Tender For Comprehensive Maintenance / Repair/ Servicing Of B Vehicles Under Age E/M Of Ge Af Tech Area Agra
Tender Value
10 Lakhs
Estimated cost
Bid Submission
21 Oct 2026
17 days left
EMD
20000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Comprehensive Maintenance / Repair/ Servicing Of B Vehicles Under Age E/M Of Ge Af Tech Area Agra
BOQ
| Sl. No. | Item Description |
| 1 | TATA MOBILE M&L for Comprehensive maint and servicing , washing, oiling, greasing, tuning, overhauling fixture accessories replacement of first moving parts changing oil/fuel filters, replacement of bulbs, fuses, replacement of coolant brake oil, engine oil, cleaning and maint of radiator, maint of battery with electrolyte solution, distilled water, wheel alignment, cleaning of fuel tank complete all as specified and as directed.(Note : Major repair, spare parts which are to replaced, oil to be filled and other part shall be measured and paid seprately). |
| 2 | Supply only Tail indicator (Left+ Right). |
| 3 | Supply only Mud guard rubber flap |
| 4 | Supply only Steering cover |
| 5 | Supply only Fuse unit complete of 10/15/20 amps |
| 6 | Supply only Fuel Filter (Primary & Secondery) |
| 7 | Supply only Oil Filter |
| 8 | Supply only Air Filter |
| 9 | Supply only Door lock complete system |
| 10 | Supply only Side mirror |
| 11 | Supply only Wiper arms with blade |
| 12 | M&L for Computerized alignment of wheel and balancing the complete system |
| 13 | M&L for Monogram and letter writing with redium retro letter writing |
| 14 | M&L for Raditor servicing incl. repair if any water leakage found. |
| 15 | M&L for opening of fly wheel repair and replacement of defective items and refixing the same after repair complete all as specified and directed. (Note : Major repair, spare parts which are to replaced, shall be measured and paid seprately). |
| 16 | Supply only UJ cross |
| 17 | Supply only Hose pipe kit with clamp |
| 18 | Supply only Fly wheel ring |
| 19 | Supply only Fly wheel nut & bolt |
| 20 | M&L for repair of armature and replacement of defective items complete all as specified and directed. (Note :Replacement of items shall be measured and paid seprately). |
| 21 | Supply only holder with head light bulb |
| 22 | Supply only Rectifier Plate |
| 23 | M&L for rewinding of starter |
| 24 | M & L for repair and Calibration of injection pump by washing of nozzles and setting of injector complete serviceable condition and testing complete all as directed by engr-in-charge. |
| 25 | M&L for repair of electric system and replacement of defective items complete all as specified and directed. (Note :Replacement of items shall be measured and paid seprately). |
| 26 | M & L for Field coil repair and taping |
| 27 | Supply only Solinoid Switch |
| 28 | Supply only Bandex pinion |
| 29 | Supply only GM Bush |
| 30 | M&L for rewinding of Self armature |
| 31 | M&L for repair and overhauling of defective shafting system and checking of parts such as propeller shaft, centre bearing, centre bearing clamp and rubber pad, universal cross, yok, teeth etc and testing complete all as directed.Note : major items which are to replaced shall be measured and paid seprately) |
| 32 | Supply only Centre bearing |
| 33 | Supply only Centre bearing rubber |
| 34 | Supply only Centre bearing clamp |
| 35 | Supply only Tie rod end set |
| 36 | M&L for repair and overhauling of defective system and checking of parts such as front disc brake, rear wheel cylender, master cylender, rear brake shoe, front disc brake pad, front disc break caliper assembly complete brake pipe, rear wheel brake shoe spring & locking assembly and repalcement of defective items and testing complete all as specified and as directed. (Note : defective items which are to be replaced shall be measured and paid separately.) |
| 37 | Supply only clutch cover assembly |
| 38 | Supply only clutch release fork |
| 39 | Supply only Assy CL. Release Brg. |
| 40 | M&L for opening of gear box and allied parts completely by loosing nuts bolts and taking out unserviceable parts and replacing the defective items, reassembling and testing complete. (Note : defective items which are to be replaced shall be measured and paid separately.) |
| 41 | Supply only Shifter Sleeve |
| 42 | Supply only Synchro Ring |
| 43 | Supply only Sub Assy helical Gear |
| 44 | Supply only Assy and yoke |
| 45 | TATA XENON : Comprehensive maint and servicing, oiling, greasing, accessory replacement of first moving parts changing oil, tightning of nut bolts washers and mechanical arrangement engine mounting system clamps fuel tank bracket and air duct checking complete all as specified and directed.(Note : All defective items which are to be replaced shall be measured and paid separately.) |
| 46 | Supply only Oil Filter |
| 47 | Supply only Fuel filter. |
| 48 | Supply only Air filter |
| 49 | M&L for Computerized alignment of wheel and balancing the complete system |
| 50 | M&L for Tail/indicator light complete fitting suitable for xenon |
| 51 | Supply only Water pump assembly |
| 52 | Supply only Head lamp bulb complete |
| 53 | M&L for fuel tank flap opening lever with complete system |
| 54 | Supply only Air vents suitable for xenon |
| 55 | M&L for Dash board/side door polishing for xenon complete all as specified and directed. |
| 56 | Supply only Air intake system assembly |
| 57 | Supply only windshield washing assembly |
| 58 | M&L for intercooler & radiator removal of external clooging |
| 59 | M&L for Complete checking of all sensors/ECU error diagnosis |
| 60 | Supply only Brake hoses and pipes |
| 61 | M&L for complete fixture of door including replacement of locking system of all door including front and back side complete all as specified and directed. |
| 62 | Eicher : Comprehensive maint and servicing, washing and oiling, greasing, replacement of first moving parts changing oil/fuel filters, replacement of coolant, brake oil, stearing oil, engine oil complete all as specified and directed. Note : Any defective items which are to be replaced shall be measured and paid separately. |
| 63 | Supply only Fuel Filter |
| 64 | Supply only Oil Filter(primary and secondary) |
| 65 | Supply only Air Filter |
| 66 | M&L for Alignment of wheel and balancing the complete system |
| 67 | Supply only Fan Belt |
| 68 | Supply only Wiper motor with connected accessories |
| 69 | Supply only Wiper arm with rubber blade |
| 70 | M&L for Raditor servicing incl. repair if any water leakge found. |
| 71 | M&L for Fuel Tank cleaning |
| 72 | Supply only Foot mat |
| 73 | Supply only Horn |
| 74 | Supply only Indicator light assy (Left & Right) |
| 75 | Supply only Side mirror |
| 76 | Supply only Salenoid Switch |
| 77 | Supply only Field Coil |
| 78 | Supply only D E ball Bearing |
| 79 | Supply only Brush Assly carrier |
| 80 | Supply only Door handle with Lock arrangement |
| 81 | Supply only Fan blade assy |
| 82 | Supply only Radiator 70KWBS-III |
| 83 | Supply only Oil Pump assy |
| 84 | Supply only Water pump assy |
| 85 | Supply only Ring Gear |
| 86 | Supply only suspension kit |
| 87 | Supply only lower wishbone assy |
| 88 | Supply only Assy timimg belt |
| 89 | Supply only Glass door operating assembly |
| 90 | Supply only Field coil repair and taping |
| 91 | Supply only Solinoid Switch |
| 92 | Supply only Bandex pinion |
| 93 | Supply only GM Bush |
| 94 | Repair/maint of tuning up the engine sound, setting of tappet cleaning of parts complete all as directed. |
| 95 | Repair and overhauling of defective suspension system and checking of parts such as front spring leaf, centre bolt, front spring leaf hanger, rear spring leaf, rear spring leaf hanger of vehicle Eicher complete all as specified and directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 96 | Supply only Shock absorber front |
| 97 | Supply only Shock absorber bush |
| 98 | Supply only centre bolt |
| 99 | Supply only hanger front |
| 100 | Supply only hanger bolt TVS |
| 101 | Supply only hanger rear |
| 102 | Supply only shackle pin |
| 103 | Supply only lock pin |
| 104 | Supply only Center Pin Washer |
| 105 | Dismantling and taking down the gear box of veh Eicher, repair and overhauling including replacement of worn spare parts and testing complete all as specified and as directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 106 | Supply only Gear Liver kit |
| 107 | Supply only Counter shaft Assy |
| 108 | Supply only Knuckle Steering |
| 109 | Supply only Thrust Bearing |
| 110 | Supply only Arm Tie Rod |
| 111 | Supply only Tie rod assy |
| 112 | Supply onlyFrame floor under center |
| 113 | Supply only Floor Reinf (LH) |
| 114 | Supply only Floor Reinf (RH) |
| 115 | Dismantling and taking down the clutch plate system of veh Eicher, refixing the same after replacing/repairing the defective items and testing complete all as specified and as directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 116 | Supply only Assy clutch master |
| 117 | Supply only clutch disc assy |
| 118 | Supply only realease bearing assy |
| 119 | Supply only Combination switch |
| 120 | Supply only But & Bolt 4*5\\" |
| 121 | Supply only outer oil seal |
| 122 | Supply only inner oil seal |
| 123 | Supply only Propeller shaft rear |
| 124 | Supply only Master Vac |
| 125 | Opening of differtial and allied parts completely by loosing nut bolts and taking out unserviceable parts & replacing the defective items reassembling and testing complete all as specified and as directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 126 | Supply only Bearing pinion outer wheel |
| 127 | Supply only Bearing pinion inner wheel |
| 128 | Supply only Gear Differntial |
| 129 | Supply only Ball joint assy |
| 130 | Supply only Oil seal |
| 131 | Supply only UJ Kit |
| 132 | Supply only Slip Yoke assy |
| 133 | Supply only Flange Yoke |
| 134 | Opening of Brake system and allied parts completely by loosing nut bolts and taking out unserviceable parts & replacing the defective items reassembling and testing complete all as specified and as directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 135 | Supply only Brake Assy Front wheel |
| 136 | Supply only Brake Assy Rear wheel |
| 137 | Supply only Bearing Ball |
| 138 | Supply only packing set and O ring Complete |
| 139 | M & L for repair and Calibration of FIP and governor by replacing pump elements, delivery valve, plugs, springs, gaskets sleeves, washers filters etc and testing complete. |
| 140 | M & L for repair/ rewinding of unsv alternator (dynmo) complete all as spd and directed. |
| 141 | Taking out old seat cover and fixing new seat cover with (complete set ) of vehicle Eicher complete all as specified and as directed. |
| 142 | Opening up the part completely by lossing nut bolts and taking out unserviceable parts and replacing the u/s defective parts reassembling and testing complete all as specified and directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 143 | Supply only Piston ring set |
| 144 | Supply only Engine overhaul gasket kit |
| 145 | Supply only Cylinder Sleve |
| 146 | Supply only Set Main Bearing |
| 147 | Supply only Piston Pin |
| 148 | Supply only Con Rod bearing |
| 149 | Supply only Valve inlet |
| 150 | Supply only valve tappet |
| 151 | Supply only valve guide |
| 152 | Supply only valve push rod |
| 153 | Motor Cycle Comprehensive maint and servicing, oiling replacement of first moving parts, changing oil of Motor Cycle complete all as specified and directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 154 | Supply only Indicator Assy front side |
| 155 | Supply only Indicator Assy rear side |
| 156 | Supply only Horn Assy |
| 157 | Supply only Chain Socket |
| 158 | Supply only Clutch Racer |
| 159 | Supply only Chain with revet |
| 160 | Supply only Side mirror |
| 161 | Supply only Fuel filter |
| 162 | Supply only Oil Filter |
| 163 | Supply only Air filter |
| 164 | Supply only Seat Cover |
| 165 | Supply only Handle grip |
| 166 | Supply only Box best suitable for fixing in motor cycle |
| 167 | Supply only Indicator sound system |
| 168 | Supply only Number plate (front and rear) black colour suitable for motor cycle |
| 169 | Supply only Spark Plug |
| 170 | Supply only High beam indicator |
| 171 | Supply only Side Stand |
| 172 | Supply only Main Stand |
| 173 | M&L for cleaning of carburator |
| 174 | Supply only Rider foot rest |
| 175 | Supply only pillion step complete cage |
| 176 | Supply only air suction valve |
| 177 | Supply only Starter Motor |
| 178 | Supply only Seat |
| 179 | Supply only speedomete |
| 180 | Supply only odometer |
| 181 | Supply only Fuel Gauge |
| 182 | Supply only Main Handle clutch assembly |
| 183 | Supply only Clutch Wire assembly |
| 184 | M&L for repair and overhauling of defective brake system of motor cycle carried out replacement of defective spare part and assembling the same with testing complete all as specified and directed. (Note : Any defective items which are to be replaced shall be measured and paid separately.) |
| 185 | Supply only Brake Pedal |
| 186 | Supply only Brake Shoe front and rear |
| 187 | Supply only Spring assy for shoe |
| 188 | M&L for repair and overhauling of defective shocker system front side (left+right) of motor cycle and carry out the repair including replacement of the defective spare parts as directed and assembling the same with proper quantity of oil fill and testing complete all as specified and directed. |
| 189 | M&L for dismantling and taking down the gear box for repair and overhauling including replacement of worn spare parts and testing complete all as specified and directed. |
| 190 | Supply only diesel Engine oil of suitable grade as recommended by OEM or authorised ageny for vehicles complete all as directed. Make:- Castrol/Valvoline/Servo |
| 191 | Supply Only patrol engine oil suitable for motor cycle/ Dzire.Make TVS/Motul/Castrol |
| 192 | Supply only Gear oil of suitable grade as recommended by OEM or authorised ageny for vehicles complete all as specified and directed. Make TVS/Motul/Castrol |
| 193 | Supply only Brake oil of suitable grade as recommended by OEM or authorised ageny for vehicles complete all as specified and directed. Make TVS/Motul/Castrol |
| 194 | Supply Only Grease suitable grade as recommended by OEM or authorised ageny for vehicles complete all as specified and directed. |
| 195 | Supply Only Coolant suitable for eicher/Tata Mobile/Dzire |
| 196 | M&L for opening of battery terminal and refixing the same after cleaning and reconditioning of battery of 80Ah battery size with suitable amount of acid and distilled water and making proper connection etc complete all as specified and directed. |
| 197 | M&L for opening up the tyre of vehicle for tyre rotation complete all as specified and directed. |
| 198 | M&L for opening up the tyre and refixing the same after retreading of tyre upto satisfaction level of JE/EIC complete all as specified and directed.. |
| 199 | M&L for removing complete wheel with tyre and tube, taking out tube repair punctures, tube Valve repair of vehicles and fixing properly for eicher complete all as specified and directed. |
| 200 | M&L for removing complete wheel with tyre and tube, taking out tube repair punctures, tube Valve repair and re-fixing properly for motor cycle complete all as specified and directed. |
| 201 | M&L for removing complete wheel with tyre and tube, taking out tube repair punctures, tube Valve repair of vehicles and fixing properly for tata mobile/xenon complete all as specified and directed. |
| 202 | M & L for washing the complete vehicle LCV/LDV/PC with foam, removing all dust particles from outside and inside using vacuum cleaner, including polshing dash board or other internal parts, greasing, tightning the loose nuts, bolts etc complete all as specified and directed. |
| 203 | Supply and fixing in replacement of heavy duty tyres of size (215/75R-16) suitable for TATA Xenon vehicles complete all as specified and directed. Make : MRF/Appolo/CEAT/TVS as approved by the GE |
| 204 | Supply and fixing in replacement of heavy duty tyres of size (7.50-16) suitable for Eicher 10.75 vehicles complete all as specified and directed. Make : MRF/Appolo/CEAT/TVS as approved by the GE |
| 205 | Supply and fix in replacement of complete Dry cell 12 V battery initially charged of capacity 130 AH for vehicles etc complete all as specified and directed. Make : Exide/Amron/Amco as approved by the GE |
| 206 | Supply and fix in replacement of complete Dry cell 12 V battery initially charged of capacity 80 AH for vehicles complete all as specified and directed. Make : Exide/Amron/Amco as approved by the GE |
| 207 | M&L for rewinding the self starter assy 12 Volts by taking out from the vehicles dismantling & cleaning , providing proper insulation rewinding with super enameled copper wire of existing size & insulating the field coil assy replacing bentec assy & fixing back after repairs complete all as specified and directed. |
| 208 | Supply and fixing in replacement of fan belt complete set of Make - Finner/ Dunlop//Tata/Eicher/or as per sample as required at site for Tata Mobile/Eicher 10.75 etc complete all as specified and directed |
| 209 | S&F rubber hose set for water circulation of Eicher/TATA Mobile as required on site by replacing the unserviceable hose set etc complete all as specified and directed. |
| 210 | Deduct Schedule of Credit of ₹ 12440.00 as brought out from serial page No 37 of tender Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs) |
| 211 | Old unsv filters any type fuel/ oil/ air filter etc. |
| 212 | Old unsv rectifier plate |
| 213 | Old unsv UJ cross/tie rod end set. |
| 214 | Old unsv air intake assembly/oil pump assy/water pump assembly. |
| 215 | Old unsv vaccum pump. |
| 216 | Old unsv wiper motor. |
| 217 | Old unsv door lock system. |
| 218 | Old unsv radiator. |
| 219 | Old unsv counter shaft assembly. |
| 220 | Old unsv knuckle steering. |
| 221 | Old unsv copper winding wire of alternator. |
| 222 | Old unsv clutch master assembly. |
| 223 | Old unsv clutch disc assembly. |
| 224 | Old unsv release bearing assembly |
| 225 | Old unsv bearing pinion. |
| 226 | Old unsv gear differential. |
| 227 | Old unsv brake assembly. |
| 228 | Old unsv chain spocket any type |
| 229 | Old unsv starter motor |
| 230 | Old unsv used engine oil/ break oil/ gear oil any type. |
| 231 | Old unsv tyres of size (7.50-16) |
| 232 | Old unsv Dry cell 12 V battery 80AH / 130 AH |
| 233 | Old unsv Dry cell 12 V battery 75 AH Total amount of credit schedule 12440.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysOct 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender