Tender For Repair Work Of Hydrographic Survey Wing Vessel Mv Jalasarveshak Belongs To Office Of Marine Surveyor, Kollam
Tender Value
16.98 Lakhs
Estimated cost
Bid Submission
17 Oct 2026
11 days left
EMD
16982
Bank guarantee accepted
Document Fee
2500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kollam → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair Work Of Hydrographic Survey Wing Vessel Mv Jalasarveshak Belongs To Office Of Marine Surveyor, Kollam
BOQ
| Sl. No. | Item Description |
| 1 | Hauling up and Launching |
| 2 | Hauling up of the Vessel having a GRT of 35.2 tonnes at a location as directed by the department officers. Keeping the vessel at a height of 75 CM above the ground level for inspection and launching the same after underwater repairs, as directed by Department Officers. |
| 3 | Dock rent (from second day onwards) of the Vessel of Tonnage 35.2 ton for keeping at a height of 75 CM above the ground level for inspection and under water repairs , as directed by department officers. |
| 4 | Berth hire charges of the Vessel of GRT 35.2 Ton for Repairs and inspection other than in Dry dock as directed by the department officers. |
| 5 | All Expense of Voyage from Ashramam wharf to Docking Yard and return. it includes cost of Diesel (LSHFHSD), store provision, arranging safe manning LSA, FFA etc as per the direction of department Officials. |
| 6 | Hull Surface Preparation |
| 7 | Removing the thickly formed oyster coating and other vegetable growth from the underwater portion of the vessel including cleaning the surface etc. complete as per the direction and satisfaction of department officers. |
| 8 | Pressure washing by using fresh water (pressure as per the marine standard) and Cleaning the hull outer surface surface area with high pressure water jet and hand scrapping, degreasing for inspection as directed by department Officers. |
| 9 | Copper slag blasting at the standard of SA 2.5 as per IS:8501-1 for the resistance of corrosion on outer portion of the vessel as per the direction of department officers |
| 10 | Steel Work and Anode Fixing |
| 11 | Gauging the thickness of the plates, beam, frame, etc., at different portions of the vessel using an ultrasonic thickness gauge after chipping and scraping/ Copper slag blasting and filing the surface to about 50 mm dia and pasting grease/oil over it as per the direction of Department officers, and steel replacement markings have to be submitted along with the gauging report. ( The work must be completed using a class-approved agency) |
| 12 | Supplying and welding with new various thickness ms plate of IS:2062 GR B quality/ ms angle/ ms flat/ms rod/ beam/ gazette of existing size and shape to the various portions (such as Hull, Deck, Ladder,hatches, chimney, mast, Louvers etc.) on the vessel's by cutting and removing the old damaged,weakened, severely damaged various thickness ms plate/ms flat/ms angles/ms rods/ beams/ girders etc.as per Surveyor instructions/ marked by dept officers in various places of the vessel withoutdamaging any other portion/ structures/ member on the vessel, after heating and bending into shape, Vcut on the matting edge of the plate and welding three layer on both sides together. The rate including the cost of materials, welding charges, tools, plants, scaffolding, other incidental expenses etc. complete as per the direction of Department officers. |
| 13 | Supplying and fitting by welding zinc anode weight 2.5 kg (excluding the weight of bracket) with bracket on the underwater portion of the hull without any damage etc. complete as per the direction of the department offices. (Material test Certificates to be provided ) |
| 14 | Painting Works |
| 15 | Repainting the Plimsoll mark, draught marks, bulbous bow marks, fore and aft, per mark number,vessel's name and port of Registry including staging per letter by Supplying and painting with approved (quality of entire quantity of marine synthetic enamel supply should be get inspected and approved by engineer, who is incharge of work/ department authority before starting / continuation of the painting work) marine synthetic enamel paint white or other approved colour two coats as per the direction and satisfaction of department officers. |
| 16 | Underwater hull area painting by supplying and applying a holding primer (200 microns Dry Film Thickness - DFT) over all chipped and surface-prepared areas. This is to be followed by two coats of anti-corrosive paint (150 microns DFT per coat, totalling 300 microns), one coat of tie coat (100 microns DFT), and a final application of anti-fouling paint (300 microns DFT). All paints must be of approved, premium-quality marine alkyd types from renowned manufacturers (such as International, Hempel, Jotun, etc.). The quality and DFT of each layer must be verified and certified in the presence of the paint manufacturers representative and the department officials in charge before the commencement or continuation of subsequent coats. All works are to be completed as per the directions of the departmental officers. |
| 17 | Above water hull area painting by supplying and applying a holding primer (200 microns Dry Film Thickness - DFT) over all chipped and surface-prepared areas. This is to be followed by two coats of anti-corrosive paint (150 microns DFT per coat, totalling 300 microns), and a final application of one coat of tie coat (100 microns DFT). All paints must be of approved, premium-quality marine alkyd types from renowned manufacturers (such as International, Hempel, Jotun, etc.). The quality and DFT of each layer must be verified and certified in the presence of the paint manufacturers representative and the department officials in charge before the commencement or continuation of subsequent coats. All works are to be completed as per the directions of the Department officers. |
| 18 | Engine room (including bilge, pipe lines and machineries base), Rudder room and internal hull surfaces areas painting by supplying and applying a holding primer (200 microns Dry Film Thickness - DFT) over all chipped and surfaceprepared areas. This is to be followed by the application of marine alkyd finish paint in approved colours (such as Deck Green, White, Grey, or Orange) at a minimum thickness of 200 microns DFT. All paints must be of approved, premium-quality marine alkyd types from renowned manufacturers (such as International, Hempel, Jotun, etc.). The quality and DFT of each layer must be verified and certified in the presence of the paint manufacturers representative and the department officials in charge before the commencement or continuation of the work. All works are to be completed as per the directions of the department officers. |
| 19 | Supplying and painting with approved best quality (marine) Alkyd primer (International / Hempel / Jotun,etc) (quality of entire quantity of primer supply should be get inspected and approved by engineer, who is in-charge of work / department authority before starting / continuation of the painting work) two coats over all chipped surface after cleaning the surface etc. complete as per the direction of department officers |
| 20 | Pipeline Works |
| 21 | Check all the pipelines in the engine room of size such as 50 and 40mm, including the Sea water cooling line, fuel and oil line, replace the damaged pipe line if any with ISI marked new MS SCH40 Pipe of existing size and good quality, make the pipelines free from air for the smooth flow of sea water, bilging etc. also conduct a pressure test for the pipes, complete as directed by the Department officers. ( The cost includes the flange, Bend, Gasket, Nut and Bolts etc. |
| 22 | Dismantling the existing Main Engines exhaust pipeline from the engine and replacing the line using 100 mm (4 Inch) nominal diameter MS SCH 40 pipes, aligning and rigidly fixing the assembly in position using suitable nuts, bolts, and gaskets, and providing proper thermal insulation (lagging) over the pipeline using suitable heat-resisting sheets/materials; all works completed as per the site requirements, direction, and satisfaction of the Department Officers. (The rate includes the cost of all required materials, labour, fabrication, tools, and plant). |
| 23 | All Sea chests shall be inspected. The grids shall be dismantled, cleaned and refitted after replacing damaged nuts, bolts and filters as per the requirements and to the satisfaction of the departmnet. This rate shall include the cost of MS/Brass bolts and nuts, as well as brass netting.If any strainers are to be replaced, the contractor shall procure the items from an authorised dealer and submit original dealer invoices along with the contractor's bill for reimbursement. In addition, 15% of the cost of spares shall be admissible towards overhead and handling chargesfor procurement and arrangement of materials. These procured as well as replaced items should get inspected by the Engineer who is in charge of the work, and the un-serviceable / old items should be returned to department for realisation of payment. |
| 24 | Other Works |
| 25 | The following Electrical System Inspection to be carried out and operation to be demonstrated to the satisfaction of department officers.1. Switch Boards & Fittings.2. Emerg. Source Of Power & Associated Equipment. 3.Navigation Lights, Indicators.4. Cables/Expansion Boxes/Fittings.5. Circuit breakers.6. Exhaust fan7. Motor/S, Control/S & Starter/S.8. Meggar test of electrical equipment as required department officials.9. check all the batteries such as GMDSS, Main Engines, Generators etc.(The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un-serviceable / old items should be returned to dept for realization of payment)\\" |
| 26 | Transferring fuel from the Centre Fuel Oil Storage tank and service tank to a clean container (to be arranged by the contractor); cleaning and gas-freeing the tanks, removing drain plugs for inspection, and refitting them back; carrying out inspection and testing (including pressure testing) of the Centre Fuel Oil Storage tank as per the direction of department officials, and submitting the inspection report; and transferring the fuel back into the tank upon successful completion and clearance. |
| 27 | Carrying out inspection and servicing of the Windlass, including tightening the foundation, removing corrosion, and applying primer and paint on the surface as per marine standards; testing brake lining and pads, and conducting a brake holding test as per the direction of department officials; dismantling the anchor along with the chain from the vessel, freeing and greasing the anchor stem, chipping and scraping the chain to remove corrosion, performing chain gauging and calibration, and applying grease to the chain, all completed to the satisfaction of the department. |
| 28 | Supply and install Various gaugesof existing type and rating by replacing defective old ones as per the direction of department officials.(The contractor should procure the defected items from the authorized dealer and submit the original dealer bill along with the contractor bill for its reimbursement.15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work and the un-serviceable / old items should be returned to dept for realization of payment). |
| 29 | Rudder bush inspection and renewal if required as per requirement. Rudder inspection, lower bush clearance check and associated works as per requirements. Rudder Lower bush to be removed if found damaged then New pintle bush to be supplied, machined to size and refitted back, Rudder stock removal and replacement for purposes of inspection of bearings and fitted parts as per the direction of department officials and as per the approved drawing. (The contractor should procure the defective items (Pintle bush, bearing etc.) from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is in charge of the work, and the un-serviceable / old items should be returned to the department for realisation of payment) |
| 30 | Propeller removal, tail shaft withdrawal and trueness checking wear down measurement, Crack Detection of Screw Shaft Cone, propeller pitch corrcetion, Propeller polishing, propeller balancing and all other requirements. Stern bush Jobs, Stern tube seal inspection and renewal if required as per the direction of department officials. Defective parts to be replaced as per the approved drawing. All items to be refitted as per existing design. (The contractor should procure the defective items(Cutlass bush) from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is in charge of the work, and the un-serviceable / old items should be returned to the department for realisation of payment) |
| 31 | Inspection of all navigational and communication equipments ( GPS, echo sounder, Compass, VHF, etc..) as per the direction of departmnet officers. (The contractor should repair the defective items and submit the bill or procure the defective items from the authorized dealer and submit the original dealer bill along with the contractor bill for reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Officer In charge who is the charge of the work and the un-serviceable / old items should be returned to dept for the realization of payment) |
| 32 | Removing the main engine attached heat exchanger from its position without causing any damage to the existing systems, thoroughly cleaning the heat exchanger using approved chemicals or suitable cleaning liquids, checking the tubes for any internal/external damages, properly assembling and refitting it back into position using suitable new gaskets and jointing materials, testing for leaks, and completing the work as per the direction and full satisfaction of the department officers. |
| 33 | Checking the performance of the existing fresh water pressure pump (Make: Aldoux, Model: FW 2845-24, Open Flow: 13.0 LPM, Max Pressure: 40 PSI / 2.8 Bar) including verifying its discharge flow, pressure cut-off mechanism, and identifying any underlying faults; executing necessary repairs to restore the pump to fully operational condition, or completely replacing it with a brand-new pump of identical technical specifications in case it is found beyond economical repair, all works completed as per the site conditions, technical requirements, direction, and full satisfaction of the Department Officers. (The contractor should procure the defective items from theauthorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is in charge of the work, and the un serviceable / old items should be returned to the department for realisation of payment) |
| 34 | Supplying, fabricating, and installing 1.25 inch diameter GI B-Class pipe handrails by welding, strictly conforming to the original design, alignment, line, and level, including removing the existing damaged handrails as per the direction and full satisfaction of department officials. |
| 35 | Check all the plumbing pipelines, water taps, closet, etc., inside the vessel for trouble-free operation, repair and replace the damaged items as per the direction and satisfaction of the department officers. (The contractor should procure the defective items from the authorised dealer and submit the original dealer bill along with the contractor bill for its reimbursement. 15% of the cost of spares will be paid to the contractor as overhead charges for arranging these items. These procured as well as the replaced items should get inspected by the Engineer who is the in-charge of the work, and the unserviceable/old items should be returned to the department. for the realisation of payment) |
| 36 | Removing the existing vinyl mat from the bathroom, Providing and laying vitrified floor tiles of approved make, in different sizes (thickness as specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622. The tiles are to be laid in all colours and shades over a 20 mm thick base of cement mortar 1:4 (1 cement: 4 coarse sand), including grouting the joints with epoxy grout, finishing, and cleaning, all completed as per the directions and satisfaction of the Department officers. |
| 37 | Inspecting the hydraulic steering system for proper operation and eliminating oil leakages, if any, by replacing the hydraulic cylinder oil seals; changing the steering oil and oil filters to make the system fully functional; repairing the rudder angle indicator sensor or replacing the sensor assembly with its attachments if found beyond repair, all completed in accordance with the directions and full satisfaction of the department officials.(The contractor shall procure all necessary replacement items from the OEM or an authorised dealer and submit original dealer invoices with their bill for reimbursement. A 15% overhead charge on the cost of spares will be paid to the contractor for arranging these items. Both the newly procured items and the replaced parts must be inspected by the Engineer-in-Charge, and all old, unserviceable items must be returned to the department for the realisation of payment.) |
| 38 | Inspecting the existing foundation framework and anti-vibration dampers/mountings of the auxiliary diesel generator onboard the tugboat to assess structural alignment, secure tightness, and vibration performance; removing and replacing defective, worn-out, or deteriorated dampers with brand-new marine-grade dampers of matching technical specifications, type, and load capacity to eliminate excessive structural vibration; repairing, realigning, and making good the structural steel foundation bed to proper service condition, including checking and tightening foundation holding-down bolts, surface preparation, and touch-up priming/painting as required; testing the diesel generator under load conditions for trouble-free, stable, and vibration-isolated operation, all works completed as per site conditions, technical requirements, and to the complete direction and satisfaction of the Department Officers. (The contractor shall procure necessary replacement items/dampers from the OEM or an authorized dealer and submit original dealer invoices with their bill for reimbursement. A 15% overhead charge on the cost of spares will be paid to the contractor for arranging these items. Both the newly procured items and the replaced parts must be inspected by the Engineer-in-Charge, and all old, unserviceable items must be returned to the department for the realization of payment.) |
| 39 | Thorough inspection and servicing of the existing wheelhouse Air Conditioner (Make: Azure Smart ,Model: AIU1800AZ028, Cooling Capacity: 1.5 TR). The scope includes deep chemical cleaning of condenser and evaporator coils, flushing the drain system, checking electrical contactors/controls, and topping up the refrigerant to restore optimum cooling efficiency as per the direction and satisfaction of the department officers. |
| 40 | Removing the existing damaged, manual rotary hand-operated forepeak bilge suction pump from its position onboard the vessel without causing any damage to the connected pipelines and surrounding structural bulkheads; supplying, installing, and alignment-checking a brand-new manual rotary hand-operated bilge suction pump strictly conforming to the existing dimensions, nominal bore (25 NB), and technical specifications as per the approved vessel drawing; ensuring robust structural mounting, renewing all associated flanges, gaskets, fasteners, and connecting suction/delivery pipe joints to prevent any air or fluid leakage; testing the pump assembly for smooth manual operation, proper priming, and effective bilge suction performance, all works completed as per marine engineering standards, site conditions, and to the complete direction and satisfaction of the Department Officers. |
| 41 | Removing the existing damaged, corroded M.S. (Mild Steel) safety chains provided at the handrails gap (door/boarding area) onboard the vessel without causing any damage to the existing structural handrail pillars; supplying, fabricating, and fitting brand-new marine-grade S.S. (Stainless Steel) 4 mm x 36.4 mm x 16.9 chains arranged in three parallel horizontal rows, with each row having a clear length of 0.9 metres; providing and securing suitable heavy-duty S.S. hooks, snap shackles, eye pads, and all necessary structural attachments at both ends to ensure robust tensioning and quick-release capability; providing slack chain support in rudders as a safety backup, properly fixed in the stern quarters with all necessary arrangements and fittings; all works completed strictly conforming to marine safety standards, proper line, level, and alignment, as per the site conditions, technical requirements, direction, and full satisfaction of the Department Officers. |
| 42 | Replacing the front crankshaft oil seal of the STB main engine (located behind the vibration damper assembly) Engine make : Ashok leyland, Model : ALM6ETI. The work involves dismantling and removing the damper pulley, unbolting and extracting the attached seal housing assembly, thoroughly cleaning the housing face and shaft surface, removing the old defective seal, supplying and safely pressing into position a brand new Ashok Leyland Genuine Part front crankshaft oil seal, renewing the necessary gaskets/packing, and boxing up the seal housing and damper pulley assembly back to operational condition, including torque tightening of fasteners as per manufacturer specifications, testing for oil tightness, and completing the entire work to the absolute direction and satisfaction of the supervising department officers. |
| 43 | Provision for the procurement of spares |
| 44 | Provision for procurement of spares for 5.003, 6.001, 6.004, 6.005, 6.006, 6.007,6.009, 6.011, 6.013,6.014 and any other |
| 45 | Unforeseen if any |
| 46 | Unforeseen if any Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 17, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysOct 19, 2026
Bid Opening Date
Technical bids will be opened and evaluated.