Tender For Contract Jp/Js14(1C&1D): Design, Manufacture, Supply, Installation, Testing And Commissioning Of Telecommunication System For 3 Stations Of Jmrts Phase-1C & 1D Project.
Tender Overview
Project Description
Tender for Contract Jp/Js14(1C&1D): Design, Manufacture, Supply, Installation, Testing And Commissioning Of Telecommunication System For 3 Stations Of Jmrts Phase-1C & 1D Project.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 16-Oct-2026 | Revised Timeline | Date | 12-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Contract JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. S. No. Preamble |
| 2 | The Bill of Quantities shall be read in conjunction with instructions to Bidders, General and Special Conditions of Contract, Notice inviting Bidders and Employer's Requirements (General specifications & Particular specifications). |
| 3 | Bidder shall note that prices shall be quoted against each item in the price schedule, the bidders are advised to quote the price inclusive of all Central/State/Local taxes (except GST and Custom duty which will be paid extra as applicable), duties, levies, cess on duties, freight, insurance and all other incidental charges required to fulfill the contract requirements including statutory deduction viz., TDS towards Income Tax/GST/Works Contract Tax /Labor Cess and any other Tax etc. and except Custom duty/ exemptions thereto, to the extent the same are applicable and available. after considering clause C2.4, C2.5 & C2.6 of ITB and SCC Clause 21. |
| 4 | The Bidder shall quote any unconditional discounts and the methodology for their application in view of the rights provided to the bidder in terms of percentage figure on total bid price so that the discounts can be evaluated by simple arithmetic calculation during financial evaluation of the bids, to arrive at the net total price of the bid. |
| 5 | If the bidder fails to quote rates against any item, the tender may be treated as incomplete and non-responsive and shall be rejected. |
| 6 | Errors will be corrected by the employer for any arithmetic errors in computation or summation as per contract conditions. |
| 7 | No Price variation is admissible in this contract. |
| 8 | Bidder shall note that total price mentioned in Bid Total of Annexure-A of Appendix-1 of COF and BOQ total price must be equal. In case of discrepancies BOQ total price shall prevail. |
| 9 | Bidder shall note that total price mentioned in BOQ after discount and Annexure-A of Appendix-1 of COF must be equal. In case of any discrepancies BOQ total price shall prevail and Milestone shall be apportioned accordingly by considering the same discount as mentioned in BOQ. |
| 10 | The rates and prices to be tendered in the Pricing Document are for completed and finished items of work and complete in all respect. It will be deemed to include cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, contractor's profit and establishment/overheads, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. |
| 11 | Bidder shall note that the Appendix-1 of COF is only instructions for completing the pricing document, whereas Appendix 14 to 16 of COF is required to be prepared and submit along with the pricing document (Vol-4) by the bidder. |
| 12 | For the List of spares for 10 years of system operation from the last date of Taking over of whole works, the bidder shall submit unpriced list of spares for maintenance of supplied system in the format as per Appendix- 14 of COF in Technical Package and priced list for the same in the Financial Package. However, due to any reason, if the bidder is not able to submit unpriced list of spares for maintenance of supplied system in the format as per Appendix- 14 of COF in Technical Package and priced list for the same in the Financial Package, bidder shall submit a undertaking in the format as per Appendix-17 of COF in the Technical Package.The rates of these spares (Appendix-14 of COF) will not be considered for tender evaluation while assessing the L1 bidder. |
| 13 | Bidder shall note that the pricing for unconditional withdrawal of the deviations from Instructions to Bidder, GCC & SCC and the Employer's Requirements (General Specifications and Particular Specifications) noted in the Appendix 13 of FOB has been given in the financial bid Appendix-N.The Bidder shall indicate price adjustment against each deviation in Appendix N of Financial bid. This price is the price on which the bidder shall reduce from his tender price if deviation(s) is/are accepted by the Employer.If there is no deviation, the statement should be returned duly signed with an endorsement indicating 'No Deviations'. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the bidder has not proposed any deviations from bid documents.Bidder must confirm that all implicit and explicit deviations, comments and remarks mentioned elsewhere in our proposal shall be treated as NULL and VOID and stand withdrawn and the unpriced deviations will be treated as NULL and VOID. |
| 14 | Bidder shall note that the copy of all the documents of Financial Package must be submitted with the Technical Package and it should be true copy of the financial package with prices left blank. Bidder shall also note that any additional comments, remarks, deviations, terms and conditions in Financial Package will be treated as NULL and VOID and stand withdrawn. |
| 15 | Bidder shall note that all the pages of documents submitted/uploaded as part of bid documents must be signed by the authorised signatory of the bidder. For detailed information ITB clause A4.1 & C24.2 may be referred. |
| 16 | Please refer Appendix 1 of COF for Instructions to complete the Pricing Document (BOQ and Milestones) |
| 17 | Foreign Currency APPENDIX J (TELECOMMUNICATION) (THIS DOCUMENT IS TO BE PREPARED AND COMPLETED BY THE TENDERER) SUMMARY OF BILL OF QUANTITIES Name of Work: Contract JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. SUMMARY OF PRICE FOR CONTRACT JP/JS14 (1C & 1D) FOR TECOMMUNICATION SYSTEMS Name of the Bidder/ Bidding Firm / Company : 0.0 S. No. Description Total Foreign Currency Local Currency USD INR |
| 18 | Schedule J : FOTS System |
| 19 | Schedule J : Telephone System |
| 20 | Schedule J : Radio System |
| 21 | Schedule J : PAS/PID System |
| 22 | Schedule J : Master Clock (MCLK) System |
| 23 | Schedule J : CCTV System |
| 24 | Schedule J : UPS (S&T) System Total 0.0 0.0 NOTE: 1. Total price quoted in the BOQs should be unit price multiplied by the total minimum quantity. 2. The BOQ indicated is the minimum BOQ and any additional items or enhancement of any quantity to complete the scope of work shall be borne by the Contractor. |
| 25 | Core Router (IP-MPLS) with all associated accessories including SFP(s), softwares & licenses etc at OCC as per Particular Specification |
| 26 | Distribution Router (IP-MPLS) with all associated accessories including SFP(s), softwares & licenses etc at stations as per Particular Specification |
| 27 | 19' Rack as per Particular Specification |
| 28 | Digital Distribution Frame, Main Distribution Frame, Intermediate distribution Frame, Power Cables, Data Cables, Pigtails, Patch Panel, Loop Box, Patch Cords, Connectors, 16 Sq. mm Earth cable, Ethernet termination panel for 32 ports Terminations, GI conduit, Flexi GI conduit, Power distribution boxes etc for complete Installation, testing of FOTS system for stations & OCC |
| 29 | 32 port Layer 3 Switch (redundant) for OCC as per PS |
| 30 | Network Management system (NMS) for IP-MPLS system as per GS & PS |
| 31 | OFC 96 Fibre Armoured FRLSZH Cable as per RDSO or TEC Specification & PS. |
| 32 | HDPE Telecom Duct (40/33mm) |
| 33 | Fiber Management System 96x2 |
| 34 | Laptop Computer loaded with all Software(s) & licenses as per GS & PS. |
| 35 | Delivery of any other items required for completion of work to fully meet the contract requirements as per GS & PS. Schedule J3 - Customisation & Configuration Cost |
| 36 | Customisation & Configuration Cost Schedule J4: FOTS System Other services |
| 37 | Application Engineering and Documentation |
| 38 | Interface Application Engineering and design with designated DDC, Construction Contractor of station, Traction, etc. |
| 39 | Integration, Testing & commissioning at Station Level |
| 40 | Integration, Testing & commissioning at OCC level including JMRC Phase-1B section. |
| 41 | Integrated Testing & Commissioning with Telecom Sub-system contractor, AFC Contractor, Rolling Stock Contractor, Traction Contractors and including all other designated Contractors. |
| 42 | As built Drawings as per General Specification and Particular Specification. |
| 43 | Supervised Maintenance (4 Man-Month) |
| 44 | Defects Liability Period Support as per General Specification and Particular Specification. |
| 45 | Contract Spares of FOTS System as per PS |
| 46 | Special Tools |
| 47 | Project Management |
| 48 | Training for FOTS as per General Specification & Particular Specification (01 Instructor for 15 Man days) |
| 49 | Any other services required to complete the scope of contract as per PS & GS. Total Cost for Schedule J (J1+J2+J3+J4) - FOTS System: Carried to Summary of BOQ |
| 50 | Upgradation of Central Telephone Exchange with Additional 60 digital phone licenses including following work: Supply of Appliance call server 2 nos. (Central Server) in redundant configuration (1+1) along with Gateway architecture cabinets & Gateway cards fulfilling 300 ports equipped, 512 port wired, Analog, Digital card, PRI card for E1 trunk, SIP Trunk (30 nos.), 20 SIP user licenses and associated accessories with licenses at OCC Mansarovar depot. Supply of NMS Server 2 nos. with redundant configuration along with supply of necessary hardware and upgrading the existing software. |
| 51 | Supply of Appliance call server in redundant configuration along with Gateway architecture cabinets & Gateway cards fulfilling 60 ports equipped (30 Analog & 30 SIP IP user), PRI card for 2 nos. of E1 trunk, SIP Trunk (20 nos.) and associated accessories with licenses at Elevated Stations |
| 52 | Supply of Appliance call server in redundant configuration along with Gateway architecture cabinets & Gateway cards fulfilling 120 ports equipped (80 Analog & 40 SIP IP user), PRI card for 2 nos. of E1 trunk, SIP Trunk (20 nos.) and associated accessories with licenses at Underground Stations |
| 53 | SIP Phone (20 Lines) for SCR at Station & OCC |
| 54 | SIP Phone (10 Line) for Station (other than SCR) |
| 55 | SIP Video Phones including licenses as detailed in PS. |
| 56 | Analog Basic Phones |
| 57 | Upgradation/replacement of existing DLC with all Hardware/Software of Phase 1A & 1B to include Phase-1C & 1D |
| 58 | Emergency telephones in underground section |
| 59 | Help point Phones with in-built camera including licenses as detailed in PS |
| 60 | GI Pipe for surface conduiting (Km) |
| 61 | Telephone cable Low Smoke Zero Halozen 2 Pair |
| 62 | Telephone cable Low Smoke Zero Halozen 2 Pair armoured (Tunnel) |
| 63 | Telephone cable Low Smoke Zero Halozen 20 Pair |
| 64 | CAT-6 Cable Low Smoke Zero Halogen (for all stations, OCC & Depots) as detailed in PS. |
| 65 | Armoured 3 Core power cable for emergency Telephones as per PS |
| 66 | Portable Notebook computers suitable for field maintenance/configuration, testing of Telephone Exchange at Station & OCC and loaded with all relevent softwares |
| 67 | Supply and Delivery of Site Material (Racks, Base Frame, AC/DC Distribution Boards for all Telephone Systems, MDF, IDF, Surge Protection Box, connectors, connecting cables, power cables, data cables, Earth Cables etc.) for complete Installation/ Testing/ Commissioning of Telephone System for 3 stations & OCC |
| 68 | Delivery any other item necessary for meeting fully the contract requirements. Schedule-J3: Telephone :Others Services (Design, Interface, Testing & Commissioning) |
| 69 | Application Engineering and Documentation |
| 70 | Interface Application Engineering and design with designated DDC, Construction Contractors of Station, Traction, E&M etc. |
| 71 | Integrated testing and commissioning with Telecom, Rolling Stock, Traction Contractors and including all other designated contractors |
| 72 | Testing & Commissioning at station level |
| 73 | Testing & Commissioning at OCC level |
| 74 | As built Drawings for Telephone System |
| 75 | Supervised maintanance local 4 Man-Month |
| 76 | Defects Liability Period Support for Telephone system (24 Month) |
| 77 | Contract Spare of Telephone System as per PS |
| 78 | Special Tools as per PS |
| 79 | Project Management for Telephone System |
| 80 | On-shore training (01 Instructor for 15 Mandays) for Telephone System. Total Cost for Schedule J (J1+J2+J3) - Telephone System: Carried to Summary of BOQ |
| 81 | Upgradation/Replacement of existing Radio Central infrastructure including NMS, AKDC, TCS, Dispatcher server etc. at OCC |
| 82 | Radio Tower for Outdoor Radio BTS site with Antenna Structure |
| 83 | Radio Base Station for: Phase-1C & 1D stations (BTS equipped with two Base Radios, redundant controller, Tx/Rx Antenna etc.) Upgradation/Replacement of existing BTS equipped with two/four Base radio, redundant controller, TxRx Antenna etc. as detailed in PS Chapter-2. |
| 84 | Upgradation/Replacement of existing RCW as detailed in PS Chapter-2 |
| 85 | RAU/RCP (Radio Control Panel) with Power Supply, Antenna, Desktop interface, Telephone Handset and other accessories for: Phase-1C & 1D Stations Upgradation/Replacement of existing Phase-1A & 1B as detailed in PS Chapter-2 |
| 86 | Upgradation/ Replacement of existing Onboard Train Radio with all accessories and interface with Signalling, TIMS & Train PA etc. as detailed in PS Chapter-2 |
| 87 | Antenna system for outdoor BTS with 2 Base Radios |
| 88 | Leaky Coaxial Cable (zero halogen low smoke) 1-1/4\\" (with clamps & accessories) |
| 89 | Leaky Coaxial Cable (zero halogen low smoke) 7/8\\" (with clamps & accessories) |
| 90 | Underground antenna coverage system complete with splitters, combiners, indoor antennas etc. for station & mid sections. |
| 91 | Combiner (4:1) |
| 92 | Master Optical BDA |
| 93 | Remote Optical BDA |
| 94 | Base Station Combiner |
| 95 | LCX Clamps (1-5/8\\") for GSM |
| 96 | Supply & Delivery of Site Material (Racks, Distribution Boards, DDF, ODF, MDF, IDF, Connectors, connecting cables, Armoured Optical Fiber Cables, Optical Fibre Patch Cords, Feeder coaxial cable & other auxillary cables etc.) for complete installation/Testing/ Commissioning of Radio System |
| 97 | Upgradation / Replacement of existing Centralized Digital Recording System |
| 98 | Unarmoured Power Cable as per specifications |
| 99 | Armoured Power Cable as per specifications |
| 100 | Unarmoured Data Cable as per specifications |
| 101 | Earthing cable as per specifications |
| 102 | Any other item necessary for meeting fully the contract requirements. Schedule-J3 (Documentation, Project management, Training, DLP) |
| 103 | Project Management for Radio System and CDRS |
| 104 | Application Engineering and Documentation |
| 105 | As built Drawings for Radio System |
| 106 | On shore Training for Radio System and CDRS (01 instructor for 03 weeks) |
| 107 | Offshore Training for Radio System (01 instructor for 01 week) |
| 108 | Supervised maintenance for Radio System & CDRS (1 Man for 4 weeks) |
| 109 | Defects Liability Period Support for complete Radio System (24 Months) Schedule-J4 (Interface, Design, Testing & Commissioning) |
| 110 | Interface Application Engineering and design with designated DDC,Construction Contractors of Station, Traction,etc |
| 111 | Testing & Commissioning and Integrated Testing & Commissioning with Rolling Stock, Traction Contractors and including all other designated Contractors including Phase-1A & 1B Network. Schedule-J5 (Contract Spares & Special Tools and Test equipment) |
| 112 | Tools and Test Equipment |
| 113 | Contract Spares Total Cost for Schedule J5 Total Cost for Schedule J (J1+J2+J3+J4+J5) - Radio System : Carried to Summary of BOQ |
| 114 | Upgradation of existing Ph-1B PAS/PIDS Server (Fully configured in Redundant configuration) at OCC including Hardware, Software, associated licenses & all accessories as detailed in PS. |
| 115 | PAS/PIDS Integrated server with common Workstation, Mic, Preview speakers etc including Hardware, Software, associated licenses & all accessories at stations, as detailed in PS. |
| 116 | Upgradation of existing Ph-1B PAS/PIDS integrated workstation for OCC/Theatre & CSS including Mic with Server. Along with mounting accessories, fixtures, furniture etc. |
| 117 | Double sided True color LED Platform Display Board including Hardware, Software, associated licenses & all accessories at Stations , as detailed in PS |
| 118 | Single Sided LED backlit LCD Panel Concourse Display Board including Hardware, Software, associated licenses & all accessories at Stations as detailed in PS. |
| 119 | PA Loudspeakers - unidirectional / Ceiling / Wall loudspeaker excluding parking area |
| 120 | PAS equipment cabinet with Amplifiers, Audio Matrix, (Channel Mixing, Equalization, Zone Controlling, Monitoring, Gate Keeping etc) including Hardware, Software, associated licenses & all accessories at Stations to meet full functionalities, as detailed in PS. |
| 121 | NLC (Noise Level Cancellation) equipment & all accessories at Stations as detailed in PS. |
| 122 | Hard Wired PAS Control Panel with microphone or Digital call station |
| 123 | PA Loudspeaker cable (unarmoured) fire survival/ resistant type with Low smoke/zero halogen properties for Stations as detailed in PS. |
| 124 | Data cables (unarmoured) for PA Control Panel, NLCD, PIDS, Clock etc with Fire retardent type with Low Smoke/Zero Helozen properties for Stations as detailed in PS. |
| 125 | PIDS Power Cable (unarmoured) fire retardant type with Low smoke/zero halogen properties for Stations as detailed in PS. |
| 126 | Supply and delivery of site materials (Racks, Distribution boards, DDF, ODF, IDF, Connectors, Connecting cables, Earth cable, HDPE, Surge Protection Device, Flexible Conduit etc.) for complete Installation, Testing, Commissioning of PAS/PIDS system as per PS & GS. |
| 127 | GI conduit as per specifications (KM) |
| 128 | Notebook loaded with NMS Software (as per PS) |
| 129 | Design, Supply & Installation of Base Frame, False floor, and under false floor cable, cable trays with required riseres for wall mount units in TER of stations as per PS |
| 130 | Any other items necessary for meeting fully the contract requirements Schedule-J3: PAS/PIDS System: Other Services |
| 131 | Application Engineering and Documantation |
| 132 | Interface application Engineering and Design with DDC contractors of station,Traction etc. |
| 133 | Testing & commissioning at Station Level |
| 134 | Testing & commissioning at OCC level including 1B section. |
| 135 | Integration testing & commissioning with TC&S and other telecom contractors including all other designated contractors. |
| 136 | As built drawing for PIDS/PAS system |
| 137 | On Shore Training for PAS/PIDS (01 Instructor for 15 Man Days) |
| 138 | Supervised Maintenance for PIDS/PAS (4 Man Months) |
| 139 | Defect Liability period maintenance support for PAS/PIDS system (24 months) |
| 140 | Tools & Test Equipment as per PS. |
| 141 | Contract Spare as per Appendix E, PS |
| 142 | Project Management for PAS/PIDS System Total Cost for Schedule J (J1+J2+J3) - PIDS/PAS System : Carried to Summary of BOQ |
| 143 | Station-Sub-Master Clock |
| 144 | Analog Clock Double Sided 60 cm dia |
| 145 | Digital Indoor Clock |
| 146 | Digital Outdoor Clock |
| 147 | Data Cable(unarmoured) (KM) Fire Retardand type with low smoke/Zero halogen |
| 148 | Earth cable for fire retardant type Fire Retardand type with low smoke/Zero halogen(16 sq mm) |
| 149 | GI Conduit (25mm)as per specifications (in KM) |
| 150 | Supply and delivery of site materials (racks,Distribution boards,DDF IDF,connectors, connecting cables, etc.) for complete installation ,Testing ,commissioning for Clock system. |
| 151 | Any other items necessary for meeting fuly the contract requirements Schedule J3: MCLK System: Other Services |
| 152 | Application Engineering and Documentation |
| 153 | Interface application Engineering and Design with DDC contractors of station,Traction etc. |
| 154 | Testing & commissioning at Station Level |
| 155 | Testing & commissioning at OCC level including 1B section. |
| 156 | Integrtating Testing & Commissioning with Other Telecom Contractors & also including all other designated contractors |
| 157 | As built drawing for Clock system |
| 158 | On shore training for Clock 01 instructor for 15 Man Days |
| 159 | Supervised Maintenance for Clock 4 Man Month local |
| 160 | Defect Liability period maintenance support for Clock system (24 months) |
| 161 | Contract Spares as per PS |
| 162 | Project Management for Clock System Total Cost for Schedule J (J1+J2+J3) - MCLK System : Carried to Summary of BOQ |
| 163 | IP Fixed Box Cameras (Quad HD or better) with all associated accessories including Verifocal lens, Housing, mounting etc as per specifications. |
| 164 | IP Fixed Box Cameras (4K Ultra HD) with IR illuminator and all associated accessories including Verifocal lens, Housing, mounting etc as per specifications. |
| 165 | CCTV camera (4K Ultra HD) including Housing, mounting etc. for facial recognition system as per specifications |
| 166 | PTZ Dome IP Cameras (Quad HD or better) with all associated accossories as per Specifications. |
| 167 | IP based Corner Lift Camera (Full HD or better) with integrated IR illuminator and all associated accessories including integrated varifocal lens, mounting arrange-ment, SPD etc, as per specifications mentioned for all components in the PS. |
| 168 | IP based Bullet Camera (Quad HD or better) with all associated accessories including integrated Varifocal lens, housing, mounting arrangement, SPD etc, as per specifications mentioned in the PS. |
| 169 | Video Analytics for 16 Cameras (2PF ends, 8 on PF, 2 in Car Park and 4 in CL)-(30 Video Analytic for each station) |
| 170 | NVR Server with RAID5 each to record all cameras of each station as per specification complete with all hardware/software/licences etc |
| 171 | Upgradation/Replacement of existing Central Management System (Redundant) to cater additional requirement of new Ph-1C & 1D cameras with required upgradation of Hardware , Software and associated licences including integration of face recognition system with all associated accossories as per specification for OCC. |
| 172 | Licenses for Cameras, Workstations, Analytics and Keyboards (for item no. 1,2,3,4,5,6,7,11, 12 & 13) incl. 25% spare licenses for cameras only |
| 173 | Local work station (MMI with two 4K LED 32\\" monitors each, for Monitoring at Stations etc) with all furniture and accessories for installation as per PS. |
| 174 | Local work station (MMI with One 4K LED 85\\" monitors for Monitoring at Security Controllers at OCC) with all furniture and accessories for installation as per PS |
| 175 | Keyboard with Joystick for CCTV with all accessories as per specification |
| 176 | KVM TX/RX Pair Complete (for both 1 & 2 Monitors, 1 Keyboard, 1 Mouse and 1 Joystick Keyboard) as in Sr. no. 14 & 15 with all accessories as per specifications |
| 177 | Unarmoured 3 Core power cable as per PS |
| 178 | Armoured 3 Core power cable as per PS |
| 179 | Unarmoured CAT 5e/Cat 6 as per PS |
| 180 | Armoured CAT 5e/Cat 6 as per PS |
| 181 | Armoured 12 Fiber Of Cable as per PS |
| 182 | HDPE Telecom Duct (40/33mm) |
| 183 | GI Conduit |
| 184 | GI Flexible Conduit |
| 185 | Single Core 16 sqmm Earthing cable as per PS |
| 186 | Single Core 4 sqmm Earthing cable as per PS |
| 187 | Single Core 1.5 sqmm Earthing cable as per PS |
| 188 | ODF 12 ports as per PS |
| 189 | ODF 24 ports as per PS |
| 190 | ODF 96 ports as per PS |
| 191 | 12U Rack/Customized JB with all accessories as per specifications |
| 192 | 9U Rack/Customized JB with all accessories as per specifications |
| 193 | 3U Rack/Customized JB with all accessories as per specifications |
| 194 | Site Material (Equipment Racks (42U), connectors, Connecting cables, Patch cords (Fibre & CAT5e/CAT6), Converters, Distribution Boards, Junction Boxes etc.) as per PS. (Minimum 1 no. per TER/CER has been assumed, bidder shall indicate actual quantity required and cost for same) |
| 195 | Surge Protection Devices for each power and each data circuilt termination at both ends at device and at equipment ends. |
| 196 | Layer 3 Switch including all SFP(s) & accessories required as per PS |
| 197 | Layer 2 Switch Industrial Grade 24-ports (min. 24 - PoE ports + 4 Fx ports) including SFPs & all accessories as per specifications |
| 198 | Layer 2 Switch Industrial Grade 08-ports Switch (min. 08 - PoE ports + 2 Fx ports) including SFPs & all accessories as per specifications |
| 199 | Laptop |
| 200 | Any other Item Necessary for completion of JP/JS14 (1C&1D) Contract Schedule-J3 CCTV System: Other Services (Design, Interface, Testing & Commissioning) |
| 201 | Application Engineering & Documentation |
| 202 | Interface Application Engineering and design with designated DDC, Contractor of Station, Traction etc |
| 203 | Testing & Commissioning |
| 204 | Integration testing with other Signalling & telecom contractors and all other designated contractors as per interface requirements of PS. |
| 205 | As built drawings as per General Specifcation and Particular Specification |
| 206 | Training for CCTV system as per GS and PS (2 weeks) |
| 207 | Supervised Maintenance (16 weeks) |
| 208 | Defect Liabillty Period Maintenance support as per GS and PS (24 Months) |
| 209 | Provision of tools and test instrument as per GS and PS |
| 210 | Provision of Contract spares as per GS and PS |
| 211 | Project Management Total Cost for Schedule J (J1+J2+J3) - CCTV System : Carried to Summary of BOQ |
| 212 | 60 KVA UPS for interlocking station complete in online redundant configuration along with Isolation transformer and ATS cubicle, Battery sharing cubicle SCVS & Remote Monitoring equipment with all accessories as per PS |
| 213 | Appropriate capacity of UPS VRLA maintainence free batteries (having Two sets of 192 cells and second sets of 06 cells) with the facility of battery bank cross redundancy as per PS for Interlocking stations/ Base stations with Radio Tower |
| 214 | UPS AC Distribution boxes in UPS room for interlocking station |
| 215 | Spare cell charger of appropriate capacity |
| 216 | 25 KVA Isolation Transformer at downstream for E&M emergency supply at each Station. |
| 217 | Supply and delivery of site material (Racks, Distribution Boards (including ACDB at TER with MCCB, MCB, connecting cables from UPS (3 Phase 415V), DDF, ODF,MDF,IDF, connectors, Power cables, data cables, Earthing Cable etc with all accessories at stations & OCC) as detailed in interface specifications & PS for all Telecom Sub-system, AFC & IT for complete installation/Testing Commissioning of power Supply System as per PS & GS |
| 218 | Upgradation of existing NMS of Ph-1B with required hardware & software kit with user liscences alongwith all accociated accessories at OCC to include Phase-1C & 1D as per PS & GS |
| 219 | Contract Spares as per PS & GS |
| 220 | Special Tools & Test Equipment as per PS & GS Schedule J3: Documentation, Testing & Commissioning for UPS System |
| 221 | Documentation (Including O&M Manual, Training Manual, As-built Drawings, DID,PDD, FDD etc.) of complete system at all stations including OCC with earthing |
| 222 | Testing & Commissioning of complete system at all stations including OCC with earthing Schedule J4: UPS(S&T) System Other services |
| 223 | Training of complete UPS System (01 Instructor for 10 Mandays) |
| 224 | DLP Support of complete UPS System (24 months) Total Cost for Schedule J (J1+J2+J3+J4) - UPS System : Carried to Summary of BOQ Name of the Work- Contract - JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. CONTRACT JP/JS14 (1C & 1D) ANNEXURE A – BID TOTAL Name of the Bidder/ Bidding Firm / Company : 0.0 The Lump Sum Price of this Contract is: In Local Currencies - Indian Rupees INR In figures: 0.0 In words: INR Zero Only In Foreignl Currencies USD In figures: 0.0 In words: USD Zero Only The above Lump Sum Price shall be apportioned among the Section as below: S. No. Sections Total Apportioned Amount of Sections Foreign Currency Local Currency USD INR |
| 225 | Section-1D (Mansarovar to Ajmer Road Chauraha) |
| 226 | Section-1C (Badi Chaupar to Transport Nagar) |
| 227 | Section 1AB (Upgradation / Replacement Work of Radio and Telephone Systems in Ph-1A & 1B) |
| 228 | MS – Miscellaneous Section BID TOTAL (TOTAL FOR ALL SECTION) 0.0 0.0 ANNEXURE B – SECTION SUMMARIES CONTRACT JP/JS14 (1C & 1D) Name of the Work- Contract - JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. NAME OF BIDDER 0.0 SECTION 1D(MANSAROVAR TO AJMER ROAD CHAURAHA) Cost Centres Description of Cost Centres Foreign Currency Local Currency USD INR A Preliminaries and General Requirements 0.0 0.0 B Detailed Design 0.0 0.0 C Manufacture and Delivery 0.0 0.0 D Installation and Site Testing 0.0 0.0 E System Acceptance Tests, Integrated Testing and Commissioning 0.0 0.0 SECTION TOTAL CARRIED TO TENDER TOTAL 0.0 0.0 SECTION 1C(BADI CHAUPAR TO TRANSPORT NAGAR) Cost Centres Description of Cost Centres Foreign Currency Local Currency USD INR A Preliminaries and General Requirements 0.0 0.0 B Detailed Design 0.0 0.0 C Manufacture and Delivery 0.0 0.0 D Installation and Site Testing 0.0 0.0 E System Acceptance Tests, Integrated Testing and Commissioning 0.0 0.0 SECTION TOTAL CARRIED TO TENDER TOTAL 0.0 0.0 SECTION 1AB(UPGRADATION / REPLACEMENT WORK OF RADIO AND TELEPHONE SYSTEMS IN PH-1A & 1B) Cost Centres Description of Cost Centres Foreign Currency Local Currency USD INR A Preliminaries and General Requirements 0.0 0.0 B Detailed Design 0.0 0.0 C Manufacture and Delivery 0.0 0.0 D Installation and Site Testing 0.0 0.0 E System Acceptance Tests, Integrated Testing and Commissioning 0.0 0.0 SECTION TOTAL CARRIED TO TENDER TOTAL 0.0 0.0 SECTION MS - MISCELLANEOUS Cost Centres Description of Cost Centres Foreign Currency Local Currency USD INR A Training 0.0 0.0 B Spares, Special Tools, Test Equipment and Contract Spares 0.0 0.0 C Supervision of Maintenance & Manuals 0.0 0.0 D Defect Liability Period 0.0 0.0 SECTION TOTAL CARRIED TO TENDER TOTAL 0.0 0.0 ANNEXURE-C : SECTION 1D(MANSAROVAR TO AJMER ROAD CHAURAHA) COST CENTRE A – PRELIMINARIES AND GENERAL REQUIREMENTS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to:• Works Program for complete JP/JS14(1C&1D) Contract.• Setting up to Site Offices & Related Activities• Submission of Plans for complete JP/JS14(1C&1D) Contract and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To” such as: a) Preliminary System Assurance Plansb) EMC Management Plans.c) RAMS Plansd) Software Quality Assurance Plans.e) Quality Plansf) Site Safety Plans.g) Site Environmental Plans.• Submission of Interface Management Plan mutually agreed and signed with Designated Contractors for Section 1D including OCC.• Submission of Preliminary System Design for complete JP/JS14(1C&1D) Contract and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”• Submission of System Verification and Validation Documents for complete JP/JS14(1C&1D) Contract and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”• Submission of Specifications for the Line Side/Indoor Equipment for Complete JP/JS14(1C&1D) Contract and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of the requirement of power, space and mounting details for Section 1D including OCC.Any other item(s) considered necessary to comply with the Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: A1 Works Programme for complete JP/JS14(1C&1D) Contract A2 Preliminary System Assurance Plans for complete JP/JS14(1C&1D) contract A3 Site Safety Plans for complete JP/JS14(1C &1D) Contract A4 Site Environmental Plans for complete JP/JS14(1C&1D) Contract A5 Interface Management Plan with Designated Contractors for Section 1D including OCC A6 Preliminary System Design for complete JP/JS14(1C&1D) Contract A7 Software & System verification and validation documents for complete JP/JS14(1C&1D) Contract A8 Specifications for equipment including the requirement of power, space and mounting details for section 1D & OCC A9 Setting up Site Office and related activities A10 Earthing and Lightening Protection Design for both indoor and outdoor equipments for complete for complete JP/JS14(1C&1D) Contract. A11 Any other item(s) considered necessary to comply with the scope of Works COST CENTRE TOTAL CARRIED TO SECTION 1D SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1D(MANSAROVAR TO AJMER ROAD CHAURAHA) COST CENTRE B–DETAILED DESIGN This Cost Centre comprises all those obligations and ongoing activities through out of the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to :• Submission of Specifications of Equipments/Cables for JP/JS14(1C&1D) Contract and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”• Submission of Final design for Radio & CDRS System for Section 1D including OCC and Submission of RF coverage Design for complete JMRC Radio network of Phase- 1A, 1B, 1C & 1 D including specific details for the Section and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for CCTV System for Section 1D and OCC including Integration with Ph-1B System and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for UPS System for Section 1D and OCC including Integration/Upgradation of Existing NMS and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for PIDS/PAS/MCLK System for Section 1D and OCC including Integration with Ph-1B System and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for FOTS System for Section 1D and OCC including Integration with Ph-1B System and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for Telephone for Section 1D and OCC including Integration with Ph-1B System and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final System Assurance Plans for JP/JS14(1C&1D) Contract and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final Design of Workstation MMI of NMS for complete JP/JS14(1C&1D) Contract (all controlled from Mansarovar OCC) including OCC and their review by employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Installation Plans, Method Statements, Installation Design & Drawings and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Bill of Material for Section 1D including OCC and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Delivery Schedules for Materials for section 1D• Any other item(s) considered necessary to comply with Scope of Work for section 1D and OCC. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: B1 Specifications for Various Cables & Equipments and associated accessories for complete JP/JS14(1C&1D) Contract. B2 Final Design for Radio & CDRS System for Section 1D & OCC. B3 Final Design for CCTV System for Section 1D & OCC including integration with Phase 1B system. B4 Final Design for UPS System for Section 1D & OCC including integration/upgradation of Existing NMS. B5 Final Design for PIDS/PAS/MCLK System for Section 1D & OCC including integration with Phase 1B system B6 Final Design for FOTS system for Section 1D & OCC B7 Final Design for Telephone System for Section 1D & OCC. B8 Final Drawings for accepted Final Design for all Telecommunication Systems for Section 1D, OCC & integration works. B9 Final System Assurance for Complete JP/JS14(1C&1D) Contract. B10 Design of MMI for NMS workstation for complete JP/JS14(1C&1D) Contract. B11 Equipment installation methods, floor plans, cable route plans, cable termination and distribution plans for Section 1D including OCC B12 List of Materials required for this Section & OCC and Delivery Schedule there of B13 Submission of Interface Document with all other relevant Contractors for this Section & OCC. B14 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1D SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1D(MANSAROVAR TO AJMER ROAD CHAURAHA) COST CENTRE C – MANUFACTURE AND DELIVERY This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This includes but is not limited to:• Submission of Type Test Reports and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Factory Acceptance Test Reports and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Delivery of Radio & CDRS System, CCTV, UPS, PIDS/PAS/MCLK, FOTS & TELEPHONE Equipment and associated Accessories including OCC’s equipment at Contractor’s premises in Jaipur.• Delivery of Radio & CDRS System, CCTV System, UPS System, PIDS/PAS/MCLK, FOTS & TELEPHONE Cables, Earthing Cable, Power Supply Cable & Associated Accessories including OCC’s equipment at Contractor’s premises in Jaipur.• Any other item(s) considered necessary to comply with Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: C1 Delivery of all type of Cables including Earthing Cable, Power Supply Cable, HDPE Duct, Main Distribution Frames, Intermediate Distribution Frames, Optical Distribution Frame, Patch Panles and Associated Accessories for all Telecommunication system of this section & OCC at Contractor’s premises in Jaipur. C2 Delivery of Radio & CDRS System including Central control equipments, Base Stations, antennas, Supporting Structure, Network Management System, Radio Control Panel/Workstations/Access units & Associated Accessories of this section & OCC at Contractor’s premises in Jaipur. C3 Delivery of CCTV system including central control equipment Network Management System, & Associated Accessories of this section & OCC at Contractor’s premises in Jaipur. C4 Delivery of UPS system & Associated Accessories of this section & OCC at Contractor’s premises in Jaipur. C5 Delivery of PIDS/PAS/MCLK system component & Associated accessories of this section & OCC at Contractor’s premises in Jaipur C6 Delivery of FOTS system component & Associated accessories of this section & OCC at Contractor’s premises in Jaipur C7 Delivery of Telephone system including central equipment, Network Management System & Associated Accessories of this section & OCC at Contractor’s premises in Jaipur. C8 Any other item(s) considered necessary to comply with Scope of Work COST CENTRE TOTAL CARRIED TO SECTION 1D SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1D(MANSAROVAR TO AJMER ROAD CHAURAHA) COST CENTRE D – INSTALLATION AND SITE TESTING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:• Delivery to Site from Contractor’s premises in Jaipur of Equipment/Cables and associated accessories.• Pre Installation Test of Equipment/Cables and associated accessories delivered to site.• Installation as per reviewed Installation Plans, Method Statements, Installation Design & Drawings.• Submission of Installation Test Plans and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Installation Test as per reviewed Installation Test Plans.• Submission of Partial Acceptance Test Plans and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Partial Acceptance Test as per reviewed Partial Acceptance Test Plans.• Any other item(s) considered necessary to comply with the Scope of Works. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: D1 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Station Indoor Equipments of all Telecommunication Systems and Associated Accessories for Section 1D & OCC D2 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of Radio & CDRS System, Cables/antenna etc. for Section 1D & OCC. D3 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of CCTV System for Section 1D & OCC. D4 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of UPS System for Section 1D & OCC. D5 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of PIDS/PAS/MCLK System for Section 1D & OCC. D6 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all outdoor Equipment and Associated Accessories of FOTS System for Section 1D & OCC. D7 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of Telephone System for Section 1D & OCC. D8 Completion of Partial Acceptance Test for the Radio & CDRS System at all stations/locations of the section(s). D9 Completion of Partial Acceptance Test for the CCTV System at all stations/locations of the section(s). D10 Completion of Partial Acceptance Test for the UPS System at all stations/locations of the section(s). D11 Completion of Partial Acceptance Test for the PAS/PIDS/MCLK System at all stations/locations of the section(s). D12 Completion of Partial Acceptance Test for the FOTS System at all stations/locations of the section(s). D13 Completion of Partial Acceptance Test for the TELEPHONE System at all stations/locations of the section(s). D14 Any other item(s) considered necessary to complete the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1D SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1D(MANSAROVAR TO AJMER ROAD CHAURAHA) COST CENTRE E – SYSTEM ACCEPTANCE TESTS AND INTEGRATED TESTING & COMMISSIONING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:• System Acceptance Tests (SAT) in accordance with Reviewed System Acceptance Plan with Designated Telecom System Project Contractors• Integrated Testing and Commissioning (ITC) with all Designated Project Contractors (including existing Telecom system)• Submission of Reviewed As-Built Drawings, Complete Configuration Data and all Related Software for Section 1D & OCC.• Service Trials• Any other item(s) considered necessary to comply with the Scope of work MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: E1 System Acceptance Test (SAT) for the Radio & CDRS System. E2 System Acceptance Test (SAT) for the CCTV System. E3 System Acceptance Test (SAT) for the UPS System. E4 System Acceptance Test (SAT) for the PIDS/PAS/MCLK System. E5 System Acceptance Test (SAT) for the FOTS System. E6 System Acceptance Test (SAT) for the Telephone System. E7 Integrated Testing and Commissioning for the Radio & CDRS System. E8 Integrated Testing and Commissioning for the CCTV System. E9 Integrated Testing and Commissioning for the UPS System. E10 Integrated Testing and Commissioning for the PIDS/PAS/MCK System. E11 Integrated Testing and Commissioning for the FOTS System. E12 Integrated Testing and Commissioning for the Telephone System. E13 Submission of reviewed As-Built Drawings, Complete Configuration Data and all Related Software for all Sub-systems of Telecommunication System. E14 Completion of Service Trials for Section as a whole. E15 Any other item(s) considered necessary to comply with the Scope of work COST CENTRE TOTAL CARRIED TO SECTION 1D SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1C(BADI CHAUPAR TO TRANSPORT NAGAR) COST CENTRE A – PRELIMINARIES AND GENERAL REQUIREMENTS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to:• Submission of Interface Management Plan mutually agreed and signed with Designated Contractors.• Submission of the requirement of power, space and mounting details for Section 1C.• Any other item(s) considered necessary to comply with the Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: A1 Interface Management Plan with Designated Contractors. A2 Requirement of power, space and mounting details. A3 Any other item(s) considered necessary to comply with the scope of Works COST CENTRE TOTAL CARRIED TO SECTION 1C SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1C(BADI CHAUPAR TO TRANSPORT NAGAR) COST CENTRE B–DETAILED DESIGN This Cost Centre comprises all those obligations and ongoing activities through out of the Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to :• Submission of Final design for Radio & CDRS System for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for CCTV System for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for UPS System for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for PIDS/PAS/MCLK System for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for FOTS for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Final design for Telephone System for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Installation Plans, Method Statements, Installation Design & Drawings and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Bill of Material for Section 1C and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Submission of Delivery Schedules for Materials for Section 1C.• Any other item(s) considered necessary to comply with Scope of Work for JP/JS14(1C) section. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: B1 Final Design for Radio & CDRS System for Section 1C B2 Final Design for CCTV System for Section 1C B3 Final Design for UPS System for Section 1C B4 Final Design for PIDS/PAS/MCLK System for Section 1C B5 Final Design for FOTS System for Section 1C B6 Final Design for Telephone System for Section 1C B7 Final Drawings for accepted Final Design for all Telecommunication Systems for Section 1C B8 Equipment installation methods, floor plans, cable route plans, cable termination and distribution plans for all Telecommunication Systems for Section 1C B9 List of Materials required for this Section and Delivery Schedule thereof. B10 Submission of Interface Document with all other relevant Contractors. B11 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1C SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1C(BADI CHAUPAR TO TRANSPORT NAGAR) COST CENTRE C – MANUFACTURE AND DELIVERY This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This includes but is not limited to:• Submission of Type Test Reports (if applicable) and its review by Employer’s Representative with “No objection “or “No objection subject to”.• Submission of Factory Acceptance Test Reports and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Delivery of Radio & CDRS, CCTV, UPS System, PIDS/PAS/MCLK, FOTS & TELEPHONE Equipment and associated Accessories at Contractor’s premises in Jaipur.• Delivery of Radio System, CCTV System, UPS System, PIDS/PAS/MCLK, FOTS & TELEPHONE Cables, Earthing Cable, Power Supply Cable & Associated Accessories at Contractor’s premises in Jaipur.Any other item(s) considered necessary to comply with Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: C1 Delivery of all type of Cables including Earthing Cable, Power Supply Cable, HDPE Duct, Main Distribution Frames, Intermediate Distribution Frames, Optical Distribution Frame, Patch Panles and Associated Accessories for all Telecommunication system of this section at Contractor’s premises in Jaipur. C2 Delivery of Radio & CDRS System including Central control equipments, Base Stations, antennas, Supporting Structure, Network Management System, Radio Control Panel/Workstations/Access units & Associated Accessories of this section at Contractor’s premises in Jaipur. C3 Delivery of CCTV system including central control equipment Network Management System, & Associated Accessories of this section at Contractor’s premises in Jaipur. C4 Delivery of UPS system & Associated Accessories of this section at Contractor’s premises in Jaipur. C5 Delivery of PIDS/PAS/MCLK system component and Associated accessories of this section at Contractor’s premises in Jaipur C6 Delivery of FOTS system component & Associated accessories of this section at Contractor’s premises in Jaipur C7 Delivery of Telephone system including central equipment & Associated Accessories of this section at Contractor’s premises in Jaipur. C8 Any other item(s) considered necessary to comply with Scope of Work COST CENTRE TOTAL CARRIED TO SECTION 1C SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1C(BADI CHAUPAR TO TRANSPORT NAGAR) COST CENTRE D – INSTALLATION AND SITE TESTING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:• Delivery to Site from Contractor’s premises in Jaipur of Equipment/Cables and associated accessories.• Pre Installation Test of Equipment/Cables and associated accessories delivered to site.• Installation as per reviewed Installation Plans, Method Statements, Installation Design & Drawings.• Submission of Installation Test Plans and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Installation Test as per reviewed Installation Test Plans.• Submission of Partial Acceptance Test Plans and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Partial Acceptance Test as per reviewed Partial Acceptance Test Plans.• Any other item(s) considered necessary to comply with the Scope of Works. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: D1 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Station Indoor Equipments of all Telecommunication Systems and Associated Accessories for Section 1C. D2 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of Radio & CDRS System, Cables/antenna etc. for Section 1C . D3 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of CCTV System for Section 1C . D4 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of UPS System for Section 1C . D5 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of PIDS/PAS/MCLK System for Section 1C . D6 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all outdoor Equipment and Associated Accessories of FOTS System for Section 1C . D7 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Outdoor Equipment and Associated Accessories of Telephone System for Section 1C . D8 Completion of Partial Acceptance Test for the Radio & CDRS System at all stations/locations of the section(s). D9 Completion of Partial Acceptance Test for the CCTV System at all stations/locations of the section(s). D10 Completion of Partial Acceptance Test for the UPS System at all stations/locations of the section(s). D11 Completion of Partial Acceptance Test for the PAS/PIDS/MCLK System at all stations/locations of the section(s). D12 Completion of Partial Acceptance Test for the FOTS System at all stations/locations of the section(s). D13 Completion of Partial Acceptance Test for the TELEPHONE System at all stations/locations of the section(s). D14 Any other item(s) considered necessary to complete the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1C SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1C(BADI CHAUPAR TO TRANSPORT NAGAR) COST CENTRE E – SYSTEM ACCEPTANCE TESTS AND INTEGRATED TESTING & COMMISSIONING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:• System Acceptance Tests (SAT) in accordance with Reviewed System Acceptance Plan with Designated Telecom System Project Contractors• Integrated testing and commissioning (ITC) with all Designated Project Contractors (including existing Telecom system)• Submission of Telecommunication Systems Reviewed As Built Drawings, Complete Configuration Data and all Related Software for Section 1C• Service TrialsAny other item(s) considered necessary to comply with the Scope of work MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: E1 System Acceptance Test (SAT) for the Radio & CDRS System. E2 System Acceptance Test (SAT) for the CCTV System. E3 System Acceptance Test (SAT) for the UPS System. E4 System Acceptance Test (SAT) for the PIDS/PAS/MCLK System. E5 System Acceptance Test (SAT) for the FOTS System. E6 System Acceptance Test (SAT) for the Telephone System. E7 Integrated Testing and Commissioning for the Radio & CDRS System. E8 Integrated Testing and Commissioning for the CCTV System. E9 Integrated Testing and Commissioning for the UPS System. E10 Integrated Testing and Commissioning for the PIDS/PAS/MCK System. E11 Integrated Testing and Commissioning for the FOTS System. E12 Integrated Testing and Commissioning for the Telephone System. E13 Submission of reviewed As-Built Drawings, Complete Configuration Data and all Related Software for all Sub-systems of Telecommunication System. E14 Completion of Service Trials for Section as a whole. E15 Any other item(s) considered necessary to complete the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1C SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1AB(UPGRADATION / REPLACEMENT WORK OF RADIO AND TELEPHONE SYSTEMS IN PH-1A & 1B) COST CENTRE A – PRELIMINARIES AND GENERAL REQUIREMENTS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This Cost Centre includes but is not limited to:• Submission of Interface Management Plan with Designated System Parties for all works of Integration/Upgradation for both Radio including CDRS and Telephone Sub-Systems.• Radio coverage survey plan in all existing station / depot/ OCC / RSS / other locations of Phase-1A & 1B for Integrated Radio Network and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Any other item(s) considered necessary to comply with the Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: A1 Interface Management Plan with Designated Contractors of Radio & CDRS Sub-System for Integration/Upgradation work. A2 Interface Management Plan with Designated Contractors of Telephone Sub-Systems for Integration/Upgradation work. A3 Radio coverage survey plan in all existing lines/ station / depot/ OCC / RSS / other locations of Ph- 1A & 1B for Integration/Upgradation work. A4 Any other item(s) considered necessary to comply with the scope of Works COST CENTRE TOTAL CARRIED TO SECTION 1AB SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1AB(UPGRADATION / REPLACEMENT WORK OF RADIO AND TELEPHONE SYSTEMS IN PH-1A & 1B) COST CENTRE B–DETAILED DESIGN This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:• Detailed Interface Document mutually agreed and signed by all designated contractors/ parties for all works of Integration / Upgradation for both Radio and Telephone Sub-Systems and its review by Employer’s Representative with “No Objection” or “No Objection Subject To”.• Detailed Migration Plan for Integration / Upgradation of all existing stations of Ph-1A & 1B, into Single Integrated network with Phase-1C & 1D for Radio System including CDRS Sub-System and its review by Employer’s Representative with “No Objection” or “No Objection Subject To”.• Detailed Migration Plan for Integration / Upgradation of existing Central System of Ph-1A & 1B into Integrated network including Phase-1C & 1D for Telephone Sub-System and its review by Employer’s Representative with “No Objection” or “No Objection Subject To”.• Detailed Design Document for Integration / Upgradation work of both Radio including CDRS and Telephone Sub-Systems and its review by Employer’s Representative with “No Objection” or “No Objection Subject To”.• List of Materials required for the Section, Delivery Schedule thereof and its review by Employer’s Representative with “No Objection” or “No Objection Subject To”.Any other item(s) considered necessary to comply with Scope of Work for this section. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: B1 Detailed Interface Document mutually agreed and signed by all designated contractors/ parties for all works of Integration for both Radio including CDRS and Telephone Sub-Systems B2 Detailed Migration Plan for Integration / Upgradation of all existing sections of Ph-1A & 1B, into Single Integrated network with Phase-1C & 1D for Radio System including CDRS Sub-System B3 Detailed Migration Plan for Integration / Upgradation of existing Central System of Ph-1A & 1B into Integrated network including Phase-1C & 1D for Telephone Sub-System B4 Detailed Design Document for Integration / Upgradation work of Radio including CDRS Sub-Systems B5 Detailed Design Document for Integration / Upgradation work of Telephone Sub-Systems B6 List of Materials required for this Section and Delivery Schedule thereof. B7 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1AB SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1AB(UPGRADATION / REPLACEMENT WORK OF RADIO AND TELEPHONE SYSTEMS IN PH-1A & 1B) COST CENTRE C – MANUFACTURE AND DELIVERY This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This includes but is not limited to:• Submission of Type Test Reports (if applicable) and its review by Employer’s Representative with “No objection “or “No objection subject to”.• Submission of Factory Acceptance Test Reports (if applicable) and its review by Employer’s Representative with “No objection “ or “No objection subject to”.• Delivery of all Radio & CDRS System equipment & cables (including Onboard radio equipment, NMS, RAU/RCP, RCW, BTS, BDA, Antennae, Antennae Supporting Structure, Associated Accessories, etc as per site requirement) at Contractor’s premises in Jaipur – for Integration / Upgradation work for all existing stations/locations/trains of Ph-1A & 1B• Delivery of all Telephone System equipment & cables (including DLC, Licenses, NMS, Associated Accessories, etc as per site requirement) at Contractor’s premises in jaipur – for Integration / Upgradation work for all existing stations/locations of Ph-1A & 1BAny other item(s) considered necessary to comply with Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: C1 Delivery of all types of Cables including Earthing Cable, Power Supply Cable, HDPE Duct, Main Distribution Frames, Intermediate Distribution Frames, Optical Distribution Frames, Patch Panels, and Associated Accessories for Radio including CDRS and Telephone Sub-Systems of this Section at Contractor’s premises in Jaipur. C2 Delivery of all Central System equipment & cables for Radio & CDRS System (including NMS, RAU/RCP, RCW, BTS, BDA, Antennae, Antennae Supporting Structure, Associated Accessories, etc as per site requirement) at Contractor’s premises in Jaipur – for Integration / Upgradation work. C3 Delivery of all Station (s) /Depot (s) System equipment & cables for Radio System (including RAU/RCP, RCW, BTS, BDA, Antennae, Antennae Supporting Structure, Associated Accessories, etc as per site requirement) at Contractor’s premises in Jaipur – for Integration / Upgradation work. C4 Delivery of all Train-borne System equipment & cables for Radio System (including TRIU, TRCP, RCH, Antennae, Antennae Supporting Structure, Associated Accessories, etc as per requirement) at Contractor’s premises in Jaipur – for Integration / Upgradation work. C5 Delivery of all Central System equipment & cables for Telephone System (including DLC, Licenses, NMS, Associated Accessories, etc as per site requirement) at Contractor’s premises in Jaipur – for Integration / Upgradation work. C6 Any other item(s) considered necessary to comply with Scope of Work COST CENTRE TOTAL CARRIED TO SECTION 1AB SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1AB(UPGRADATION / REPLACEMENT WORK OF RADIO AND TELEPHONE SYSTEMS IN PH-1A & 1B) COST CENTRE D – INSTALLATION AND SITE TESTING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre. This shall include but not be limited to:• Delivery to Site from Contractor’s premises in Jaipur of Equipment/Cables and associated accessories.• Pre Installation Test of Equipment/Cables and associated accessories delivered to site.• Installation as per reviewed Installation Plans, Method Statements, Installation Design & Drawings.• Submission of Installation Test Plans and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Installation Test as per reviewed Installation Test Plans.• Submission of Acceptance Test Plans and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Acceptance Test as per reviewed Acceptance Test Plans.• Any other item(s) considered necessary to comply with the Scope of Works. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: D1 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Indoor & Outdoor Equipment and Associated Accessories for Radio System including CDRS system for this section. D2 Delivery to Site from Contractor’s premises in Jaipur, Installation and Testing (includes Pre Installation Tests & Post Installation Tests) of all Indoor & Outdoor Equipment and Associated Accessories for Telephone system for this section. D3 Completion of Acceptance Test for the Radio including CDRS System for Integration / Upgradation work D4 Completion of Acceptance Test for the Telephone System for Integration / Upgradation work D5 Any other item(s) considered necessary to complete the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1AB SUMMARY 0.0 0.0 ANNEXURE-C : SECTION 1AB(UPGRADATION / REPLACEMENT WORK OF RADIO AND TELEPHONE SYSTEMS IN PH-1A & 1B) COST CENTRE E – SYSTEM ACCEPTANCE TESTS AND INTEGRATED TESTING & COMMISSIONING This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This shall include but not be limited to:• Integrated testing and commissioning (ITC) for Radio & CDRS system for Integration / Upgradation work with all Designated Project Contractors/Parties (including existing Telecom system)• Integrated testing and commissioning (ITC) for Telephone system for Integration / Upgradation work with all Designated Project Contractors/Parties (including existing Telecom system)• Submission of Radio & CDRS Systems Reviewed As Built Drawings, Complete Configuration Data and all Related Software for Integration / Upgradation work• Submission of Telephone System Reviewed As Built Drawings, Complete Configuration Data and all Related Software for Integration / Upgradation workAny other item(s) considered necessary to comply with the Scope of work MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the ”Notice of No Objection” or “Notice of No Objection subject to…” from the Employer’s Representative for: E1 Integrated testing and commissioning (ITC) for Radio & CDRS system for Integration / Upgradation work E2 Integrated testing and commissioning (ITC) for Telephone system for Integration / Upgradation work E3 Submission of reviewed As-Built Drawings, Complete Configuration Data and all Related Software of Radio & CDRS system for Integration / Upgradation work E4 Submission of reviewed As-Built Drawings, Complete Configuration Data and all Related Software of Telephone system for Integration / Upgradation work E5 Any other item(s) considered necessary to complete the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION 1AB SUMMARY 0.0 0.0 ANNEXURE-C : SECTION MS - (MISCELLANEOUS) COST CENTRE A – TRAINING This Cost Centre comprises all those obligation and ongoing activities throughout Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to:• Submission of Training Plan, Training Guide, Training Manuals and their review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Training of Employer’s Maintenance Personnel as per provisions of Contract.• Submission of Training Report and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Any other item(s) considered necessary to comply with the scope of Works. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Employer’s Representative for MS-A1 Training of Employer’s Maintenance Personnel as per provisions of Radio & CDRS System. MS-A2 Training of Employer’s Maintenance Personnel as per provisions of CCTV System. MS-A3 Training of Employer’s Maintenance Personnel as per provisions of UPS System MS-A4 Training of Employer’s Maintenance Personnel as per provisions of PIDS/PAS/MCLK System MS-A5 Training of Employer’s Maintenance Personnel as per provisions of FOTS System MS-A6 Training of Employer’s Maintenance Personnel as per provisions of Telephone System MS-A7 Submission of Training Equipment & Training Manuals as per provisions of all Telecommunications Systems. MS-A8 Any other item(s) considered necessary to comply with the scope of Works. COST CENTRE TOTAL CARRIED TO SECTION MS SUMMARY 0.0 0.0 ANNEXURE-C : SECTION MS - (MISCELLANEOUS) COST CENTRE- B - SPARES, SPECIAL TOOLS, TEST EQUIPMENT AND CONTRACT SPARES This Cost Centre comprises all those obligation and ongoing activities throughout Contract not associated directly with any other Cost Centre.This Cost Centre includes but is not limited to:• Submission of “List of Spares along with supporting Calculations and other information as per provisions of Contract” its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”• Submission of “List of Special Tools & Test Equipments along with other information as per provisions of contract” its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Delivery to Employer of Contract Spares as per provisions of Contract.• Delivery to Employer of Special Tools & Test Equipment as per provisions of Contract.• Any other item(s) considered necessary to comply with the scope of Works. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Employer’s Representative for MS-B1 Delivery of Contract Spares to Employer as per provisions of Radio & CDRS System. MS-B2 Delivery of Contract Spares to Employer as per provisions of CCTV System. MS-B3 Delivery of Contract Spares to Employer as per provisionsof UPS System. MS-B4 Delivery of Contract Spares to Employer as per provisionsof PIDS/PAS/MCLK System. MS-B5 Delivery of Contract Spares to Employer as per provisions of FOTS System. MS-B6 Delivery of Contract Spares to Employer as per provisions of Telephone System. MS-B7 Delivery of Special Tools & Test Equipment to Employer as per provisions of all Telecommunication Systems. MS-B8 Any other item(s) considered necessary to comply with the Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION MS SUMMARY 0.0 0.0 ANNEXURE-C : SECTION MS - (MISCELLANEOUS) COST CENTRE- C - SUPERVISION OF MAINTENANCE & MANUALS This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This includes but is not limited to:• Submission of Maintenance Plan and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Completion of Supervision of Maintenance as per provisions of contract.• Submission of Operation & Maintenance Manuals (Original plus One bound and one unbound copy for each Telecom system) and in electronic (soft) format as per provisions of all Telecommunication Systems and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Delivery of Operation & Maintenance Manuals to Employer as per provisions of contract. • Any other item(s) considered necessary to comply with Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Employer’s Representative for MS-C1 Completion of Supervision of Maintenance as per provisions of Radio & CDRS System MS-C2 Completion of Supervision of Maintenance as per provisions of CCTV System MS-C3 Completion of Supervision of Maintenance as per provisions of UPS System. MS-C4 Completion of Supervision of Maintenance as per provisions of PIDS/PAS/MCLK System. MS-C5 Completion of Supervision of Maintenance as per provisions of FOTS System. MS-C6 Completion of Supervision of Maintenance as per provisions of Telephone System. MS-C7 Submission of Operation & Maintenance Manuals as per provisions of all Telecommunication Systems MS-C8 Any other item(s) considered necessary to comply with the scope of Works. COST CENTRE TOTAL CARRIED TO SECTION MS SUMMARY 0.0 0.0 ANNEXURE-C : SECTION MS - (MISCELLANEOUS) COST CENTRE- D - DEFECT LIABILITY PERIOD This Cost Centre comprises all those obligations and ongoing activities throughout the Contract not associated directly with any other Cost Centre.This includes but is not limited to:• Defect liability Plan and its review by Employer’s Representative with “No Objection” or as “No Objection Subject To”.• Completion of Defect liability as per provisions of contract for all Telecommunication Systems.• Any other item(s) considered necessary to comply with Scope of Work. MILESTONE NO. WORK DESCRIPTION Apportioned Amount Date of Completion Foreign Currency Local Currency MILESTONE ACTIVITY USD INR Obtain the “Notice of No Objection” or “Notice of No Objection Subject to ---“ from the Employer’s Representative for MS-D1 Completion of Defect liability Period as per provisions of Radio & CDRS Sub-System MS-D2 Completion of Defect liability Period as per provisions of CCTV Sub-System MS-D3 Completion of Defect liability Period provisions of UPS Sub-System. MS-D4 Completion of Defect liability Period as per provisions of PIDS/PAS/MCLK Sub-System. MS-D5 Completion of Defect liability Period as per provisions of FOTS Sub-System. MS-D6 Completion of Defect liability Period as per provisionsof Telephone Sub-System. MS-D7 Any other item(s) considered necessary to comply with Scope of Work. COST CENTRE TOTAL CARRIED TO SECTION MS SUMMARY 0.0 0.0 APPENDIX- 14 Name of the Work- Contract No. JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. Performa for List of Spares for 10 years of system operation from the last date of Taking over of whole works (refer Additional Clause-30 of SCC) Name of the Bidder: 0.0 S.No Description of Items Equipments/ subsystem details Part No. Drawing No. Lead time (in week) Shelf Life No. of Units Principal source of supply (Phone No. & E-mail Id's) Secondary source of supply (Phone No. & E-mail Id's) Unit Cost Foreign Currency Local Currency USD INR Notes:- 1. The bidder shall submit unpriced list of spares for maintenance of supplied system in the format ‘Form APPENDIX 14, COF’ and a corresponding priced list in the Price Bid. However, due to any reason(s), if the Bidder is not able to submit unpriced list of spares for maintenance of supplied system in the format ‘Form APPENDIX 14, COF’ in Technical Bid and priced list for the same in the Price Bid, Bidder shall submit an undertaking in the format ‘Appendix-17’ in COF in the Technical Bid.2. The rates of these spares (‘Form APPENDIX 14, COF’ in Bidding Forms) will not be considered for Bid evaluation while assessing the L1 bidder.3. The schedule of spare parts duly indicating, for each item of spares, its description, part number, drawing number, lead time, shelf life and number of units required for the system after taking over of whole of the works, principal as well as secondary sources of supply, and also the unit price with escalation/de-escalation clause shall be submitted in the format. In addition, contact details like phone number and email id’s for principal source and secondary source may also be provided.4. Sum of Unit price of sub assembly/card/part of a Sub system should match with the price of complete unit indicated in the BOQ (Price Bid). All parts of the complete unit should be covered in the list of spares. APPENDIX-15 MANDAY RATES (Refer COF Appendix-1) Name of the Work- Contract - JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. Name of Bidder: 0.0 Item No. Job Title and Grade of Staff Max. Daily Rate in Foreign Currency(A) Max. Daily Rate in Local Currency(B) Rate proposed by the bidder in FC Rate proposed by the bidder in INR EURO INR USD INR |
| 229 | Rates for Works Carried Out Overseas- Expatriate Staff |
| 230 | Project Manager |
| 231 | Engineer |
| 232 | Assistant Engineer |
| 233 | Rates for Works Carried Out in Jaipur - Expatriate Staff |
| 234 | Project Manager |
| 235 | Engineer |
| 236 | Assistant Engineer |
| 237 | Rates for Works Carried Out in Jaipur - Local Jaipur Staff |
| 238 | Manager |
| 239 | Engineer |
| 240 | Assistant Engineer 1. These are maximum rates fixed (Column A & B) by the employer for the contract period. 2. This Document is to be prepared by the Bidder and submitted as part of the Bill of Quantities/ Pricing Document (Volume 4 of the bid documents) in Package 2 (i.e., Financial Package) on e-bidding website https://eproc.rajasthan.gov.in. APPENDIX-16 MONTHLY CASH FLOWS FOR THE CONTRACT (Refer Clause No. C (11) & Appendix-1 of COF) Name of the Work- Contract - JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. Name of Bidder: 0.0 Sr. No Months Foreign Currency Local Currency Remarks USD INR APPENDIX- N PRICING OF UNQUALIFIED WITHDRAWAL OF CONDITIONS, QUALIFICATIONS, DEVIATIONS ETC. SUBMITTED IN FORMAT APPENDIX 13 of FORM OF BID Name of the Work- Contract No. JP/JS14(1C&1D): Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for 3 Stations of JMRTS Phase-1C & 1D Project. PROFORMA FOR COST OF EACH OF MINOR DEVIATIONS / NONMATERIAL NONCONFORMITY (Refer ITB Clause C15.1) Name of Bidder: 0.0 The following are the particulars of minor deviations / nonmaterial nonconformity from the requirements of the Bidding Documents: Sr. No Clause Deviations Price Adjustments Foreign Currency Local Currency USD INR Note:1. The Bidder shall indicate price adjustment against each minor deviation/ non material nonconformity in Form as per Appendix-N of Price Bid. This price is the price which the bidder shall reduce from their Bid Price if deviation(s) is/are accepted by the Employer.2. Where there is no deviation, please indicate ‘No Deviations’. In case, Performa of deviations is left as blank, it will be construed that the bidder has not proposed any deviations from the Bidding Documents.3. If the bidder proposes deviations in Bidding Documents, and/or any other terms and conditions of the Bid, other than in this Form, it will have no effect.4. Ensure all deviations have been listed and priced in the Price Bid and in case deviations not priced will be treated as null and void and stand withdrawn. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 10 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender