Tender For Construction Of 2- Ponds At Pyt Topa Thera W.No 07 Mankote, Mohalla Patri Pyt Chajjla Upper, And Construction Of Water Harvesting Structure At Mohalla Bandi, Chajjla Upper Construction Of 139/M , Block Mankote , Constituency Mendhar Distri
Tender Overview
Project Description
Tender for Construction Of 2- Ponds At Pyt Topa Thera W.No 07 Mankote, Mohalla Patri Pyt Chajjla Upper, And Construction Of Water Harvesting Structure At Mohalla Bandi, Chajjla Upper Construction Of 139/M , Block Mankote , Constituency Mendhar District Poonch
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Pond at PYT TOPA THERA W.No 07 MANKOTE |
| 2 | Clearing jungle including uprooting of rank vegetation grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared |
| 3 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mt in depth, 1.5 mt in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) crushed |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 6 | Centring and shuttering including strutting propping etc and removal of form work for.- Foundations, footings, bases of columns |
| 7 | Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 Coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 8 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) Raised and cut pointing |
| 9 | Providing and Laying damp proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 10 | Carriage of Materials from source to site of work Stone av 20 K M by MT and 300 Mtr HL |
| 11 | Carriage of Materials from source to site of work Sand av 20 K M by MT and 300 Mtr HL |
| 12 | Carriage of Materials from source to site of work : Bajri av 20 K M by Mt and 300 Mtr HL |
| 13 | Construction of Pond at MOHALLA PATRI PYT CHAJJLA UPPER |
| 14 | Clearing jungle including uprooting of rank vegetation grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared |
| 15 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mt in depth, 1.5 mt in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 16 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) crushed |
| 17 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 18 | Centring and shuttering including strutting propping etc and removal of form work for.- Foundations, footings, bases of columns |
| 19 | Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 Coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 20 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) Raised and cut pointing |
| 21 | Providing and Laying damp proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 22 | Carriage of Materials from source to site of work Stone av 20 K M by MT and 300 Mtr HL |
| 23 | Carriage of Materials from source to site of work Sand av 20 K M by MT and 300 Mtr HL |
| 24 | Carriage of Materials from source to site of work : Bajri av 20 K M by Mt and 300 Mtr HL |
| 25 | Construction of Pond at MOHALLA BANDI, CHAJJLA UPPER CO 139/m |
| 26 | Clearing jungle including uprooting of rank vegetation grass, brushwood, trees and saplings of girth upto 30 cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared |
| 27 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 mt in depth, 1.5 mt in width as well as 10 sqm on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil |
| 28 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) |
| 29 | Centring and shuttering including strutting propping etc and removal of form work for.- Foundations, footings, bases of columns |
| 30 | Dry stone pitching (any thickness) excluding cost of stones. On Slopes |
| 31 | Supply of stone at site |
| 32 | Providing and Laying damp proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete |
| 33 | Carriage of Materials from source to site of work Stone av 20 K M by MT |
| 34 | Carriage of Materials from source to site of work Sand av 20 K M by MT |
| 35 | Carriage of Materials from source to site of work : Bajri av 20 K M by Mt Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender