Tender For Renewal Of Internet Leased Line Connectivity And Allied Infrastructure For The Centralized Internet Service Of The State Headquarters Nabanna At 325, Sarat Chatterjee Road, Shibpur, Howrah - 711102 (Main Feed) [Job No: Kit/Rw/192 Of 26-27]
Tender Overview
Project Description
Tender for Renewal Of Internet Leased Line Connectivity And Allied Infrastructure For The Centralized Internet Service Of The State Headquarters Nabanna At 325, Sarat Chatterjee Road, Shibpur, Howrah - 711102 (Main Feed) [Job No: Kit/Rw/192 Of 26-27]
BOQ
| Sl. No. | Item Description |
| 1 | Renewal of 2500-MB/s (1:1) Dedicated Internet Leased Line Connectivity (Main Feed) including all accessories and minimum 5 Public IPs.[Location: IT, P.W.Dte., Server Room, State Headquarters Nabanna, 325, Sarat Chatterjee Road, Shibpur, Howrah - 711 102]Interface Required: Ethernet Media: Through Single-Mode Optical Fiber Cable (OFC) or RF and which will be Owned by Service Provider][DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: < 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] |
| 2 | One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate / undertaking has to provide. Minimum Accessories Required to Complete the Installation as per site requirement:a) Last-mile connectivity should be optical fiber cable only and handshaking will be done by OFC SFP Module only.Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement and will be considered as one time supply. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery.[excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network] |
| 3 | Recurring charges including Internet bandwidth charges, or other configuration and interfacing charges etc for 01(One) Year. |
| 4 | Renewal of 10-GBps (1:1) Dedicated Point to Point Leased Line Connectivity (Main Feed) including all accessories.[Point-A Location: IT, P.W.Dte., Server Room, State Headquarters Nabanna, 325, Sarat Chatterjee Road, Shibpur, Howrah - 711 102][Point-B Location: P.W.Dte. IT Data Center, at Ground Floor, Main Block, Writers Building, Kolkata - 700 001]Interface Required: Ethernet Media: Through Single-Mode Optical Fiber Cable (OFC) or RF and which will be Owned by Service Provider][DILL Condition: Throughput: 100% Non – blocking (after Firewall); Packet Drop: < 0.5 %; Network Uptime: > 99.5 %; RTD: Less than 300 ms; MRTG: Online] |
| 5 | One time installation charge including Integration charges with the Existing Infrastructure of One fully dedicated and seperate (includnig all used component) line with Single Mode OFC Media only and should be laid through Aerial/Underground outside & suitable fire retardant conduit inside the building premises as per direction engineer-in-charge. Service provider must have a Underground ISP Laynig Backbone at Kolkata and necessary certificate / undertaking has to provide. Accessories Required as per site requirement:a) a) Last-mile connectivity should be optical fiber cable only and handshaking will be done by OFC SFP Module only.Accessories including MUX, Router, Network Switchs or other accessories required as per site requirement and will be considered as one time supply. Any Asset Recovery is subject to the availability of permission from the concerned Govt. Authority or End User. PWD authority will not take any responsibility of Any Asset Recovery.[excluding Shared Internet Leased Line Service (SILL) and GPON (Gigabit Passive Optical Network) Technology Network] |
| 6 | Recurring charges including Internet bandwidth charges, or other configuration and interfacing charges etc for 01(One) Year. |
| 7 | ADD GST @18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 29 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 31 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender