Tender For Conservation Of Water Bodies Of Rohini Zone.Sub- Head : Development And Upgradation Works In Waterbody Located At Kh. No. 87/4 In Village Barwala,Rohini-Delhi.
Tender Value
1.74 Crore
Estimated cost
Bid Submission
07 Oct 2026
6 days left
EMD
3.48 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Conservation Of Water Bodies Of Rohini Zone.Sub- Head : Development And Upgradation Works In Waterbody Located At Kh. No. 87/4 In Village Barwala,Rohini-Delhi.
BOQ
| Sl. No. | Item Description |
| 1 | Pumping out/De-watering of staganated water from DDA water body into near by existing drain with pumping arrangement by installing requisite nos. of pump having minimum capacity of 10 HP as per direction of Engineer-in-charge. (The rate is inclusive of cost of services of operating staff, diesel/petrol/kerosene oil, lubricating oil, providing & fixing discharge hose pipe & foot valve hose pipe etc. required as per site condition and nothing will be paid extra). |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 15 cm measured at a height of 1 m above ground level ,if required , Providing and spraying herbicide such as Amonium Sulfamate on vegetation and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by Engineer-in-Charge. |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift upto1.5 m. (a)All kinds of soil. |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
| 5 | Taking out existing CC interlocking paver blocks from footpath, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural resources : 10 graded stone aggregate 40 mm nominal size derived from naturaL resources ) |
| 7 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. |
| 8 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. |
| 9 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: (a)Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 11 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : (a)In cement mortar |
| 12 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with : (a)Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 13 | Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at window sills, ceiling level and the like. (a)Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 14 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift. |
| 15 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. |
| 16 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade. |
| 17 | 12 mm cement plaster of mix : (a)1:4 (1 cement: 4 coarse sand) |
| 18 | 15 mm cement plaster on rough side of single or half brick wall of mix : (a)1:4 (1 cement: 4 coarse sand) |
| 19 | Neat cement punning |
| 20 | Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) : Raised and cut pointing |
| 21 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : (a)1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 22 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. |
| 23 | Centering and shuttering including strutting, propping etc. and removal of form work for : (a)Columns, piers, abutments, pillars, posts and struts. |
| 24 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 25 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 26 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : (a)Two or more coats on new work. |
| 27 | Providing and fixing SFRC railing of required size of M-30 grade concrete suitably reinforced using vibro compaction process and fixed in a block of mix 1:1.5:3(1 cement:1.5 coarse sand :3 graded stone aggregate 20mm nominal size)(Cost of CC 1:1.5:3 will be paid separately. |
| 28 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm). |
| 29 | 40 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. Red sand stone |
| 30 | Disposal of broken kerb stones / brickwork/malba / similar unserviceable, dismantled or waste materials i/c C&D waste by mechanical means, including loading, transporting, unloading to nearest C&D waste plant i/c processing fee charged by the plant , beyond 50 m initial lead, for all leads including all lifts involved. |
| 31 | Note :- The payment shall be made based on the receipt obtained from C&D waste plant & nothing shall be paid extra beyond this quantity. |
| 32 | Total= (Rs.) 17190147.58 |
| 33 | Total after applying GST factor @0.973=(Rs.) 16726013.59 |
| 34 | Add Cost Index @ 4.03%= (Rs.) |
| 35 | Total= (Rs.) 17400071.94 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 07, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓
Disclaimer