Housing Urban and Rular Development Government Departments Closing in 2 days TDR #57789174

Tender For Construction Of 11 Kv Line And 100 Kva ,11/0.4 Kv Pole Mounted Dss For Providing Power Supply To Common Facility Center At Ramdaspur I.E., Cuttack.

Issued by Government Departments · Cuttack, Odisha
Tender Value
7.82 Lakhs
Estimated cost
Bid Submission
09 Oct 2026
2 days left
EMD
7830
Bank guarantee accepted
Document Fee
4720
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of 11 Kv Line And 100 Kva ,11/0.4 Kv Pole Mounted Dss For Providing Power Supply To Common Facility Center At Ramdaspur I.E., Cuttack.

BOQ

Name of Work:- Construction of 11 KV line and 100 KVA ,11/0.4 KV pole mounted DSS for providing power supply to Common Facility Center at Ramdaspur I.E., Cuttack.
Sl. No. Item Description
1Part A- Cost of Materials for 11 KV Cut Point with 90 Degree Angle- 1 No.
2Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
3Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr. each channel(GI) length 1.2 mtr, 4no's channel(GI) required =( 4x9.56x1.2). Complete in all respect as per the approved technical specification and direction of EIC.
4Supply & installation of Fish Plate(GI) 50x6mm., 2.36 kg/Mtr. each 0.280 mtr length,16 no's required =(16x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC.
5Supply & installation of Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel(GI) length 0.306 mtr. 4no's channel(GI) required =(4x9.56x0.306). Complete in all respect as per the approved technical specification and direction of EIC.
6Supply and installation of Danger Plate,1 no. Complete in all respect as per the approved technical specification and direction of EIC.
7Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's= (1x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC.
8Supply & installation of GI barbed wire anticlimbing device 3 Kg. per support. Complete in all respect as per the approved technical specification and direction of EIC.
9Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 4 no's =(4x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
10Supply & installation of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
11Supply & installation of H W fitting (B&S) 70KN,3Bolt. Complete in all respect as per the approved technical specification and direction of EIC.
12Supply & installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
13Supply & installation of Earthing of support(Coil Type). Complete in all respect as per the approved technical specification and direction of EIC.
14Supply & installation of No-8 GI wire (Dia 4.6mm) 0.131 KG/Mtr- 2Mtr for connecting pole with coil earthing. Complete in all respect as per the approved technical specification and direction of EIC.
15Supply & installation of NON METALLIC TIES-11KV 55SQMM CVRD AAAC. Complete in all respect as per the approved technical specification and direction of EIC.
16Supply & installation of IPC FOR 55SQMM AAA CONDUCTOR (For covered conductor) - 11 KV. Complete in all respect as per the approved technical specification and direction of EIC.
17Supply & installation of SPIKE(GI)(using 50x6mm flat(GI) welded with 8mm square bar)(2 no. Spike per set in each pole). Complete in all respect as per the approved technical specification and direction of EIC.
18Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC.
19Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC.
20Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC.
21Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC.
22Supply & installation of GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole). Complete in all respect as per the approved technical specification and direction of EIC.
23Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC.
24Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC.
25Part A- Cost of Civil Works.
26Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.
27Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
28Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
29Part B- Cost of Materials for 11 KV Pin Points With WPB - 0.02CKM.
30Supply & Stringing of 55 SQ.MM AAAC XLPE Covered Conductor. Complete in all respect as per the approved technical specification and direction of EIC.
31Part C- Cost of meterial for Line protecting Guarding for road crossing
32Supply and Installation of Guarding Channel(GI) 75x40 x4.8 mm, 7.14 KG/Mtr,, each Channe(GI) length 2.2 mtr., 4 no's Channel(Gl) required = ( 4x7.14x2.2) ( For Single Pole). Complete in all respect as per the approved technical specification and direction of EIC.
33Supply and Installation of No-6 GI wire (0.192 kg/mtr.) for Main String.Complete in all respect as per the approved technical specification and direction of EIC.
34Supply and Installation of No-8 GI wire (0.131 kg/mtr.) for lacing.Complete in all respect as per the approved technical specification and direction of EIC.
35Supply and Installation of Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.). Complete in all respect as per the approved technical specification and direction of EIC.
36Supply and Installation of GI pipe earthing 40mm ,3mtr long. Complete in all respect as per the approved technical specification and direction of EIC.
37Supply and Installation of 50x6mm,Flat(GI) for earthing, 2.36kg/mtr,( 10.7 meter for rising) =10.7x2.36 .Complete in all respect as per the approved technical specification and direction of EIC.
38Part -C : Cost of Civil Work
39Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC.
40Part D- Cost of meterial for Pole mounted DSS (11/0.4 KV, 100 KVA DSS) with Transformer- 01 Nos
41Supply and Installation of WPB Pole 160x152 (11mtr long , 30.44KG/MTR)-DP(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58). Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height, Complete in all respect as per the approved technical specification and direction of EIC.
42Supply and Installation of Top Channel (GI) 100X 50X6mm , 9.56 KG/Mtr., each Channel (GI) length 3 mtr., 2 no's Channel(GI) required =( 2x 9.56x3 = 57.36 Kg). Complete in all respect as per the approved technical specification and direction of EIC.
43Supply and Installation of Fish plate(GI) 50x6, 2.36kg/mtr ,each 0.280mtr length, 6 no's required=(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC.
44Supply and Installation of AB switch mounting channel(GI) 75x40x4.8mm, 7.14kg/mtr each channel (GI) lenth 3mtr ,2nos channel(GI) required=(7.14x3x2 = 42.84 Kg).Complete in all respect as per the approved technical specification and direction of EIC.
45Supply and Installation of AB Switch Side Support Channel (GI) 100X50X6mm, 9.56KG/Mtr, each Channel (GI) length 0.35 Mtr., 2 no's Channel(GI) required =(9.56x0.35x2). Complete in all respect as per the approved technical specification and direction of EIC.
46Supply and Installation of Channel(GI) Support for down Pipe 75X40X 4.8mm. 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required =( 7.14x0.8x1). Complete in all respect as per the approved technical specification and direction of EIC.
47Supply and Installation of HG/ DO Fuse Mounting Channel(Gl) 75x40x4.8 mm Gl Channel(GI) (3000 mm long) (7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14 = 42.84 Kg). Complete in all respect as per the approved technical specification and direction of EIC.
48Supply and Installation of Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel (GI) (810 mm long,2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.81x7.14 = 11.57 Kg).Complete in all respect as per the approved technical specification and direction of EIC.
49Supply and Installation of Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg). Complete in all respect as per the approved technical specification and direction of EIC.
50Supply and Installation of Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg/Mtr, 2 No's.) (Each 2x3.000x9.56= 57.36 Kg). Complete in all respect as per the approved technical specification and direction of EIC.
51Supply and Installation Transformer Base Support GI Channel(GI) 100X 50 X 6 MM (515 mm long) (9.56Kg./Mtr, 2 No's) (Each 2x0.515x9.56= 9.85Kg) .Complete in all respect as per the approved technical specification and direction of EIC.
52Supply and Installation Transformer Belting Angle(Gl) 50 X 50 X 6 MM GI (3000 mm long) (4.5Kg./Mtr., 2 No's) (Each 2x3.0x4.5 Kg) .Complete in all respect as per the approved technical specification and direction of EIC.
53Supply and Installation Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long) (4.5Kg/Mtr,2 No's) (Each 2x0.580x4.5= 5.22Kg) .Complete in all respect as per the approved technical specification and direction of EIC.
54Supply and Installation LTDB Mounting Angel(GI) 50 x 50 x 6 MM GI (1000 mm long) (4.5Kg / Mtr, 2 no's) (Each 2x1x4.5 Kg) .Complete in all respect as per the approved technical specification and direction of EIC.
55Supply and Installation of 50x6mm Flat(Gl) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) (Each 65.6x 2.36= 154.81 Kg) .Complete in all respect as per the approved technical specification and direction of EIC.
56Supply and Installation 100KVA,11/0.4KV(AL) Transformer,bis Energy Loss level II,Amendment-4.Complete in all respect as per the approved technical specification and direction of EIC.
57SITC of LT Distribution Box with MCCB, Aluminium Busbar of 2 Bay with kit kat fuse for 100 KVA S/S. Complete in all respect as per the approved technical specification and direction of EIC.
58SITC of 55 SQ.MM. AAAC XLPE Covered Conductor.Complete in all respect as per the approved technical specification and direction of EIC.
59SITC of 4C x 150 mm2 LT XLPE Cable (Armoured) - FOR 100 KVA Trf.Complete in all respect as per the approved technical specification and direction of EIC.
60SITC of AB Switch (11KV,200A,3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC.
61SITC of H.G.Fuse( 11KV,200A,3Pole). Complete in all respect as per the approved technical specification and direction of EIC.
62Supply and Installation of WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR. Complete in all respect as per the approved technical specification and direction of EIC.
63Supply and Installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC.
64Supply and Installation of Disc insulator (B&S) 70 KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
65Supply and Installation of HW Fitting(B&S)70KN, 3Bolt. Complete in all respect as per the approved technical specification and direction of EIC.
66SITC of Lightning Anester(12KV,10KA) (Station Class, class-2). Complete in all respect as per the approved technical specification and direction of EIC.
67Supply and Installation of 11 KV pin insutator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
68Supply and Installation of HT Stay set complete.Complete in all respect as per the approved technical specification and direction of EIC.
69Supply and Installation of HT stay clamp(1.9kg/pair). Complete in all respect as per the approved technical specification and direction of EIC.
70Supply and Installation of H.T. stay insulater Type-C .Complete in all respect as per the approved technical specification and direction of EIC.
71Supply and Installation of 7/10 swg GI Stay wire, Grade- 2 (15Kg/Set). Complete in all respect as per the approved technical specification and direction of EIC.
72Supply and Installation of 40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long. Complete in all respect as per the approved technical specification and direction of EIC.
73Supply and Fixing of GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP). Complete in all respect as per the approved technical specification and direction of EIC.
74Supply and Installation of GI Barbed wire/ Anticlimbing device (3Kg /Pole). Complete in all respect as per the approved technical specification and direction of EIC.
75Supply and Installation of Black Clamp for anticlimbing device 25x3 mm. Flat(GI), 0.59Kg /Mtr. Flat(GI)) of 0.510mtr length 8 no's= (8x0.59x0.510).Complete in all respect as per the approved technical specification and direction of EIC.
76Supply and Installation of Danger plate ,11kv.Complete in all respect as per the approved technical specification and direction of EIC.
77Supply and Installation of Back clamp for danger plate 25x3mm, Flat(GI) 0.59kg/mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
78Supply and Installation of Name Plate. Complete in all respect as per the approved technical specification and direction of EIC.
79Structure Numbering and Marking
80Supply and Painting of Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background as per Specification and the direction of EIC.
81Supply and Painting of Black Paint(GIS Numbering & Zebra Stripping) as per Specification and the direction of EIC.
82Pat -D : Cost of Civil Work
83Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mm X1800mm)=0.450Cu.mtr (Per Pole) (For WPB Pole).Complete in all respect as per the direction of EIC.
84Couping ratio 1:1.5:3 (M-20 Grade) (500mmX500mmX450mm)= 0.1125Cu.mtr(Per Pole). Complete in all respect as per the direction of EIC.
85PCC ratio 1:3:6(M-10 Grade) For DSS Area (5X3X0.1)=1.5 Cu. mtr.Complete in all respect as per the direction of EIC.
86Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx 600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay insulator.Complete in all respect as per the direction of EIC.
87Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonide powder, calculation of earth resistance, including Installation of 3Mtr Gl Pipe 40mm/ 50mm including welding of Flat(GI) around pipe.Complete in all respect as per the direction of EIC.
88Laying of 4 Cx 150 mm2 LT XLPE Cable.Complete in all respect as per direction of EIC.
89SITC and Erection of GI Fencing with Gate.Complete in all respect as per the approved specification and direction of EIC.
90Supply of AL Lugs suitable for 150 sq mm cable/conductor,Crimping with cable and Fixing/ connecting include supply and erection of PVC Tape as per voltage requirement.Complete in all respect as per the direction of EIC.
91Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly .Supply to be done as per TPCODL Spec and approved make dowells.
92N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57789174
AUTHORITY Government Departments
TENDER VALUE 7.82 Lakhs
LAST DATE 09-10-2026
Authority
Authority Name Orissa Industrial Infrastructure Development Corporation
Work Description Tender for Construction Of 11 Kv Line And 100 Kva ,11/0.4 Kv Pole Mounted Dss For Providing Power Supply To Common Facility Center At Ramdaspur I.E., Cuttack.
Basic Detail
Tender No BBSR/ELECT/e-23/26-27
Bidding Type Tender
Location
City Cuttack
State Odisha
Key Dates
Publish Date 29 Sep 2026
Submission Date 09 Oct 2026
Open Date 12 Oct 2026
Finance
Tender Value 7.82 Lakhs
Tender Fee 4720
EMD 7830
Exemption Not Available
Document List
BID.pdf
BOQ_611397.xls
cfbeedae-f80f-4804-af4b-a7bba62c8db2.html
Tendernotice_1 (23).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 29, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 09, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Oct 12, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
pdf

BID.pdf

xls

BOQ_611397.xls

html

cfbeedae-f80f-4804-af4b-a7bba62c8db2.html

pdf

Tendernotice_1 (23).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders