Public Administrative Department Government Departments Closing in 20 days TDR #57765109

Tender For Mc & Ew (Cam) To Conservation To Madarasa Mahmud Gaawan At Bidar

Issued by Government Departments · Bidar, Karnataka
Tender Value
49.26 Lakhs
Estimated cost
Bid Submission
20 Oct 2026
20 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Bidar → Karnataka
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Mc & Ew (Cam) To Conservation To Madarasa Mahmud Gaawan At Bidar-1 Dismantling The Damaged/Rusted Railing At The Top Of The Monument (Steel Work) Including All Bolts, Nuts, Cutting Rivets, And Stacking The Useful Materials Within 50 Metres Lead, Including, Conveyance, Carrying, Lifting, All Labour Charges Etc. Complete All As Per The Directions Of The Site In-Charge 2 3 Carefully Removing Of The Dead And Deteriorated Lime Mortar Plaster Of The Wall, Roof, Ceiling, Merlons, Inars, Etc. Complete Of The Monument Manually Without Causing Any Damage To The Monument And The Structure And Architectural Members, Including Cost Of Labours, Conveyance And Disposing The Waste Materials Away From The Site, Etc Complete All As Per Directions Of Site-In Charge. Carefully Removing Of The Additional Wall Constructed In The Arch Which Is Not A Part Of The Original Structure Carefully Without Causing Any Damage To The Monument And Disposing The Waste Materials Away From The Site Conveyance, Carrying, Lifting, All Labour Charges Etc Complete All As Per The Directions Of The Site Charge... 4 5 6 Providing And Applying Of Lane Mortar Plaster For The Walls, Ceiling, Minars, Etc Complete Co The Monument, Matching The Original In Three Kats With Rough Coat Of 20Mm Thick, In 1:2 Lm And Rich Lime Fatal Sat Of 5Mm Thickness M 1:1.5 Lime Mortar And Pure Lame Coat/ Lime Punning Including The Cost Of Materials, Labnur, Adding Traditional Materials Such As Gallest, Jaggery Etc., Including Cost Of All Materials And Labours, Conveyance, Carrying, Ling Preparation Of Lame Mortar, Stacking The Materiak, Scaffolding, Curing, Etc., Complete All As Per The Directions Of The Site In Charge. Providing And Applying Of Lime Mortar Plaster For The Roof, Merions, Etc. Complete Of The Monument, Matching The Original In 2 Couts With Rough Coat Of 20Mm Thickness, In 1:2 Lm And Rich Lime Final Coat Of 5Mm Thickness In 1:1.5 Lime Mortar Mcluding The Cost Of Materials Jabour, Adding Traditional Materials S Gallnut, Jaggery Ste, Mcluding Cost Of All Materials And Labours, Coyance, Carryng Lifting, Preparation Of Lime Mortar, Stacking The Materials, Scaffolding, Curing, Etc., Complete All As Per The Directions Of The Site In Charge. Raking Out The Joints Of Stone Masonry Surfac Carefully To The Reqared Walth And Depth, With Due Care And Precaution, By Mechanical Manual Means, Muhaling Preparing And Cleaning The Surface For Re-Pontung/ Refilling Of Mchuding Disposal Of Rubbish To The Dumping Grund Away From The Site, Nechoding Conveyance, Carrying, Lifting, All Labour Charges Te Complete All As Per The Directions Of The Situ In-Charge. Pointing The Walls, Arches And Other Structural Members With Lime Mortar 1:1.5, Includang Of All Materials And Labours, Conveyance Carrying, Lifting, Preparation Of Lane Mortar, Stacking The Materials, Scaffolding, Curing, S Complete All As Per The Directans Of The Site In Charge. Providing And Constructing By Using Trap Stone Mannry Work Of The Missing Portions As Per Original Using Trap Stone Of Average Sab 0.50 0.30 X 0.13 M To 0.20 M In Lime Mortar 1:1.5 Including Stone Dresing, Cutting, Lifung Carrying The Material To Requisite Height, Carrying The Materials Mamully From Stock Yard Work Spest, Curing, Placing The Stones By Matching The Stone Layers With The Existing Stone Layers, Ncluding Cost Of All Materials And Labours, Conveyaux, Carrying, Lifting Preparation Of Lame Mortar, Stacking The Materials, Scaffolding, Curing, Etc., Complete All As Per The Directions Of The Site In Charge. Providing And Fixing Double Scaffolding Systems (Cup Lock Type) On The Exterior Bulding/Structure, Upto 25 Metre Laight Aboveground Level, Including Additional Rous Nepped Mamer Per Requirement Of Site, Made With 40Mm Da M.S Tube, Placed 1.5 Metre Contre To Contre, Horizontal & Vertical Tubes Punt With Cup & Lock Stem With M.S.Tulso, M.S. Tube Challis, M.S Clamps And Staircase System In The Scaffolding For Working Platform Etc. And Maintaining It In An Serviceable Condition For Execution Of Work Of Cleaning And Or Pointing And/ Or Applying Chemical And Removing It Thereafter. The Scaffolding System Shall Be Stiffened With Bracings, Runners, Connecting With The Building Etc, Wherever Required, If Feasible, For Inspection Of Work At Required Locations With Sential Safety Features For The Workmen Ve Kompletu All As Per Directions Of Site-In Charge 10 Providing Repairs To The Loose Out Of Plumbe Pinnacle/Manaret By Placing The Top Metal Portin Over The Minaret Back Is Postion Whichs Has Gut Delocated, Anchusding Welding The Same Te He Intact In Its Original Position At A Height Of About 40 M Above The Ground Level, Including Ost Of Materiale And Labours, Commeyance And Disposing The Waste Materials Away Froan The Site, Ete Complete All As Per Directions Of Charge 11 Providing Ms Steed Work For Frames Using 40X40X5 Mm Ms Angle Section And 40X5 Ms Flat And 10 Mm Sq Bars At Hem C/C Fur Frames Of Mush Door/Mesh Closure For Arches, Doors, Windows, Openings Etc. Acluding Crot F Materiak, Cutting, Bending To Requisite Shapes, As Per The Drawing Enclosed The Frame To Be Fixed Without Causing Any Damage To The Including Cutting, Welding Fabrication, Fixing, Installing, Conveyance Lifting, Cost Of All Materials And Labour Charges Etc Complete All As Per The Directions Of Site-Incharge 12 Providing And Fixing Angle Iron Frames For Doors Windows And Ventilators Of Mild Stoel Angle Sections Of 35X35X5 Mm, Joints Metired And Welded By Angle Trom 35X35X5Mm Or 35X5 M Flat Pieces To The Existing T-Iron Frame Or To The Wall As Per The Drawings Enclosed With Dashe Fastener, Mchoching Fixing Of Necessary Batt Hinges And Wrews, Including Cutting, Welding Fabrication, Focing, Installing, Conveyance Fiftung, Cost Of All Materials And Labour Charges, Te Complete All As Per Specifications And Directions Of Site-In Charge 13 Providing And Fixing Of Welded Steel Mesh To The Frame And Doors Of The Grills Including Cost Of Materials, Welding/ Installation Charges Etc Complete All As Per Specifications And Directions Of Site-In Charge.. 68.45 Sqm 1Sqm 14 Providing And Fixing Trap Stone Water Outlets To The Missing Portions As Per Original To Avoid Seepage Of Rainwater Through Walls, Etc Complete All As Per Specifications And Directions Of Site-In Charge 0.44 Cum 1Cum 15 Providing And Applying Painting To The Grills With Enamel Paint And Primer To Give An Even Shade Approved Brand And Manufacture Including Cost Of All Materials And Labour Charges, Etc Complete All As Per Specifications And Directions Of Site-In Charge

BOQ

Name of Work:- MC & EW (CAM) to Conservation to Madarasa Mahmud Gaawan at Bidar
Sl. No. Item Description
1Sub Heading 1
2Dismantling the damaged/rusted railing at the top of the monument (steel work) including all bolts, nuts, cutting rivets,and stacking the useful materials within 50 metres lead, including, conveyance, carrying, lifting, all labour charges etc. complete all as per the directions and specifications of the site in-charge
3Carefully removing of the dead and deteriorated lime mortar plaster of the wall, roof, ceiling,merlons, inars, etc. complete of the monument manually without causing any damage to themonument and the structure and architectural members, including cost of labours, conveyanceand disposing the waste materials away from the site, etc complete all as per directions of site-in charge.
4Carefully removing of the additional wall constructed in the arch which is not a part of theoriginal structure carefully without causing any damage to the monument and disposing the waste materials away from the site conveyance, carrying, lifting, all labour charges etc complete all as per the directions of the site charge..
5Providing and applying of Lime Mortar plaster for the walls, ceiling, minars, etc complete of the monument, matching the original in three coats with rough coat of 20mm thickness, in 1:2 LM and rich lime final coat of 5mm thickness in 1:1.5 Lime mortar and pure lime coat/ lime punning including the cost of materials , labour, adding traditional materials such as gallnut, jaggery etc., including cost of all materials and labours, conveyance, carrying, lifting, preparation of lime mortar, stacking the materials, scaffolding, curing, etc., complete all as per the directions of the site in charge.
6Providing and applying of Lime Mortar plaster for the roof, merlons, etc. complete of the monument, matching the original in 2 coats with rough coat of 20mm thickness, in 1:2 LM and rich lime final coat of 5mm thickness in 1:1.5 Lime mortar including the cost of materials , labour, adding traditional materials such as gallnut, jaggery etc., including cost of all materials and labours,conveyance, carrying, lifting, preparation of lime mortar, stacking the materials, scaffolding, curing, etc., complete all as per the directions of the site in charge.
7Raking out the joints of stone masonry surface carefully to the required width and depth, with due care and precaution, by mechanical / manual means, including preparing and cleaning the surface for re-pointing/ refilling of joints, including disposal of rubbish to the dumping ground away from the site, including, conveyance, carrying, lifting, all labour charges etc complete all as per the directions of the site in-charge
8Pointing the walls, arches and other structural members with lime mortar 1:1.5, including cost of all materials and labours, conveyance, carrying, lifting, preparation of lime mortar, stacking the materials, scaffolding, curing, etc., complete all as per the directions of the site in charge.
9Providing and constructing by using trap stones masonry work of the missing portions as peroriginal using trap stone of average size about 0.50x 0.30 x 0.13 m to 0.20 m in lime mortar 1:1.5 including stone dressing, cutting, lifting, carrying the material to requisite height, carrying the materials manually from stock yard to work spot, curing, placing the stones by matching the stone layers with the existing stone layers, including cost of all materials and labours, conveyance, carrying, lifting, preparation of lime mortar, stacking the materials, scaffolding, curing, etc., complete all as per the directions of the site in charge.
10Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, aboveground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S.Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc complete all as per directions of site-in charge
11Providing repairs to the loose/out of plumb pinnacle/minaret by placing the top metal portion over the minaret back in position which has got dislocated, including welding the same to be intact in its original position at a height of about 40 m above the ground level, including cost of materials and labours, conveyance and disposing the waste materials away from the site, etc complete all as per directions of site-in charge
12Providing MS steel work for frames using 40X40X5 mm MS angle section and 40X5 mmMS flat and 10 mm Sq bars at 10cm c/c for frames of mesh door/mesh closure for arches, doors, windows, openings etc. including cost of materials, cutting, bending to requisite shapes, The frame to be fixed without causing any damage to the monument, including cutting, welding, fabrication, fixing, installing, conveyance, lifting, cost of all materials and labour charges, etc complete all as per the directions of site-incharge
13Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws, including cutting, welding, fabrication, fixing, installing, conveyance, lifting, cost of all materials and labour charges, etc complete all as per specifications and directions of site-in charge
14providing and fixing of welded steel mesh tothe frame and doors of the grills including cost of materials, welding/ installation charges etc complete all as per specifications and directions of site-in charge.
15providing and fixing trap stone water outletsto the missing portions as per original to avoid seepage of rainwater through walls, etc complete all as per specifications and directions of site-in charge
16providing and applying painting to the grillswith enamel paint and primer to give an even shade approved brand and manufacture including cost of all materials and labour charges, etc complete all as per specifications and directions of site-in charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57765109
AUTHORITY Government Departments
TENDER VALUE 49.26 Lakhs
LAST DATE 20-10-2026
Authority
Authority Name Archaeological Survey Of India
Work Description Tender For Mc & Ew (Cam) To Conservation To Madarasa Mahmud Gaawan At Bidar-1 Dismantling The Damaged/Rusted Railing At The Top Of The Monument (Steel Work) Including All Bolts, Nuts, Cutting Rivets, And Stacking The Useful Materials Within 50 Metres Lead, Including, Conveyance, Carrying, Lifting, All Labour Charges Etc. Complete All As Per The Directions Of The Site In-Charge 2 3 Carefully Removing Of The Dead And Deteriorated Lime Mortar Plaster Of The Wall, Roof, Ceiling, Merlons, Inars, Etc. Complete Of The Monument Manually Without Causing Any Damage To The Monument And The Structure And Architectural Members, Including Cost Of Labours, Conveyance And Disposing The Waste Materials Away From The Site, Etc Complete All As Per Directions Of Site-In Charge. Carefully Removing Of The Additional Wall Constructed In The Arch Which Is Not A Part Of The Original Structure Carefully Without Causing Any Damage To The Monument And Disposing The Waste Materials Away From The Site Conveyance, Carrying, Lifting, All Labour Charges Etc Complete All As Per The Directions Of The Site Charge... 4 5 6 Providing And Applying Of Lane Mortar Plaster For The Walls, Ceiling, Minars, Etc Complete Co The Monument, Matching The Original In Three Kats With Rough Coat Of 20Mm Thick, In 1:2 Lm And Rich Lime Fatal Sat Of 5Mm Thickness M 1:1.5 Lime Mortar And Pure Lame Coat/ Lime Punning Including The Cost Of Materials, Labnur, Adding Traditional Materials Such As Gallest, Jaggery Etc., Including Cost Of All Materials And Labours, Conveyance, Carrying, Ling Preparation Of Lame Mortar, Stacking The Materiak, Scaffolding, Curing, Etc., Complete All As Per The Directions Of The Site In Charge. Providing And Applying Of Lime Mortar Plaster For The Roof, Merions, Etc. Complete Of The Monument, Matching The Original In 2 Couts With Rough Coat Of 20Mm Thickness, In 1:2 Lm And Rich Lime Final Coat Of 5Mm Thickness In 1:1.5 Lime Mortar Mcluding The Cost Of Materials Jabour, Adding Traditional Materials S Gallnut, Jaggery Ste, Mcluding Cost Of All Materials And Labours, Coyance, Carryng Lifting, Preparation Of Lime Mortar, Stacking The Materials, Scaffolding, Curing, Etc., Complete All As Per The Directions Of The Site In Charge. Raking Out The Joints Of Stone Masonry Surfac Carefully To The Reqared Walth And Depth, With Due Care And Precaution, By Mechanical Manual Means, Muhaling Preparing And Cleaning The Surface For Re-Pontung/ Refilling Of Mchuding Disposal Of Rubbish To The Dumping Grund Away From The Site, Nechoding Conveyance, Carrying, Lifting, All Labour Charges Te Complete All As Per The Directions Of The Situ In-Charge. Pointing The Walls, Arches And Other Structural Members With Lime Mortar 1:1.5, Includang Of All Materials And Labours, Conveyance Carrying, Lifting, Preparation Of Lane Mortar, Stacking The Materials, Scaffolding, Curing, S Complete All As Per The Directans Of The Site In Charge. Providing And Constructing By Using Trap Stone Mannry Work Of The Missing Portions As Per Original Using Trap Stone Of Average Sab 0.50 0.30 X 0.13 M To 0.20 M In Lime Mortar 1:1.5 Including Stone Dresing, Cutting, Lifung Carrying The Material To Requisite Height, Carrying The Materials Mamully From Stock Yard Work Spest, Curing, Placing The Stones By Matching The Stone Layers With The Existing Stone Layers, Ncluding Cost Of All Materials And Labours, Conveyaux, Carrying, Lifting Preparation Of Lame Mortar, Stacking The Materials, Scaffolding, Curing, Etc., Complete All As Per The Directions Of The Site In Charge. Providing And Fixing Double Scaffolding Systems (Cup Lock Type) On The Exterior Bulding/Structure, Upto 25 Metre Laight Aboveground Level, Including Additional Rous Nepped Mamer Per Requirement Of Site, Made With 40Mm Da M.S Tube, Placed 1.5 Metre Contre To Contre, Horizontal & Vertical Tubes Punt With Cup & Lock Stem With M.S.Tulso, M.S. Tube Challis, M.S Clamps And Staircase System In The Scaffolding For Working Platform Etc. And Maintaining It In An Serviceable Condition For Execution Of Work Of Cleaning And Or Pointing And/ Or Applying Chemical And Removing It Thereafter. The Scaffolding System Shall Be Stiffened With Bracings, Runners, Connecting With The Building Etc, Wherever Required, If Feasible, For Inspection Of Work At Required Locations With Sential Safety Features For The Workmen Ve Kompletu All As Per Directions Of Site-In Charge 10 Providing Repairs To The Loose Out Of Plumbe Pinnacle/Manaret By Placing The Top Metal Portin Over The Minaret Back Is Postion Whichs Has Gut Delocated, Anchusding Welding The Same Te He Intact In Its Original Position At A Height Of About 40 M Above The Ground Level, Including Ost Of Materiale And Labours, Commeyance And Disposing The Waste Materials Away Froan The Site, Ete Complete All As Per Directions Of Charge 11 Providing Ms Steed Work For Frames Using 40X40X5 Mm Ms Angle Section And 40X5 Ms Flat And 10 Mm Sq Bars At Hem C/C Fur Frames Of Mush Door/Mesh Closure For Arches, Doors, Windows, Openings Etc. Acluding Crot F Materiak, Cutting, Bending To Requisite Shapes, As Per The Drawing Enclosed The Frame To Be Fixed Without Causing Any Damage To The Including Cutting, Welding Fabrication, Fixing, Installing, Conveyance Lifting, Cost Of All Materials And Labour Charges Etc Complete All As Per The Directions Of Site-Incharge 12 Providing And Fixing Angle Iron Frames For Doors Windows And Ventilators Of Mild Stoel Angle Sections Of 35X35X5 Mm, Joints Metired And Welded By Angle Trom 35X35X5Mm Or 35X5 M Flat Pieces To The Existing T-Iron Frame Or To The Wall As Per The Drawings Enclosed With Dashe Fastener, Mchoching Fixing Of Necessary Batt Hinges And Wrews, Including Cutting, Welding Fabrication, Focing, Installing, Conveyance Fiftung, Cost Of All Materials And Labour Charges, Te Complete All As Per Specifications And Directions Of Site-In Charge 13 Providing And Fixing Of Welded Steel Mesh To The Frame And Doors Of The Grills Including Cost Of Materials, Welding/ Installation Charges Etc Complete All As Per Specifications And Directions Of Site-In Charge.. 68.45 Sqm 1Sqm 14 Providing And Fixing Trap Stone Water Outlets To The Missing Portions As Per Original To Avoid Seepage Of Rainwater Through Walls, Etc Complete All As Per Specifications And Directions Of Site-In Charge 0.44 Cum 1Cum 15 Providing And Applying Painting To The Grills With Enamel Paint And Primer To Give An Even Shade Approved Brand And Manufacture Including Cost Of All Materials And Labour Charges, Etc Complete All As Per Specifications And Directions Of Site-In Charge
Basic Detail
Tender No Sout/Hamp/Bida/4Ma/23418587
Bidding Type Tender
Location
City Bidar
State Karnataka
Key Dates
Publish Date 28 Sep 2026
Submission Date 20 Oct 2026
Open Date 21 Oct 2026
Finance
Tender Value 49.26 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
BOQ_975236.xls
dc2661b8-c734-41bc-815a-a45fa7885534.html
Madarasanit.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Oct 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_975236.xls

html

dc2661b8-c734-41bc-815a-a45fa7885534.html

pdf

Madarasanit.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders