Tender For Annual Operation And Maintenance Of Apc Systems Attached With The Furnace No. 3 & 4 And Wooden Pyre Facilities At Sirity Burning Ghat
Tender Value
Ref. Documents
Estimated cost
Bid Submission
09 Oct 2026
10 days left
EMD
19000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Operation And Maintenance Of Apc Systems Attached With The Furnace No. 3 & 4 And Wooden Pyre Facilities At Sirity Burning Ghat
BOQ
| Sl. No. | Item Description |
| 1 | Engagement of three (03) number skilled workers havingability of fault- finding, minor repairing of electro- mechanical system, water circuit and slurry dischargearrangements for operation of Air Pollution Control Device in three shifts (including damper & I.D fan operation)(As per Mpl. Secretary's CircularNo. 30 of 2025-26 dt. 09.03.2026). |
| 2 | Proportionate Casual Leave imposedas per Mpl. Secretary's Circular No.23 of 2012-13 dt.10.12.2012vide the MIC Item No.M 39.7dt.14.08.2012. adding the totalwages amount 4.53%. |
| 3 | Engagement of a Reliever for operators (Skilled category) in the weekly off-Days (As per Mpl. Secretary's Circular No. 30 of 2025-26 dt. 09.03.2026).Total nos. of off-days for an operator in a year = 52 nos.Total off -days for three (03) nos. operators = (52 X 3) nos. = 156 nos.Total working days for Relieve throughout year =156 Days |
| 4 | Labour charges for monthly as per directed by EIC, removing the carbon and particle/sludge arrested by Ceramic Saddles (3000 Nos. per stage for two stages for total of 6000 Nos.) from the Precooler and cleaning of the same in two stages. Two nos. of stainless-steel strainer /net to be cleaned by way of high-pressure jet pump and by scrubbing hammer manually. (Precaution to be taken for fresh air circulation during cleaning inside) |
| 5 | Labour charges for monthly as per directed by EIC, opening the two doors of mist eliminator by unscrewing 60(sixty) nos. nut and bolt and drawing out two nos. strainer. Cleaning the strainers by using scrubbing hammer and high pressure jet pump. Strainers to be fitted in proper position inside Mist Eliminator and closing the two doors and fitting 60 nos. nut and bolts. |
| 6 | Labour charges for monthly as per directed by EIC, cleaning of Blower by opening the inlet hub and removing canvas cloth. The deposited carbon from inside the blower to be cleaned manually and by high-pressure jet pump. After cleaning the inlet hub to be refitted and canvas cloth to be re wrapped. |
| 7 | Labour charges for monthly as per directed by EIC, chimney door to be unscrewed and deposited carbon particles are to be manually removed from inside the Chimney Base and washed with water. Removed Carbon particles to be packed up in gunny bags and dropped at the departmental Vat. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 09, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysOct 12, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender