Defence Statutory Bodies & Commissions/Committees Closing in 17 days TDR #57773058

Tender For Provision Of Package Type Sewage Treatment Plant For Various Pockets In Ratnuchak Mil Stn Under Ge Kaluchak Station.

Issued by Statutory Bodies & Commissions/Committees · kaluchak, Jammu And Kashmir
Tender Value
12.70 Crore
Estimated cost
Bid Submission
18 Nov 2026
17 days left
EMD
9.60 Lakhs
Bank guarantee accepted
Document Fee
3000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kaluchak → Jammu And Kashmir
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Provision Of Package Type Sewage Treatment Plant For Various Pockets In Ratnuchak Mil Stn Under Ge Kaluchak Station.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 26-Oct-2026 datecorrigendum1 Date 18-Nov-2026

BOQ

Name of Work:- PROVISION OF PACKAGE TYPE SEWAGE TREATMENT PLANT FOR VARIOUS POCKETS IN RATNUCHAK MIL STN UNDER GE KALUCHAK STATION.
Sl. No. Item Description
1SEWAGE TREATMENT PLANT (75 KLD CAPACITY) Design,Supply, installation, testing and commissioning of underground Package Sewage Treatment System of capacity 75 KLD made of 100% FRP, with in build standard manholes and manhole cover based on any suitable technology/method as per Geographical location, temperature differential and rainfall complete with Mechanical, Electrical with tertiary treatment facilities to achieve desgined Parameters of Sewage. Complete sewage treatment plant to be provided as per the details given in Schedule 'A' Part-I from page No 36 to 39 of CA.
2Design, supply, installation, testing and commissioning of PLC based SCADA system for 75 KLD underground FRP STP including PLC panel, HMI, SCADA workstation, field instrumentation, control logic, interlocking, alarm, annunciation, trend logging, report generation, remote monitoring provision and integration with OCEMS/data logger complete as required as per the details given in Schedule 'A' Part-I from page No 40 of CA.
3Low voltage panel (LV )PANEL . Suitable.Power contractor as per load make ABB AX09-30-10-80 rated operation voltage 690V AC, 21A . Thermal overload relay ABB Class 20/22 , Air Circuit Breaker , MicroProcessor Based Overcurrent releases(MBOR), Machinery Drive ACS 380 with software , General purpose Drive ACS 580 , Aapp Cables , MCB .Qty:01 setNOTE: The complete STP includes LT Panel for the operation of various Air blower , pumps(Recirculation Pump,Filter Feed Pump Raw sewage collection pump,treated water storage pump and treated water distribution pump,Chlorine Dosing pump)) ,filteration plant ,sensors and compressors and DOL Starter 415 V AC, 50Hz, 2Hp- 1 No (for Distribution pump) . The LT panel should be confirming to IEC/IS61439- 1 &2I approved, double door totally enclosed weather dust and vermin proof as per IS code with front and rear opening suitable locking arrangement, top with canopy having copper bus bar of suitable capacity for RYB and for neutral and insulated with insulators, including provision of cable glands, connecting incoming and outgoing cables along with necessary PCC 1:3:6 in foundation and suitable size of angle iron grouted at terrace floor above 30 cm from floor level comprising the Change over switch . of suitable capcity, MCCBS, Contractors, Automatic starters of various capacities ,MPCBs, Protection /Differentila relay OV Relays, UV relays etc ,Digital switches/senors ,APFC capacitor Banks, measurement devices like Ammeter,Voltmeters,Frequency meters, Digital MF meters,energy meters,Indicators etc ,control wiring /Power wiring etc .
4SEWAGE TREATMENT PLANT (100 KLD CAPACITY) Design,Supply, installation, testing and commissioning of underground Package Sewage Treatment System of capacity 100 KLD made of 100% FRP, with in build standard manholes and manhole cover based on any suitable technology/method as per Geographical location, temperature differential and rainfall complete with Mechanical, Electrical with tertiary treatment facilities to achieve desgined Parameters of Sewage. Complete sewage treatment plant to be provided as per the details given in Schedule 'A' Part-I from page No 41 to 44 of CA.
5Design, supply, installation, testing and commissioning of PLC based SCADA system for 100 KLD underground FRP STP including PLC panel, HMI, SCADA workstation, field instrumentation, control logic, interlocking, alarm, annunciation, trend logging, report generation, remote monitoring provision and integration with OCEMS/data logger complete as required as per the details given in Schedule 'A' Part-I from page No 45 of CA.
6Low voltage panel (LV )PANEL . Suitable.Power contractor as per load make ABB AX09-30-10-80 rated operation voltage 690V AC, 21A . Thermal overload relay ABB Class 20/22 , Air Circuit Breaker , MicroProcessor Based Overcurrent releases(MBOR), Machinery Drive ACS 380 with software , General purpose Drive ACS 580 , Aapp Cables , MCB .Qty:01 setNOTE: The complete STP includes LT Panel for the operation of various Air blower , pumps(Recirculation Pump,Filter Feed Pump Raw sewage collection pump,treated water storage pump and treated water distribution pump,Chlorine Dosing pump)) ,filteration plant ,sensors and compressors and DOL Starter 415 V AC, 50Hz, 2Hp- 1 No (for Distribution pump) . The LT panel should be confirming to IEC/IS61439- 1 &2I approved, double door totally enclosed weather dust and vermin proof as per IS code with front and rear opening suitable locking arrangement, top with canopy having copper bus bar of suitable capacity for RYB and for neutral and insulated with insulators, including provision of cable glands, connecting incoming and outgoing cables along with necessary PCC 1:3:6 in foundation and suitable size of angle iron grouted at terrace floor above 30 cm from floor level comprising the Change over switch . of suitable capcity, MCCBS, Contractors, Automatic starters of various capacities ,MPCBs, Protection /Differentila relay OV Relays, UV relays etc ,Digital switches/senors ,APFC capacitor Banks, measurement devices like Ammeter,Voltmeters,Frequency meters, Digital MF meters,energy meters,Indicators etc ,control wiring /Power wiring etc .
7Lumpsum price worked out by the contractor for 'Earthwork and Site Clearance Works' as listed in Schedule 'A' Part-II.
8Lumpsum price worked out by the contractor for 'External Water Supply Works' as listed in Schedule 'A' Part-III.
9Lumpsum price worked out by the contractor for 'External Electric Supply Works' as listed in Schedule 'A' Part-IV.
10Lumpsum price worked out by the contractor for 'Sewage Disposal Works, as listed in Schedule 'A' Part-V.
11Lumpsum price worked out by the contractor for 'Area Drainage Works' as listed in Schedule 'A' Part-VI.
12Lumpsum price worked out by the contractor for 'Chain Link Fencing Works' as listed in Schedule 'A' Part-VII.
13Lumpsum price worked out by the contractor for 'Road, Path and Culvert Works' as listed in Schedule 'A' Part-VIII.
14EXTERNAL WATER SUPPLYConstruction masonary valve chamber size 60 X 60 X 75 cm (Internal dimension) in repair with 100 mm thick PCC 1:4:8 type D-2 (using 40mm graded stone aggregate) sub base of floor, 50mm thick PCC 1:2:4 type B-1 (using 20mm graded stone aggregate) in floor finished even and smooth without using extra cement, one brick thick wall in cm 1:4 using old size sub class 'B' bricks and plastering internally and externally upto 150mm below GL 15 mm thick with cement mortar (1:4) and MS sheet cover not less than 6 mm thick with angle iron frame size 40x40x6mm, locking arrengement and painting with two coats synthewtic enamel painting over a coat of the red oxide primer including excavation and earth work in any type of soil, complete all as specified and directed.
15Monoblock pump set suitable for 415 V ,3 phase system having capacity 5 HP, complete all as specified and directed.
16Non Clog submersible pump set suitable for 415 V ,3 phase system having capacity 5 HP, complete all as specified and directed.
17EXTERNAL ELECTRIC SUPPLYSupply, installation, testing and commissioning of 100 KVA transformer step down outdoor type, plateform mounted11/0.433 kV, (at no load), oil immersed confirming to IS 1180 (PART-I) 2014 Energy Efficiency level-3 complete with standard fittings copper wound 3 phase 4 wire 50 c/s oil immersed naturally cooled with external cooling tube, delta connected on HT side and star connection on LT side with tapping on HT side to vary secondary voltage (+) 2.5 % to (+) 7.5 % in steps including first filling of transformer oil as per IS 1180 Part -I 2014 & BEE certified having dielectric strength not less than 50 kV , complete all as specified and directed with following accessories (a) cable end box on HT side suitable for 120 sqmm 3 core XLPE cable(b) cable end box on LV side suitable for 400sqmm 3.5 core XLPE cable(c) Oil conservator with filter type frain valve and oil level gauge(d) dehyderating breather with first fill dehyderating agent (silica gel)(e) explosive vent(f) Thermometer pocket on tank cover (g) One no 100mm dia , dial type thermometer , vapour pressure type , having range 0-120 degree celcius with metal guard having maximim perimeter reading , temperature indicator with resisting device for transformer.(h) Two earthing terminals on tank cover to facilate fixing of 32x6mm copper earth strip for earthing of neutral body.(i) Rating plate and terminal making plate (j) Oil level gauge
18Item no. 17(contd...)(k) Oil drain/filter valve(l) lifting lugs (m) Oil filling hole with cap / plug with connecting plate complete (n) air release valve plug(o) Four plain solid cast steel deattachable rollers(p) extra bushing for neutral , outside the LT cable box for providing independent earthing for Neutral(q) First filling of new and unused transformer oil IS:35/93(4th revision), marked Note: (i) Routine test as per IS 1180 shall be carried out at the works. Type test including temperature rise test shall also be carried out at works. Site tests are also to be carried out in presence of company representative. All the tests whether at works/at site are to be conducted in presence of MES representative and all test certificate duly signed by all concerned to be submitted by the contractor to the deptartment. (ii) The equipment should carry a guarantee of 30 months from the date of dispatch or 24 months from date of completion of the contract, which ever is later. Any defect during this period will be attended in a period of three days including spares and labour without any extra cost to Govt, complete all as specified and directed.
19Panel cubical type of suitable size, 415 volt, factory made CPRI approved dust proof vermin proof (Kiosik type) for outdoor use made out of CRCA sheet 3.15 mm thick exept inner sheath OG 2 mm powder coated, machine pressed, both side opening in two halves with provision of rubber beading and locking system, inciuding aluminium bus bar of 200 Amp capacity, 4 strip mounted on porcelain insulator, bus bar chamber shall be provided with inspection covers each MCCB/ cubical switch shall have be independent opening, panel should be monthed on angle iron frame and legs (vertcal height of legs not less than 30 cm exept in PCC) made from angle of size 50x50x5 mm, frame and legs duly spray painted internally and externally with two coats of synthetic enamel paint over a coat of red oxide primer legs grouted in PCC(1:3:6) type B-2(using 40 mm graded stone aggregate) complete including all connection/ control wiring with suitable size of copper conductor cable, including danger notice sticker, comprising the following accessory including testing, complete all as specified and directed.(a) MCCB 100 Amp 16 kA, 4 pole,415V,50HZ - 01 No. (b) MCCB 63Amp 16kA, TP,415V,50HZ -02 Nos. (c) MCB 6 Amp 10 kA, SP, Icu=100% Ics - 2 Nos. (d) Change over switch 63 amp-01 No.(e) R,Y,B Indicators -01 Set(f) Digital Multifunction meter incl necessary CTs (set of three) - 1 set
20Panel cubical type of suitable size, 415 volt, factory made CPRI approved dust proof vermin proof (Kiosik type) for outdoor use made out of CRCA sheet 3.15 mm thick exept inner sheath OG 2 mm powder coated, machine pressed, both side opening in two halves with provision of rubber beading and locking system, inciuding aluminium bus bar of 200 Amp capacity, 4 strip mounted on porcelain insulator, bus bar chamber shall be provided with inspection covers each MCCB/ cubical switch shall have be independent opening, panel should be monthed on angle iron frame and legs (vertcal height of legs not less than 30 cm exept in PCC) made from angle of size 50x50x5 mm, frame and legs duly spray painted internally and externally with two coats of synthetic enamel paint over a coat of red oxide primer legs grouted in PCC(1:3:6) type B-2(using 40 mm graded stone aggregate) complete including all connection/ control wiring with suitable size of copper conductor cable, including danger notice sticker, comprising the following accessory including testing , complete all as specified and directed.(a) MCCB 160 Amp 16 kA, 4 pole,415V,50HZ - 01 No. (Incomer)(b) MCCB 100Amp 16kA, TP,415V,50HZ -02 Nos. (c) MCB 6 Amp 10 kA, SP, Icu=100% Ics - 2 Nos. (d) Change over switch 100 amp-01 No.(f) R,Y,B Indicators -01 Set(g) Digital Multifunction meter incl necessary CTs (set of three) - 1 set
21Supply and inatallation, testing and commissioning complte of 30 kVA/24 KW Liquid Cooled Diesel Generating Set with Cold Starting Capability Comprising of Liquid Cooled (CPCB IV+ Norms compliance) developing 42 BHP @ 1500 RPM Directly coupled with 30 kVA Alternator rated at 3Phase 415 Volts ,50 Hz and 0.8 p.f. both mounted and Aligned on Common Base Frame complete with inbuilt MS Fuel Tank, Residential Exhaust Silencer, AVM pads fitted on Base Frame 1 No of Battery of suitable capacity for 12 Volts Operating System, Remote Monitoring and Integrated Manual Panel with feature of Auto Start and Auto Stop subject to (Auto-Changeover) all housed in Acoustic Enclosure , complete all as specified and directed.
22Supply and inatallation, testing and commissioning complte of 60 kVA/48 KW Liquid Cooled Diesel Generating Set with Cold Starting Capability Comprising of Liquid Cooled (CPCB IV+ Norms compliance) developing 42 BHP @ 1500 RPM Directly coupled with 60 kVA Alternator rated at 3Phase 415 Volts ,50 Hz and 0.8 p.f. both mounted and Aligned on Common Base Frame complete with inbuilt MS Fuel Tank, Residential Exhaust Silencer, AVM pads fitted on Base Frame 1 No of Battery of suitable capacity for 12 Volts Operating System, Remote Monitoring and Integrated Manual Panel with feature of Auto Start and Auto Stop subject to (Auto-Changeover) all housed in Acoustic Enclosure, complete all as specified and directed.
23Construction of platform of size 3000mm x 2500mm x 1200 mm for installation of transformer with brick steps on one side, chain link fencing around transformer, fencing should have hinged door and locking arrangements complete all as shown on drawing No CEPZ/C-TD/002/13 sht 2/5, complete all as specified and directed.
24PCC cable route indicator duly engraved with words \\"HT Cable 11 KV\\" and arrow indicating direction of laying of cable, complete all as specified and directed.Note: PCC cable route indicator shall be provided at specified distance along the HT cable at all cable joint and turning etc.
25SEWAGE DISPOSALEarth work in excavation by mechanical means (Hydraulic excavator) in foundation / trenches or drains (exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift exceeding 1.5m depth but not exceeding 3.0m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m in any type of soil, complete all as specified and directed.
26Supply, laying and testing of 150mm nominal diameter of double wall corrugated (DCW) high density polythelene pipes (HDPE) and stiffness classes-8 (SN-8) with ISI marked (with CML no) with including all fitting & jointing material for sewage line and laid in trenches as specified in IS-16098 (Part-2) :2013 and as per manufacturer's Instruction, complete all as specified and directed.Note:- Bedding of pipe shall not be provided in normal condition and CONSTRUCTION METHOD shall be strictly compiled as per clause no A-4 of ANNEX ' A ' of IS 16098(part-2) :2013
27Supply, laying and testing of 200mm nominal diameter of double wall corrugated (DCW) high density polythelene pipes (HDPE) and stiffness classes-8 (SN-8) with ISI marked (with CML no) with including all fitting & jointing material for sewage line and laid in trenches as specified in IS-16098 (Part-2) :2013 and as per manufacturer's Instruction, complete all as specified and directed.Note:- Bedding of pipe shall not be provided in normal condition and CONSTRUCTION METHOD shall be strictly compiled as per clause no A-4 of ANNEX ' A ' of IS 16098(part-2) :2013
28Designing (hydraulically, structurally and aesthetically), and constructing RCC sumps in M-30 mix of required capacity (average flow 101-200 Cum/d, IL of incoming sewer upto 4m, inner dia-2m & overall depth-7m) including excavation in all types of strata, foundation concrete, container walls, bottom slab, top RCC roof slab with CI manhole covers and with plaster and water proofing as per zonal specification including epoxy paint inside, refilling of earth and disposal of surplus earth within 50 m lead, including all piping connections, valves, internal electrification, MS ladder, ventilation shaft, BB chambers with 5m of outer wall of tank complete including test for water tightness and hydraulic functioning, complete all as specified and directed.
29Precast factory made Man hole Covers slab set in CM 1:6 of dia 560 mm, complete all as specified and directed.
30Precast RCC factory made Man hole Covers slab set in CM 1:6 of dia 900 mm, complete all as specified and directed.
31Supply and lay pipe Ductile Iron pipe , S/S including specials, Class “K-9” ,150 mm dia, complete all as specified and directed.
32ROAD, PATH AND CULVERTDual directional reflective cat eye aluminium casted stud 100X100 mm having 3 round plastic ABS discs containing 21 mini retro-reflective glass beads of colour white/red/yellow a side provided with steel zinc plated nails of dia 12 mm of length 120mm for fixing to road by hammering, complete all as specified and directed. CAT PART No. 01-01 CAT EYE AL 100x100 (21B)
33Mild steel heavy duty instriyal grade seamless pipies of 300 mm dia 8 mm thick and over , plain or chequeredor or circular cutting on iron or steel, cuts, notches, rounded angles,sheets etc used for sleeves for concrete pipes, complete all as specified and directed.
34Mild steel heavy duty instriyal grade seamless pipies of 200 mm dia 8 mm thick and over , plain or chequeredor or circular cutting on iron or steel, cuts, notches, rounded angles,sheets etc used for sleeves for concrete pipes, complete all as specified and directed.
35Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 12 months { PHASE - I refer Sch \\"A\\" note no.2.1(b) } , after completion of STP & SCADA :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 12 (Twelve Months) including all sunday & holidays, complete all as specified and directed.
36Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 12 months, after completion of Phase-II { Phase-III refer Sch \\"A\\" note no.2.1(c) } complete :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 12 (Twelve Months) including all sunday & holidays, complete all as specified and directed.
37Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 11 months, after completion of Phase-III { Phase-IV refer Sch \\"A\\" note no.2.1(d) } complete :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all sunday & holidays, complete all as specified and directed.
38Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 11 months, after completion of Phase-IV { Phase-V refer Sch \\"A\\" note no.2.1(e) } complete :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all sunday & holidays, complete all as specified and directed.
39Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 11 months, after completion of Phase-V { Phase-VI refer Sch \\"A\\" note no.2.1(f) } complete :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 11 (Eleven Months) including all sunday & holidays, complete all as specified and directed.
40Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 03 months, after completion of Phase- VI { Phase-VII refer Sch \\"A\\" note no.2.1(g) } complete :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 03 (Three Months) including all sunday & holidays, complete all as specified and directed. Please Enable Macros to View BoQ information
41Manning & Operation of the STP & SCADA (of capacity 75 KLD and 100KLD as per srl item No 1 to 6 of this BOQ) for 03 months, after completion of Phase- VI { Phase-VII refer Sch \\"A\\" note no.2.1(g) } complete :- Operating and keeping the capacity in running / operational condition by deploying FGM / technical staff to produce the treated effluent of specified quality including Sundays and holidays including all connected LT cubicle STP panel , electrical & sewage pumps items such as main switch, starter, change over switch, MCCB, voltmeter, ammeter, panel board etc, Sewage water pump, valve system, controlling syatem, daily checking, leakage, checking noise, cleaning of plant and its surrounding area etc for a period of 03 (Three Months) including all sunday & holidays, complete all as specified and directed. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57773058
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 12.70 Crore
LAST DATE 18-11-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Provision Of Package Type Sewage Treatment Plant For Various Pockets In Ratnuchak Mil Stn Under Ge Kaluchak Station.
Basic Detail
Tender No CA NO CEPZ-22/2026-27
Bidding Type Tender
Location
City kaluchak
State Jammu And Kashmir
Key Dates
Publish Date 26 Oct 2026
Submission Date 18 Nov 2026
Open Date 28 Nov 2026
Finance
Tender Value 12.70 Crore
Tender Fee 3000
EMD 9.60 Lakhs
Exemption Available
Document List
4663669c-f576-42c7-b77e-ff4f6736e43c.html
BOQ_887648.xls
Tender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 18, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 17 days
Nov 18, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 17 days
Nov 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 27 days

Tender Documents

Download All (ZIP) ↓
html

4663669c-f576-42c7-b77e-ff4f6736e43c.html

xls

BOQ_887648.xls

pdf

Tender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender