Tender For Running Maintenance Of The Distributary-1 Of Teesta Jaldhaka Main Canal (T.J.M.C.) At Block:- Kranti, Ps:- Mal, Dist. Jalpaiguri For The Financial Year 2026-2027. (During-Boro).
Tender Value
97686
Estimated cost
Bid Submission
06 Oct 2026
4 days left
EMD
1954
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jalpaiguri → West Bengal
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Running Maintenance Of The Distributary-1 Of Teesta Jaldhaka Main Canal (T.J.M.C.) At Block:- Kranti, Ps:- Mal, Dist. Jalpaiguri For The Financial Year 2026-2027. (During-Boro).
BOQ
| Sl. No. | Item Description |
| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. to be measured at mid length). |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (a) Where boats are not necessary. |
| 3 | Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 4 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 5 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags , (tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 6 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 7 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of, NB :- Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking.Note :Add extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned /arranged by the Department and for royalty charges on earth as per latest rate as mentioned in PWD Schedule. The royalty will be paid to the agency on production of necessary documents in support of payment made toward the royalty. During initial payment of bill a deduction as per considered rate may be made. B) Beyond 1.00 km and upto 2.00 kmNote:- For compensation for earth for land owned and arranged by Contractor add Rs. 25.00 per cum extra over rate of E/W for land owned/arranged by the Department. Royalty charge on [email protected] per cum & cesses charges @Rs. 5.30 per cum (i.e. Rs. 15.00 per 100 cft), as per Govt. notification, which will be paid on production of necessary documents in support of payment made towards the royalties & Cesses |
| 8 | Clearing and removal of water hyacinth including weeds, thick and thorny floating jungles and burning them to ashes when dry or removing them outside Government land including all leads and lifts to stack in a nearby available space complete |
| 9 | Supplying un-skilled labour for guarding & operating the various C/R and H/R gates including guarding ,watching canal banks, clearing the obstucles of channels to assure smooth flow of irrigation water related all other necessary duties as per direction of the Engineer-In-Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 29, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysOct 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender