Housing Urban and Rular Development Government Departments Closing in 21 days TDR #57794932

Tender For Construction Of 100 Mtrs Span Foot Bridge At Padg Ora To Khowra Khari Under Road Sector Capex Budget 2025-26

Issued by Government Departments · Ramban, Jammu and Kashmir
Tender Value
2.91 Crore
Estimated cost
Bid Submission
21 Oct 2026
21 days left
EMD
5.82 Lakhs
Bank guarantee accepted
Document Fee
6000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Ramban → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of 100 Mtrs Span Foot Bridge At Padg Ora To Khowra Khari Under Road Sector Capex Budget 2025-26

BOQ

Name of Work:- Construction of 100 mtrs Span Foot Bridge at Padg ora to Khowra Khari under Road Sector Capex Budget 2025-26
Sl. No. Item Description
1Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority : Superintending Engineer PWD (R&B) Circle Udhampur-Ramban HQ Udhampur Name of Work: Construction of 100 mtrs Span Foot Bridge at Padgampora to Khowra Khari under Road Sector Capex Budget 2025-26 Contract No: E-NIT No. 51 of 2026-27 Tender cost=Rs. 291.49 lakh Time of Completion= 18 months JKSOR 2022 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S.No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Ordinary Rock
3Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kind of Soil
4Providing and Laying of boulder filling / broken stone layer under foundation concrete
5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
6Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 with 30% boulder(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
7Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
8Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge All work upto plinth level.
9Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
10Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
11Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge All work above plinth level upto floor V level
12Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete.
13Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
14Centering and shuttering including strutting, propping etc. and removal of form for: Columns, pillars, piers, abutments, posts and struts.
15Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platforms.
16Add Cost of Weep holes all complete
17Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded
18DECK SLAB M-35 Providing and laying in position machine batched and machine mixed design mix M-35 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge All works above plinth level upto floor V level
19Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level and above plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
20Supply, fabrication, and installation of metal bearing components made from high quality structural steel, including cutting, shaping, drilling, welding and finisging as per approved drawings and specifications. The work includes proper alignment, fitting, and placement at designated locations, complete with necessary bolts, nuts, washers, and anchoring arrangement.
21Painting with synthetic enamel paint of approved brand and manufacture to give an even shade Two or more coats on new work
2212mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 coarse sand)
23Carriage of Material by Mechanical Transport including loading, unloading and stacking at site1. Sand for an avg lead of 65 Km by MT
242. Aggregate<40mm by avg lead of 25 Km by MT
253. Stone by avg lead of 2 Km by MT
264. Cement by avg lead of 15 Km by MT Total in Figures 29149028.0 29149028.0 Two Crore Ninety One Lakh Forty Nine Thousand &Twenty Eight Only Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57794932
AUTHORITY Government Departments
TENDER VALUE 2.91 Crore
LAST DATE 21-10-2026
Authority
Authority Name Public Works Department
Work Description Tender for Construction Of 100 Mtrs Span Foot Bridge At Padg Ora To Khowra Khari Under Road Sector Capex Budget 2025-26
Basic Detail
Tender No NIT 51 of 2026-27 Dated 29-09-2026
Bidding Type Tender
Location
City Ramban
State Jammu and Kashmir
Key Dates
Publish Date 29 Sep 2026
Submission Date 21 Oct 2026
Open Date 22 Oct 2026
Finance
Tender Value 2.91 Crore
Tender Fee 6000
EMD 5.82 Lakhs
Exemption Not Available
Document List
ba0a56e8-b91c-4654-b5ec-69512f1ea609.html
BOQ_1104416.xls
Tendernotice_1 (23).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 21 days
Oct 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 22 days

Tender Documents

Download All (ZIP) ↓
html

ba0a56e8-b91c-4654-b5ec-69512f1ea609.html

xls

BOQ_1104416.xls

pdf

Tendernotice_1 (23).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders