Tender for Tender for Release New Connection Of Differrent Category At Nivesh Mitra And Jhatpat Portal Under Full Deposit Scheme Under Edd-Shikarpur
Tender Value
Ref. Documents
Estimated cost
Bid Submission
06 Oct 2026
3 days left
EMD
30000
Bank guarantee accepted
Document Fee
3540
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Hathras → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Release New Connection Of Differrent Category At Nivesh Mitra And Jhatpat Portal Under Full Deposit Scheme Under Edd-Shikarpur
BOQ
| Sl. No. | Item Description |
| 1 | Carriage of following from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required completion of work, distance about to 45 to 70 Km. approx. |
| 2 | STP 9/11 mtr Long from E.S.C Bulandshahr to Site |
| 3 | PCC 8.5/9 mtr from E.S.C Bulandshahr to Site |
| 4 | PCC 11 mtr Long from E.S.C Bulandshahr to Site |
| 5 | CT/PT unit 10/5A Different specification from ESC. BSR to site |
| 6 | Piffer ressitant metering cubicle from ESC. BSR to site |
| 7 | Cable 3x70 sqmm 11 KV XLPE |
| 8 | Carriage 10/16 kva TF |
| 9 | Carriage 25/63/100 kva TF |
| 10 | Carriage 250/400 kva TF |
| 11 | Carriage & Erection of 11 KV VCB (Incoming/Outgoing) |
| 12 | Carriage of All line Material from store to site or j.e's store as ACSR Weasel conductor, GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator & Pin Insulator etc. |
| 13 | Erection of Single support PCC 11 mtr long including complete LT/HT as per RESPO. |
| 14 | Erection of Single support PCC 8.5/9 mrt long/ STP 9 mtr/ STP 11 mtr. including complete LT/HT as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 15 | Grouting of Single support including complete 1 LT as per RESPO manual and as per direction ot Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. |
| 16 | Plinth of 250 /400 KVA TF as per Respo. |
| 17 | Fencing of 250 /400 KVA TF as per Respo. |
| 18 | Water level Earthing of 250 /400 KVA TF with copper wire |
| 19 | Fixing of Stay rod with Stay wire in proper way with Nozelling. |
| 20 | Mounting & Installation 25/63/100 kva T/F on the double Pole |
| 21 | Grouting of Stay rods. |
| 22 | Fixing of erathing rod. |
| 23 | Laying of 3x70 sqmm 11KV XLPE cable putting sand around the cable Fixing of bricks in both sides & top and refilling of trench and its proper ramming including providing necessary loop on both sides. |
| 24 | Laying, sagging. Stringing and binding and jumpering of ACSR weasel, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. |
| 25 | Mounting CT/PT unit on D/P . |
| 26 | Fixing of Cable Box suitable for 3X70 sqmm 11KV XLPE. |
| 27 | Providing & Fixing Barbad wire. |
| 28 | Providing & Fixing Holding Clamps. |
| 29 | Laying and AB Cable |
| 30 | Providing & Fixing Stay Clamps. |
| 31 | Providing & Fixing Stay Insulator. |
| 32 | Providing & Fixing Double pole clamp. |
| 33 | Providing & Fixing LT Clamp. |
| 34 | Providing & Fixing Clamp for sutatble AB Cable. |
| 35 | Providing & Fixing Suspention Clamp. |
| 36 | Providing & Fixing Dead end Clamp |
| 37 | Providing & Fixing PRC. |
| 38 | Providing & Fixing F Clamp. |
| 39 | Providing Nut & Bolts off-size |
| 40 | Installation & Errection of Piffer ressitant metering cubicle. |
| 41 | Gaurding of 11 kv line/ road crossing as per site requirement. |
| 42 | Dismantaling of old Pole. |
| 43 | Dismantaling of old Conductor and other accessories. |
| 44 | Dumping of Old Material from site to store center bsr with loading & unloading. |
| 45 | Extra Milage charges and carriage for PCC/ST Pole/TF & other material. |
| 46 | Above work shall be done as per UPPCL/RESPO Rules. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 06, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender