Agriculture Government Departments Closing in 24 days TDR #57738673

Tender For Supply, Installation, Commissioning & Testing Of Apeda Accredited Integrated Mango Pack House

Issued by Government Departments · Sindhudurg, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
29 Oct 2026
24 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sindhudurg → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Supply, Installation, Commissioning & Testing Of Apeda Accredited Integrated Mango Pack House , Supply, Installation, Commissioning & Testing Of Apeda Accredited Integrated Mango Pack House , Precooling Cum Ripening Chamber-1 Capacity- 6 Mt Room Size External Lxbxh: 7.65 Mtrs X 4.62 Mtrs X 3.0 Mtrs External 1. Fb-60 Mm Thick Puf Panels With 0.5 Mm Tct Gipp Sheets Both Sides For Walls & Ceiling Average Of 40 Kg/Cu M Complete With Cam Locks. Fb Door System 80 Mm Door Size: 1.2 Mt X 2.25 Mt Clear Opening Gipp / Gipp Skin Material With Kan Type Indian Hardware For The Door Such Handle, Hinges, Door Closure. 2. Catalytic Ethylene Generator - Generator Capable Of Generating Enough Ethylene To Bring Up The Ethylene Levels In The Room To 200 Ppm In 12 To 18 Minutes. Specs: 600 Cu Meter Per Hour, Power 200W, Volage: Volts:240Vac 3.Ventilation Equipment: A Set Of Two Specially Designed Blowers Of 350-Meter Cube Per Hour For The Chamber To Draw In Fresh Air And Exhaust Carbon Dioxide Laden Stale Air. Specs: 600Cu. Meters Per Hour, Power: 150W, Volts: @ 240 Vac. 4. Control Panel: Microprocessor Based Controlled Unit With Hmi Touchscreen Parameter Controlling System For Controlling/Displaying Parameters. Parameters To Be Controlled: Temperature, Ventilation, Ethylene Level, Humidity, Carbon Di Oxide. Specs: Temperature: 0 Deg Cent To 60 Deg Cent, Ventilation: On /Off Real Time Ventilation Control For Ripening Cycle Programming, Ethylene Injection Time: On /Off Real Time Ventilation Control For Ripening Cycle Programming. 5. Refrigeration System: Condensing Unit Scroll Compressor Based. 3 Tr × 2 Per Hour High Humidity Secondary Refrigeration System To Remove The Heat Of Respiration Of The Mangoes. Specs. Evaporators: Secondary Coolant Evaporator Coils 3 Tr × 2 Having Large Surface Area For Fast And Efficient Cooling. Blower: High-Capacity Centrifugal Blowers × 2., Additional Circulating Fan: 2 Nos. Insulated Steel Chiller Tank, Coolant Circulation Pump, And Piping System. 6. Ripening Controller: Standard Microprocessor Based Ripening Controller Unit. 7. Carbon Di-Oxide Sensor Installation Of Puf Panels And Door System With Installation Accessories Such As Silicon Sealant, Flashers, Angles, Rivets Etc Complete. Installation And Commissioning Of All Machines And Equipment With Wire And Cabling And Switch Gear Complete. , Precooling Cum Ripening Chamber-2 Capacity 6 Mt Room Size External Lxbxh : 6.4 Mtrs X 3.75 Mtrs X 3.0 Mtrs External A Wall Of 3.75 Mtrs Combined With Precooling Cum Cold Storage Cum Ripening Chamber. 1. Fb- 80 Mm Thick Puf Panels With 0.5 Mm Tct Gipp Sheets Both Sides For Walls & Ceiling Average Of 40 Kg/ Cu Meter Complete With Cam Locks. High-Density Puf Floor Insulation Slabs (40 Kg/M3) Faced With Bitumen/Tar Felt On Both Sides For Flooring Underlayment. Fb Door System 80 Mm Door Size : 1.2 Mt X 2.25 Mt Clear Opening Gipp / Gipp Skin Material With Kasan Type Indian Hardware For The Door Such Handle, Hinges, Door Closure 2. Catalytic Ethylene Generator - Generator Capable Of Delivering Controlled Ethylene Output, Allowing The Operator To Set And Achieve Customized Ppm Levels In 12 To 18 Minutes. Specs: Power 200W, Voltage: 240Vac. 3.Ventilation Equipment: A Set Of Two Specially Designed Blowers Of 350-Meter Cube Per Hour For The Chamber To Draw In Fresh Air And Exhaust Carbon Dioxide Laden Stale Air. Specs: 600Cu. Meters Per Hour Power: 150W Volts: @ 240 Vac 4. Control Panel: Microprocessor Based Controlled Unit With Hmi Touchscreen Parameter Controlling System For Controlling/Displaying Parameters. Parameters To Be Controlled: Temperature, Ventilation, Ethylene Level, Humidity, Carbon Di Oxide. Specs: Temperature: 0 Deg Cent To 60 Deg Cent Ventilation: On /Off Real Time Ventilation Control For Ripening Cycle Programming Ethylene Injection Time: On /Off Real Time Ventilation Control For Ripening Cycle Programming. 5. Refrigeration System: Condensing Unit Scroll Compressor Based. 3 Tr × 2 Per Hour High Humidity Secondary Refrigeration System To Remove The Heat Of Respiration Of The Mangoes. Specs. Evaporators: Secondary Coolant Evaporator Coils 3 Tr × 2 Having Large Surface Area For Fast And Efficient Cooling. Blower: High-Capacity Centrifugal Blowers × 2., Additional Circulating Fan: 2 Nos. Insulated Steel Chiller Tank, Coolant Circulation Pump, And Piping System. 6. Ripening Controller : 7. Wire And Cabling And Switch Gear Installation And Commissioning Of Equipment Complete 8. Carbon Di-Oxide Sensor Installation Of Puf Panels And Door System With Installation Accessories Such As Silicon Sealant, Flashers, Angles, Rivets Etc Complete. Installation And Commissioning Of All Machines And Equipment With Wire And Cabling And Switch Gear Complete. , Precooling Cum Ripening Chamber Cum Cold Storage Capacity 6 Mt Room Size External Lxbxh : 6.4 Mtrs X 3.75 Mtrs X 3.0 Mtrs External A Wall Of 3.75 Mtrs Combined With Precooling Cum Ripening Chamber 1. Fb- 80 Mm Thick Puf Panels With 0.5 Mm Tct Gipp Sheets Both Sides For Walls & Ceiling Average Of 40 Kg/ Cu Meter Complete With Cam Locks. High-Density Puf Floor Insulation Slabs (40 Kg/M3) Faced With Bitumen/Tar Felt On Both Sides For Flooring Underlayment. Fb Door System 80 Mm Door Size : 1.2 Mt X 2.25 Mt Clear Opening Gipp / Gipp Skin Material With Kasan Type Indian Hardware For The Door Such Handle, Hinges, Door Closure 2. Catalytic Ethylene Generator - Generator Capable Of Delivering Controlled Ethylene Output, Allowing The Operator To Set And Achieve Customized Ppm Levels In 12 To 18 Minutes. Specs: Power 200W, Voltage: 240Vac. 3.Ventilation Equipment: A Set Of Two Specially Designed Blowers Of 350-Meter Cube Per Hour For The Chamber To Draw In Fresh Air And Exhaust Carbon Dioxide Laden Stale Air. Specs: 600Cu. Meters Per Hour Power: 150W Volts: @ 240 Vac 4. Control Panel: Microprocessor Based Controlled Unit With Hmi Touchscreen Parameter Controlling System For Controlling/Displaying Parameters. Parameters To Be Controlled: Temperature, Ventilation, Ethylene Level, Humidity, Carbon Di Oxide. Specs: Temperature: 0 Deg Cent To 60 Deg Cent Ventilation: On /Off Real Time Ventilation Control For Ripening Cycle Programming Ethylene Injection Time: On /Off Real Time Ventilation Control For Ripening Cycle Programming. 5. Refrigeration System: Condensing Unit Make Emerson Recipl Compressor R22 Based 2.5Tr X 2 High Humidity Secondary Refrigeration System To Remove The Heat Of Respiration Of The Mangoes. 6. Ripening Controller: 7. Wire And Cabling And Switch Gear Installation And Commissioning Of Equipment Complete 8. Carbon Di-Oxide Sensor Installation Of Puf Panels And Door System With Installation Accessories Such As Silicon Sealant, Flashers, Angles, Rivets Etc Complete. Installation And Commissioning Of All Machines And Equipment With Wire And Cabling And Switch Gear Complete. , Standby Ethylene Generators Generator Capable Of Delivering Controlled Ethylene Output, Allowing The Operator To Set And Achieve Customized Ppm Levels. Specs: Power 200W, Voltage: 240Vac , Power Distribution Panel Incoming Feeder 2 X 125 Amps Outgoing Feeder 12 X 32 Amps With All Fuse Ryb Meter And Accessories In Ms Cabinet , Hot Water Treatment Unit With Drier And Data Logger Capacity- 3.6 Mt/Day Hot Water Treatment System: Logistics: 20 Kgs X 18 Crates = 360 Kgs Per Batch. Batch Time For Treatment = 60 Minutes. Rate Per Hour = 360 Kgs/Hour. Total Per 12-Hour Shift = 4,320 Kgs. Approx. Avg. Mango Dozen = 1,728 Dz. Hot Water Insulated Tank: In Ss With Circulation Assembly To Accommodate 18 Crates Of 20 Kg Capacity (Total 360 Kgs). Hoist System: Hydraulic/Electric Based For 18 Crates Of 20 Kg Capacity (Total 360 Kgs) With Ss Cage. Heating System: Heat Pump Based To Bring Water Temperature To 55 Degree Centigrade. This System Shall Heat Water At One Third Of The Energy Required By Heaters. Tunnel Dryer Conveyor Assembly: Perforated Belt Based With Air Blowers Approx. 15 Feet X 1.5 Feet, Fabricated In Ss202 For Non-Wettable Parts Of The Conveyor. Plc Based Temperature Control And Display Unit With Data Logging. , X-Ray Mango Scanning System Capacity 0.6 Mt / Hour Scanning Speed: Up To 35 To 40 Mangoes A Minute. Approx. 200 Dozen Per Hour. Two Mangoes To Be Scanned Side By Side Per Scan. The Conveyors Shall Be Sufficiently Long To Remotely Access The Mangoes Without Going Into The X-Ray Machine Area. Shall Have A 9 X 9-Inch Dynamic Flatbed X Ray Detector With Maximum Resolution Of Up To 150 Microns To Capture The Mango X Ray Image Coupled With Hd Computer To Display The X Ray Image. Shall Have A Rejection System For Rejecting Bad Mangoes Using Motorized Diverter. Shall Have Microprocessor-Based Image /Source Synchronizing Software And Hardware So As To Improve Timing And Quality Of The X Ray Image. The X-Ray Machines Must Be Housed In Radiation Insulated Lead Cabinet Enabling Only Authorized Personnel To Enter X-Ray Machine Area. , Transport And Erection

BOQ

Name of Work:- Supply, Installation, Commissioning & Testing of APEDA Accredited Integrated Mango Pack House
Sl. No. Item Description
1Supply, Installation, Commissioning & Testing of APEDA Accredited Integrated Mango Pack House
2Precooling Cum Ripening Chamber-1Capacity- 6 MTRoom Size External LXBXH: 7.65 Mtrs x 4.62 Mtrs x 3.0 Mtrs External1. FB-60 mm thick PUF Panels with 0.5 mm TCT GIPP Sheets both sides for Walls & Ceiling average of 40 kg/cu m complete with cam locks. FB Door System 80 mm Door size: 1.2 MT x 2.25 MT clear opening GIPP / GIPP skin material with KAN Type Indian hardware for the door such handle, hinges, door closure.2. Catalytic ethylene generator - Generator capable of generating enough ethylene to bring up the ethylene levels in the room to 200 ppm in 12 to 18 minutes.Specs: 600 Cu Meter per hour, Power 200W, Volage: Volts:240VAC3.Ventilation equipment: A set of two specially designed blowers of 350-meter cube per hour for the chamber to draw in fresh air and exhaust Carbon dioxide laden stale air. Specs: 600cu. Meters per hour, power: 150W, Volts: @ 240 VAC.4. Control panel: Microprocessor based controlled unit with HMI touchscreen parameter controlling system for controlling/displaying parameters. Parameters to be controlled: Temperature, Ventilation, Ethylene level, Humidity, Carbon Di Oxide.Specs: Temperature: 0 deg Cent to 60 deg cent, Ventilation: On /Off real time ventilation control for ripening cycle programming, Ethylene injection time: On /Off real time ventilation control for ripening cycle programming. 5. Refrigeration system: Condensing unit scroll compressor based. 3 TR × 2 per hour high humidity secondary refrigeration system to remove the heat of respiration of the mangoes. Specs. Evaporators: Secondary coolant evaporator coils 3 TR × 2 having large surface area for fast and efficient cooling. Blower: High-capacity centrifugal blowers × 2., Additional circulating fan: 2 nos. Insulated Steel chiller tank, coolant circulation pump, and piping system.6. ripening Controller:Standard microprocessor based ripening controller unit.7. Carbon di-oxide sensorInstallation of PUF panels and door system with installation accessories such as silicon sealant, flashers, angles, rivets etc complete. Installation and commissioning of all machines and equipment with wire and cabling and switch gear complete.
3Precooling Cum Ripening Chamber-2Capacity 6 MTRoom Size External LXBXH : 6.4 Mtrs x 3.75 Mtrs x 3.0 Mtrs ExternalA wall of 3.75 Mtrs combined with Precooling cum Cold Storage cum ripening chamber.1. FB- 80 mm thick PUF Panels with 0.5 mm TCT GIPP Sheets both sides for Walls & Ceiling average of 40 Kg/ Cu Meter complete with cam locks. High-density PUF floor insulation slabs (40 kg/m3) faced with bitumen/tar felt on both sides for flooring underlayment.FB Door System 80 mm Door size : 1.2 MT x 2.25 MT clear opening GIPP / GIPP skin material with KASAN Type Indian hardware for the door such handle, hinges, door closure2. Catalytic ethylene generator - Generator capable of delivering controlled ethylene output, allowing the operator to set and achieve customized PPM levels in 12 to 18 minutes. Specs: Power 200W, Voltage: 240VAC.3.Ventilation equipment: A set of two specially designed blowers of 350-meter cube per hour for the chamber to draw in fresh air and exhaust Carbon dioxide laden stale air. Specs: 600cu. Meters per hour power: 150W Volts: @ 240 VAC4. Control panel: Microprocessor based controlled unit with HMI touchscreen parameter controlling system for controlling/displaying parameters. Parameters to be controlled: Temperature, Ventilation, Ethylene level, Humidity, Carbon Di Oxide.Specs: Temperature: 0 deg Cent to 60 deg cent Ventilation: On /Off real time ventilation control for ripening cycle programming Ethylene injection time: On /Off real time ventilation control for ripening cycle programming. 5. Refrigeration system: Condensing unit scroll compressor based. 3 TR × 2 per hour high humidity secondary refrigeration system to remove the heat of respiration of the mangoes. Specs. Evaporators: Secondary coolant evaporator coils 3 TR × 2 having large surface area for fast and efficient cooling. Blower: High-capacity centrifugal blowers × 2., Additional circulating fan: 2 nos. Insulated Steel chiller tank, coolant circulation pump, and piping system.6. ripening Controller :7. Wire and cabling and switch gear Installation and commissioning of equipment complete8. Carbon di-oxide sensorInstallation of PUF panels and door system with installation accessories such as silicon sealant, flashers, angles, rivets etc complete. Installation and commissioning of all machines and equipment with wire and cabling and switch gear complete.
4Precooling Cum Ripening Chamber Cum Cold StorageCapacity 6 MTRoom Size External LXBXH : 6.4 Mtrs x 3.75 Mtrs x 3.0 Mtrs ExternalA wall of 3.75 Mtrs combined with Precooling cum ripening chamber1. FB- 80 mm thick PUF Panels with 0.5 mm TCT GIPP Sheets both sides for Walls & Ceiling average of 40 Kg/ Cu Meter complete with cam locks. High-density PUF floor insulation slabs (40 kg/m3) faced with bitumen/tar felt on both sides for flooring underlayment.FB Door System 80 mm Door size : 1.2 MT x 2.25 MT clear opening GIPP / GIPP skin material with KASAN Type Indian hardware for the door such handle, hinges, door closure2. Catalytic ethylene generator - Generator capable of delivering controlled ethylene output, allowing the operator to set and achieve customized PPM levels in 12 to 18 minutes. Specs: Power 200W, Voltage: 240VAC.3.Ventilation equipment: A set of two specially designed blowers of 350-meter cube per hour for the chamber to draw in fresh air and exhaust Carbon dioxide laden stale air. Specs: 600cu. Meters per hour power: 150W Volts: @ 240 VAC4. Control panel: Microprocessor based controlled unit with HMI touchscreen parameter controlling system for controlling/displaying parameters. Parameters to be controlled: Temperature, Ventilation, Ethylene level, Humidity, Carbon Di Oxide.Specs: Temperature: 0 deg Cent to 60 deg cent Ventilation: On /Off real time ventilation control for ripening cycle programming Ethylene injection time: On /Off real time ventilation control for ripening cycle programming. 5. Refrigeration system: Condensing unit Make Emerson recipl compressor R22 based 2.5tr x 2 high humidity secondary refrigeration system to remove the heat of respiration of the mangoes.6. ripening Controller:7. Wire and cabling and switch gear Installation and commissioning of equipment complete8. Carbon di-oxide sensorInstallation of PUF panels and door system with installation accessories such as silicon sealant, flashers, angles, rivets etc complete. Installation and commissioning of all machines and equipment with wire and cabling and switch gear complete.
5Standby Ethylene Generators Generator capable of delivering controlled ethylene output, allowing the operator to set and achieve customized PPM levels. Specs: Power 200W, Voltage: 240VAC
6Power Distribution PanelIncoming feeder 2 x 125 amps Outgoing feeder 12 x 32 amps With all fuse RYB meter and accessories in MS cabinet
7Hot Water Treatment Unit with Drier and Data LoggerCapacity- 3.6 MT/DayHot water Treatment system: Logistics: 20 kgs x 18 crates = 360 kgs per batch. Batch time for treatment = 60 minutes. Rate Per Hour = 360 kgs/hour. Total per 12-hour shift = 4,320 kgs. Approx. avg. mango dozen = 1,728 dz.Hot water insulated Tank: In SS with circulation assembly to accommodate 18 crates of 20 kg capacity (total 360 kgs). Hoist system: Hydraulic/electric based for 18 crates of 20 kg capacity (total 360 kgs) with SS cage. Heating system: Heat pump based to bring water temperature to 55 degree centigrade. This system shall heat water at one third of the energy required by heaters.Tunnel Dryer conveyor assembly: Perforated belt based with air blowers approx. 15 feet x 1.5 feet, fabricated in SS202 for non-wettable parts of the conveyor.PLC based temperature control and display unit with data logging.
8X-RAY Mango Scanning SystemCapacity 0.6 MT / hourScanning speed: up to 35 to 40 mangoes a minute. Approx. 200 dozen per hour. Two mangoes to be scanned side by side per scan. The conveyors shall be sufficiently long to remotely access the mangoes without going into the x-ray machine area. Shall have a 9 x 9-inch dynamic flatbed x ray detector with maximum resolution of up to 150 microns to capture the mango x ray image coupled with HD computer to display the x ray image. Shall have a rejection system for rejecting bad mangoes using motorized diverter. Shall have microprocessor-based image /source synchronizing software and hardware so as to improve timing and quality of the x ray image. The x-ray machines must be housed in radiation insulated lead cabinet enabling only authorized personnel to enter x-ray machine area.
9Transport and Erection Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57738673
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 29-10-2026
Authority
Authority Name Department Of Agriculture
Work Description Tender for Supply, Installation, Commissioning & Testing Of Apeda Accredited Integrated Mango Pack House , Supply, Installation, Commissioning & Testing Of Apeda Accredited Integrated Mango Pack House , Precooling Cum Ripening Chamber-1 Capacity- 6 Mt Room Size External Lxbxh: 7.65 Mtrs X 4.62 Mtrs X 3.0 Mtrs External 1. Fb-60 Mm Thick Puf Panels With 0.5 Mm Tct Gipp Sheets Both Sides For Walls & Ceiling Average Of 40 Kg/Cu M Complete With Cam Locks. Fb Door System 80 Mm Door Size: 1.2 Mt X 2.25 Mt Clear Opening Gipp / Gipp Skin Material With Kan Type Indian Hardware For The Door Such Handle, Hinges, Door Closure. 2. Catalytic Ethylene Generator - Generator Capable Of Generating Enough Ethylene To Bring Up The Ethylene Levels In The Room To 200 Ppm In 12 To 18 Minutes. Specs: 600 Cu Meter Per Hour, Power 200W, Volage: Volts:240Vac 3.Ventilation Equipment: A Set Of Two Specially Designed Blowers Of 350-Meter Cube Per Hour For The Chamber To Draw In Fresh Air And Exhaust Carbon Dioxide Laden Stale Air. Specs: 600Cu. Meters Per Hour, Power: 150W, Volts: @ 240 Vac. 4. Control Panel: Microprocessor Based Controlled Unit With Hmi Touchscreen Parameter Controlling System For Controlling/Displaying Parameters. Parameters To Be Controlled: Temperature, Ventilation, Ethylene Level, Humidity, Carbon Di Oxide. Specs: Temperature: 0 Deg Cent To 60 Deg Cent, Ventilation: On /Off Real Time Ventilation Control For Ripening Cycle Programming, Ethylene Injection Time: On /Off Real Time Ventilation Control For Ripening Cycle Programming. 5. Refrigeration System: Condensing Unit Scroll Compressor Based. 3 Tr × 2 Per Hour High Humidity Secondary Refrigeration System To Remove The Heat Of Respiration Of The Mangoes. Specs. Evaporators: Secondary Coolant Evaporator Coils 3 Tr × 2 Having Large Surface Area For Fast And Efficient Cooling. Blower: High-Capacity Centrifugal Blowers × 2., Additional Circulating Fan: 2 Nos. Insulated Steel Chiller Tank, Coolant Circulation Pump, And Piping System. 6. Ripening Controller: Standard Microprocessor Based Ripening Controller Unit. 7. Carbon Di-Oxide Sensor Installation Of Puf Panels And Door System With Installation Accessories Such As Silicon Sealant, Flashers, Angles, Rivets Etc Complete. Installation And Commissioning Of All Machines And Equipment With Wire And Cabling And Switch Gear Complete. , Precooling Cum Ripening Chamber-2 Capacity 6 Mt Room Size External Lxbxh : 6.4 Mtrs X 3.75 Mtrs X 3.0 Mtrs External A Wall Of 3.75 Mtrs Combined With Precooling Cum Cold Storage Cum Ripening Chamber. 1. Fb- 80 Mm Thick Puf Panels With 0.5 Mm Tct Gipp Sheets Both Sides For Walls & Ceiling Average Of 40 Kg/ Cu Meter Complete With Cam Locks. High-Density Puf Floor Insulation Slabs (40 Kg/M3) Faced With Bitumen/Tar Felt On Both Sides For Flooring Underlayment. Fb Door System 80 Mm Door Size : 1.2 Mt X 2.25 Mt Clear Opening Gipp / Gipp Skin Material With Kasan Type Indian Hardware For The Door Such Handle, Hinges, Door Closure 2. Catalytic Ethylene Generator - Generator Capable Of Delivering Controlled Ethylene Output, Allowing The Operator To Set And Achieve Customized Ppm Levels In 12 To 18 Minutes. Specs: Power 200W, Voltage: 240Vac. 3.Ventilation Equipment: A Set Of Two Specially Designed Blowers Of 350-Meter Cube Per Hour For The Chamber To Draw In Fresh Air And Exhaust Carbon Dioxide Laden Stale Air. Specs: 600Cu. Meters Per Hour Power: 150W Volts: @ 240 Vac 4. Control Panel: Microprocessor Based Controlled Unit With Hmi Touchscreen Parameter Controlling System For Controlling/Displaying Parameters. Parameters To Be Controlled: Temperature, Ventilation, Ethylene Level, Humidity, Carbon Di Oxide. Specs: Temperature: 0 Deg Cent To 60 Deg Cent Ventilation: On /Off Real Time Ventilation Control For Ripening Cycle Programming Ethylene Injection Time: On /Off Real Time Ventilation Control For Ripening Cycle Programming. 5. Refrigeration System: Condensing Unit Scroll Compressor Based. 3 Tr × 2 Per Hour High Humidity Secondary Refrigeration System To Remove The Heat Of Respiration Of The Mangoes. Specs. Evaporators: Secondary Coolant Evaporator Coils 3 Tr × 2 Having Large Surface Area For Fast And Efficient Cooling. Blower: High-Capacity Centrifugal Blowers × 2., Additional Circulating Fan: 2 Nos. Insulated Steel Chiller Tank, Coolant Circulation Pump, And Piping System. 6. Ripening Controller : 7. Wire And Cabling And Switch Gear Installation And Commissioning Of Equipment Complete 8. Carbon Di-Oxide Sensor Installation Of Puf Panels And Door System With Installation Accessories Such As Silicon Sealant, Flashers, Angles, Rivets Etc Complete. Installation And Commissioning Of All Machines And Equipment With Wire And Cabling And Switch Gear Complete. , Precooling Cum Ripening Chamber Cum Cold Storage Capacity 6 Mt Room Size External Lxbxh : 6.4 Mtrs X 3.75 Mtrs X 3.0 Mtrs External A Wall Of 3.75 Mtrs Combined With Precooling Cum Ripening Chamber 1. Fb- 80 Mm Thick Puf Panels With 0.5 Mm Tct Gipp Sheets Both Sides For Walls & Ceiling Average Of 40 Kg/ Cu Meter Complete With Cam Locks. High-Density Puf Floor Insulation Slabs (40 Kg/M3) Faced With Bitumen/Tar Felt On Both Sides For Flooring Underlayment. Fb Door System 80 Mm Door Size : 1.2 Mt X 2.25 Mt Clear Opening Gipp / Gipp Skin Material With Kasan Type Indian Hardware For The Door Such Handle, Hinges, Door Closure 2. Catalytic Ethylene Generator - Generator Capable Of Delivering Controlled Ethylene Output, Allowing The Operator To Set And Achieve Customized Ppm Levels In 12 To 18 Minutes. Specs: Power 200W, Voltage: 240Vac. 3.Ventilation Equipment: A Set Of Two Specially Designed Blowers Of 350-Meter Cube Per Hour For The Chamber To Draw In Fresh Air And Exhaust Carbon Dioxide Laden Stale Air. Specs: 600Cu. Meters Per Hour Power: 150W Volts: @ 240 Vac 4. Control Panel: Microprocessor Based Controlled Unit With Hmi Touchscreen Parameter Controlling System For Controlling/Displaying Parameters. Parameters To Be Controlled: Temperature, Ventilation, Ethylene Level, Humidity, Carbon Di Oxide. Specs: Temperature: 0 Deg Cent To 60 Deg Cent Ventilation: On /Off Real Time Ventilation Control For Ripening Cycle Programming Ethylene Injection Time: On /Off Real Time Ventilation Control For Ripening Cycle Programming. 5. Refrigeration System: Condensing Unit Make Emerson Recipl Compressor R22 Based 2.5Tr X 2 High Humidity Secondary Refrigeration System To Remove The Heat Of Respiration Of The Mangoes. 6. Ripening Controller: 7. Wire And Cabling And Switch Gear Installation And Commissioning Of Equipment Complete 8. Carbon Di-Oxide Sensor Installation Of Puf Panels And Door System With Installation Accessories Such As Silicon Sealant, Flashers, Angles, Rivets Etc Complete. Installation And Commissioning Of All Machines And Equipment With Wire And Cabling And Switch Gear Complete. , Standby Ethylene Generators Generator Capable Of Delivering Controlled Ethylene Output, Allowing The Operator To Set And Achieve Customized Ppm Levels. Specs: Power 200W, Voltage: 240Vac , Power Distribution Panel Incoming Feeder 2 X 125 Amps Outgoing Feeder 12 X 32 Amps With All Fuse Ryb Meter And Accessories In Ms Cabinet , Hot Water Treatment Unit With Drier And Data Logger Capacity- 3.6 Mt/Day Hot Water Treatment System: Logistics: 20 Kgs X 18 Crates = 360 Kgs Per Batch. Batch Time For Treatment = 60 Minutes. Rate Per Hour = 360 Kgs/Hour. Total Per 12-Hour Shift = 4,320 Kgs. Approx. Avg. Mango Dozen = 1,728 Dz. Hot Water Insulated Tank: In Ss With Circulation Assembly To Accommodate 18 Crates Of 20 Kg Capacity (Total 360 Kgs). Hoist System: Hydraulic/Electric Based For 18 Crates Of 20 Kg Capacity (Total 360 Kgs) With Ss Cage. Heating System: Heat Pump Based To Bring Water Temperature To 55 Degree Centigrade. This System Shall Heat Water At One Third Of The Energy Required By Heaters. Tunnel Dryer Conveyor Assembly: Perforated Belt Based With Air Blowers Approx. 15 Feet X 1.5 Feet, Fabricated In Ss202 For Non-Wettable Parts Of The Conveyor. Plc Based Temperature Control And Display Unit With Data Logging. , X-Ray Mango Scanning System Capacity 0.6 Mt / Hour Scanning Speed: Up To 35 To 40 Mangoes A Minute. Approx. 200 Dozen Per Hour. Two Mangoes To Be Scanned Side By Side Per Scan. The Conveyors Shall Be Sufficiently Long To Remotely Access The Mangoes Without Going Into The X-Ray Machine Area. Shall Have A 9 X 9-Inch Dynamic Flatbed X Ray Detector With Maximum Resolution Of Up To 150 Microns To Capture The Mango X Ray Image Coupled With Hd Computer To Display The X Ray Image. Shall Have A Rejection System For Rejecting Bad Mangoes Using Motorized Diverter. Shall Have Microprocessor-Based Image /Source Synchronizing Software And Hardware So As To Improve Timing And Quality Of The X Ray Image. The X-Ray Machines Must Be Housed In Radiation Insulated Lead Cabinet Enabling Only Authorized Personnel To Enter X-Ray Machine Area. , Transport And Erection
Basic Detail
Tender No SMART/SINDH/VENG/MACH/01/2026
Bidding Type Tender
Location
City Sindhudurg
State Maharashtra
Key Dates
Publish Date 28 Sep 2026
Submission Date 29 Oct 2026
Open Date 30 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee 1000
EMD Ref. Documents
Exemption Not Available
Document List
017825b6-2bbc-4a67-b628-44259473fec0.html
BOQ_2292800.xls
Tendernotice_1 (79).pdf
vengurlatenderdocuments.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Sep 28, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 29, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 24 days
Oct 30, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 25 days

Tender Documents

Download All (ZIP) ↓
html

017825b6-2bbc-4a67-b628-44259473fec0.html

xls

BOQ_2292800.xls

pdf

Tendernotice_1 (79).pdf

pdf

vengurlatenderdocuments.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders