Tender For Supply And Etc Of Smart Pneumatic Positioners For Unit#1 To 6 Of Stps-O&M, Suratgarh
Tender Overview
Project Description
Tender for Supply And Etc Of Smart Pneumatic Positioners For Unit#1 To 6 Of Stps-O&M, Suratgarh , Item Rate Boq Boq_Ver3.0 Item Rate Normal Inr Only Inr Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Se(Proc) Stps,Suratgarh Name Of Work: Supply And Etc Of Smart Pneumatic Positioners For Unit#1 To 6 Of Stps-O&M, Suratgarh Contract No: Tn-Mm-2208 Name Of The Bidder/ Bidding Firm / Company : Price Schedule (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # Sl. No. Item Discription Item Code / Make Quantity Units Estimated Rate In Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency Per Unit Basic Rate In Figures To Be Entered By The Bidder In Rs. P Excise Duty Vat Gst% Per Unit To Be Entered By The Bidder (In % Percentage) Total Gst Amount In Rs. Other Taxes 2 Iiird Party I.E Dgs&D / Rites Etc Inspection Charges @0.34%+Service Tax Less For Cenvat Credit,If Any Respect Of Supplies Under Full Excise Duty Category Total Amount (Without Gst) In Rs. Total Amount (Including All) In Rs. Total Amount In Words , Supply (As Per Technical Specification) , Smart Positioner For Control Valves (Single Acting) With Mounting Bracket And Feedback Linkage Kit , Smart Positioner For Control Valves (Double Acting) With Mounting Bracket And Feedback Linkage Kit , Smart Positioner For Control Dampers With Mounting Bracket And Feedback Linkage Kit , Smart Positioner For Rotory Actuators With Mounting Bracket And Feedback Linkage Kit , Smart Positioner For Control Dampers (Flame Proof) With Mounting Bracket And Feedback Linkage Kit , Sub Total(From 1.02 To 1.06) , Total Packing & Forwarding Charges(On 1.07) , Sub Total Of Suppy+P&F (Including Gst) , Total Freight , Total Insurance Charges , Other Taxes/ Charges(If Any) , Total Supply Amount (1.09 To 1.12) , Etc ( As Per Scope Of Work) , Etc Of Above Positioner , Any Other Charges , Total Etc Amount (2.01+2.02) Total In Figures (Supply+Etc) 0.0 0.0 Zero Only 4.0 Construction Of Chamber For 100Mm Sluice Plates Item5 10.0 Nos Quoted Rate In Figures Select 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: |
| 2 | Supply (as per technical specification) |
| 3 | Smart Positioner for Control Valves (Single Acting) with mounting bracket and feedback linkage kit |
| 4 | Smart Positioner for Control Valves (Double Acting) with mounting bracket and feedback linkage kit |
| 5 | Smart Positioner for Control Dampers with mounting bracket and feedback linkage kit |
| 6 | Smart Positioner for Rotory Actuators with mounting bracket and feedback linkage kit |
| 7 | Smart Positioner for Control Dampers (Flame Proof) with mounting bracket and feedback linkage kit |
| 8 | Sub Total(From 1.02 to 1.06) |
| 9 | Total Packing & Forwarding Charges(on 1.07) |
| 10 | Sub Total of Suppy+P&F (Including GST) |
| 11 | Total Freight |
| 12 | Total Insurance Charges |
| 13 | Other taxes/ charges(If any) |
| 14 | Total Supply amount (1.09 to 1.12) |
| 15 | ETC ( As per scope of work) |
| 16 | ETC of above positioner |
| 17 | Any other charges |
| 18 | TOTAL ETC AMOUNT (2.01+2.02) Total in Figures (Supply+ETC) 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender