Tender For Complete Rewinding Of 3 No. Air Cooled Condenser Fan Motor Released From Location No. 4 Sl.No.Nil), 6 ( Sl.No.072078) & 7 (Sl.No.071164) (Make: Abb, Capacity: 18/ 75Kw, 24/100Hp, 415V / 3 Phase, 740/1480 Rpm) And Replacement Of Drive End &
Tender Overview
Project Description
Tender for Complete Rewinding Of 3 No. Air Cooled Condenser Fan Motor Released From Location No. 4 Sl.No.Nil), 6 ( Sl.No.072078) & 7 (Sl.No.071164) (Make: Abb, Capacity: 18/ 75Kw, 24/100Hp, 415V / 3 Phase, 740/1480 Rpm) And Replacement Of Drive End & Non-Drive End Bearings With New Bearings Including Material, Labour & Transportation Charges And Painting Works At Kgtps Maruthur Note : Quoted Prices Inclusive Of Epf & Esi
BOQ
| Sl. No. | Item Description |
| 1 | Description |
| 2 | Labour charge for Rewinding of 3 Nos. defective ABB make 18/ 75KW , 3 phase , 415 V 740/1485 rpm released from Air Cooler condenser Dismantling, Cleaning , winding the stator coils , applying one coat of Insulating varnish, replacement of both driven and non driven end bearings and assembling |
| 3 | Labour charges for metal filling, Mechanizing and Repairing of worn out shaft/ Bearing seating surface on DE side and NDE side. Checking of bearing housings, providing sleeves in end cover on DE& NDE. (i.e., Cutting, welding, lathe work, Machining and Repairing work ) If it Necessary |
| 4 | Labour charges for painting with 2 coats of Motor body. |
| 5 | Material charges for standard make super enameled copper wire ( F Class ) , Class F insulation sheet for inter winding separation, Fiber glass sheet for slot insulation, Dr Beck’s Insulation varnish, Copper lead wire , silver brazing rod , Charges of End sleeves (if necessary), Cost of paint, consumables such as Fibre glass sleeve, lugs, Insulating tape, Soldering lead |
| 6 | Cost of DE Bearing 6316 C3 SKF Make IMPORTED |
| 7 | Cost of NDE bearing 6315 C3 SKF Make IMPORTED |
| 8 | To and fro transport charges from KGTPS to contractor site and back |
| 9 | Less retrieved copper value (old scrap) (for 3 Motors) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender