts = 1 Sq Cm Service Cost , Pits Build Up At Various U/W Hull And Decks As Per Surveys Report 1 Pts = 1 Sq Cm Material Cost , Renew Sacrificial Anodes As Per Anode Plan Qty Of Anodes-Mk Ii - 16 In Nos And Mk Iii - 38 In Nos Service Cost , Renew Sacrificial Anodes As Per Anode Plan Qty Of Anodes-Mk Ii - 16 In Nos And Mk Iii - 38 In Nos Material Cost , Fender Securing Rail To Be Renewed Service Cost , Fender Securing Rail To Be Renewed Material Cost , Vertical Ladders (02 In Nos Between Fr Stn 0-45), 02 In Nos In Void Tank 7 (S), 02 In Nos Void Tank 8(S) And 01 In Nos Transverse Ladder Of Length 2000X800x500 Mm With Stanching Height 1100 Mm At Main Deck To Be Renewed And Painted Service Cost , Vertical Ladders (02 In Nos Between Fr Stn 0-45), 02 In Nos In Void Tank 7 (S), 02 In Nos Void Tank 8(S) And 01 In Nos Transverse Ladder Of Length 2000X800x500 Mm With Stanching Height 1100 Mm At Main Deck To Be Renewed And Painted Material Cost , Port And Stbd Fender Securing Foundations To Be Renewed Service Cost , Port And Stbd Fender Securing Foundations To Be Renewed Material Cost , Water Tight Hatches And Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Service Cost , Water Tight Hatches And Rubber Coaming On Weather Deck To Be Renewed And Proved. Chalk Test To Be Carried Out Post Renewal. Material Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved Service Cost , Rope Reel On Weather Deck Drum To Be Overhauled And Proved Material Cost , Poles Of The Lattice Structure And Light Poles (Dia 3 Inch, Length -20 Feet ) To Be Renewed Service Cost , Poles Of The Lattice Structure And Light Poles (Dia 3 Inch, Length -20 Feet ) To Be Renewed Material Cost , Repair Crafts Illuminated Name Board Service Cost , Repair Crafts Illuminated Name Board Service Cost , Replacement And Load Test Of Towing Pendents And Their Accessories Including Shackle And Panama Plate Service Cost , Replacement And Load Test Of Towing Pendents And Their Accessories Including Shackle And Panama Plate Material Cost , Deck Lockers (Ms And Grp) To Be Renewed Service Cost , Deck Lockers (Ms And Grp) To Be Renewed Material Cost , Air Pressure Testing Of All Affected Tanks And Compartments Post Completion Of Hot Work Service Cost , Air Pressure Testing Of All Affected Tanks And Compartments Post Completion Of Hot Work Material Cost , Renew Jack Staff And Ensign Staff Support Pipe With Socket And Shoe In Forecastle And Quarter Deck As Per S Le Mat- Gi Pipe 50 Nb Service Cost , Renew Jack Staff And Ensign Staff Support Pipe With Socket And Shoe In Forecastle And Quarter Deck As Per S Le Mat- Gi Pipe 50 Nb Material Cost , Netting/Mesh To Be Renewed As Per S Le Material 16 Mm Rope Service Cost , Netting/Mesh To Be Renewed As Per S Le Material 16 Mm Rope Material Cost , Fire Hose Box And Brackets To Be Renewed Matl Frp Service Cost , Fire Hose Box And Brackets To Be Renewed Matl Frp Material Cost , Layout Anchor And Chain Cable On Deck. Range Anchor, Chain Cable Joining Shackles Change Cable Ends And Re-Mark Cable Lengths Lubricate Anchor Flukes And Survey Of Cable Clench To Be Carried Out Service Cost , Layout Anchor And Chain Cable On Deck. Range Anchor, Chain Cable Joining Shackles Change Cable Ends And Re-Mark Cable Lengths Lubricate Anchor Flukes And Survey Of Cable Clench To Be Carried Out Service Cost , Anchor And Chain Cable To Be Surveyed By Class Surveyor Defective Cable Lengths To Be Renewed On Completion Painting To Be Done.; Paint Scheme: 3 Coatsbitumi8nous Solution Each Coat 30 Microns Each Service Cost , Anchor And Chain Cable To Be Surveyed By Class Surveyor Defective Cable Lengths To Be Renewed On Completion Painting To Be Done.; Paint Scheme: 3 Coats Bituminous Solution Each Coat 30 Microns Each Material Cost , Deck Plates Of Switch Board, Battery And Fwd Stores Compartment Deformed And Damaged Service Cost , Deck Plates Of Switch Board, Battery And Fwd Stores Compartment Deformed And Damaged Material Cost , Inclining Ladders Of Switch Board Compartment, Fwd Store Deformed And Damaged Service Cost , Inclining Ladders Of Switch Board Compartment, Fwd Store Deformed And Damaged Material Cost , Vent Heads For Switch Board Battery And Battery Compartments Damaged Service Cost , Vent Heads For Switch Board Battery And Battery Compartments Damaged Material Cost , Catamarans Supporting Pipe And Pillar At Mid Section Broken, Damaged Deformed Service Cost , Catamarans Supporting Pipe And Pillar At Mid Section Broken, Damaged Deformed Material Cost , Manhole Covers And Coming Of Foam Filled Tanks Deformed And Damaged Service Cost , Manhole Covers And Coming Of Foam Filled Tanks Deformed And Damaged Material Cost , Cargo Nets With Frame Deformed And Damaged (Rope- 16 Mm Pp Rope ) Dimension- 50 M X 12 M Service Cost , Cargo Nets With Frame Deformed And Damaged (Rope- 16 Mm Pp Rope ) Dimension- 50 M X 12 M Material Cost , Reflectors Alongwith, Stands/ Pipes Found Deformed And Damaged Service Cost , Reflectors Alongwith, Stands/ Pipes Found Deformed And Damaged Material Cost , Operating Panels & Gear Box Of Anchors Windlass Defective View Water Ingress Repair/Renewal To Be Carried Out Service Cost , Operating Panels & Gear Box Of Anchors Windlass Defective View Water Ingress Repair/Renewal To Be Carried Out Material Cost , Twin/Towing Bollard Found Deformed Repair/ Renewal To Be Carried Out Load Test As Per Class To Be Undertaken Certificate For The Same To Be Provided Service Cost , Twin/Towing Bollard Found Deformed Repair/ Renewal To Be Carried Out Load Test As Per Class To Be Undertaken Certificate For The Same To Be Provided Material Cost , Foundation Of Anchor Windlass Deformed Repair/ Renewal To Be Carried Out Service Cost , Foundation Of Anchor Windlass Deformed Repair/Renewal To Be Carried Out Material Cost , Bulwark Alongwith Found Deformed Repair/ Renewal To Be Carried Out Service Cost , Bulwark Alongwith Found Deformed Repair/ Renewal To Be Carried Out Material Cost , Dg Service Tank Found Deformed And Damaged Repair/Renewal To Be Carried Out Service Cost , Dg Service Tank Found Deformed And Damaged Repair/Renewal To Be Carried Out Material Cost , Repair And Refurbishment Of Mushroom Head Service Cost , Repair And Refurbishment Of Mushroom Head Material Cost , Undertake Removal, Repairs & Fitment Of Pipes From Exhaust Manifold Of Both Dg Exhaust Trunking Dia - 100Mm (Nb) Chemical Cleaning And Pressure Testing (2.5Kg/Cm2) Service Cost , Undertake Removal, Repairs & Fitment Of Pipes From Exhaust Manifold Of Both Dg Exhaust Trunking Dia - 100Mm (Nb) Chemical Cleaning And Pressure Testing (2.5Kg/Cm2) Material Cost , Painting & Re-Lagging Of Exhaust System Of Both Dgs(Paint H.R Aluminium Paint, Lagging Material Cerawool Blanket And Fiberglass Cloth Service Cost , Painting & Re-Lagging Of Exhaust System Of Both Dgs(Paint H.R Aluminium Paint, Lagging Material Cerawool Blanket And Fiberglass Cloth Material Cost , Renewal Of Exhaust Compensator Of Both Main Engines Mat Ss Dia 300Mm Service Cost , Renewal Of Exhaust Compensator Of Both Main Engines Mat Ss Dia 300Mm Material Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M154 T Service Cost , Overhaul Of 40 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M154 T Material Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M100 M Service Cost , Overhaul Of 20 Tph Portable Submersible Pumps Along With Starter Panel Make:Mody, Model M100 M Material Cost , Renew And Fit Firemain System Pipes (Dia-80Mm) Service Cost , Renew And Fit Firemain System Pipes (Dia-80Mm) Material Cost , Sea Water Inlet Strainer Of Sea Water System To Be Renewed (Dia-40 Mm, Mat-Cuni) Service Cost , Sea Water Inlet Strainer Of Sea Water System To Be Renewed (Dia-40 Mm, Mat-Cuni) Service Cost , Renew Fuel Lines From Ru Tank To Da Inlet And Return Line From Da To Ru Tank For Both Das (Mat- Ms, Dia-15 Mm) Service Cost. , Renew Fuel Lines From Ru Tank To Da Inlet And Return Line From Da To Ru Tank For Both Das (Mat- Ms, Dia-15 Mm) Material Cost. , Renew Fuel Ru Tank Filing Pipe Alongwith Cap From Main Deck To Ru Tank (Dia-50 Mm, Mat- Ms Service Cost , Renew Fuel Ru Tank Filing Pipe Alongwith Cap From Main Deck To Ru Tank (Dia-50 Mm, Mat- Ms Material Cost , Renew Fuel Ru Tank Breather Pipe With Alternate Filling Adapter In Y Shape From Main Deck To Ru Tank Main Pipe Dia-50 Mm, Mat- Ms Branch Pipe With Adapter Dia-25Mm Service Cost , Renew Fuel Ru Tank Breather Pipe With Alternate Filling Adapter In Y Shape From Main Deck To Ru Tank Main Pipe Dia-50 Mm, Mat- Ms Branch Pipe With Adapter Dia-25Mm Material Cost , Fuel Ru Tank Drain And Valves To Be Provided (Type- Spring Loaded S ) Service Cost , Fuel Ru Tank Drain And Valves To Be Provided (Type- Spring Loaded S ) Material Cost , Renew Dd Pump Inlet And Outlet Pipes (Dia-80Mm, Mat- Cuni) Service Cost , Renew Dd Pump Inlet And Outlet Pipes (Dia-80Mm, Mat- Cuni) Material Cost , Dd Pump Inlet Strainer To Be Provided (Type-Gate Valve, Dia 80Mm) Service Cost , Dd Pump Inlet Strainer To Be Provided (Type-Gate Valve, Dia 80Mm) Material Cost , Dd Pump Strainer Purging Cock To Be Provided (Dia-15 Mm) Service Cost , Dd Pump Strainer Purging Cock To Be Provided (Dia-15 Mm) Service Cost , Dd Pump Discharge Line To Firemain System To Be Provided (Dia-80Mm, Mat-Cuni) Service Cost , Dd Pump Discharge Line To Firemain System To Be Provided (Dia-80Mm, Mat-Cuni) Service Cost , Renew Dd Pump Flexible Exhaust Piping (Dia-50 Mm, Mat- Ms) Service Cost , Renew Dd Pump Flexible Exhaust Piping (Dia-50 Mm, Mat- Ms) Material Cost , O/H Hand Pump Fitted On Forecastle And Quarter Deck And Renew Handles (Size As Per S Le) Service Cost , O/H Hand Pump Fitted On Forecastle And Quarter Deck And Renew Handles (Size As Per S Le) Material Cost , Tank Sounding Cap To Be Renewed. Mat Brass Service Cost , Tank Sounding Cap To Be Renewed. Mat Brass Material Cost , Mushroom Heads Of Various Sizes To Be Overhauled And Repaired Spindle To Be Renewed Service Cost , Mushroom Heads Of Various Sizes To Be Overhauled And Repaired Spindle To Be Renewed Material Cost , Heavy Sea Water Ingress In Fuel System, Lub Oil System And Fresh Water System On Both Dgs Repair/Renewal To Be Carried Out Service Cost , Heavy Sea Water Ingress In Fuel System, Lub Oil System And Fresh Water System On Both Dgs Repair/ Renewal To Be Carried Out Material Cost , Port Dg Fuel Pipeline From Service Tank To Dg To Be Renewed Service Cost , Port Dg Fuel Pipeline From Service Tank To Dg To Be Renewed Material Cost , Port Dg Control Panel Missing/Damaged And To Be Renewed Service Cost , Port Dg Control Panel Missing/Damaged And To Be Renewed Material Cost , Both Dd Fire Pump To Be Replaced Service Cost , Both Dd Fire Pump To Be Replaced Material Cost , Dd Fire Pump System Pipe Line To Be Renewed Including Bellows Service Cost , Dd Fire Pump System Pipe Line To Be Renewed Including Bellows Material Cost , Fuel Line From Sequence Tank To Dg Head Valve Damaged. Repair/ Replacement Required Service Cost , Fuel Line From Sequence Tank To Dg Head Valve Damaged. Repair/ Replacement Required Material Cost , Water Ingress In Both Dgs Major Overhauling Required Service Cost , Water Ingress In Both Dgs Major Overhauling Required Material Cost , Multiple Pipe Lines Pertaining To Fresh Water, Sea Water & Fuel Damaged And Is To Be Repaired/Replaced Service Cost , Multiple Pipe Lines Pertaining To Fresh Water, Sea Water & Fuel Damaged And Is To Be Repaired/ Replaced Material Cost , Electrical Conduit Pipes To Be Renewed Service Cost , Electrical Conduit Pipes To Be Renewed Material Cost , Undertake Functional Checks Of Main Engine Local Control Panel Replace/ Rectify Defective Instrumentation Wiring Indications Switches Alarms Etc Service Cost , Undertake Functional Checks Of Main Engine Local Control Panel Replace/ Rectify Defective Instrumentation Wiring Indications Switches Alarms Etc Material Cost , Overhauling And Serviceability Checks Of Dg Alternator Assembly And Battery Charging Alternator Undertake Complete Rewinding Of Stator And Rotor Winding Renewal Of Bearings, Renewal Of Avr. Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50Hz Alternator (Make-Kirlkosar) Service Cost , Overhauling And Serviceability Checks Of Dg Alternator Assembly And Battery Charging Alternator Undertake Complete Rewinding Of Stator And Rotor Winding Renewal Of Bearings, Renewal Of Avr. Replacement Of Rotating Rectifier Assembly, Renewal Of Sv Mounts And Fitting Back Of 100 Kva, 415 V, 3Ph, 50Hz Alternator (Make-Kirlkosar) Material Cost , Serviceability Checks Of Sensors/ Cut Offs (I.E Fw, Lub Oil And Alternator Temperature Sensors, Low Lub Oil Pressure Sensor) Service Cost , Serviceability Checks Of Sensors/ Cut Offs (I.E Fw, Lub Oil And Alternator Temperature Sensors, Low Lub Oil Pressure Sensor) Material Cost , Renewal Of 12V Dc Dg Sel Starter Service Cost , Renewal Of 12V Dc Dg Sel Starter I Material Cost , Renewal Of Control Wiring Front Panel Of Lcp (20X1.5 Sqmm, Cu Multi Strand Cable) Service Cost , Renewal Of Control Wiring Front Panel Of Lcp (20X1.5 Sqmm, Cu Multi Strand Cable) Material Cost , Dg Starting Batteries (12V Dc) To Be Replaced Service Cost , Dg Starting Batteries (12V Dc) To Be Replaced Material Cost , Renew Tube Fittings In Dg Compt-06 Nos, Overhead Tub Light Fittings (Wt Industrial Type) 20W X 2 -10 Nos, Halogen L S (203V,500W) Alongwith Fittings On Weather Deck-10 Nos, Bpt Name Board Tube Light Fittings Alongwith Switches (230V, 20W)-02 Nos, Twin Tube Light(220V,20W)-10 Nos, Flood Lights-04 Nos Service Cost , Renew Tube Fittings In Dg Compt-06 Nos, Overhead Tub Light Fittings (Wt Industrial Type) 20W X 2 -10 Nos, Halogen L S (203V,500W) Alongwith Fittings On Weather Deck-10 Nos, Bpt Name Board Tube Light Fittings Alongwith Switches (230V, 20W)-02 Nos, Twin Tube Light(220V,20W)-10 Nos, Flood Lights-04 Nos Material Cost , Tube Light And Foundation Are Missing/ Damaged Renewal/ Replacement Required Service Cost , Tube Light And Foundation Are Missing/ Damaged Renewal/ Replacement Required Material Cost , Undertake Complete Renewal Of Main Switchboard Comprising 3 Vertical Sections Viz. (I) Generator Section G1, G2 36Kw, 415V, 3Ph, 50Hz And Shore Supply 40A, 415V, 3Ph, 50 Hz (Ii) Distribution Section 415V, 3Ph, 50Hz (Iii) Distribution Section 240V, 3Ph, 50Hz And Trans-Rectifier Unit (Tru). Fabrication Of New Msb Foundation And Brackets. Renewal Of Wiring Alongwith Cable Trays. Details Of Electrical Components And Equipments Are As Follows:- (A) Transformer 1 (40Kva) (B) Transformer 2 (35Kva) (C) Generator Protection Circuit Breaker (D) Triple Pole Molded Case Circuit Breaker Rated 100A With Micro Logic 2.2G Trip Unit - 16 Nos (E) Triple Pole Molded Case Circuit Breaker Rated 50A - 08 Nos (F) Triple Pole Molded Case Circuit Breaker Rated 100A - 06 Nos (G) Shrouded Pushbutton Yellow Colour With 1No Contact- 11 Nos (H) Illuminated Selector Switch Blue Colour, 230V Ac, 2 Maintained Position With 1No Contact - 02 Nos (I) Ammeter Selector Switch Rated 6A - 02 Nos (J) Voltmeter Selector Switch Rated 6A, Line To Line - 02 Nos (K) Triple Pole Three Way Without Rotary Switch Rated 6A - 01 Nos (I) Auxiliary Contactor Rated 10A, 220V Ac Coil With 2No + 2 Nc - 03 Nos (M) 2No + 2Nc Contacts Add On Block, Front Mounted - 03 Nos (N) Electronic Timer Range 0.1 Sec To 100Hrs With 2 C/O Contacts - 01 Nos (O) Triple Pole Miniature Circuit Breaker Rated 63A - 01 Nos (P) Triple Pole Miniature Circuit Breaker Rated 50A - 01 Nos (Q) Triple Pole Miniature Circuit Breaker Rated 25A - 04 Nos (R) Triple Pole Miniature Circuit Breaker Rated 16A - 01 Nos (S) Triple Pole Miniature Circuit Breaker Rated 10A-05 Nos (T) Triple Pole Miniature Circuit Breaker Rated 6A-06 Nos (U) Triple Pole Miniature Circuit Breaker Rated 2A-03 Nos (V) Double Pole Miniature Circuit Breaker Rated 32A - 06 Nos (W) Mx + Of Shunt Rel. 110-415V Ac - 05 Nos (X) Double Pole Miniature Circuit Breaker Rated 10A - 01 Nos (Y) Double Pole Miniature Circuit Breaker Rated 6A - 13 Nos (Z) Double Pole Miniature Circuit Breaker Rated 4A - 14Nos (Aa) Double Pole Miniature Circuit Breaker Rated 2A - 05 Nos (Bb) Current Transformer 100/5A, 5Va, Class 1 Accuracy-06 Nos (Cx) Insulation Motor, Size 96X96 -02Nos (Dd) Kilo-Wattmeter 0-50Kw, 3 Wire 2 Elements, Size 96X96 -01 Nos (Ee) Ammeter 0-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 62A -01 Nos 9 (Ff) Frequency Meter 45-50-55Hz 400V, Size 96X96xmm Red At 50Hz, 415V-01 Nos (Gg) Ac Voltmeter 0-500V, Size 96X96 Mm Red Mark At 415V, 50Hz -01 Nos (Hh) Ac Voltmeter 0-300V, Size 96X96 Mm Red Mark At 240V, 50Hz-01 Nos (Ii) Ammeter 01-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 84A -01 Nos (Ii) Indicating L Integral Led White Colour, 230V Ac -07 Nos (Kk) Indicating L Integral Led White Colour, 24V Ac/Dc-01 Nos (Ii) Indicating L Integral Led Green Colour , 230V Ac-04 Nos (Mm) Indicating Led Red Colour, 230V Ac-05 Nos (Nn) Indicating L Integral Led Red Colour,24V Ac/Dc - 01 Nos (Oo) Indicating L Integral Led Yellow Colour, 24V Ac/Dc-01 Nos (Gg) Indicating L Integral Led White Colour, 24V Ac/Dc-04 Nos (Rr) Indicating L Integral Led Amber Colour , 230V Ac-02 Nos (Ss) Single Phase Double Wound Control Transformer 415/24V,5Va,50/60Hz -06 Nos (Tt) Single Phase Double Wound Control Transformer, Primary: 440/415/380V Secondary:230/220/24V, 100 Va 50/60Hz-03 Nos (Uu) Clip On Type Terminal 4 Sqmm--38 Nos(Vv) Stud Type Terminal 6-35 Sqmm-03 Nos (Ww) Phase Sequence Indicator 50-500V , Size 96X96mm-01 Nos (Xx) Cable Entry Gland-01 Nos (Yy) Four Pole Contactor Rated 9A,220V,50/60Hz Ac Coil With 2No+2Nc-01 Nos (Zz) Navigational Light Panel, 230V Ac-01 Nos (Aaa) Fuse Terminal Block 6A-06 Nos (Bbb) Smps, 500W-01 Nos And Renewal Of Cabling From Distribution Section 415V,3Ph,50Hz To Following Equipments:- (A) Generator -1 415V,3Ph,50Hz (B) Generator-2 415V,3Ph,50Hz (C) Shore Supply Connection (D) Ups System 40Kva (E) Anchor Windlass No.1 (F) Anchor Windlass No 2 (G) Anchor Windlass No.3 (H) Anchor Windlass No 4, Cabling From Distribution Section 240V, 3Ph, 50Hz To Following Equipments (A) Primary Of Transformer 35Kva, 415/240V 50Hz (B) Transformer -2 40 Kva, 415/240C , 3Ph, 50Hz (C) Transformer 2 35Kva,415/340V 3Ph, 50Hz (D) Ir Source No.1 (E) Ir Source No 2 (F) Ir Source No 3 (G) Ir Source No. 4 (H) Ir Source No .5 (I) Video Camera Recording (I) Fan Switchboard (K) Navigational Light Panel (I) Flood Light Fwd (M) Flood Light Aft (N) Lighting Swbd & Dg Rooms (O) Receptacle In Switchboard & Dg Rooms (P) Lighting In Battery (S) & Electrical Room (P) (Q) Gsp- Ventilation Fans (R) Tru Cum Dcdb (S) Fans In Batteries Room P & S Cabling Form Tru Cum To :- (A) Electric Horn (B) Video Camera 1,2,3,4,5,6 (C) Incoming Supply From Msb 240V, 1Ph, 50Hz, Cabling From Navigational Light Panel To :- (A) Stern Light (B) Anchor Light (Fwd) (C) Port Side Light (D) Stbd Side Light (E) Anchor Light (Aft) And Main Switchboard To Shore Supply Connection Box Service Cost , Undertake Complete Renewal Of Main Switchboard Comprising 3 Vertical Sections Viz. (I) Generator Section G1, G2 36Kw, 415V, 3Ph, 50Hz And Shore Supply 40A, 415V, 3Ph, 50 Hz (Ii) Distribution Section 415V, 3Ph, 50Hz (Iii) Distribution Section 240V, 3Ph, 50Hz And Trans-Rectifier Unit (Tru). Fabrication Of New Msb Foundation And Brackets. Renewal Of Wiring Alongwith Cable Trays. Details Of Electrical Components And Equipments Are As Follows :- (A) Transformer 1 (40Kva) (B) Transformer 2 (35Kva) (C) Generator Protection Circuit Breaker (D) Triple Pole Molded Case Circuit Breaker Rated 100A With Micro Logic 2.2G Trip Unit - 16 Nos (E) Triple Pole Molded Case Circuit Breaker Rated 50A - 08 Nos (F) Triple Pole Molded Case Circuit Breaker Rated 100A - 06 Nos (G) Shrouded Pushbutton Yellow Colour With 1No Contact- 11 Nos (H) Illuminated Selector Switch Blue Colour, 230V Ac, 2 Maintained Position With 1No Contact - 02 Nos (I) Ammeter Selector Switch Rated 6A - 02 Nos (J) Voltmeter Selector Switch Rated 6A, Line To Line - 02 Nos (K) Triple Pole Three Way Without Rotary Switch Rated 6A - 01 Nos (I) Auxiliary Contactor Rated 10A, 220V Ac Coil With 2No + 2 Nc - 03 Nos (M) 2No + 2Nc Contacts Add On Block, Front Mounted - 03 Nos (N) Electronic Timer Range 0.1 Sec To 100Hrs With 2 C/O Contacts - 01 Nos (O) Triple Pole Miniature Circuit Breaker Rated 63A - 01 Nos (P) Triple Pole Miniature Circuit Breaker Rated 50A - 01 Nos (Q) Triple Pole Miniature Circuit Breaker Rated 25A - 04 Nos (R) Triple Pole Miniature Circuit Breaker Rated 16A - 01 Nos (S) Triple Pole Miniature Circuit Breaker Rated 10A-05 Nos (T) Triple Pole Miniature Circuit Breaker Rated 6A-06 Nos (U) Triple Pole Miniature Circuit Breaker Rated 2A-03 Nos (V) Double Pole Miniature Circuit Breaker Rated 32A - 06 Nos (W) Mx + Of Shunt Rel. 110-415V Ac - 05 Nos (X) Double Pole Miniature Circuit Breaker Rated 10A - 01 Nos (Y) Double Pole Miniature Circuit Breaker Rated 6A - 13 Nos (Z) Double Pole Miniature Circuit Breaker Rated 4A - 14Nos (Aa) Double Pole Miniature Circuit Breaker Rated 2A - 05 Nos (Bb) Current Transformer 100/5A, 5Va, Class 1 Accuracy-06 Nos (Cx) Insulation Motor, Size 96X96 -02Nos (Dd) Kilo Wattmeter 0-50Kw, 3 Wire 2 Elements, Size 96X96 -01 Nos (Ee) Ammeter 0-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 62A -01 Nos 9 (Ff) Frequency Meter 45-50-55Hz 400V, Size 96X96xmm Red At 50Hz, 415V-01 Nos (Gg) Ac Voltmeter 0-500V, Size 96X96 Mm Red Mark At 415V, 50Hz -01 Nos (Hh) Ac Voltmeter 0-300V, Size 96X96 Mm Red Mark At 240V, 50Hz-01 Nos (Ii) Ammeter 01-100A, Ctr 100/5A, Size 96X96 Mm Red Mark At 84A -01 Nos (Ii) Indicating L Integral Led White Colour, 230V Ac -07 Nos (Kk) Indicating L Integral Led White Colour, 24V Ac/Dc-01 Nos (Ii) Indicating L Integral Led Green Colour , 230V Ac-04 Nos (Mm) Indicating Led Red Colour, 230V Ac-05 Nos (Nn) Indicating L Integral Led Red Colour,24V Ac/Dc - 01 Nos (Oo) Indicating L Integral Led Yellow Colour, 24V Ac/Dc-01 Nos (Gg) Indicating L Integral Led White Colour, 24V Ac/Dc-04 Nos (Rr) Indicating L Integral Led Amber Colour , 230V Ac-02 Nos (Ss) Single Phase Double Wound Control Transformer 415/24V,5Va,50/60Hz -06 Nos (Tt) Single Phase Double Wound Control Transformer, Primary: 440/415/380V Secondary:230/220/24V, 100 Va 50/60Hz-03 Nos (Uu) Clip On Type Terminal 4 Sqmm--38 Nos(Vv) Stud Type Terminal 6-35 Sqmm-03 Nos (Ww) Phase Sequence Indicator 50-500V, Size 96X96mm-01 Nos (Xx) Cable Entry Gland-01 Nos (Yy) Four Pole Contactor Rated 9A,220V,50/60Hz Ac Coil With 2No+2Nc-01 Nos (Zz) Navigational Light Panel, 230V Ac-01 Nos (Aaa) Fuse Terminal Block 6A-06 Nos (Bbb) Smps, 500W-01 Nos And Renewal Of Cabling From Distribution Section 415V,3Ph,50Hz To Following Equipments:- (A) Generator -1 415V,3Ph,50Hz (B) Generator-2 415V,3Ph,50Hz (C) Shore Supply Connection (D) Ups System 40Kva (E) Anchor Windlass No.1 (F) Anchor Windlass No 2 (G) Anchor Windlass No.3 (H) Anchor Windlass No 4, Cabling From Distribution Section 240V, 3Ph, 50Hz To Following Equipments (A) Primary Of Transformer 35Kva, 415/240V 50Hz (B) Transformer -2 40 Kva, 415/240C , 3Ph, 50Hz (C) Transformer 2 35Kva,415/340V 3Ph, 50Hz (D) Ir Source No.1 (E) Ir Source No 2 (F) Ir Source No 3 (G) Ir Source No. 4 (H) Ir Source No .5 (I) Video Camera Recording (I) Fan Switchboard (K) Navigational Light Panel (I) Flood Light Fwd (M) Flood Li9ght Aft (N) Lighting Swbd & Dg Rooms (O) Receptacle In Switchboard & Dg Rooms (P) Lighting In Battery (S) & Electrical Room (P) (Q) Gsp- Ventilation Fans (R) Tru Cum Dcdb (S) Fans In Batteries Room P & S Cabling Form Tru Cum To :- (A) Electric Horn (B) Video Camera 1,2,3,4,5,6 (C) Incoming Supply From Msb 240V, 1Ph, 50Hz, Cabling From Navigational Light Panel To :- (A) Stern Light (B) Anchor Light (Fwd) (C) Port Side Light (D) Stbd Side Light (E) Anchor Light (Aft) And Main Switchboard To Shore Supply Connection Box Material Cost , Renew Cabling Form Dg To Switch Board (Wire 3X25sqmm, Cu Multi Strand Cable -150 Meters), Main Switchboard (Msb) Distribution Panel (Dp) Various Fittings On Both Port And Stbd Side Of Weather Deck (Wre 2X1.5 Sqmm, Cu Multi Strand Cable -300 Meters) Main Switchboard To Capstan Control Panels (3X4 Sqmm, Cu Multi Strand Cable -200 Mtrs) Service Cost , Renew Cabling Form Dg To Switch Board (Wire 3X25sqmm, Cu Multi Strand Cable -150 Meters), Main Switchboard (Msb) Distribution Panel (Dp) Various Fittings On Both Port And Stbd Side Of Weather Deck (Wre 2X1.5 Sqmm, Cu Multi Strand Cable -300 Meters) Main Switchboard To Capstan Control Panels (3X4 Sqmm, Cu Multi Strand Cable -200 Mtrs) Material Cost , Exhaust Motors To Be Renewed (415V,3Ph,1Hp) Service Cost , Exhaust Motors To Be Renewed (415V,3Ph,1Hp) Material Cost , Serviceability Checks Of 04 In Nos High Speed Cameras (Make- Mega Speed Corporation ) And 01 In Nos Camera Display Unit Service Cost , Serviceability Checks Of 04 In Nos High Speed Cameras (Make- Mega Speed Corporation ) And 01 In Nos Camera Display Unit Material Cost , Replacement Of Pole (Dia -5 Inch, Length- 20 Feet) And Fitting For Camera Service Cost , Replacement Of Pole (Dia -5 Inch, Length- 20 Feet) And Fitting For Camera Material Cost , All Navigational Light Fittings To Be Renewed Alongwith Nav Light Holders (02 Stair Type) Service Cost , All Navigational Light Fittings To Be Renewed Alongwith Nav Light Holders (02 Stair Type) Material Cost , Serviceability Checks Of Both Port And Stbd Capstan Control Panel And Undertake Insulation Checks Of Cabling (100 Meters) Service Cost , Serviceability Checks Of Both Port And Stbd Capstan Control Panel And Undertake Insulation Checks Of Cabling (100 Meters) Material Cost , Serviceability Checks Of Anchor Drives Service Cost , Serviceability Checks Of Anchor Drives Material Cost , Shore Supply Connection Box To Be Overhauled, Proved Onboard. Renew Following:- (A) Voltmeter-0-500V Ac -01 Nos (B) Phase Consequence Indicator Meter -01 No (C) 3 Pole Mccb-50 S-01 Nos (D) Indicating L -03 No. 9 (E) Voltmeter Selector Switch -01 Nos Service Cost , Shore Supply Connection Box To Be Overhauled, Proved Onboard. Renew Following:- (A) Voltmeter-0-500V Ac -01 Nos (B) Phase Consequence Indicator Meter -01 No (C) 3 Pole Mccb-50 S-01 Nos (D) Indicating L -03 No. (E) Voltmeter Selector Switch -01 Nos Material Cost , Provide Shore Supply 3 Corex16 Sq Mm (Shielded) 100 Mtrs Cable With Lugs Crimping At Both Ends Service Cost , Provide Shore Supply 3 Corex16 Sq Mm (Shielded) 100 Mtrs Cable With Lugs Crimping At Both Ends Material Cost , Renew Ir Source Exide Power Safe Sealed Maintenance Free Vrla Batteries In Room. Model Upst- 12 V, 320Ah, 180 Cells Service Cost , Renew Ir Source Exide Power Safe Sealed Maintenance Free Vrla Batteries In Room. Model Upst- 12 V, 320Ah, 180 Cells Material Cost , Renew Cable For Flood L S (Dia 02 X 1.5 Sqmm)-80 Mtrs), For Fitment Of Tube Lights (Dia 02X1.5 Sqmm-80 Mtrs) And 05 Sets Of Cables (1.5 Sqmm, Shielded Two Core Cable-200 Meters) On Weather Deck For Navigational Lights Service Cost , Renew Cable For Flood L S (Dia 02 X 1.5 Sqmm)-80 Mtrs), For Fitment Of Tube Lights (Dia 02X1.5 Sqmm-80 Mtrs) And 05 Sets Of Cables (1.5 Sqmm, Shielded Two Core Cable-200 Meters) On Weather Deck For Navigational Lights Material Cost , Renew Fwd (Stbd And Port) And Aft (Stbd And Port) Anchor Capstan Motors (9.3 Kw, 12.5 Hp, 415 V, 3Ph 50 Hz, Frame 160M Make- Narhari) Service Cost , Renew Fwd (Stbd And Port) And Aft (Stbd And Port) Anchor Capstan Motors (9.3 Kw, 12.5 Hp, 415 V, 3Ph 50 Hz, Frame 160M Make- Narhari) Material Cost , Overhaul Anchor Windlass (Port Fwd, Stbd Fwd, Port Aft, Stbd Aft), Make Geeta Engineering Along With Motors And Fittings Service Cost , Overhaul Anchor Windlass (Port Fwd, Stbd Fwd, Port Aft, Stbd Aft), Make Geeta Engineering Along With Motors And Fittings Material Cost , Battery Chargers To Be Overhauled And Tested Onboard 415 V 3 Ph 50 Hz, Output V 24V Service Cost , Battery Chargers To Be Overhauled And Tested Onboard 415 V 3 Ph 50 Hz, Output V 24V Material Cost , Renewal Of All Temperature Gauges Of The Systems. Service Cost , Renewal Of All Temperature Gauges Of The Systems. Material Cost , Overhauling Of 02 In Nos Transformers (I) 35 Kva (Make Marine Electricals (I) Pvt Ltd, Sl No-21081/1/7/5163) To Be Carried Out And Insulation To Be Improved Service Cost , Overhauling Of 02 In Nos Transformers (I) 35 Kva (Make Marine Electricals (I) Pvt Ltd, Sl No-21081/1/7/5163) To Be Carried Out And Insulation To Be Improved Material Cost , Undertake Checks Of Electrical Horn (Make-Mjr Corporations, Type-Sewn 50K-Ws) And Prove Its Operation Service Cost , Undertake Checks Of Electrical Horn (Make-Mjr Corporations, Type-Sewn 50K-Ws) And Prove Its Operation Material Cost , Carry Out Overhauling Of Magnetic Compass ( Cassens & Plath Type 51) And Renew Supporting Liquid Post Overhauling Undertake Swing Check And Calibrate The Compass Service Cost , Carry Out Overhauling Of Magnetic Compass ( Cassens & Plath Type 51) And Renew Supporting Liquid Post Overhauling Undertake Swing Check And Calibrate The Compass Material Cost , Nlcp Box Entirely Damaged. Renewal/ Replacement Required Along With Cabling From Panel To Respective Equipment Service Cost , Nlcp Box Entirely Damaged. Renewal/ Replacement Required Along With Cabling From Panel To Respective Equipment Material Cost , Remote Control Panel Of Both Dgs Are Missing/ Damaged Renewal/ Replacement Required Service Cost , Remote Control Panel Of Both Dgs Are Missing/ Damaged Renewal/ Replacement Required Material Cost , 24V Db Along With Internal And External Wiring Near Compartment Ladder Missing/ Damaged Renewal/ Replacement Required Service Cost , 24V Db Along With Internal And External Wiring Near Compartment Ladder Missing/ Damaged Renewal/ Replacement Required Material Cost , Batteries (2V, 54Ah) Are Burnt Out/ Damaged Renewal/ Replacement Required Service Cost , Batteries (2V, 54Ah) Are Burnt Out/Damaged Renewal/Replacement Required Material Cost , Ups (4Kva) Found Damaged Along With Heavy Water Ingress. Repairs/ Replacement Required. Input -340V-460V Ac 3Ph, Output-415V Ac, 3Ph, 60Hz Service Cost , Ups (4Kva) Found Damaged Along With Heavy Water Ingress. Repairs/ Replacement Required. Input -340V-460V Ac 3Ph, Output-415V Ac, 3Ph, 60Hz Material Cost , Cabling From Battery To Ups And Connection Of Battery Are Burnt Out/ Damaged Renewal/Replacement Required Service Cost , Cabling From Battery To Ups And Connection Of Battery Are Burnt Out/ Damaged Renewal/ Replacement Required Material Cost , Side Light (Starboard) Along With Foundation Heavily Damaged. Renewal/ Replacement Required Service Cost , Side Light (Starboard) Along With Foundation Heavily Damaged. Renewal/ Replacement Required Material Cost , Voltmeter, Shore Supply Meter And Synchro-Scope Meter Of Shore Supply Panel Damaged/ Defective Repair/ Replacement Required Service Cost , Voltmeter, Shore Supply Meter And Synchro-Scope Meter Of Shore Supply Panel Damaged/ Defective Repair/ Replacement Required Material Cost , Docking In Ver-I & Ii For 20 Days As Per Docking Plan Joint Insp With Paint Oem/Ss & Insp Agency To And For Towing From Nd(Mbi) To Shipyard & Back Service Cost , Qc Coverage By Irs Service Cost , Voyage Insurance Of The Vessel Considering Cost Of Vessel As Rs. 19 Cr Service Cost , Wet Basin/Wharfage Facility For Duration Of 30 Days Service Cost
Basic Detail
Tender No GEM/2026/B/8082296
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 01 Oct 2026
Submission Date 22 Oct 2026
Open Date 23 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 18.36 Lakhs
Exemption Not Available
Document List
5dee6817-c5a1-41ae-bcbf-05f71ad35018.pdf
1790764386.xlsx
1790681487.pdf
1790681489.pdf
FINAL_9737d55c-af40-47f3-a4d21790835733883_SMCOM.pdf
SafetyClau_7613ff53-09a1-49d0-91491790681645903_SMCOM.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 01, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 22, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 15 days
Oct 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
pdf

5dee6817-c5a1-41ae-bcbf-05f71ad35018.pdf

xlsx

1790764386.xlsx

pdf

1790681487.pdf

pdf

1790681489.pdf

pdf

FINAL_9737d55c-af40-47f3-a4d21790835733883_SMCOM.pdf

pdf

SafetyClau_7613ff53-09a1-49d0-91491790681645903_SMCOM.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders