Bids Are invited for Tool Trolley, 7 Drawer, Complete With 90 Tools - Required For Intermediate Repair Schedule , Two Stage Air Compressor 5 Hp With Accessories - Required For Intermediate Repair Schedule , Mechanic Creeper, 1200 X 1020 X 475 Mm - Re
Tender Overview
Project Description
Bids Are invited for Tool Trolley, 7 Drawer, Complete With 90 Tools - Required For Intermediate Repair Schedule , Two Stage Air Compressor 5 Hp With Accessories - Required For Intermediate Repair Schedule , Mechanic Creeper, 1200 X 1020 X 475 Mm - Required For Intermediate Repair Schedule , Digital Torque Wrench, Range 50-220 Nm - Required For Intermediate Repair Schedule , Impact Wrench, 20V, Electric Operated - Required For Intermediate Repair Schedule , Pneumatic Impact Wrenches - Required For Intermediate Repair Schedule , Pneumatic Impact Wrenches - Required For Intermediate Repair Schedule , Heavy Duty Work Bench, 5 Ft X 3.5 Ft X 4 Ft - Required For Intermediate Repair Schedule , Rubber Mat For Work Bench, 5 Ft X 3 Ft - Required For Intermediate Repair Schedule , Steel Tray Case, 350 X 265 X 60 Mm - Required For Intermediate Repair Schedule
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Tool Trolley, 7 Drawer, Complete with 90 Tools | Required for Intermediate Repair Schedule |
| 2 | Two Stage Air Compressor 5 HP with Accessories | Required for Intermediate Repair Schedule |
| 3 | Mechanic Creeper, 1200 x 1020 x 475 mm | Required for Intermediate Repair Schedule |
| 4 | Digital Torque Wrench, Range 50-220 Nm | Required for Intermediate Repair Schedule |
| 5 | Impact Wrench, 20V, Electric Operated | Required for Intermediate Repair Schedule |
| 6 | Pneumatic Impact Wrenches | Required for Intermediate Repair Schedule |
| 7 | Pneumatic Impact Wrenches | Required for Intermediate Repair Schedule |
| 8 | Heavy Duty Work Bench, 5 ft x 3.5 ft x 4 ft | Required for Intermediate Repair Schedule |
| 9 | Rubber Mat for Work Bench, 5 ft x 3 ft | Required for Intermediate Repair Schedule |
| 10 | Steel Tray Case, 350 x 265 x 60 mm | Required for Intermediate Repair Schedule |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender