Housing Urban and Rular Development Government Departments Closing in 20 days TDR #57750085

Tender For Construction Of 11 Kv Ug Line And Installation Of 11Kv Rmu For Providing Power Supply To Balabhadrapur Industrial Area,Kendrapara.

Issued by Government Departments · Kendrapara, Odisha
Tender Value
3.29 Crore
Estimated cost
Bid Submission
21 Oct 2026
20 days left
EMD
3.29 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kendrapara → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of 11 Kv Ug Line And Installation Of 11Kv Rmu For Providing Power Supply To Balabhadrapur Industrial Area,Kendrapara.

BOQ

Name of Work:- Construction of 11 KV UG line and Installation of 11KV RMU for providing power supply to Balabhadrapur Industrial Area,Kendrapara.
Sl. No. Item Description
1Part A- Cost of Supply Of Materials.
2Supply of materials for 11kV, 3Core, 400sqmm Aluminium, XLPE insulation armoured UG cable with accessories.
3Length of 11kV 3C, 400sqmm cable (Open trench - 2530 Mtr)
4Length of 11kV 3C, 400sqmm cable (HDD - 3000 Mtr)
5Supply of 11kV, 3Core, 400sqmm, XLPE insulation armoured UG cable (SC rating of cable in kA- 37.7kA and SC rating of Armour in kA- 15kA) as per the approved technical specification and direction of EIC.
6Supply of Straight through jointing kits Heat Shrinkable type suitable for 11kV, 3Core, 400 sqmm, aluminium UG cable kits. as per the approved technical specification and direction of EIC.
7Supply of Indoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC.
8Supply of Outdoor termination kits Heat Shrinkable type suitable for 11kV 3Core, 400 sqmm, HT UG cable kits. as per the approved technical specification and direction of EIC.
9Supply of materials for High Density Polyethelene (HDPE) pipe 200mm diameter, PE 80- PN8 for laying of 11kV UG cable. as per the approved technical specification and direction of EIC.
10Supply of 11 KV RMU
11Supply of 11kV RMU 3WAY 630A LLV WITH FRTU & AUX PT as per the approved technical specification and direction of EIC.
12Earthing
13Supply of Earthing Conductor: 50X6 mm (2.4kg./mtr.) GI Flat for equipment, structure etc as per the approved technical specification and direction of EIC.
14Supply Pipe Earthing 40mm. GI Pipe as per the approved technical specification and direction of EIC.
15Part A- Cost of Erection Of Materials.
16Erection, Commissioning, Testing of 11kV new line by 3core, 400sqmm, aluminium, XLPE UG cable.
17Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm XLPE insulation (extruted type) UG cable by open trench method. as per direction of EIC.
18Erection of Straight through jointing Kits/ Outdoor termination kits/Indoor termination Kits Heat Shrinkable type suitable for 11kV, 3Core, 400sqmm, aluminium UG cable kits. as per direction of EIC.
19Installation, Laying, Commissioning & Testing of 11kV, 3Core, 400sqmm, XLPE U/G cable by HDD method with HDPE pipe (200mm dia, PN8 PE80) including suply of HDPE Pipe. Complete as per the approved technical specification and direction of EIC.
20Laying of 200mm dia PE 80-PN8, HDPE pipe inside open trench.as per direction of EIC.
21Erection, Commissioning, Wiring and Testing of 11kV RMU
22Erection of 11kV RMU 3WAY 630A LLV WITH FRTU & AUX PT.as per direction of EIC.
23Part A- Cost of Civil Works.
24Civil works with supply of all materials like cement, MS tor rod, brick, coarse & fine aggregates and labour, T&P, etc for UG Cable Trench
25Earth work excavation of soil (1mtr. width X 1mtr. depth)- Route Length
26Earth work excavation of soil. complete as per the direction of EIC.
27Earth work excavation of hard rock. complete as per the direction of EIC.
28Back flling with excavated soil outside and above the trench. complete as per the direction of EIC.
29Civil works for Prefabricated RCC foundation with supply of all materials
30Prefabricated RCC foundation of 11kV RMU. complete as per the direction of EIC.
31SITC of GI Fencing with Gate around each RMU as per the direction of EIC.
32Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flataround pipe as per the specification of TPCODL.
33Supply and Erection of Cable Route Marker along the cable route at an interval of 30mtrs with civil works.Complete as per the approved technical specification and direction of EIC.
34Part B- Cost of Material For 11KV DP With AB Switch - 1 No.
35Supply & installation of WPB (GI) Pole 160x152 (11Mtr. Long,30.44KG/Mr.)(Total pole weight with base plate & stiffner = 334.84 Kg + 10.74 Kg = 345.58).Including excavation of pole pit in all king of soil with depth upto 1/6th of pole height. Complete in all respect as per the approved technical specification and direction of EIC.
36Supply & installation of Top Channel(GI) 100X50 X6mm, 9.56 KG/Mtr., each channel(GI) length 3 mtr.,2 no's channel(GI) required =(2x9.56x3). Complete in all respect as per the approved technical specification and direction of EIC.
37Supply & installation of Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr.,each 0.280 mtr. length,6 no's reguired =(6x2.36x0.280).Complete in all respect as per the approved technical specification and direction of EIC.
38Supply & installation of AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each channel(GI) length 3 Mtr., 2 no's channel(GI) required =(7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC.
39Supply & installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each channel(GI) length 0.35 mtr., 2 no's channel(GI) required =(9.56x2x0.35).Complete in all respect as per the approved technical specification and direction of EIC.
40Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr, each channel(GI) length 0.8 Mtr..1 no's channel(GI) required =(7.14x0.8x1).Complete in all respect as per the approved technical specification and direction of EIC.
41Supply & installation of Double Pole Belting Channel(GI) 75X40X4.8mm.,7.14KG/Mtr.,each channel(GI) length 3.0 Mtr., 4 no's channel(GI) required = (7.14x3x4). Complete in all respect as per the approved technical specification and direction of EIC.
42Supply and installation of 50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle(GI) length 3.512 mtr.,4 nos angle(GI) required = (4x4.5x 3.512).Complete in all respect as per the approved technical specification and direction of EIC.
43Supply and installation of Danger Plate,2 no's. Complete in all respect as per the approved technical specification and direction of EIC.
44Supply and installation of Back Clamp for danger Plate 25X3 mm. flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 2 no's= (2x0.59x 0.510) .Complete in all respect as per the approved technical specification and direction of EIC.
45Supply and installation of H.T. Stay clamp, 50x8 mm. flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. reguired(1 Pair) .Complete in all respect as per the approved technical specification and direction of EIC.
46Supply & installation of H.T. Stay set (Complete). Complete in all respect as per the approved technical specification and direction of EIC.
47Supply & installation of H.T. Stay Insulator Type-C . Complete in all respect as per the approved technical specification and direction of EIC.
48Supply & installation of 7/10 SWG Stay Wire 15kg /stay. Complete in all respect as per the approved technical specification and direction of EIC.
49Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC.
50Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36. Complete in all respect as per the approved technical specification and direction of EIC.
51Supply & installation of GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required = (2 x 3 Kg). Complete in all respect as per the approved technical specification and direction of EIC.
52Supply & installation of Back Clamp for anticlimbing device 25X3 mm. flat(GI), 0.59Kg /Mtr. Flat(GI) of 0.510mtr length 8 no's =(8x0.59x0.510). Complete in all respect as per the approved technical specification and direction of EIC.
53SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC.
54SITC of AB Switch (11KV,400A, 3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC.
55SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
56Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC.
57SITC of Disc insulator (B&S) 70KN polymer. Complete in all respect as per the approved technical specification and direction of EIC.
58Supply & installation of WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR.Complete in all respect as per the approved technical specification and direction of EIC.
59Supply & installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC.
60Supply & installation of Gl Nut, Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch). Complete in all respect as per the approved technical specification and direction of EIC.
61Supply and painting of Black paint(GIS Numbering & Zebra Stripping) as required and direction of EIC.
62Supply and painting of Yellow colour paint(GIS Numbering & Zebra Stripping) for background as required and direction of EIC.
63Part B- Cost of Civil Works.
64Fixing of 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3)Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5 Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mnm) using 20mm BHG metal with all labour and material .Complete in all respect as per TPCODL Drawing & Standard.
65Concreting ratio 1:1.5:3 (M-20 Grade)(500mm X500mmX1800mm) = 0.45Cu.mtr(per Pole). Complete in all respect as per the direction of EIC.
66Couping ratio 1:1.5:3 (M-20 Grade) with dimension (500X 500X450)= 0.1125 Cumtr(per Pole). Complete in all respect as per the direction of EIC.
67Provide necessary civil material for construction of Earthing chamber, excavation & installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg Bentonide Power , connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design.
68Part C- Cost of Material for Installation of 1 no of 11KV AB switch in existing 4 Pole .
69Supply & installation of AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr, each channel(GI) length 3 Mtr., 2 no's channel(GI) required =(7.14x3x2).Complete in all respect as per the approved technical specification and direction of EIC.
70Supply & installation of AB Switch Side Support Channel(GI) 100X50X6mm,9.56 KG/Mtr., each channel(GI) length 0.35 mtr., 2 no's channel(GI) required =(9.56x2x0.35).Complete in all respect as per the approved technical specification and direction of EIC.
71Supply & installation of Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr, each channel(GI) length 0.8 Mtr..1 no's channel(GI) required =(7.14x0.8x1).Complete in all respect as per the approved technical specification and direction of EIC.
72Supply & installation of GI Pipe Earthing 40mm. 3 Mtr. Long. Complete in all respect as per the approved technical specification and direction of EIC.
73Supply & installation of 50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 5 mtr. For raising)= 23x2.36. Complete in all respect as per the approved technical specification and direction of EIC.
74SITC of Lightning Arrester (12KV,10KA) (Station Class,class-2). Complete in all respect as per the approved technical specification and direction of EIC.
75SITC of AB Switch (11KV,400A, 3pole,50Hz). Complete in all respect as per the approved technical specification and direction of EIC.
76SITC of 11 KV pin insulator polymer. Complete in all respect as per the approved technical specification and direction of EIC.
77Supply & installation of H W fitting(B&S) 70KN,3 Bolt Complete in all respect as per the approved technical specification and direction of EIC.
78SITC of Disc insulator (B&S) 70KN polymer.Complete in all respect as per the approved technical specification and direction of EIC.
79Supply & Stringing of 100 SQ.MM AAAC Conductor. Complete in all respect as per the approved technical specification and direction of EIC.
80Supply & installation of WEDGE CONNECTOR FOR 100 SQMM.CONDUCTOR.Complete in all respect as per the approved technical specification and direction of EIC.
81Supply & installation of Paddle clamp for wedge connector of 100 sq.mm AAA conductor. Complete in all respect as per the approved technical specification and direction of EIC.
82Supply & installation of POLYCARBONATE BIRD GUARD. Complete in all respect as per the approved technical specification and direction of EIC.
83Supply & installation of Gl Nut, Bolt & Washer of different sizes . Complete in all respect as per the approved technical specification and direction of EIC.
84Part C- Cost of Civil Works.
85Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. The work to be executed as per TPCODL drawing & design.
86N.B: The bidders are required to Quote theire rates excluding of Goods & Service Tax (GST). GST as applicable will be paid extra. The existing rule of Govt. and any amendment made in future will be followed. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57750085
AUTHORITY Government Departments
TENDER VALUE 3.29 Crore
LAST DATE 21-10-2026
Authority
Authority Name Orissa Industrial Infrastructure Development Corporation
Work Description Tender for Construction Of 11 Kv Ug Line And Installation Of 11Kv Rmu For Providing Power Supply To Balabhadrapur Industrial Area,Kendrapara.
Basic Detail
Tender No PC/EST/E-26/2026-27
Bidding Type Tender
Location
City Kendrapara
State Odisha
Key Dates
Publish Date 28 Sep 2026
Submission Date 21 Oct 2026
Open Date 22 Oct 2026
Finance
Tender Value 3.29 Crore
Tender Fee 11800
EMD 3.29 Lakhs
Exemption Available
Document List
19992b3f-07d1-4505-9b8c-2cd53d418c15.html
bid.pdf
BOQ_611280.xls
Tendernotice_1 (22).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Oct 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 21 days

Tender Documents

Download All (ZIP) ↓
html

19992b3f-07d1-4505-9b8c-2cd53d418c15.html

pdf

bid.pdf

xls

BOQ_611280.xls

pdf

Tendernotice_1 (22).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders