Tender For Maintenance & Repair Of Cooling Appliances In Otm Accn Of Wac Under Ge (Af) Subroto Park
Tender Value
25 Lakhs
Estimated cost
Bid Submission
19 Oct 2026
19 days left
EMD
50000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
New Delhi → Delhi
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Maintenance & Repair Of Cooling Appliances In Otm Accn Of Wac Under Ge (Af) Subroto Park
BOQ
| Sl. No. | Item Description |
| 1 | AIR CONDITIONING Overhauling and servicing of split type ACs 1.5 Ton / 2.0 Ton capacity of any make, opening top and side covers disconnecting all electrical controls components and carry out of following tasks at different location of different establishment and testing the same after overhauling / servicing complete including the following :- (a) Inspection opening (dismantling) washing the condenser and cooling coil complete with chemical followed with pressurized water jet complete as required and cleaning with air blower and testing complete (b) Checking / examine operation of condenser, blower motor, cooling coil and checking the air circulation to ensure complete movement of working part trouble free (c) Inspection of leakage in system (cooling) and removal obstruction if any (d) Checking and correction earth continuity of electric items (e) Checking servicing thermostat and over load and other spares and test its functioning (f) Inspecting all electrical connection and remove if any defects (g) Checking servicing and greasing oiling of blower motor (h) Checking the functional of electronic remote control unit to ensure satisfactory functioning of unit complete all as specified and as directed. Note:- (a) Spare parts shall be measured and paid separately. (b) Repeated complaints of same air conditioner will not be measured again and no extra payment will be made. (c) Rate of visit against complaint deemed to be included in the rate quoted above |
| 2 | All as per item No 1 here-in-before but window type AC of capacity 1.5 TR |
| 3 | M&L re-marking of MES No on window / split type AC of any capacity and make using black paint complete all as specified and as directed by Engineer-in-charge |
| 4 | S&F in replacement of unserviceable / burnt Starting relay for 1.5 TR Window type AC and 1.5/2.0 TR Split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 5 | S&F in replacement of unserviceable / burnt Starting capacitor 100-120 mfd for compressor motor of 1.5 TR Window type AC and 1.5 TR Split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 6 | S&F in replacement of unserviceable / burnt Starting capacitor 120-150 mfd for compressor motor of 2.0 TR Split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 7 | S&F in replacement of unserviceable / burnt Running capacitor 2.5-6 mfd for condenser motor window type / Split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 8 | S&F in replacement of unserviceable / burnt Running capacitor 36-45 mfd for compressor motor of 1.5 TR Window type AC and 1.5 TR Split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 9 | S&F in replacement of unserviceable / burnt Running capacitor 45-50 mfd for compressor motor of 2.0 TR Split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 10 | S&F in replacement of unserviceable / burnt Split type AC contactor single phase 230 V of suitable capacity for Split type AC of capacity 1.5/2.0 TR of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 11 | Taking out old / burnt Thermostat switch and S&F in replacement new Thermostat switch for window type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 12 | S&F in replacement of unserviceable Propeller fan suitable for window type AC 1.5 TR, Split type AC of capacity 1.5/ 2.0 TR of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 13 | S&F in replacement of unserviceable condenser fan motor 1/5 HP 230 volts AC single phase double shaft suitable for 1.5 Ton window type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 14 | S&F in replacement of unserviceable condenser fan motor 230 volts AC single phase suitable for 1.5/2.0 Ton split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 15 | S&F in replacement of unserviceable blower motor 230 volts AC single phase suitable for 1.5/2.0 Ton split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 16 | S&F in replacement of unserviceable blower suitable for 1.5/2.0 Ton split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 17 | S&F in replacement of overload relay suitable for 1.5 Ton window type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 18 | S&F in replacement of unserviceable remote control with PC board suitable for 1.5 Ton window type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 19 | S&F in replacement of unserviceable remote control with PC board suitable for 1.5/2.0 Ton split type AC of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 20 | M&L for repair to unserviceable cordless PCB remote control unit of split type AC of Cap 1.5/2.0 TR including replacement of unserviceable spare parts and refixing connection of electrical control circuit, testing for satisfactory functioning complete all as specified and as directed by Engineer-in-charge |
| 21 | M&L for repair to unserviceable Electronic control circuit board (PCB) and S&F new electronic control circuit board PCB of outdoor unit for digital invertor fitted CFC free split type AC of capacity 1.5/2.0 TR as per existing make and model complete all as specified and as directed by Engineer-in-charge |
| 22 | Taking out old unserviceable, burnt out sealed unit compressor FOR WINDOW TYPE AC OF CAPACITY 1.5 TR by means of unscrewing foundation nut bolts disconnecting from suction & discharge side mechanically and electrically and Supply & Fixing new sealed unit compressor of approved make and capacity 230 Volt AC including transportation, brazing work, laying of extra copper tubing, pressure testing, dehydration complete all as specified and as directed by Engineer-in-charge |
| 23 | Taking out old unserviceable, burnt out sealed unit compressor FOR SPLIT TYPE AC OF CAPACITY 1.5 TR by means of unscrewing foundation nut bolts disconnecting from suction & discharge side mechanically and electrically and Supply & Fixing new sealed unit compressor of approved make and capacity 230 Volt AC including transportation, brazing work, laying of extra copper tubing, pressure testing, dehydration complete all as specified and as directed by Engineer-in-charge |
| 24 | Taking out old unserviceable, burnt out sealed unit compressor FOR SPLIT TYPE AC OF CAPACITY 2.0 TR by means of unscrewing foundation nut bolts disconnecting from suction & discharge side mechanically and electrically and Supply & Fixing new sealed unit compressor of approved make and capacity 230 Volt AC including transportation, brazing work, laying of extra copper tubing, pressure testing, dehydration complete all as specified and as directed by Engineer-in-charge |
| 25 | M&L for carrying out leakage testing of split type air conditioner of capacity 1.5/2.0 TR of existing make and type, charging dehydrated Nitrogen gas up to 280 PSI in refrigerant system for a period of 24 hours for detecting leakages and repairing of tubing by brazing / welding suitably and repeating the pressure test to obtain 100% leak proof condition in the system, charging the refrigerant gas R-22/410-A/R-32 and testing complete all as specified and directed by Engineer-in-charge |
| 26 | All as per item No 25 here-in-before but window type AC of cap 1.5 TR of existing make and type |
| 27 | Supply and laying in replacement of refrigerant line copper tubing of size 5/8\\" with clamping on wall surface or concealed with both the ends connection as in repair complete all as specified and as directed by Engineer-in-charge |
| 28 | Supply and laying in replacement of refrigerant line copper tubing of size 3/8\\" with clamping on wall surface or concealed with both the ends connection as in repair complete all as specified and as directed by Engineer-in-charge |
| 29 | Supply and laying in replacement of refrigerant line copper tubing of size 1/2\\" with clamping on wall surface or concealed with both the ends connection as in repair complete all as specified and as directed by Engineer-in-charge |
| 30 | Supply and laying in replacement of refrigerant line copper tubing of size 1/4\\" with clamping on wall surface or concealed with both the ends connection as in repair complete all as specified and as directed by Engineer-in-charge |
| 31 | Supply and fixing in replacement of foam insulation for copper tubing of size 5/8\\" complete all as specified and as directed by Engineer-in-charge |
| 32 | Supply and fixing in replacement of foam insulation for copper tubing of size 3/8\\" complete all as specified and as directed by Engineer-in-charge |
| 33 | Supply and fixing in replacement of foam insulation for copper tubing of size 1/2\\" complete all as specified and as directed by Engineer-in-charge |
| 34 | Supply and fixing in replacement of foam insulation for copper tubing of size 1/4\\" complete all as specified and as directed by Engineer-in-charge |
| 35 | S&F in replacement of unserviceable PVC insulated and PVC sheathed with stranded coper conductor (flexible) industrial cable 1100 volts conforming to IS-694 of size 2.5 sqmm 3 core complete all as specified and directed. |
| 36 | S&F in replacement of unserviceable PVC insulated and PVC round sheathed with stranded coper conductor (flexible) industrial cable 1100 volts conforming to IS-694 of size 4.0 sqmm 3 core complete all as specified and directed. |
| 37 | S&F in replacement sheet metal single pole and neutral enclosure with two pin and earth plug and socket capacity 20-32 amps complete with one No SP MCB capacity 20-32 amps complete all as specified and directed by Engineer-in-charge |
| 38 | S&F in replacement SP MCB capacity 20-32 amps complete all as specified and directed by Engineer-in-charge |
| 39 | S&F in replacement metal clad plug top 20/25 amps complete all as specified and directed by Engineer-in-charge |
| 40 | S&F in replacement metal clad socket 20/25 amps complete all as specified and directed by Engineer-in-charge |
| 41 | S&F in replacement of indoor unit for split type AC min 5 star complete with motor, blower, remote control, filters having cooling capacity 6000 K.Cal/Hr of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 42 | S&F in replacement of indoor unit for split type AC min 5 star complete with motor, blower, remote control, filters having cooling capacity 4500 K.Cal/Hr of existing make and type complete all as specified and as directed by Engineer-in-charge |
| 43 | S&F in replacement of outdoor unit for split type AC min 5 star complete of capacity 6000 K.Cal/Hr with charging valves and gas filter, condenser coil and fan motor, PCB etc suitable for invertor type Split AC 5 Star Rating without compressor complete all as specified and as directed by Engineer-in-charge |
| 44 | S&F in replacement of outdoor unit for split type AC min 5 star complete of capacity 4500 K.Cal/Hr with charging valves and gas filter, condenser coil and fan motor, PCB etc suitable for invertor type Split AC 5 Star Rating without compressor complete all as specified and as directed by Engineer-in-charge |
| 45 | S&F in replacement of body (kit) of window type AC 1.5 TR capacity min 5 star rating including body, condenser coil, cooling coil, blower motor, front grill and outer cover without compressor complete all as specified and as directed by Engineer-in-charge |
| 46 | S&F in replacement of copper cooling coil assembly suitable for 1.5 TR window type air conditioner of any make complete all as specified and as directed by Engineer-in-charge. Note: - Charging of Refrigerant gas shall be measured and paid separately. |
| 47 | S&F in replacement of condenser assembly suitable for 1.5 TR window type air conditioner of any make complete all as specified and as directed by Engineer-in-charge. Note: - Charging of Refrigerant gas shall be measured and paid separately. |
| 48 | M&L for rewinding of condenser fan motor of split type AC of capacity 1.5/2.0 TR including replacement of gun metal bushes, testing for noise free operation and refixing as its original position complete all as specified and as directed by Engineer-in-charge |
| 49 | M&L for rewinding of blower motor of split type AC of capacity 1.5/2.0 TR including replacement of gun metal bushes, testing for noise free operation and refixing as its original position complete all as specified and as directed by Engineer-in-charge |
| 50 | M&L for rewinding of blower / condenser motor of window type AC of capacity 1.5 including replacement of gun metal bushes, testing for noise free operation and refixing as its original position complete all as specified and as directed by Engineer-in-charge |
| 51 | M & L for in submain wiring with two run of 6.0 sqmm single core PVC insulated and unsheathed FRLSH cable multistranded copper conductor 1100 volts grade IS:694 marked and one run of 6.0 sqmm PVC insulated Unsheathed FRLSH cable 1100 volt grade, IS :694 marked, including drawn through PVC casing and capping /surface conduit complete ISI marked (not less than 20 mm dia on surface in ceiling with all accessories such as bend, elbows, tees etc. NOTE - 2 Runs of 6.0 Sqmm single core and one run of 6.0 sqmm single core cable (earth wire) and one run of PVC conduit will be measured as one unit. |
| 52 | M&L for Dismantling, shifting of split type AC of any make & model from one location to another location and refixing the AC with gitties/fasteners, cutting wall/concrete incl arrangement of required T&P, laying of extra insulated copper tubing, positioning of condensing unit and stand, fixing of extra pvc flexible multistranded copper conductor of size 2.5 sq mm and brazing work, leak check, dehydration and topping up of refrigerant gas upto recommended level, connection of drain pipe, making good the disturbed surface including PCC and brick work and testing the unit for satisfactory functioning complete all as specified and directed |
| 53 | Ditto - all as per item No 52 above but of window type AC including replacement of PVC sun board (PVC foam board) sheet white colour of min 3 mm thick complete |
| 54 | M&L in replacement of unserviceable Low density polyethylene pipes (LDPE) 20 mm dia of pressure rating 6 kg/cm2 fixed complete to walls, ceilings or in floors etc. including accessories, clamps and fasteners complete all as specified and as directed by Engineer-in-charge |
| 55 | M&L in replacement of PVC 1.5\\" connection pipe for water dropping point from outer of indoor unit to ground floor dropping point complete all as specified and as directed by Engineer-in-charge |
| 56 | M&L cross arms bracings supports clamps and back plates fabricated from structural steel sections including nuts bolts washers welding bending cold or hold drilled holes for bolts in any shape or size as indicated or directed and inclusive of one primer coat one under and one finished coat of paint for installation of condensing unit on the wall / ground complete all as specified and as directed by Engineer-in-charge |
| 57 | Overhauling and servicing of Air Curtain of any capacity of any make including taking down the air curtain from existing location, refixing/commissioning and testing the same after overhauling / servicing complete unit to ensure satisfactory functioning of unit complete all as specified and as directed |
| 58 | M&L in replacement of unserviceable / burnt air curtain blower motor single phase 230 V as per existing make and capacity complete all as specified and as directed. |
| 59 | M&L in replacement of unserviceable / burnt air curtain blower as per existing make and capacity complete all as specified and as directed. |
| 60 | M&L in replacement of unserviceable bearing for air curtain as per existing make and capacity complete all as specified and as directed. |
| 61 | WATER COOLER Taking down the water cooler of any capacity / make / size from site, opening side covers of water cooler and overhauling / servicing of water cooler by carrying out the following works at different location complete all as specified and directed by Engineer-in-charge (a) Inspection, taking down opening & dismantling descaling brushing cleaning of storage tanks (b) Examine water tightness of storage tank after cleaning (c) Carry out operations of stop cock, push cock, float valve etc (d) Replace washer & glands of all taps to ensure water tightness (e) Inspect over flow and remove blockage obstruction if any (f) Check and correct earth continuity of electrical items (g) Check thermostat and test its functioning (h) Inspect drain pipe and remove blockage if any (j) Check & correct all electrical wiring and its functioning (k) Testing of water coolers after repairs for satisfactory functioning complete |
| 62 | Taking out old unserviceable compressor of water cooler of capacity 40/80 to 60/120 litres any make / size and providing new company sealed compressor and connecting up suction and discharge copper pipe including extra copper tubing with brazing work, gas welding, pressure testing of leakage, leakage rectification, vacuumizing and charging of refrigerant gas R-22/ Non-CFC as applicable up to required level testing commissioning complete all as specified and as directed by Engineer-in-charge |
| 63 | Taking out old unserviceable compressor of water cooler of capacity 150/150 litres any make / size and providing new company sealed compressor and connecting up suction and discharge copper pipe including extra copper tubing with brazing work, gas welding, pressure testing of leakage, leakage rectification, vacuumizing and charging of refrigerant gas R-22/ Non-CFC as applicable up to required level testing commissioning complete all as specified and as directed by Engineer-in-charge |
| 64 | M&L in replacement of Starting capacitor 36/40/60/80 mfd for water cooler complete all as specified and as directed by Engineer-in-charge |
| 65 | M&L in replacement of Starting capacitor 80/100 mfd for water cooler complete all as specified and as directed by Engineer-in-charge |
| 66 | M&L in replacement of Starting capacitor 120/150 mfd for water cooler complete all as specified and as directed by Engineer-in-charge |
| 67 | M&L in replacement of running capacitor 10/15/20 mfd for water cooler complete all as specified and as directed by Engineer-in-charge |
| 68 | M&L in replacement of running capacitor 30/36 mfd for water cooler complete all as specified and as directed by Engineer-in-charge |
| 69 | M&L in replacement of condenser 2.5/4/6 mfd for fan motor of water cooler complete all as specified and as directed by Engineer-in-charge |
| 70 | M&L in replacement of thermostat switch for water cooler of any make and capacity complete all as specified and as directed by Engineer-in-charge |
| 71 | M&L in replacement of overload protector suitable for compressor for water cooler of any make and capacity complete all as specified and as directed by Engineer-in-charge |
| 72 | M&L in replacement of starting relay kit suitable for any make and capacity of water cooler complete all as specified and as directed by Engineer-in-charge |
| 73 | M&L in replacement of Condenser motor of 1/16 or 1/32 or 1/40 HP of water cooler complete all as specified and as directed by Engineer-in-charge |
| 74 | M&L in replacement of Condenser fan blade for 1/16 or 1/32 or 1/40 HP motor suitable for water cooler of any make and capacity complete all as specified and as directed by Engineer-in-charge |
| 75 | M&L in replacement of bib cock 15mm bore fancy type chromium plated push type screwed down scewed for iron pipe or for brass ferrule fixed in repair suitable for existing water cooler complete all as specified and as directed by Engineer-in-charge |
| 76 | M&L in replacement of electric wiring kit suitable for existing water cooler complete all as specified and as directed by Engineer-in-charge |
| 77 | S&F in replacement of copper condenser coil for water cooler of cap 40/80 Itrs as per existing model and thickness including Gl frame, brazing work, leak check and dehydration complete all as specified and as directed by Engineer-in-charge |
| 78 | S&F in replacement of copper condenser coil for water cooler of cap 60/120 Itrs as per existing model and thickness including Gl frame, brazing work, leak check and dehydration complete all as specified and as directed by Engineer-in-charge |
| 79 | S&F in replacement of copper condenser coil for water cooler of cap 150/150 Itrs as per existing model and thickness including Gl frame, brazing work, leak check and dehydration complete all as specified and as directed by Engineer-in-charge |
| 80 | S&F in replacement of PVC float valve assembly suitable for water cooler of any size / capacity non metallic PTMT symet body complete all as specified and as directed by Engineer-in-charge |
| 81 | S&F in replacement of PVC waste pipe 20/32mm dia with complete fittings suitable for water cooler of any make and capacity complete all as specified and directed. |
| 82 | M&L in replacement of receptacle water cooler tray made out of 18 gauge Gl sheet size as specified and directed by Engineer-in-charge with PVC drain pipe (not less than 2.0 mtr) and fixing in water cooler complete all as specified and as directed by Engineer-in-charge |
| 83 | Taking down repair to water cooler storage tanks removal of leakage including soldering, welding, sealing condenser motor base and arms (Stand) removed old and new 18 gauge Gl sheet and arms fitting with soldering/welding with component in workshop as per requirement complete all as specified and as directed by Engineer-in-charge |
| 84 | Disconnecting and taking out water cooler of any type any capacity and refixing the same after removal of leakage in condenser of cooling coil including flushing dehydration and charging refrigerant gas R-22/Non-CFC as applicable in the system including pressure testing, vacuumizing and extra copper tubing complete and testing the water cooler for proper functioning in workshop complete all as specified and as directed by Engineer-in-charge |
| 85 | M&L rubber gasket suitable for water cooler top cover and repair to top tank cover replacement of hinges fitting of glass wool finishing of sheet work and light closing complete all as specified and as directed by Engineer-in-charge |
| 86 | Shifting & Installation of water cooler of any make and capacity including all accessories from one location to other location of building / one building to another building and or from site to store or sub-division vice versa reconnecting electrical / water connections complete all as specified and as directed by Engineer-in-charge |
| 87 | REFRIGERATOR / DEEP FREEZER Taking down the Refrigerator / Deep freezer of any capacity / make / size from site and overhauling / servicing of refrigerator / Deep Freezer by carrying out the following works at different location complete all as specified and directed by Engineer-in-charge (a) Inspection, taking down opening & dismantling descaling brushing cleaning refrigerator / deep freezer (b) Check and correct earth continuity of electrical items (c) Check thermostat and test its functioning (d) Check & correct all electrical wiring and its functioning complete |
| 88 | M&L re-marking of MES No Refrigerator / Deep freezer of any capacity and make using black paint complete all as specified and as directed by Engineer-in-charge |
| 89 | S&F in replacement of Thermostat switch of existing capacity and make for Refrigerator / Deep Freezer including taking down old unserviceable thermostat complete all as specified and as directed by Engineer-in-charge |
| 90 | S&F in replacement of overload protection relay of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable overload protection relay complete all as specified and as directed by Engineer-in-charge |
| 91 | S&F in replacement of Defrost timer 50 HZ single phase 220-240 Volt of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable defrost timer complete all as specified and as directed by Engineer-in- charge |
| 92 | S&F in replacement of lamp with holder of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable lamp with holder complete all as specified and as directed by Engineer-in-charge |
| 93 | S&F in replacement of copper capillary tube of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable copper capillary tube complete all as specified and as directed by Engineer-in-charge |
| 94 | S&F in replacement of Freezer cabinet of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable Freezer cabinet complete all as specified and as directed by Engineer-in-charge |
| 95 | S&F in replacement of waste water tray of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable waste water tray complete all as specified and as directed by Engineer-in-charge |
| 96 | S&F in replacement of copper tube of size 1/4\\" of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable copper tube complete all as specified and as directed by Engineer-in-charge |
| 97 | S&F in replacement of Anti moist solution of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable Anti moist solution complete all as specified and as directed by Engineer-in-charge |
| 98 | S&F in replacement of Dry filter of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable Dry filter complete all as specified and as directed by Engineer-in-charge |
| 99 | S&F in replacement of Condensor coil complete including gas welding and soldering of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable Condensor coil complete all as specified and as directed by Engineer-in-charge |
| 100 | S&F in replacement of Magnetic door gasket of existing capacity and make Refrigerator / Deep Freezer including taking down old unserviceable gasket complete all as specified and as directed by Engineer-in-charge |
| 101 | Taking out unserviceable compressor (sealed unit) from from refrigerator / Deep freezer of capacity 165/175 ltrs, opening of compressor unit and replacement with new compressor as per existing make and model complete with relay and gas charging complete all as specified and as directed by Engineer-in-charge |
| 102 | Taking out unserviceable compressor (sealed unit) from from refrigerator / Deep freezer of capacity 285/300/310/340 Itrs, opening of compressor unit and replacement with new compressor as per existing make and model complete with relay and gas charging complete all as specified and as directed by Engineer-in-charge |
| 103 | Disconnecting and taking out Refrigerator / Deep freezer of any type any capacity and refixing the same after removal of leakage in condenser of cooling coil including flushing dehydration and charging refrigerant gas R-22/Non-CFC as applicable in the system including pressure testing, vacuumizing and extra copper tubing complete and testing the Refrigerator / Deep freezer for proper functioning in workshop complete all as specified and as directed by Engineer-in-charge |
| 104 | DESERT COOLER Taking down the desert cooler of any size comprising of following task at different location complete all as specified and directed by Engineer-in-charge (a) Disconnecting of electric supply and taking down desert cooler from existing location and refixing after overhauling servicing with greasing oiling complete (b) Descaling brushing cleaning of bottom tank (c) Examine water leaking of storage tank after cleaning and servicing (d) Check & Examine all items i.e Fan motor, pump, regulator, fan blades rectify defects of minor nature (e) Testing of desert cooler after repair / servicing and fixing position complete. |
| 105 | Painting to desert coolers at site or site of work with two coats of synthetic enamelled greay paint on extarnal surfaces, two coats of black anti corrosive paint on internal surfaces by spray painting machine including shutter, top, bottom and re- marking of MES No using black paint complete all as specified and as directed by Engineer-in-charge |
| 106 | S&F in replacement of Electric motor for fan 18\\" / 20\\" sweep, single phase 3 speed 100% water resistance, 100% dust proof withstand, voltage fluctuation 170 V - 270 V, rust proof totally enclosed with double ball bearing 900-1400 RPM, electric connection with copper cable of appropriate gauge including dismantling of unserviceable electric motor complete all as specified and as directed by Engineer-in-charge |
| 107 | Taking down including rewinding of electrical fan motor kit single phase 230 Volt 900-1400 RPM for 300 CuM/Hr to 5000 Cum/Hr capacity as required at site with super enamelled copper winding wire complete all as specified and as directed by Engineer-in-charge |
| 108 | S&F in replacement of 15mm dia PVC pipe for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 109 | S&F in replacement of PVC distributor with one inlet and three outlet heavy duty complete all as specified and as directed by Engineer-in-charge |
| 110 | S&F in replacement of PVC elbow 15mm size heavy duty complete all as specified and as directed by Engineer-in-charge |
| 111 | S&F in replacement of PVC/MS blade heavy duty of existing size complete all as specified and as directed by Engineer-in-charge |
| 112 | S&F in replacement of Mild steel bracket for cooler fan of existing size complete all as specified and as directed by Engineer-in-charge |
| 113 | S&F in replacement of capacitor of 3.15 to 4.0 mfd complete all as specified and as directed by Engineer-in-charge |
| 114 | S&F in replacement of three speed electronic regulator for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 115 | S&F in replacement of knob for selector switch for pump for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 116 | S&F in replacement of Plug top 3 pin 5 amps for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 117 | S&F in replacement of Plug top 3 pin 15 amps for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 118 | S&F in replacement of new submersible pump 1/25 HP 230 Volt 50 C/S single phase of ISI Marked suitable for desert cooler of cap 3000 CuM/Hr to 5000 CuM/Hr complete all as specified and as directed by Engineer-in-charge |
| 119 | S&F in replacement of wood wool pad (set of 03 Nos) heavy duty weight not less than 750 gm suitable for desert cooler of cap 3000 CuM/Hr to 5000 CuM/Hr complete all as specified and as directed by Engineer-in-charge |
| 120 | S&F in replacement of front grill steel frame (Metallic) of best quality suitable size and capacity for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 121 | S&F in replacement of wire mesh (set of three) powder coated for fixing wood wool pads complete all as specified and as directed by Engineer-in-charge |
| 122 | S&F in replacement of side shutter steel frame (set of three) suitable size and capacity for desert cooler complete all as specified and as directed by Engineer-in-charge |
| 123 | Shifting & Installation of Desert cooler of any capacity including all accessories from one location to other location of building / one building to another building and or from site to store or sub-division vice versa refixing, reconnecting electrical / water connections complete all as specified and as directed by Engineer-in-charge |
| 124 | Supply and fixing in replacement of Gl tubing medium grade 15mm dia with all fittings complete laid on walls / on ceiling / roof etc incl necessary suitable size of MS clamps / saddling on walls / ceiling etc complete all as specified and as directed by Engineer-in-charge |
| 125 | Supply and fixing in replacement gun metal globe or gate valve with iron wheel head screwed both ends for iron pipe 15mm dia complete all as specified and as directed by Engineer-in-charge. |
| 126 | S&F in replacement PVC connection PIPE for 15mm dia 45 CM LONG complete with two Nos brass unions heavy duty complete all as specified and as directed by Engineer-in-charge. Make- Havells |
| 127 | M & L PVC sun board sheet 3 mmt hick including complete fitting / railing in the window as required for desert cooler complete all as specified and as directed. |
| 128 | Taking out rusted & leaking desert coolers from site/ store dismantling removing old body accessories supply & fixing body for desert cooler in replacement of 3000 Cum/Hr to 5000 Cum/Hr capacity made out of GI sheet 20 SWG including refixing of impeller fan blade motor stands nuts and bolts and refixing pump fan motor assembly compete all as specified and as directed by Engineer-in-change Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 19, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysOct 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 22 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender