Tender For 1. A)Construction Of 37.903 Km Lilo Of 220 Kv S/C Bikaner (400 Kv Gss)-Bikaner (220 Kv Gss) Interconnection-Ii At Proposed 220 Kv Gss Palana (Bikaner) On Opgw Line In Rajasthan Including Survey, Supply Of All Equipments/Materials, Erection
Tender Overview
Project Description
Tender for 1. A)Construction Of 37.903 Km Lilo Of 220 Kv S/C Bikaner (400 Kv Gss)-Bikaner (220 Kv Gss) Interconnection-Ii At Proposed 220 Kv Gss Palana (Bikaner) On Opgw Line In Rajasthan Including Survey, Supply Of All Equipments/Materials, Erection (Including Civil Works), Testing And Commissioning (Turnkey Project) Against Specification No. Rvpn/Ehv/Bn-9019002613.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Nov-2026 | CORRIGENDUM | Date | 17-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Tower: Fabrication, galvanising and supply of various types of towers (including special towers), & its body / leg (equal & unequal) extensions (complete) including stubs and hangers, D-shackles, Bird Guard, U-Bolt, Pack washer, Anticlimbing devices etc. |
| 2 | High Tensile Steel |
| 3 | Mild Steel |
| 4 | Supply of Bolts & Nuts for towers and stubs (including step bolts & nuts and anti theft bolts & nuts, Spring Washers Etc. ) |
| 5 | Sub-Station Structure All Types |
| 6 | Supply of Earthing material of Towers |
| 7 | Pipe Type Set |
| 8 | Counter Poise Earthing set |
| 9 | Supply of following Tower Accessories |
| 10 | Danger Plate |
| 11 | Number Plate |
| 12 | Phase Plate (Set of three) |
| 13 | Design, manufacture and supply of following line material. ** |
| 14 | Disc Insulator - 70 kN |
| 15 | Porcelein Long Rod Insulators 70 kN |
| 16 | Disc Insulator - 120 kN |
| 17 | Porcelein Long Rod Insulators 120 kN |
| 18 | Hardware Fittings for ACSR Zebra Conductor |
| 19 | Single Suspension H/W fittings for ACSR Zebra Conductor |
| 20 | Single Tension H/W fittings for ACSR Zebra Conductor |
| 21 | Double Suspension H/W fittings for ACSR Zebra Conductor |
| 22 | Double Tension H/W fittings for ACSR Zebra Conductor |
| 23 | Accessories for ACSR Zebra Conductor |
| 24 | Mid Span Compression Joint for ACSR Zebra Conductor |
| 25 | Repair Sleeve for ACSR Zebra Conductor |
| 26 | Preformed Armour Rod for ACSR Zebra Conductor |
| 27 | Vibration Damper for ACSR Zebra Conductor |
| 28 | Fiber Optic Approach Cable |
| 29 | OPGW Cable |
| 30 | 48 Fibre (DWSM) OPGW fibre optic cable |
| 31 | Installation Hardware set for 48 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories except joint box |
| 32 | Joint box (48 Fibre) |
| 33 | Any Other item required for successful completion of work |
| 34 | Note: *One set of installation hardware shall contain all installation hardware fittings as may be required for 1 km of OPGW. ** Quantity indiacted is for evaluation purpose. Actual quantity to be supplied after getting approval from owner. *** Bidder will quote either for Disc or Long Rod or Composit Long Rod insualtors. In case of bidder quote for more than one types of insulators, then in evaluation highest cost of insulators will be considered. |
| 35 | Dismantling 132KV, 220KV, D/C Tower all |
| 36 | Detail Survey as per tentative route-Which includes the following major activities-Pegging of line route, providing of survey pillar at an interval of 3-4 KM in the line route with required jungle clearance for survey, profile preparation of approved route on graph sheet and marking of offset on either side of line, marking of side clearance for hills, sand dunes etc, as per specification and tower scheduling. |
| 37 | Check survey as per approved route of line which includes-Re-checking of the line route as per approved profile, chainage, tower center marking, pit marking, bisection of angle tower as required at site. |
| 38 | Excavation-Excavation, excluding back filling, including shoring,shuttering, dewatering, etc. upto the required depth as per foundation specification/drawings. |
| 39 | (i) Any soil, soft rock other than hard rock |
| 40 | (ii) Hard Rock (with Blasting subject to permission or without permission ) |
| 41 | SETTING OF TEMPLATE & STUB/ANCHOR BOLT:-Setting of template & stub/ anchor bolt & removal after concreting, excluding cost of excavation and concreting but including back filling with excavated/ borrowed earth (with lead & lift) in layers with ramming andwatering as per specification. |
| 42 | (i) Tower including extension upto 9 Meter |
| 43 | CONCRETING: Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size,water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. |
| 44 | (i) 1:3:6 Mix |
| 45 | (iv) 1:1.5:3 Mix |
| 46 | STEEL REINFORCEMENT: Cutting, bending, welding of joints if required,fixing and placing of steel reinforcement as per specification and drawings including material. |
| 47 | EARTHING: |
| 48 | (A) Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats &connectors, but including coke/charcoal, etc.,excavation,augering and backfilling in all types of soil. |
| 49 | (B) Earthing of towers legs with counterpoise typeearthings excluding supply of materialsbut including excavation and backfilling in all types of soil.(i)each set by laying 4 wires each 15m long at a depth of 600mm l. |
| 50 | ERECTION OF TOWERS: Erection of super structures including D-shackles,ACD, Hangers, U-Bolts, step bolts, danger plate, phase plate, number plate etc. Also including tack welding of bolts & nuts upto bottom cross arm/beam level including application of Zinc Rich paint |
| 51 | Erection of tower (with extension upto 9 Meters) |
| 52 | Erection of Sub Station Structures including levelling , setting of Stub and tightening , punching of nuts and Bolts and tack welding upto beam level as per specification |
| 53 | CONDUCTOR STRINGING: Stringing of ACSR Panther including hoisting of insulator string, laying, jointing & tensioning of conductor, clamping with Armour rods and fixing of vibration damper per route KM of the line. |
| 54 | (i) Single Conductor |
| 55 | Installation of OPGW cable & Accessories |
| 56 | Stringing of 48 Fibre (DWSM) OPGW fibre optic cable |
| 57 | Installation Hardware set for 48 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories except joint box |
| 58 | Joint box (48 Fibre) |
| 59 | Revitment work |
| 60 | (A) Providing & laying cement concrete including curing compacting etc. complete using stone aggregate 40mm nominal size (crusher broken) in foundation plinth using 1 cement:5 sand:10 Aggregate mix |
| 61 | (B)Random rubble stone massonary for rivertment in 1:5 cement sand mortal including providing and fixing 100 mm dia PCC drain pipe and raised and cut pointing on stone masonary in 1:3 cement sand mortar excluding excavation but including Back filling inside rivetment using excavated/borrowed earth (with all lead & lift) in layers not exceeding 20cm in depth & consolidated each depositing layer by ramming and watering. |
| 62 | (C)Cement concrete coping grade 1:2:4 (1. cement:2 coarse sand:4 granded stone aggregate) rounding off edges etc but excluding the cost of nosing of step etc complete for 50mm thik with 20mm thik normal size aggregate. |
| 63 | Land Compensation |
| 64 | Identification of Land and perpration of land compensation case |
| 65 | Documentation of perpration of case of land compensation case |
| 66 | Any Other Item |
| 67 | Tower: Fabrication, galvanising and supply of various types of towers (including special towers), & its body / leg (equal & unequal) extensions (complete) including stubs and hangers, D-shackles, Bird Guard, U-Bolt, Pack washer, Anticlimbing devices etc. |
| 68 | High Tensile Steel |
| 69 | Mild Steel |
| 70 | Supply of Bolts & Nuts for towers and stubs (including step bolts & nuts and anti theft bolts & nuts, Spring Washers Etc. ) |
| 71 | Sub-Station Structure All Types |
| 72 | Supply of Earthing material of Towers |
| 73 | Pipe Type Set |
| 74 | Counter Poise Earthing set |
| 75 | Supply of following Tower Accessories |
| 76 | Danger Plate |
| 77 | Number Plate |
| 78 | Phase Plate (Set of three) |
| 79 | Design, manufacture and supply of following line material. ** |
| 80 | Disc Insulator - 70 kN |
| 81 | Porcelein Long Rod Insulators 70 kN |
| 82 | Disc Insulator - 120 kN |
| 83 | Porcelein Long Rod Insulators 120 kN |
| 84 | ACSR panther Conductor |
| 85 | Single Suspension H/W fittings for ACSR Panther Conductor |
| 86 | Single Tension H/W fittings for ACSR Panther Conductor |
| 87 | Double Suspension H/W fittings for ACSR Panther Conductor |
| 88 | Double Tension H/W fittings for ACSR Panther Conductor |
| 89 | Accessories for ACSR Panther Conductor |
| 90 | Mid Span Compression Joint for ACSR Panther Conductor |
| 91 | Repair Sleeve for ACSR Panther Conductor |
| 92 | Preformed Armour Rod for ACSR Panther Conductor |
| 93 | Vibration Damper for ACSR Panther Conductor |
| 94 | OPGW Cable |
| 95 | 48 Fibre (DWSM) OPGW fibre optic cable |
| 96 | Installation Hardware set for 48 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories except joint box |
| 97 | Joint box (48 Fibre) |
| 98 | Any Other item required for successful completion of work |
| 99 | Note: *One set of installation hardware shall contain all installation hardware fittings as may be required for 1 km of OPGW. ** Quantity indiacted is for evaluation purpose. Actual quantity to be supplied after getting approval from owner. *** Bidder will quote either for Disc or Long Rod or Composit Long Rod insualtors. In case of bidder quote for more than one types of insulators, then in evaluation heighest cost of insulators will be considered. |
| 100 | Detail Survey as per tentative route-Which includes the following major activities-Pegging of line route, providing of survey pillar at an interval of 3-4 KM in the line route with required jungle clearance for survey, profile preparation of approved route on graph sheet and marking of offset on either side of line, marking of side clearance for hills, sand dunes etc, as per specification and tower scheduling. |
| 101 | Check survey as per approved route of line which includes-Re-checking of the line route as per approved profile, chainage, tower center marking, pit marking, bisection of angle tower as required at site. |
| 102 | Excavation-Excavation, excluding back filling, including shoring,shuttering, dewatering, etc. upto the required depth as per foundation specification/drawings. |
| 103 | (i) Any soil, soft rock other than hard rock |
| 104 | SETTING OF TEMPLATE & STUB/ANCHOR BOLT:-Setting of template & stub/ anchor bolt & removal after concreting, excluding cost of excavation and concreting but including back filling with excavated/ borrowed earth (with lead & lift) in layers with ramming andwatering as per specification. |
| 105 | (i) Tower including extension upto 9 Meter |
| 106 | CONCRETING: Providing and laying cement concrete for all types of foundation as per latest ISS:456 including cement, sand, stone aggregate 20mm nominal size,water etc., preparing surfaces, shuttering, mixing, placing, ramming, curing, finishing as per specification and drawings. |
| 107 | (i) 1:3:6 Mix (M-10) |
| 108 | (iii) 1:1.5:3 Mix (M-20) |
| 109 | STEEL REINFORCEMENT: Cutting, bending, welding of joints if required,fixing and placing of steel reinforcement as per specification and drawings including material. |
| 110 | EARTHING: |
| 111 | (A) Earthing of towers with pipe type earthing excluding the supply of pipes, wires, flats &connectors, but including coke/charcoal, etc.,excavation,augering and backfilling in all types of soil. |
| 112 | (B) Earthing of towers legs with counterpoise typeearthings excluding supply of materialsbut including excavation and backfilling in all types of soil.(i)each set by laying 4 wires each 15m long at a depth of 600mm l. |
| 113 | ERECTION OF TOWERS: Erection of super structures including D-shackles,ACD, Hangers, U-Bolts, step bolts, danger plate, phase plate, number plate etc. Also including tack welding of bolts & nuts upto bottom cross arm/beam level including application of Zinc Rich paint |
| 114 | Erection of tower (with extension upto 9 Meters) |
| 115 | Erection of Sub Station Steel Structures |
| 116 | CONDUCTOR STRINGING: Stringing of ACSR Panther including hoisting of insulator string, laying, jointing & tensioning of conductor, clamping with Armour rods and fixing of vibration damper per route KM of the line. |
| 117 | Stringing Panther Conductor |
| 118 | Installation of OPGW cable & Accessories |
| 119 | Stringing 48 Fibre (DWSM) OPGW fibre optic cable |
| 120 | Installation Hardware set for 48 Fibre OPGW Fibre Optic cabling including all cable fittings & accessories except joint box |
| 121 | Joint box (48 Fibre) |
| 122 | Revitment work |
| 123 | (A) Providing & laying cement concrete including curing compacting etc. complete using stone aggregate 40mm nominal size (crusher broken) in foundation plinth using 1 cement:5 sand:10 Aggregate mix |
| 124 | (B)Random rubble stone massonary for rivertment in 1:5 cement sand mortal including providing and fixing 100 mm dia PCC drain pipe and raised and cut pointing on stone masonary in 1:3 cement sand mortar excluding excavation but including Back filling inside rivetment using excavated/borrowed earth (with all lead & lift) in layers not exceeding 20cm in depth & consolidated each depositing layer by ramming and watering. |
| 125 | (C)Cement concrete coping grade 1:2:4 (1. cement:2 coarse sand:4 granded stone aggregate) rounding off edges etc but excluding the cost of nosing of step etc complete for 50mm thik with 20mm thik normal size aggregate. |
| 126 | Land Compensation |
| 127 | Identification of Land and perpration of land compensation case |
| 128 | Documentation of perpration of case of land compensation case |
| 129 | Any Other Item |
| 130 | OPGW Cable |
| 131 | Fiber optic Distribution Panel(96 F) |
| 132 | Fiber optic Distribution Panel(48 F) |
| 133 | HDPE Conduit Pipe |
| 134 | Fiber optic approach Cable (48F DWSM) |
| 135 | 48 Fiber (DWSM) OPGW Fiber Optic Cable |
| 136 | Installation Hardware set for 48 Fiber OPGW |
| 137 | Joint Box (48 Fiber) OPGW Cable |
| 138 | Any Other item required for successful completion of work |
| 139 | Note: *One set of installation hardware shall contain all installation hardware fittings as may be required for 1 km of OPGW. ** Quantity indiacted is for evaluation purpose. Actual quantity to be supplied after getting approval from owner. |
| 140 | Stringing of 48 Fiber OPGW Cable |
| 141 | Installation Hardware set for above 48 Fiber OPGW cabling including of al cable fitting and accessories exept joint Box(++) |
| 142 | Joint Box (48 Fibre) OPGW |
| 143 | Destringing of E/W-1 No, 7/3.15 MM |
| 144 | Any Other Item Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender