Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
West Siang → Arunachal Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of 220 Kv Heo Tato-I Kaying Transmission System
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 29-Sep-2026 | Corrigendum No.01 dated 29.09.26 | Technical Bid | 12-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Total from Price Schedule A1 SUPPLY |
| 2 | Total from Price Schedule A2 Erection |
| 3 | Fabrication, Galvanising & Supply of various types of towers & its body/leg (equal & unequal) extensions (complete) excluding bolts & nuts but including stubs, hangers, D-Shackle, pack washers etc. |
| 4 | High Tensile Steel |
| 5 | Mild Steel |
| 6 | Supply of Fasteners (Bolts & Nuts) with spring washer, including Step Bolts |
| 7 | Earthing of Towers |
| 8 | Pipe type earthing including all associated materials such as charcoal, Salt, Clamps etc. |
| 9 | Counter-poise type earthing including all associated materials such as Lugs, Clamps, Bentonite (if required) etc. |
| 10 | Composite Silicon Rubber Insulator String with Hardware Fittings |
| 11 | Pilot Suspension String Set (90 kN) for Twin Bundle conductor as per requirement |
| 12 | Tension String Set (120 kN) for Twin Bundle conductor as per requirement |
| 13 | Quad String Set (120 kN) for Twin Bundle conductor as per requirement |
| 14 | Tower Accessories |
| 15 | Number Plate as per requirement |
| 16 | Danger Board as per requirement |
| 17 | Phase Plate (Set of 3) as per requirement |
| 18 | Circuit Plate (set of two) as per requirement |
| 19 | Anti-Climbing Devices as per requirement |
| 20 | Bird Guard (Set of Three) as per requirement |
| 21 | Design, Manufacture & Supply of Conductor and Accessories |
| 22 | AL59 (Moose Equivalent) conductor |
| 23 | Mid-span Compression Joint |
| 24 | Repair Sleeves |
| 25 | Insulation Sleeves |
| 26 | Vibration Dampers |
| 27 | Bundle Spacer |
| 28 | Rigid Spacer |
| 29 | Design, Manufacture & Supply of OPGW and Accessories |
| 30 | 48 Fibre OPGW |
| 31 | 24 Fibre OPGW |
| 32 | Approach Cable for 48F OPGW |
| 33 | Approach Cable for 24F OPGW |
| 34 | OPGW Tension Assy Set with JB |
| 35 | OPGW Suspension Assy Set with JB |
| 36 | OPGW Vibration Damper |
| 37 | OPGW Down lead Clamps |
| 38 | OPGW Joint Boxes 2-Way |
| 39 | OPGW Joint Boxes 3-Way |
| 40 | FODP at each location |
| 41 | FOTE panel including: 1. SDH Base Equipment & its related accessories2.Networking equipment & its related accessories 3. Networking equipment and VOIP phone4. Amplifier/Booster if required5. NMS with Hardware & accessories including license OS with PC NOTE: 1. The list of items is indicative and not exhaustive. Any other item necessary for completion of the entire scope of works shall be deemed included. |
| 42 | FOTE panel including: 1. SDH Base Equipment & its related accessories2.Networking equipment & its related accessories 3. Networking equipment and VOIP phone4. Amplifier/Booster if required5. NMS with Hardware & accessories including license OS with PC NOTE: 1. The list of items is indicative and not exhaustive. Any other item necessary for completion of the entire scope of works shall be deemed included. |
| 43 | Survey, Soil Investigation and Forest Case Preparation |
| 44 | Detailed survey including route alignment survey (preliminary), profiling, tower spotting, optimization of tower locations, soil resistivity measurement & geotechnical investigation (including special foundation locations viz. pile/well foundation locations); |
| 45 | Check Survey to locate tower locations on ground conforming to the profile and tower schedule |
| 46 | Preparation of Complete Survey Report, Geo-technical Investigation Report, Soil Resistivity Report, Complete \\"Bill of Quantities\\" and any other reports/documents as may be necessary |
| 47 | Preparation of Documents related to Right of Way (RoW) and Forest Case |
| 48 | Clearing of RoW |
| 49 | Benching and Tower Protection Works as required |
| 50 | Benching of Tower Locations as per requirement, in all kinds of soils, including supply of material and removal of soil/muck etc. |
| 51 | Random rubblestone masonry including excavation and supply of all materials (1:5 cement Mortar ratio) |
| 52 | Revetment of pack 6 inch & above stone/Boulders in heavily coated GI 4 mm dia Preformed wire mesh (Mesh size 100x100mm) |
| 53 | M 15 (1:2:4) mixed concrete for top seal cover of revetment |
| 54 | Back filling and leveling of volumes enclosed by revetment |
| 55 | Excavation in various types of soils |
| 56 | Dry Soil |
| 57 | Wet Soil |
| 58 | Dry Fissured Rock |
| 59 | Wet Fissured Rock |
| 60 | Hard Rock |
| 61 | Concreting including supply of all materials as may be required (including all associated works related to foundation not covered in excavation and reinforcement steel works) |
| 62 | M-20 Concrete (PCC) (1:1.5:3) |
| 63 | Lean Concrete (1:3:6) |
| 64 | M-25 Concrete (1:1:2) |
| 65 | M30 Design Mix Concrete |
| 66 | Reinforcement Steel |
| 67 | Installation of Reinforcement Steel including supply of materials |
| 68 | Stub Setting |
| 69 | Stub Setting including Bolts & Nuts, and all associated items |
| 70 | Erection of Double Circuit Towers |
| 71 | Erection of various types of towers & tower parts, tower extensions (complete), bolts & nuts, hangers, d-shackles, Step bolts, pack washers, earthing as required etc. Including tack welding & supply & application of zinc rich primer & enamel paint and installation of all tower accessories. |
| 72 | Installation and Stringing of Conductors |
| 73 | Installation and Stringing of Twin Bundled Al-59 Conductor in Double Circuit Towers for all three phases including Installation of Insulator Strings complete with Arcing Horns and necessary hardware and fixing of all conductor accessories |
| 74 | Installation and Stringing of OPGW |
| 75 | Installation and Stringing of OPGW including Installation of required hardwares, OPSE, Approach Cable, FODP, FOTE, all Clamps, Joint boxes (2-way/3-way) and other accessories as required |
| 76 | Works Related to Aviation Signal including supply of material |
| 77 | Painting of normal tower above 45m from ground level as required |
| 78 | Obstruction light on normal tower (to be provided as per 5613) |
| 79 | 1 medium + 2 low intensity |
| 80 | 1 medium + 4 low intensity |
| 81 | Span Maker as required NOTE: 1. The list of items is indicative and not exhaustive. For Sl. No. 1, any other item required for completion of works in all aspects shall be deemed included. 2. For civil works of foundation and tower footing protection, any new/extra items required depending on survey report and site conditions shall be guided by the relevant contract clauses. Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: HOD, C&P, NEEPCO, Shillong. Name of Work: CONSTRUCTION OF 220 KV HEO TATO-I KAYING TRANSMISSION SYSTEM. Contract No: NIT No 492 Dated 28.08.2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE V (TAX Rate)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of supply as per the Bidder's GST classification Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency HSN / SAC(to be declared) GST rate (%) inclusive of GST Cess, if any(to be declared) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT including taxes and duties inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words Remarks |
| 82 | Span Maker as required NOTE: 1. The list of items is indicative and not exhaustive. For Sl. No. 1, any other item required for completion of works in all aspects shall be deemed included. 2. For civil works of foundation and tower footing protection, any new/extra items required depending on survey report and site conditions shall be guided by the relevant contract clauses. Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: HOD, C&P, NEEPCO, Shillong. Name of Work: CONSTRUCTION OF 220 KV HEO TATO-I KAYING TRANSMISSION SYSTEM. Contract No: NIT No 492 Dated 28.08.2026 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE V (TAX Rate)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description of supply as per the Bidder's GST classification Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency HSN / SAC(to be declared) GST rate (%) inclusive of GST Cess, if any(to be declared) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT including taxes and duties inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words Remarks |
| 83 | The Contract as a whole(Schedules A-1 and A-2):Composite supply of works contract service for construction of the transmission line (where so classified by the Bidder) Total in Figures(Composite supply of works contract service for construction of the transmission line (where so classified by the Bidder) 0.0 0.0 INR Zero Only Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only |
| 84 | (Schedule A-1 — Supply)Where the Bidder's classification is other than Sl. 1: goods supplied, category-wise (rows may be added) |
| 85 | (Schedule A-2 — Erection, Testing & Commissioning)Where the Bidder's classification is other than Sl. 1: services, category-wise (rows may be added) NOTES: 1. This Schedule is a declaration only. It carries no amount, and it is neither priced nor evaluated; the evaluated price remains the total of Schedules A-1 and A-2, exclusive of GST and GST Cess. 2. The classification and rate declared shall be those applicable under law as on the deadline for submission of bids, and shall form the baseline for invoicing and for the administration of any statutory variation under GCC Clause 8.4 read with Clause 9.8 (SCC entry against Clause 8.4). 3. In case of any difference between the declared classification / rate and that applicable under law, the law shall prevail; the declaration shall not confer any right to a rate. Where this Schedule is not furnished, or the classification or rate is left undeclared, it shall be presumed, in accordance with ITB Clause 33.2, that no GST or GST Cess is applicable or payable by the Employer, and no statutory variation in GST shall be paid. 4. GST and GST Cess, if applicable, shall be shown separately, by rate and amount, in every invoice; input tax credit documents shall conform to the declaration or to the law, whichever governs. 5. This Schedule shall be submitted with the Price Bid (Cover-2). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
Completed
Nov 12, 2026
18:00 IST
Corrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 42 daysNov 12, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 42 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender