Defence Statutory Bodies & Commissions/Committees Closing in 12 days TDR #57739254

Tender For Addition / Alternation & Special Repairs To Existing Swimming Pool At Subathu.

Issued by Statutory Bodies & Commissions/Committees · Solan, Himachal Pradesh
Tender Value
3.14 Crore
Estimated cost
Bid Submission
12 Oct 2026
12 days left
EMD
3.89 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Solan → Himachal Pradesh
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Addition / Alternation & Special Repairs To Existing Swimming Pool At Subathu.

BOQ

Name of Work:- Addition / Alternation & Special Repairs to Existing Swimming Pool at Subathu.
Sl. No. Item Description
1Total amount of Sch 'A' Sec-I (BUILDING WORKS ) Lump sum price worked out by the contractor for \\" BUILDING WORKS \\" as listed in schedule 'A' Part-I
2Total amount of Sch 'A' Sec-II (SWIMMING POOL CHANGING ROOM WORKS) Lump sum price worked out by the contractor for \\" SWIMMING POOL CHANGING ROOM WORKS\\" as listed in schedule 'A' Part-II
3Total amount of Sch 'A' Sec-III (DEMOLITION OF BUILDINGS WORKS) Lump sum price worked out by the contractor for \\" DEMOLITION OF BUILDINGS WORKS \\" as listed in schedule 'A' Part-III
4Total amount of Sch 'A' Sec-IV (SITE CLEARANCE, EARTHWORK AND EXCAVATION WORKS) Lump sum price worked out by the contractor for \\" SITE CLEARANCE, EARTHWORK AND EXCAVATION WORKS\\" as listed in schedule 'A' Part-IV
5Total amount of Sch 'A' Sec-V (INTERNAL WATER SUPPLY WORKS) Lump sum price worked out by the contractor for \\"INTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-V
6Total amount of Sch 'A' Sec-VI (INTERNAL ELECTRIFICATION WORKS ) Lump sum price worked out by the contractor for \\" INTERNAL ELECTRIFICATION WORKS \\" as listed in schedule 'A' Part-VI
7Total amount of Sch 'A' Sec-VII (ROAD, PATH, CULVERTS AND HARDSTANDING WORKS) Lump sum price worked out by the contractor for \\"ROAD, PATH, CULVERTS AND HARDSTANDING WORKS \\" as listed in schedule 'A' Part-VII
8Total amount of Sch 'A' Sec-VIII (EXTERNAL WATER SUPPLY WORKS Lump sum price worked out by the contractor for \\"EXTERNAL WATER SUPPLY WORKS \\" as listed in schedule 'A' Part-VIII
9Total amount of Sch 'A' Sec-IX ( EXTERNAL ELET SUPPLY WORKS ) Lump sum price worked out by the contractor for \\"EXTERNAL ELET SUPPLY WORKS \\" as listed in schedule 'A' Part-IX
10Total amount of Sch 'A' Sec-X (SEWAGE DISPOSAL WORKS ) Lump sum price worked out by the contractor for \\" SEWAGE DISPOSAL WORKS \\" as listed in schedule 'A' Part-X
11Total amount of Sch 'A' Sec-XI (AREA DRAINAGE WORKS ) Lump sum price worked out by the contractor for \\"AREA DRAINAGE WORKS \\" as listed in schedule 'A' Part-XI
12Material and Labour for surface preparation of swimming pool, cleaning of the floor, wall-vertical portion from all surface dust, dirt and loose material etc making it free from all loose particles complete all as specified and as directed.
13Material and Labour for joint repairing of Pitt and all joint with sika latex power and cement before water proofing treatment complete all as specified and as directed as per manufacturers instructions.
14Material and Labour for water proofing treatment , application of 1st coat of primer with water 1-2 water proofing compound sika raintite liquid primer by brush over the prepared surface complete all as specified and as directed as per manufacturers instructions.
15Material and Labour for water proofing treatment, application of 2nd coat of water proofing compound sika 109 two compound coating with fiber mash by brush as par mixing ratio, over the chemical according complete all as specified and as directed as per manufacturers instructions.
16Material and Labour for water proofing treatment, application of 3rd coat of water proofing compound sika 109 two compound coating by brush as par mixing ratio,over the chemical complete all as specified and as directed as per manufacturers instructions.
17Material and Labour for Injection grouting, Drilling & Fixing the Nozzle depending on the porosity of the surface. Injection the cement slurry using non shrink interplast EP grout admixture to seal the honeycombing & porosity in the well complete all as specified and as directed as per manufacturers instructions.
18Supply and Fixing of 100mmx100mmx4.5mm thick glass mosaic tiles blue random premium( 1st quality coloured swimming pool floor and wall tiles, rectangular in shape with suitable for bareful usage in wet area for wall and floor tiles in swimming pool and tiles should comply with international ASA and FINA standards, the glazed of tiles should also be resistant to swimming pool water cleaning agents as per test method ISO 10545-13 and fixed on & incl minimum 3mm thick bed of tiles adhesive by leaving 3mm space and pointed the same with approved coloured Epoxy grout and complete all as jobs as specified and directed by Engr-in -Charge.
19Supply and Fixing for GI metal suspended ceiling system, GI lay in plain of 600x600x0.5mm (TEGULAR) edge tiles in globel white colour to be laid on strong 24mm Tee section flanges colour white having roatary stiching on the main runner with web height of 38mm complete all as specified and as directed. Note:- (i) To comprise main runner spaced at 1200mm centres securely fixed to the structural soffits at 1200mm maximum centre. The first/last suspension system at the end of each main runner should not be greater than 450mm from the adjacent wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm centre to form 1200mmx600mm module. Cut cross tees longer than 600mm required independent support. 600mmx600mm module to be found by fittings 600mm long flush fitting cross tees centrally between the 1200mm cross tees. Perimeter trime to be wall angles of size 3000mm x 19mm x 19mm secured to walls at 450mm maximum centres. (ii) The HCL sleeve anchor fastnor of thread size 6.50mm x 25/5 with soffits cleat made of galvanised steel of size 27x37x25x1.6mm and level clip in dimensions of 85x30x0.8mm with 4mm GI wire complete all as specified and as directed.
20HEATING SYSTEM Design, supply, install, test, and commission complete swimming pool heating (including necessary plumbing) system connecting it with the existing swimming pool circulation and filtration system. Following parameters shall be followed for designing the Heating system :Ambient and Design ParametersAmbient Parameters Swimming Pool Size : 33mx11m(Depth varying uniformly from 01 M to 4M)Location : Subathu, Himachal PradeshMin Temperature : 5 CAltitude : 1250 – 1300 Meters Desired ParametersTemperature : 30+2 CMaximum Heat up Time : 72 HrsThe contractor shall submit the design along with layout diagram of complete heating system including Heat pumps, circulation pumps, plumbing and connection with existing swimming pool and balancing tank for the approval of Accepting Officer before commencement of work. The scope of work shall include Heating Pumps, Circulation pumps, all piping, fittings, bends, tees, reducers, flanges, unions, valves, strainers, flexible connections, balancing arrangements, flow measurement devices, pressure gauges, temperature gauges, test points, drains, vents, supports, hangers, anchors, guides, insulation, cladding where required, pipe identification, labels, accessories and all ancillary materials necessary to provide a complete and fully functional system. SCHEDULE OF CREDIT Notes:-(a) The items and quantities given under in the respective columns are provisional; however, the rates inserted for credit are firm. The recovery for the credit shall be made for the actual quantities ordered and retrieved from the demolition/dismantling /taking down under respective items of BOQ. Contractor shall be permitted to remove the materials indicated in this credit schedule only after affecting the recovery for the same from the RAR/Final bill asapplicable and after written permission is obtained by the contractor from the Engineer-in-Charge. (b) Tenderers are advised to visit the site to ascertain the worth value, prevailing conditions of the existing materials for which credit is to be afforded. No claim whatsoever on account of above shall however be entertained at any stage whether the contractor (s) inspected the site or not. (c) The old materials obtained will not be allowed to be re-used in the work unless it is specifically mentioned in the description of relevant items of BOQ. All other serviceable/ salvage value materials obtained from the site other than those considered in this schedule shall be Govt. property and contrator’s quoted rates shall be deemed inclusive of removing such material to MES store yard of the Engineer-in-Charge, who will take such material on charge. In case of the dispute related to the interpretation of the provision with regard to the credit schedule, the decision of the Accepting Officer shall be final & binding. Ser No. Description of item A/U Qty Rate Amount
21HEATING SYSTEM Design, supply, install, test, and commission complete swimming pool heating (including necessary plumbing) system connecting it with the existing swimming pool circulation and filtration system. Following parameters shall be followed for designing the Heating system :Ambient and Design ParametersAmbient Parameters Swimming Pool Size : 33mx11m(Depth varying uniformly from 01 M to 4M)Location : Subathu, Himachal PradeshMin Temperature : 5 CAltitude : 1250 – 1300 Meters Desired ParametersTemperature : 30+2 CMaximum Heat up Time : 72 HrsThe contractor shall submit the design along with layout diagram of complete heating system including Heat pumps, circulation pumps, plumbing and connection with existing swimming pool and balancing tank for the approval of Accepting Officer before commencement of work. The scope of work shall include Heating Pumps, Circulation pumps, all piping, fittings, bends, tees, reducers, flanges, unions, valves, strainers, flexible connections, balancing arrangements, flow measurement devices, pressure gauges, temperature gauges, test points, drains, vents, supports, hangers, anchors, guides, insulation, cladding where required, pipe identification, labels, accessories and all ancillary materials necessary to provide a complete and fully functional system. SCHEDULE OF CREDIT Notes:-(a) The items and quantities given under in the respective columns are provisional; however, the rates inserted for credit are firm. The recovery for the credit shall be made for the actual quantities ordered and retrieved from the demolition/dismantling /taking down under respective items of BOQ. Contractor shall be permitted to remove the materials indicated in this credit schedule only after affecting the recovery for the same from the RAR/Final bill asapplicable and after written permission is obtained by the contractor from the Engineer-in-Charge. (b) Tenderers are advised to visit the site to ascertain the worth value, prevailing conditions of the existing materials for which credit is to be afforded. No claim whatsoever on account of above shall however be entertained at any stage whether the contractor (s) inspected the site or not. (c) The old materials obtained will not be allowed to be re-used in the work unless it is specifically mentioned in the description of relevant items of BOQ. All other serviceable/ salvage value materials obtained from the site other than those considered in this schedule shall be Govt. property and contrator’s quoted rates shall be deemed inclusive of removing such material to MES store yard of the Engineer-in-Charge, who will take such material on charge. In case of the dispute related to the interpretation of the provision with regard to the credit schedule, the decision of the Accepting Officer shall be final & binding. Ser No. Description of item A/U Qty Rate Amount
22Old u/s tiles any types & size.
23old u/s mild steel scrap
24Old u/s Brick work built in cement mortar
25Old u/s CGI/PGI sheets of any gauge thickness & type
26Old u/s Chowkats or frames with shutters (without taking off shutters from the frame) area exc. 1.50sqm & not exc 4.00 sqm each –ditto- with iron mongery.
27Old u/s Chowkats or frames with shutters (without taking off shutters from the frame) area not exc. 1.5sqm with iron mongery.
28Old u/s ceiling board of any size & type
29Old u/s timber scantling of any description
30Old u/s granite, kota stone, PCC tiles of any desc
31Old u/s Steel water tubing and connection of 15mm bore
32Old u/s Steel water tubing and connection of 20mm bore
33Old u/s Chromium plated brass bib tap, Pillar tap, angular stop cock, concealed, showers, etc
34Old u/s WHB of including bracket.
35Old u/s Mixers of any type & size
36Old u/s vitreous china WC with all fittings (excluding flushing cistern).
37Old u/s flushing cistern of any desc
38Old u/s china Urinal (any type).
39Old u/s gate valve of 15mm
40Old u/s gate valve of 20mm
41Old u/s PVC(SWR) pipe 100mm bore
42Old u/s PVC water storage tank of exc 250 ltrs capacity but not exc 500 ltr capicity
43Unsv light fittings including old sketch fittings
44Unsv MCB DB TPN/SPN any capacity
45Unsv MCB SP/SPN/TPN, Isolator any capacity
46Unsv mtrl of old two run sub main wiring 4 sqmm.
47Unsv UG cable 10 Sqmm 2 core
48Old U/S earthing materials
49Old U/S SWG Pipe TOTAL 106202.5 Signature of Contractor For Accepting officer Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57739254
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 3.14 Crore
LAST DATE 12-10-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Addition / Alternation & Special Repairs To Existing Swimming Pool At Subathu.
Basic Detail
Tender No CE CHZ/CHM/T-07/2026-27
Bidding Type Tender
Location
City Solan
State Himachal Pradesh
Key Dates
Publish Date 26 Sep 2026
Submission Date 12 Oct 2026
Open Date 14 Oct 2026
Finance
Tender Value 3.14 Crore
Tender Fee 2000
EMD 3.89 Lakhs
Exemption Available
Document List
24bc063e-345b-4206-9798-26a5fc763a0c.html
BOQ_886687.xls
Drg.rar
ftender.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 12, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Oct 14, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 14 days

Tender Documents

Download All (ZIP) ↓
html

24bc063e-345b-4206-9798-26a5fc763a0c.html

xls

BOQ_886687.xls

rar

Drg.rar

pdf

ftender.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders