Tender For Manufacture And Supply Of Ceramic Lined Orifice, Bends, Elbow And Transition Piece For Sstpp-Dongalia, Atps-Chachai, Stps-Sarni.
Tender Overview
Project Description
Tender for Manufacture And Supply Of Ceramic Lined Orifice, Bends, Elbow And Transition Piece For Sstpp-Dongalia, Atps-Chachai, Stps-Sarni. , A-1 Ceramic Lined Orifice For Ph-Ii,Sstpp, Dongalia , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 530Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 545Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 551Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 563Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 581Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 594Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 696Mm , Coal Pipe Orifice-750A (Ceramic Lined) As Per Drg. No.07-08/Blr/270 Id 736Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 513Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 514Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 517Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 518Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 519Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 521Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 522Mm , Coal Pipe Orifice-550A (Ceramic Lined) As Per Drg. No.07-08/Blr/271 Id 533Mm , A-2 Ceramic Lined Transition Piece For 2X660 Mw, Ph-Ii, Sstpp, Dongalia , Ceramic Lined Transition Piece Tp-01 Drg. No.07-08/Blr/284 , Ceramic Lined Transition Piece Tp-02 Drg. No.07-08/Blr/284 , Ceramic Lined Transition Piece Tp-03 Drg. No.Bmd-Ii/Sstpp/27:230426) , A-3 Ceramic Lined Orifice For Ph-Iv,Stps, Sarni , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 437Mm , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 442Mm , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 448Mm , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 453Mm , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 458Mm , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 463Mm , Ceramic Lined Orifices For Ph-Iv, Stps, Sarni As Per Drg. No. Bm-07-08/Blr/239 Id 469Mm , A-4 Ceramic Lined Elbow For Ph-Iv, Stps, Sarni . , Ceramic Lined Fuel Inlet Elbows (Short) 900 Id-533 Mm, L-658 Mm (Without Divider Plate) As Per Drg. No. 07-08/ Blr/236 , Ceramic Lined Fuel Inlet Elbows (Long) 900 Id-533 Mm, L-1368 Mm (With Divider Plate) As Per Drg. No. 07-08/ Blr/235 , Ceramic Lined Mill Outlet Elbow 90 Degree As Per Drg. No.07-08/Blr/237 , Ceramic Lined 90 Degree Bend One End Without Coupling (Wc) As Per Drg. No. 07-08/Blr/274 , Ceramic Lined 90 Degree Bend Both End Without Coupling (Ww) As Per Drg. No. 07-08/Blr/275 , Ceramic Lined Coal Pipe Bend 75 Degree As Per Drg. No. Bm-Iv/024 , Ceramic Lined Coal Pipe Bend 60 Degree As Per Drg. No. Bm-Iv/023 , Ceramic Lined Coal Pipe Bend 50 Degree As Per Drg. No. Bm-Iv/022 , Ceramic Lined Coal Pipe Bend 45 Degree (Sort) Both Side Coupling As Per Drg. No. Bm-Iv/021 , Ceramic Lined Coal Pipe Bend 45 Degree (Long) One End Without Coupling As Per Drg. No. Bm-Iv/055 , Ceramic Lined Coal Pipe Bend 45 Degree (Long) Both End Without Coupling As Per Drg. No. Bm-Iv/055 , Ceramic Lined Coal Pipe Bend 40 Degree As Per Drg. No. Bm-Iv/75 , A-5 Ceramic Lined Orifice For Ph-Iii,Atps, Chachai , Ceramic Lined Orifice Of Following Inner Dia. As Per Drawing No. 07-08/Blr-273 Id 442Mm , Ceramic Lined Orifice Of Following Inner Dia. As Per Drawing No. 07-08/Blr-273 Id 448Mm , Ceramic Lined Orifice Of Following Inner Dia. As Per Drawing No. 07-08/Blr-273 Id 458Mm , Ceramic Lined Orifice Of Following Inner Dia. As Per Drawing No. 07-08/Blr-273 Id 463Mm
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 09-Oct-2026 | Amendment in Technical Specification Clause No. (B) TECHNICAL SCHEDULE, Sub Clause (2) (a) (xi) | Other | 14-Oct-2026 |
| 2 | 09-Oct-2026 | Amendment in Technical Specification Clause No. (B) TECHNICAL SCHEDULE, Sub Clause (2) (a) (xi) | Other | 21-Oct-2026 |
| 3 | 15-Oct-2026 | Due Date Extension-I | Date | 21-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | A-1 Ceramic Lined Orifice for PH-II,SSTPP, Dongalia |
| 2 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 530MM |
| 3 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 545MM |
| 4 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 551MM |
| 5 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 563MM |
| 6 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 581MM |
| 7 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 594MM |
| 8 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 696MM |
| 9 | Coal Pipe Orifice-750A (Ceramic Lined) as per Drg. No.07-08/BLR/270 ID 736MM |
| 10 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 513MM |
| 11 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 514MM |
| 12 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 517MM |
| 13 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 518MM |
| 14 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 519MM |
| 15 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 521MM |
| 16 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 522MM |
| 17 | Coal Pipe Orifice-550A (Ceramic Lined) as per Drg. No.07-08/BLR/271 ID 533MM |
| 18 | A-2 Ceramic Lined Transition Piece for 2x660 MW, PH-II, SSTPP, Dongalia |
| 19 | Ceramic Lined Transition Piece TP-01Drg. No.07-08/BLR/284 |
| 20 | Ceramic Lined Transition Piece TP-02Drg. No.07-08/BLR/284 |
| 21 | Ceramic Lined Transition Piece TP-03 Drg. No.BMD-II/SSTPP/27:230426) |
| 22 | A-3 Ceramic Lined Orifice for PH-IV,STPS, Sarni |
| 23 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 437MM |
| 24 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 442MM |
| 25 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 448MM |
| 26 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 453MM |
| 27 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 458MM |
| 28 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 463MM |
| 29 | Ceramic Lined Orifices for PH-IV, STPS, Sarni as per Drg. No. BM-07-08/BLR/239 ID 469MM |
| 30 | A-4 Ceramic Lined Elbow for PH-IV, STPS, Sarni . |
| 31 | Ceramic Lined Fuel inlet Elbows (Short) 900 ID-533 mm, L-658 mm (without divider plate) as per Drg. No. 07-08/ BLR/236 |
| 32 | Ceramic Lined Fuel inlet Elbows (Long) 900 ID-533 mm, L-1368 mm (with divider plate) as per Drg. No. 07-08/ BLR/235 |
| 33 | Ceramic Lined Mill Outlet Elbow 90 Degree as per Drg. No.07-08/BLR/237 |
| 34 | Ceramic Lined 90 Degree bend one end without coupling (WC) as per Drg. No. 07-08/BLR/274 |
| 35 | Ceramic Lined 90 Degree bend both end without coupling (WW) as per Drg. No. 07-08/BLR/275 |
| 36 | Ceramic Lined coal pipe bend 75 Degree as per Drg. No. BM-IV/024 |
| 37 | Ceramic Lined coal pipe bend 60 Degree as per Drg. No. BM-IV/023 |
| 38 | Ceramic Lined coal pipe bend 50 Degree as per Drg. No. BM-IV/022 |
| 39 | Ceramic Lined coal pipe bend 45 Degree (Sort) both side coupling as per Drg. No. BM-IV/021 |
| 40 | Ceramic Lined coal pipe bend 45 Degree (Long) one end without coupling as per Drg. No. BM-IV/055 |
| 41 | Ceramic Lined coal pipe bend 45 Degree (Long) both end without coupling as per Drg. No. BM-IV/055 |
| 42 | Ceramic Lined coal pipe bend 40 Degree as per Drg. No. BM-IV/75 |
| 43 | A-5 Ceramic Lined Orifice for PH-III,ATPS, Chachai |
| 44 | Ceramic Lined Orifice of following Inner Dia. as per Drawing No. 07-08/BLR-273 ID 442MM |
| 45 | Ceramic Lined Orifice of following Inner Dia. as per Drawing No. 07-08/BLR-273 ID 448MM |
| 46 | Ceramic Lined Orifice of following Inner Dia. as per Drawing No. 07-08/BLR-273 ID 458MM |
| 47 | Ceramic Lined Orifice of following Inner Dia. as per Drawing No. 07-08/BLR-273 ID 463MM Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender