Tender For Mtps - I - Bm - Unit - Ii - Boiler Pressure Parts - Aoh - 2026 - Rectification Of Worn Out Lines & Bends Of Ibd & Low Point Drain Lines, Atomizing Steam Drain Lines, Drain Line Of Sh/Rh Vents, Drain Lines Of Erv Silencer, After Removal Of
Tender Overview
Project Description
Tender for Mtps - I - Bm - Unit - Ii - Boiler Pressure Parts - Aoh - 2026 - Rectification Of Worn Out Lines & Bends Of Ibd & Low Point Drain Lines, Atomizing Steam Drain Lines, Drain Line Of Sh/Rh Vents, Drain Lines Of Erv Silencer, After Removal Of Insulation And Wrapping Over The Drain Line And Bends After Completion Of Work Etc.
BOQ
| Sl. No. | Item Description |
| 1 | Charges for removal of worn out/ damaged insulation and Aluminium sheet from Boiler pipe lines. |
| 2 | Charges for cutting of new / old ceramic blanket/wool mattress for required size and fixing on Boiler pipe lines. |
| 3 | Charges for cutting new Aluminium / G.I sheet to required size, bending forming and making locking grooves and Fixing / Repairing, dents removal from released Aluminium/ G.I sheets, fixing on insulation and positioning the sheets intact with suitable fasteners on Boiler pipe lines. |
| 4 | Charges for repairing old / Providing new Aluminium sheet over the 90 deg. Bend pipe lines of size above 2” involves cutting, bending and fixing on insulation |
| 5 | Charges for leading, lifting of platform material arranging scaffolding and plat form wherever required in the boiler area for rectification works, dismantling after completion of work and normalizing site. |
| 6 | Charges for removal of concrete slabs laid over the trench, transferring and positioning the same at nearby place as per the direction of Engineer-in-charge including lead, lift and transportation, etc |
| 7 | \\"Charges for breaking and removal of hard rocky,clinkers, boulders, scrapes, cut pit pipes, wooden pieces,cotton waste, empty gunny bags and other debris from BAH, ESP, APH & ECO hoppers outlet slurry trenches to ash slurry pump house\\" |
| 8 | Charges for relaying the concrete slabs laying over the trench as per the direction of Engineer-in-charge |
| 9 | Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test. |
| 10 | Charges for dismantling the worn out (or) punctured MS ERW new bend and fabrication, erection by cutting and welding including cost of consumables such as cutting gas,welding electrodes, etc.. (300 NB) |
| 11 | Seamless pipe size 168 x7.1 mm SA 210 Grade : C,Carbon Steel |
| 12 | Supratherm special welding electrode 2.5 mm (E7018) with material/ manufacturer's test certificate |
| 13 | Cutting Gas |
| 14 | Argon gas |
| 15 | T & Ps and consumables Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender