Tender For Replacement Of Damaged Wooden Wall Paneling(Bottom Portion) By Wall Tiles With Related Other Civil Works At It Deptt. 4Th & 5Th Floor.
Tender Value
1.59 Lakhs
Estimated cost
Bid Submission
06 Oct 2026
3 days left
EMD
3200
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Replacement Of Damaged Wooden Wall Paneling(Bottom Portion) By Wall Tiles With Related Other Civil Works At It Deptt. 4Th & 5Th Floor.
BOQ
| Sl. No. | Item Description |
| 1 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.b) 3- track sliding window. i) Bottom frame |
| 2 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white.b) 3- track sliding window. ii) Top and side frame. |
| 3 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. d) Shutter for all track sliding window. i) Bottom & Top member. |
| 4 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In- Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. d) Shutter for all track sliding window. ii) Style side member. |
| 5 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. d) Shutter for all track sliding window. iii) Interlock member. |
| 6 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter.i) Door frame. (Top & sides). |
| 7 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding &casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter. ii) Shutter :Top rail. |
| 8 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding &casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter. ii) Shutter :Bottom rail. |
| 9 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized (with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISI embossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter. ii) Shutter :Lock rail |
| 10 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finished conforming to IS: 1868-1983 for fabrication of composit door, sliding & casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - In- Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter. ii) Shutter :Door vertical. |
| 11 | BUILDING WORKS(R) ALUMINIUM WORKS???(1)Supplying profiles of required section made of Aluminium Alloy Extrusions conforming to IS: 732-1983 and IS: 1285- 1975; Annodized(with required film thickness and specified colour / natural) matt finishedconforming to IS: 1868-1983 for fabrication of composit door, sliding &casement windows, partitions, formed of basic sections of any ISIembossed / certified make and brand as per direction of Engineer - In-Charge. (Payment will be made on finished length of the work).(A) In 10-12 Micron thickness Annodizing film. I) Natural white. k) Movable door shutter. ii) Shutter :Glazing cleap. |
| 12 | BUILDING WORKS(R) ALUMINIUM WORKS??(27)Providing and fixing exterior quality Aluminium Composite Panel (ACP)wall cladding on existing Al. /MS frame work with GI brackets, ACP fixed on the existing frame work by folding the edges of ACP panel (Engraving the rear surface of ACP sheet) with CP angles, cleats andstrainless Steel screws forming groves at the periphery of ACP panel.Such grooves filled with foam and silicon sealant etc. complete with all materials (but including the cost of silicon sealant), labour, scaffolding and all other incidental charges complete in all respect as per specification and direction of Engineer-in-charge. (Mode of payment is on finished surface area of ACP)(a) 3mm thick (0.25mm Al.+2.5mm LDPE +0.25mm Al. PVDF coating) |
| 13 | BUILDING WORKS(R) ALUMINIUM WORKS??(9)Supplying bubble free float glass of approved make and brand conforming to IS: 2835-1987. ii) 4mm thick coloured / tinted / smoke glass. |
| 14 | BUILDING WORKS(R) ALUMINIUM WORKS??(2)Labour charge for fabrication and installation of composite door,window, partitions made from annodized extruded alloy aluminiumsections for the following units:(A) Glazed aluminium sliding windows made of extruded and annodizedalloy aluminium sections, fabrications, including cutting to proper shapeand size, drilling and aligning of window shutter frame fitted with in builtlocking arrangements, sliding rollers and other necessary fittings, fixture,adhesives and joineries along with extruded neoprine or EPDMgasketing in between window frame and masonry work (walls, column,beam.lintels etc.) as well as between glass and shutter frame for fixingglass and Polysulphide sealant and in between shutter and window framewhere necessary including cutting to requisite size and fixing glass asper drawing, specification and direction of EIC.The rate includes the hire charge of all tools and plants, including allincidental charges, adhesive, joineries such as screw, cleat angle etc.butexcluding the cost of extruded aluminium sections, glass, neoprene /EPDM gasket, locking arrangement and rollers. ii ) 3 /4 track sliding window.Note: Add extra for each Addl. Floor over the rate of item 2A, 2B, 2Cand 2D except 2A(vi)i) Upto 4th Floor Rs.12.00 per Sq.mii) Above 4th Floor Rs.16.00 per Sq.m |
| 15 | BUILDING WORKS(R) ALUMINIUM WORKS??(2)Labour charge for fabrication and installation of composite door,window, partitions made from annodized extruded alloy aluminiumsections for the following units:-(B) Partly glazed partly panelled or fully glazed single leaf alunminiumswing door made of extruded and annodized alloy aluminium sections,fabrication including cutting to proper shape and size, drilling andaligning, fitted with heavy duty hydraulic action floor sping placed in thefloor with mending damages,with top pin assembly of approve make andbrand, fitted with in built locking arrangement, flush bolt, glazing clipsand all other necessary fittings, fixtures, adhesives and joineries, cuttingglass of approved make to requisite shape and size fitting with dry set neoprene or EPDM gasketing, cutting to requisite shape and size panelboard (prelaminated particle block) fixing them with glazing clips as perdrawing, specification and direction of Engineer in charge.The rate includes the hire charge of all tools and plants, adhesive,joineries such as screw, cleat angle etc. but excluding the cost of extrudedalumium sections, glass, panel boards neoprene / EPDM gasket, lockingarrangement, weather gasket / wool pile, floor spring, top pin, handle,tower bolt, glazing clips etc. (10% rate reduction has to be made forswing doors or partitions where floor sping is not used. 10%enhancement of rate is to be made where door frame of extrudedaluminium sections has to be fitted and fixed to masonry wall. 5% rateenhencement may be allowed for double leaf swing door. Payment shallbe made for the shutter area only exept where door frame is fixed theentire opening shall be taken to consideration.Payment for door framesections are to be paid seperately).Note: Add extra for each Addl. Floor over the rate of item 2A, 2B, 2Cand 2D except 2A(vi)i) Upto 4th Floor Rs.12.00 per Sq.mii) Above 4th Floor Rs.16.00 per Sq.m |
| 16 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 6. Dismantling artificial stone flooring upto 50 mm. thick by carefully chiselling without damaging the base and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. |
| 17 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(6)Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement.(iii) 35 mm. thick.(Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A). |
| 18 | BUILDING WORKS (G) WOOD AND PVC WORKS D. ACCESSORIES 23.ii) Godrej Hydraulic door closer fitted and fixed complete. (b) Medium type |
| 19 | BUILDING WORKS (D) Flooring A. ORIGINAL WORKS 35. Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles includingroughening of concrete surface, if necessary or by synthetic adhesive& grout materials etc. (B) Wall. With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (b) Area of each tile above 0.09 Sq.m (ii) Other than Coloured decorative including white. Note: 2. Add extra for each addl,floor over the rate for item 35 & 36 of subhead A. (i) upto 4 th floor-Rs5/ Sq.m (i) above 4 th floor-Rs 6.25/ Sq.m |
| 20 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 2.Supplying, fitting and fixing boiling water proof ply conforming to IS: 710-1977 bonded with phenol formaldehyde synthetic resin conforming to IS: 848-1974 of approved make and brand fitted and fixed as per design as per approval and direction of Engineer-in-Charge. [excluding the cost of supporting frame work and teak wood batten/Lipping] In Ground Floor (ii) 6mm.(Note: For Boiling Water Resistant Block Boards reduce the above rates by 5%). For upper floor refer Item H (4) for item 1, 2, 3, 4 under subhead G |
| 21 | BUILDING WORKS (G) WOOD AND PVC WORKS G. WALL PANELLING 14Supplying fitting, fixing decorative lamination conforming to IS: 2046 : 1995 as per approved make, brand, finish and thickness with fitting, fixing the same on Particle/MDF / Ply Boards with recommended / approved adhesive with proper clipping the sides for better attachment as per direction of Engineer-incharge. The rate includes the cost of labour, adhesive and all incidental charges thereof.In ground floor Glossy/Matt/Suede excluding surface texture or metallic lustre.(i) Thickness of laminate 1.5mm (For upper floors refer to item H(4) for items 13, 14, 15, 16 under subhead G |
| 22 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 23 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 13)Santras. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 24 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 7)Carpenter (Helper). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. |
| 25 | Sub Total |
| 26 | GST 18% |
| 27 | CESS 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 28, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 06, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 08, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents