Tender For Nctps-I - Operation - Ca Dn. - Cwph -Unit - I - Overhauling Of Air Release Valves And Their Isolation Valves In Cwp Discharge Line Of Unit - I. Removal And Refixing Of Man Hole Covers Of Cooling Water Inlet Tunnel Near Switch Yard For Faci
Tender Overview
Project Description
Tender for Nctps-I - Operation - Ca Dn. - Cwph -Unit - I - Overhauling Of Air Release Valves And Their Isolation Valves In Cwp Discharge Line Of Unit - I. Removal And Refixing Of Man Hole Covers Of Cooling Water Inlet Tunnel Near Switch Yard For Facilitating Tunnel Works During Respective Overhaul / Shutdown Period During The Year 2026-27.
BOQ
| Sl. No. | Item Description |
| 1 | Charges for overhauling of air release valve, by dismantling of top cover plate, air release cover, air release valve assembly, wooden balls, cleaning, rectifying the defects in the released valve and balls, rectification of top cover plate, overhauling and assembling of air release valve internals in position and checking the operation |
| 2 | Charges for overhauling of isolation valve of the air release valve, by dismantling the valve flange bolts, valve internals, cleaning, overhauling and assembling the isolation valve internals and checking the operation. |
| 3 | Charges for leading, lifting and removal of man hole cover of cold water tunnel, renewal of gasket, worn out bolts and nuts, including hire charges for T & Ps. |
| 4 | Special Consumable Material Contractors scope: Bolt and Nut M16X150MM MS Full Thread with 2 Nos washers |
| 5 | Special Consumable Material Contractors scope: Bolt and Nut M16X80MM Full Thread with washer |
| 6 | Special Consumable Material Contractors scope: HT Hexagonal Bolt and Nut M24X100MM |
| 7 | Special Consumable Material Contractors scope: Ball Gasket 200NB, Neoprene Rubber Ring, Thickness:5mm |
| 8 | Special Consumable Material Contractors scope: Painting of newly erected structures with one coat of protective coating of self priming Epoxy primer and two coats of Epoxy paint using different shades after thorough scrapping with emery sheet with manual labour and as per the direction and satisfaction of the engineer in charge, the rate including the cost of scaffolding, T&P labour, lead, lift, etc., complete. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender