Tender For General-Rm 2026-27 / Rc 2 - Zone Iii-For Various Pwd Roads Under Roads Section- Karimannoor In Idukki District - 5 Road Stretches For A Length Of 21.600 Km-General Civil Work
Tender Value
69.03 Lakhs
Estimated cost
Bid Submission
05 Oct 2026
3 days left
EMD
50000
Bank guarantee accepted
Document Fee
2760
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Idukki → Kerala
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for General-Rm 2026-27 / Rc 2 - Zone Iii-For Various Pwd Roads Under Roads Section- Karimannoor In Idukki District - 5 Road Stretches For A Length Of 21.600 Km-General Civil Work
BOQ
| Sl. No. | Item Description |
| 1 | APPENDIX A: REACTIVE MAINTENANCE (INITIAL RECTIFICATION WORKS) |
| 2 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 3 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. |
| 4 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) |
| 5 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. |
| 6 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. |
| 7 | 55.5.a:Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm. |
| 8 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 9 | OD195205/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) or 13.2 mm to 0.09 mm (Type-B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD.Type-A :- By Manual Means |
| 10 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) |
| 11 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 12 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) |
| 13 | OD195207/2025-2026:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15. complete all as per the direction of Engineer in charge. |
| 14 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications |
| 15 | OD195206/2025-2026:Providing and fixing vinyl sticker in existing DLP board including lettering and printing |
| 16 | APPENDIX B: PRE MONSOON WORKS |
| 17 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area |
| 18 | OD195200/2025-2026:Engaging Small Tipper for various works in the PWD roads as per the directions of Engineer in charge, including fuel charge and all other expenditures etc. complete |
| 19 | OD195199/2025-2026:Engaging Backhoe loaders equipped with a front loader bucket of 1.00 cum bucket capacity near excavating attachment (incl POL) for Various works as per the direction of Enginner in charge |
| 20 | OD195201/2025-2026:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge |
| 21 | OD75504/2026-2027:Filling up potholes with bituminous ready mix compound(25kg/bag) and compacting by ramming to get a compact surfacing including cost of material |
| 22 | 55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete. |
| 23 | APPENDIX C:PROACTIVE/PREVENTIVE MAINTENANCE |
| 24 | OD75505/2026-2027:Filling up potholes with bituminous ready mix compound(25kg/bag) and compacting by ramming to get a compact surfacing including cost of material |
| 25 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. |
| 26 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. |
| 27 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 28 | OD195211/2025-2026:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) or 13.2 mm to 0.09 mm (Type-B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 KN static roller and finishing to required level and grades as per Technical specification Clause 509 of MORD.Type-A :- By Manual Means |
| 29 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. |
| 30 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor |
| 31 | OD195210/2025-2026:Engaging mazdoor/Labour for Various works in Roads as per the direction of Engineer in charge |
| 32 | OD195209/2025-2026:Conducting and Reporting Inspections for the entire length of the Project Road frequency of 7 days throughout the agreement period for the Running Contract as directed byEngineer in charge |
| 33 | APPENDIX D:EMERGENCY WORKS |
| 34 | OD195203/2025-2026:Engaging coolie/labour for miscellaneous works |
| 35 | OD195202/2025-2026:Engaging Small Tipper for various works in the PWD roads as per the directions of Engineer in charge, including fuel charge and all other expenditures etc. complete |
| 36 | OD195204/2025-2026:Engaging Hydraulic backhoe loader equipped with a front loader bucket of 1.000 cum bucket capacity and near Excavating attachment( incl POL) for various works as per the direction of engineer in charge Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Sep 26, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 05, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 07, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender