Bids Are invited for Provn Of Store Room For Grocery Items
Tender Overview
Project Description
Bids Are invited for Site Clearing Setting Out And Levelling , Earth Work And Foundation Excavation Work , Pcc Bellow Foundation , Rcc Foundation Pedestal , Reinforcement Steel , Anchor Bolt Plates , Primary Steel Frame , Main Structural Steel , Secondary Members Purlin Girts Bracing System , Connection Plates Cleats Bolt , Roof Sheeting Roof Thermal Insulation , Wall Cladding Wall Insulation , Basic Drainage , Structural Painting Coating , Debris Removal , Rcc Industrial Floor And Floor Concrete - Rcc Industrial Floor And Floor Concrete , Testing And Inspection , Installation And Errection Comisiong And Handover , As Built Drawing , Rain Water Downpipes , Rcc Industrial Floor , Floor Concrete , Floor Reinforcement
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Site Clearing Setting out and levelling | Site Clearing Setting out and levelling |
| 2 | Earth work and foundation excavation work | Earth work and foundation excavation work |
| 3 | PCC Bellow Foundation | PCC Bellow Foundation |
| 4 | RCC Foundation Pedestal | RCC Foundation Pedestal |
| 5 | Reinforcement Steel | Reinforcement Steel |
| 6 | Anchor Bolt Plates | Anchor Bolt Plates |
| 7 | Primary Steel Frame | Primary Steel Frame |
| 8 | Main Structural Steel | Main Structural Steel |
| 9 | Secondary Members purlin girts bracing system | Secondary Members purlin girts bracing system |
| 10 | Connection Plates cleats bolt | Connection Plates cleats bolt |
| 11 | Roof Sheeting roof thermal insulation | Roof Sheeting roof thermal insulation |
| 12 | wall cladding wall insulation | wall cladding wall insulation |
| 13 | Basic drainage | Basic drainage |
| 14 | Structural Painting Coating | Structural Painting Coating |
| 15 | Debris Removal | Debris Removal |
| 16 | RCC Industrial Floor and Floor concrete | RCC Industrial Floor and Floor concrete |
| 17 | Testing and inspection | Testing and inspection |
| 18 | Installation and errection comisiong and handover | Installation and errection comisiong and handover |
| 19 | As built drawing | As built drawing |
| 20 | Rain water Downpipes | Rain water Downpipes |
| 21 | RCC industrial floor | RCC industrial floor |
| 22 | Floor concrete | Floor concrete |
| 23 | Floor reinforcement | Floor reinforcement |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender