Tender For Permanent Restoration For Steel Foot Bridge Guntrian,Tehsil Haveli,District Poonch (Under Ut Capex Bridge Sector)Aaa-Superintending Engineer Pwd(R&B) Circle Poonch Vide Order No 24 Of 2025-26,Dated 15-01-2026
Tender Value
50 Lakhs
Estimated cost
Bid Submission
08 Oct 2026
9 days left
EMD
1 Lakhs
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Poonch → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Permanent Restoration For Steel Foot Bridge Guntrian,Tehsil Haveli,District Poonch (Under Ut Capex Bridge Sector)Aaa-Superintending Engineer Pwd(R&B) Circle Poonch Vide Order No 24 Of 2025-26,Dated 15-01-2026
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 3 | Extra rates for quantities of works executed :In or under water and/ or liquid mud, including pumping out water( For De-Watering) as required . |
| 4 | Provision for construction of the abutment shall be made strictly as per the structural design and drawings prepared by the authorized structural designer and duly vetted by the competent authority, taking into consideration the site conditions, design loads, soil parameters and all relevant stability requirements |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering . All work up to plinth level with :1:5:10 ( 1 cement :5 coarse sand :10 graded stone aggregate 40 mm nominal size ) |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering .All work up to plinth level with :1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills,fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). |
| 8 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone.Nallah |
| 9 | Reinforced cement concrete work in walls (any thickness) including attached pilasters,buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 11 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering,finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 12 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 13 | Foundations, footings, bases of columns etc. for mass concrete. |
| 14 | Walls (any thickness) including attached pilasters,buttreses,plinth and string courses etc. |
| 15 | Columns, pillars, piers, abutments, posts and struts. |
| 16 | Stone Filling in wire crates , including cost of wire crates and all carriages upto site of work complete. |
| 17 | Dumping stone including cost of stones. On Horizontal on level. |
| 18 | Fabrication and launching of bridge superstructure materials, including transoms, H.R. sheets, railings, road bearers, nuts and bolts, primer and paint, along with provision of new materials as required at site for completion of the superstructure of Steel Foot Bridge(Total Span of bridge 54 Mtr comprises of 3 Span i.e 17 Mtr ,12 Mtr & 25 Mtr) |
| 19 | Span First(From Left Side) |
| 20 | Span Second(FromMiddle) |
| 21 | Span Third (From Right Side) |
| 22 | Carriage of material by M.T incl loading/unloading & stacking complete |
| 23 | Sand/Stone agg. below 40 mm nominal size avg. lead 08 Km by MT and 500Mtr by H.L |
| 24 | Stone avg. lead 400 Mtr by H.L Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 08, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysOct 09, 2026
Bid Opening Date
Technical bids will be opened and evaluated.