Supply Of Supply, installation, testing & commissioning of Aerosol fire detection and suppression system cartridge 01 nos. of minimum 10 g (1 no with complete accessories) of aerosol cartridge as per the technical requirement specified in Annexure G-
Tender Overview
Project Description
Supply Of supply, installation, testing & commissioning of aerosol fire detection and suppression system cartridge 01 nos. of minimum 10 g (1 no with complete accessories) of aerosol cartridge as per the technical requirement specified in annexure g-1 of rdso specification rdso/pe/spec/ac/0192-2018 (rev.1) and temperature setting of as 68-72 degree celcius as per rdso letter no. el/7.1.108/sbc/main dt 06.08.25. these cartridges to be installed in panels of non ac coaches. all necessary modification, back pieces, mounting accessories etc. required for installation of this item shall be with the scope of supplier. and supply, installation, testing & commissioning of aerosol fire detection and suppression system cartridge 01 nos. of minimum 20g (with complete accessories) of aerosol cartridge as per the technical requirement specified in annexure g-1 of rdso specification rdso/pe/spec/ac/0192-2018 (rev.1) and temperature setting of as 68-72 degree celcius as per rdso letter no. el/7.1.108/sbc/main dt 06.08.25. these cartridges to be installed in panels of non ac coaches. all necessary modification, back pieces, mounting accessories etc. required for installation of this item shall be with the scope of supplier. , supply, installation, testing & commissioning of aerosol fire detection and suppression syste m cartridge 01 nos. of minimum 20g (with complete accessories) of aerosol cartridge as per the technical r equirement specified in annexure g-1 of rdso specification rdso/pe/spec/ac/0192-2018 (rev.1) and tem perature setting of as 68-72 degree celcius as per rdso letter no. el/7.1.108/sbc/main dt 06.08.25. these cartridges to be installed in panels of non ac coaches. all necessary modification, back pieces, mounting a ccessories etc. required for installtion of this item shall be with the scope of supplier. [ warranty period: 30 months after the date of delivery ] ] , supply, installation, testing & commissioning of aerosol fire detection and suppression syste m cartridge 01 nos. of minimum 10 g (1 no with complete accessories) of aerosol cartridge as per the tech nical requirement specified in annexure g-1 of rdso specification rdso/pe/spec/ac/0192-2018 (rev.1) an d temperature setting of as 68-72 degree celcius as per rdso letter no. el/7.1.108/sbc/main dt 06.08.25. these cartridges to be installed in panels of non ac coaches. all necessary modification, back pieces, mou nting accessories etc. required for installtion of this item shall be with the scope of supplier. [ warranty p eriod: 30 months after the date of delivery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply, installation, testing & commissioning of Aerosol fire detection and suppression syste m cartridge 01 nos. of minimum 20g (with complete accessories) of aerosol cartridge as per the technical r equirement specified in Annexure G-1 of RDSO Specification RDSO/PE/SPEC/AC/0192-2018 (Rev.1) and tem perature setting of as 68-72 degree Celcius as per RDSO letter no. EL/7.1.108/SBC/Main dt 06.08.25. These cartridges to be installed in panels of Non AC coaches. All necessary modification, back pieces, mounting a ccessories etc. required for installtion of this item shall be with the scope of supplier. [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | Supply, installation, testing & commissioning of Aerosol fire detection and suppression syste m cartridge 01 nos. of minimum 10 g (1 no with complete accessories) of aerosol cartridge as per the tech nical requirement specified in Annexure G-1 of RDSO Specification RDSO/PE/SPEC/AC/0192-2018 (Rev.1) an d temperature setting of as 68-72 degree Celcius as per RDSO letter no. EL/7.1.108/SBC/Main dt 06.08.25. These cartridges to be installed in panels of Non AC coaches. All necessary modification, back pieces, mou nting accessories etc. required for installtion of this item shall be with the scope of supplier. [ Warranty P eriod: 30 Months after the date of delivery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysTender Documents